CN104294749B - A kind of installation method of cylinder foundation trestle work structure - Google Patents

A kind of installation method of cylinder foundation trestle work structure Download PDF

Info

Publication number
CN104294749B
CN104294749B CN201410397891.9A CN201410397891A CN104294749B CN 104294749 B CN104294749 B CN 104294749B CN 201410397891 A CN201410397891 A CN 201410397891A CN 104294749 B CN104294749 B CN 104294749B
Authority
CN
China
Prior art keywords
cylinder
top cover
cover plate
cylinders
trestle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410397891.9A
Other languages
Chinese (zh)
Other versions
CN104294749A (en
Inventor
甄宏昌
巩向楠
袁宏振
宋元丽
黄诚
邵雪莉
隋玉良
魏薇
周凯
张秀荣
郭华锋
曹永利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Dagang Oilfield Group Engineering Construction Co., Ltd.
China National Petroleum Corp
China Petroleum Pipeline Engineering Corp
Original Assignee
TIANJIN DAGANG OILFIELD GROUP ENGINEERING CONSTRUCTION Co Ltd
China National Petroleum Corp
China Petroleum Pipeline Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN DAGANG OILFIELD GROUP ENGINEERING CONSTRUCTION Co Ltd, China National Petroleum Corp, China Petroleum Pipeline Bureau Co Ltd filed Critical TIANJIN DAGANG OILFIELD GROUP ENGINEERING CONSTRUCTION Co Ltd
Priority to CN201410397891.9A priority Critical patent/CN104294749B/en
Publication of CN104294749A publication Critical patent/CN104294749A/en
Application granted granted Critical
Publication of CN104294749B publication Critical patent/CN104294749B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/24Bridges or similar structures, based on land or on a fixed structure and designed to give access to ships or other floating structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses the installation method of a kind of cylinder foundation trestle work structure, will be by cylinder, cylinder top cover plate, circular abutment, the trestle bridge pier structure that crossbeam is constituted is inflated processing, then haul to infield and bleed, and add the downside that ballast makes four cylinders sink down into cylinder top cover plate and contact with soft soil foundation, a layer concrete is poured respectively again on two crossbeams, and lift floorings shelve and be fixed on complete between two crossbeams install, as can be seen here, the transport of cylinder foundation trestle work structure need not transport barge, in-site installation need not argosy and hangs, marine on-site installation work amount is few, construct little by Lidar Equation, efficiency of construction and quality are high, integrated construction expense is low.

Description

A kind of installation method of cylinder foundation trestle work structure
Technical field
The present invention relates to technical field of petroleum extraction, particularly to the installation side of a kind of cylinder foundation trestle work structure Method.
Background technology
The petroleum resources of coastal waters shallow water area is developed, uses the development mode of " Hai Youlu adopts ", be one Kind of approach economic, quick, effective, i.e. first at sea builds man-made island and links entering of man-made island and land Sea route, then exploits submarine oil resources on man-made island.Cylinder foundation trestle work structure is that one is applicable to closely The sea-going road structure of sea soft soil foundation.This structure by reinforced concrete cylinder, cylinder top cover plate, circular abutment, Crossbeam, floorings form.At shallow sea water, the general employing site-assembled installation method of prefabricated components, should Efficiency and the quality of construction method are easily affected by stormy waves.Particularly in deeper water, wave and stream are the biggest, Impact on assembled in situ construction is bigger.
For the feature of cylinder foundation trestle work structure, present invention employs a set of new method and it is spelled Dress, transport and sink install, to reduce the impact of on-site installation work amount and wave, improve efficiency of construction and Construction quality, reduces construction cost.
Summary of the invention
Invention provides the installation method of a kind of cylinder foundation trestle work structure, to solve prior art is adopted The technology easily being affected by stormy waves by efficiency and the quality of the site-assembled installation method of prefabricated components and reducing is asked Topic.
For solving above-mentioned technical problem, the invention provides the installation method of a kind of cylinder foundation trestle work structure, Detailed description of the invention is as follows:
(1) platform for lining is built under water: in waters, wharf apron, the sea bottom surface of a rectangular area is made smooth place Reason, and place mat metalling or concrete slab, form platform for lining under water;
(2) cylinder foundation trestle work structure sea is assembled.
The cylinder foundation of cylinder foundation trestle work structure, cylinder top cover plate, circular abutment, the assembled process of crossbeam Including:
1) 4 prefabricated cylinders are hung on platform for lining under water by trestle spacing and status requirement;
2) lift 4 groups of cylinder top cover plates and circular abutment prefabricated all-in-one-piece plate part is positioned over 4 cylinders On the bracket of wall, by the mode of pre-buried steel Member Welding, cylinder and cylinder top cover plate are connected;
3) 2 crossbeams of lifting are positioned on the bracket on 2 groups of arranged side by side two circular abutment tops, circle are stood Capital end and crossbeam are made connection and are processed, and constitute 2 groups of structures;
4) by connecting into an entirety with dismountable shaped steel between 2 groups of structures, cylinder foundation trestle is constituted Structure;
(3) cylinder foundation trestle work structure sea transportation by driving: inflate in 4 cylinders of cylinder foundation trestle work structure, Structure floats, and haul is to infield;
(4) cylinder foundation trestle work structure sinks to installing: cylinder foundation trestle work structure, after infield positions, is put Going out the gas in cylinder, cylindrical wall is lowered in foundation soil by deadweight, and repressurization carries and makes cylinder sink down into afterwards Cylinder top cover plate downside contacts with mud face, seabed, and cylinder foundation trestle work structure sinking installation puts in place;
(5) floorings are installed: on the crossbeam of cylinder foundation trestle work structure, pour one layer of blinding concrete, make Cross rail top is smooth, and makes the crossbeam end face of all installations reach identical elevation, and lifting floorings are put afterwards Put and be fixed on adjacent two crossbeam.
The specific configuration of the cylinder foundation trestle work structure that the present invention relates to is as follows, including: barrel assemblies, cylinder Lamina tecti assembly, circular abutment assembly, transverse beam assembly, floorings.
Described barrel assemblies is made up of described four cylinders, described four cylinders parallel and in constitute rectangle, and And be all reinforced concrete structure;Wherein, each cylinder is hollow type, and inside top wall is both provided with Described ring bracket structure, described ring bracket structure is for placing the cylinder top cover plate of correspondence.
Described cylinder top cover plate assembly is made up of four cylinder top cover plates, and each cylinder top cover plate is individually positioned in On corresponding ring bracket structure.
Circular abutment assembly is made up of four circular abutments, each circular abutment and corresponding cylinder top cover plate structure Become one group of plate part;Wherein, the side, top of each circular abutment is both provided with bracket structure;Four circles The bracket structure of shape column side is divided into two groups, and two the bracket structure opposition often organized are arranged, and are used for placing horizontal stroke Beam.
Described transverse beam assembly is made up of two crossbeams, and each crossbeam is rigidly attached to two brackets of each group respectively In structure.
Described floorings fixed placement is on two crossbeams.
By one or more technical scheme of the present invention, the invention have the advantages that or advantage:
The installation method of a kind of cylinder foundation trestle work structure that the present invention provides, the fortune of cylinder foundation trestle work structure The defeated transport barge that need not, in-site installation need not argosy and hangs, and marine on-site installation work amount is few, construction Little by Lidar Equation, efficiency of construction and quality are high, and integrated construction expense is low.
Accompanying drawing explanation
Fig. 1 is the schematic cross-sectional view of cylinder foundation trestle work structure in the embodiment of the present invention;
Fig. 2 is the vertical section schematic diagram of cylinder foundation trestle work structure in the embodiment of the present invention;
Fig. 3 is the installation process figure of cylinder foundation trestle work structure in the embodiment of the present invention;
Fig. 4 is that in the embodiment of the present invention, 4 cylinders are lifted on the plan view from above on platform for lining waterborne;
Fig. 5 is the cross-sectional view that in the embodiment of the present invention, cylinder is lifted on platform for lining waterborne;
Fig. 6 is the cross-sectional view after lifting cylinder top cover plate and circular abutment in the embodiment of the present invention on cylinder;
Fig. 7 be in the embodiment of the present invention on circular abutment lifting cross beam and make connection process after structure transverse Face figure;
Fig. 8 is with shaped steel 11, structure to be made the structure skiagraph after connection processes in the embodiment of the present invention;
Fig. 9 is the assembled cylinder foundation trestle work structure plan view from above shaped in the embodiment of the present invention;
Figure 10 is the schematic diagram that in the embodiment of the present invention, cylinder foundation trestle work structure is in air float hauling state;
Figure 11 is the schematic diagram that in the embodiment of the present invention, cylinder foundation trestle work structure is in sinking state;
Figure 12 is that cylinder foundation trestle work structure sinking installation puts in place state.
Description of reference numerals: cylinder 1, cylinder top cover plate 2, circular abutment 3, crossbeam 4, floorings 5, ring Circle bracket structure 6, bracket structure 7, the cast-in-place joint of crossbeam 8, platform for lining 9 under water, for harbour 10, type Steel 11.
Detailed description of the invention
In order to make the application the technical staff in the technical field be more clearly understood that the application, below in conjunction with Accompanying drawing, is described in detail technical scheme by specific embodiment.
Cylinder foundation trestle work structure as depicted in figs. 1 and 2, specifically includes that barrel assemblies, cylinder top cover Board component, circular abutment assembly, transverse beam assembly, floorings 5.
Barrel assemblies is made up of four cylinders 1, and four cylinders 1 are parallel and in constituting rectangle, for as Support structure, four cylinders 1 are all reinforced concrete structures.
Wherein, each cylinder 1 is hollow type, and inside top wall is both provided with ring bracket structure 6, ring The bracket end face of circle bracket structure 6 arranges caulking gum packing ring;Ring bracket structure 6 is for placing correspondence Cylinder top cover plate 2.Wherein, the race diameter of each cylinder 1 is 9.0m, wall thickness 0.25m, height are 6.5m, The end face width 0.3m of ring bracket structure 6, away from barrel end face 0.5m, single cylinder 1 weight 125 tons.
Cylinder top cover plate assembly is made up of four cylinder top cover plates 2, and each cylinder top cover plate 2 is individually positioned in On corresponding ring bracket structure 6, lay degree for labelling cylinder foundation trestle work structure.Wherein, often Individual cylinder top cover plate 2 diameter 8.4m, edge thickness is 0.5m.
Circular abutment assembly is made up of four circular abutments 3, each circular abutment 3 fixing connection correspondence Cylinder top cover plate 2 is integrally formed;Wherein, the side, top of each circular abutment 3 is both provided with bracket structure 7; The bracket structure 7 of four circular abutment 3 sides is divided into two groups, and two bracket structure 7 opposition often organized are arranged, It is used for placing crossbeam 4.The edge thickness of circular abutment 3 is 0.8m, and external diameter is 1.5m, wall thickness 0.3m, high Degree 5.0m, the end face width 0.5m of side, the top bracket structure 7 of circular abutment 3, one group of cylinder top cover plate 2 With circular abutment 3 weight 108 tons.
Transverse beam assembly is made up of two crossbeams 4, and each crossbeam 4 is rigidly attached to two brackets of each group respectively In structure 7.The high 1.5m of crossbeam 4, wide 1.5m, long 9.5m, single beam weighs 54 tons.
Floorings 5 fixed placement is on two crossbeams 4.The thick 1.0m of single floorings 5, wide 1.0m, long 14m, Weigh 35 tons.
Preferably, in order to preferably fixing make crossbeam 4 and bracket structure 7 in being rigidly connected, cylinder foundation stack Bridge construction also includes: the cast-in-place joint of crossbeam 8, is cast in crossbeam 4 and the junction of bracket structure 7, is used for solid Determine crossbeam 4 and bracket structure 7.
Refer to Fig. 3 below, introduce the installation method of cylinder foundation trestle work structure:
Four cylinders 1 are hung on platform for lining 9 under water by S1 according to trestle spacing and trestle position.
Wherein, after the soft soil foundation of one piece of rectangular area is specifically made smooth process by platform for lining 9 under water, The platform that place mat metalling and/or concrete slab are formed.
S2, lift four groups pre-with the circular abutment 3 of bracket structure 7 by cylinder top cover plate 2 and side, top The plate part being formed integrally is correspondingly placed on the ring bracket structure 6 of four cylinder 1 inside top.
It addition, four groups of cylinder top cover plates 2 are welded on the ring bracket structure 6 of correspondence.
S3, lifts two crossbeams 4 and is placed on two groups of respective bracket structures of circular abutment 37, and will be every Root crossbeam 4 and corresponding bracket structure 7 are rigidly connected process, to constitute two groups of structures.
S4, will connect with dismountable shaped steel 11 between two groups of structures, constitutes trestle bridge pier structure.
S5, inflates, so that trestle bridge pier structure is floating in four cylinders 1.
S6, hauls trestle bridge pier structure to infield, then pulls out the gas in four cylinders 1, make Four cylinders 1 are lowered in soft soil foundation.
S7, adds ballast and makes four cylinders 1 sink, until the downside of cylinder top cover plate 2 and soft soil foundation connect Touch.
S8, pours a layer concrete on two crossbeams 4 respectively, so that two with crossbeam 4 upper flat and reach To identical height.
S9, lifting floorings 5 are shelved and are fixed between two crossbeams 4.
Illustrate underneath with concrete example.
Element precast: reinforced concrete cylinder 1, cylinder top cover plate 2 and circular abutment 3, crossbeam 4, bridge floor Plate 5 is first the most prefabricated at land precasting yard.
Wherein, cylinder top cover plate 2 and circular abutment 3 are prefabricated integral.
Platform for lining 9 is built under water: in waters, harbour 10 forward position, by wide 24m, the rectangular area of long 28m Weak soil sea bottom surface suitably dredge and make smooth process, the metalling that place mat 0.5 to 1.0m is thick, metalling top Lay the thick concrete slab of 0.5m after face is smooth, form platform for lining 9 under water.When high-tide level, it is ensured that The depth of water on platform for lining is no less than 4.5m.
Cylinder foundation trestle work structure sea is assembled, by following process by prefabricated cylinder 1, cylinder top cover plate 2, Circular abutment 3, crossbeam 4 carry out assembly:
1) 4 prefabricated cylinders 1 are hung on platform for lining 9 under water according to trestle spacing and trestle position, As shown in Figure 4 and Figure 5,4 prefabricated cylinders 1 are parallel to each other and constitute rectangle.It addition, 4 prefabricated Cylinder 1 between spacing can be different, such as, side cylinder 1 center distance is 11m, opposite side circle Cylinder 1 center distance is 15m;
2) 4 groups of cylinder top cover plates 2 and circular abutment 3 prefabricated all-in-one-piece cover plate structure as shown in Figure 6, are lifted Part is positioned on 4 ring bracket structures 6, by the mode of pre-buried steel Member Welding by cylinder 1 and cylinder top Cover plate 2 connects;
3) as it is shown in fig. 7,2 crossbeams 4 of lifting are positioned over 2 groups of arranged side by side two circular abutment 3 tops On bracket structure 7, top and the crossbeam 4 of circular abutment 3 are made connection and processed, constitutes 2 groups of structures;
4) as illustrated in figs. 8-9, one will be connected into dismountable auxiliary shaped steel 11 between 2 groups of structures Individual entirety, constitutes cylinder foundation trestle work structure, and its overall weight is about 1100 tons.
Cylinder foundation trestle work structure sea transportation by driving: when the depth of water on platform for lining is more than 4.5m as the tide rises, to Inflation in 4 cylinders 1 of cylinder foundation trestle work structure, makes structure float, and haul is to infield.Such as figure Shown in 10, arrow represents the direction of haul.
Cylinder foundation trestle work structure sinks to installing: cylinder foundation trestle work structure, after infield positions, is released Gas in cylinder 1, cylinder 1 is lowered in foundation soil by deadweight, and as shown in figure 11, what arrow represented is The direction of venting.When venting, exitting generally by air valve, air valve bottom has pipeline to pass cylinder Lamina tecti 2 connects with cylinder 1 internal cavity, opens air valve and just can release the air in cylinder 1.Then, then Adding ballast to make cylinder 1 sink down into cylinder top cover plate 2 downside to contact with mud face, seabed, cylinder foundation trestle is tied Structure sinking installation puts in place.As shown in figure 12, the cylinder foundation trestle work structure of position it is mounted to.
Floorings 5 are installed: on the crossbeam 4 of cylinder foundation trestle work structure, pour one layer of blinding concrete, Make crossbeam 4 upper flat, and make crossbeam 4 end face of all installations reach identical elevation, lift bridge afterwards Panel 5 is shelved and is fixed on adjacent two crossbeam 4.The floorings 5 of 9 pieces of wide 1.0m are placed side by side, Form the wide bridge floor of 9.0m.
So build trestle, floorings 5 end face away from mud face, seabed height at more than 8.3m, bridge floor width 9.0m.
By one or more embodiment of the present invention, the invention have the advantages that or advantage:
The installation method of a kind of cylinder foundation trestle work structure that the present invention provides, the fortune of cylinder foundation trestle work structure The defeated transport barge that need not, in-site installation need not argosy and hangs, and marine on-site installation work amount is few, construction Little by Lidar Equation, efficiency of construction and quality are high, and integrated construction expense is low.
Although having been described for the preferred embodiment of the application, but one of ordinary skilled in the art once learning Basic creative concept, then can make other change and amendment to these embodiments.So, appended power Profit requires to be intended to be construed to include preferred embodiment and fall into all changes and the amendment of the application scope.
Obviously, those skilled in the art can carry out various change and modification without deviating from this Shen to the application Spirit and scope please.So, if the application these amendment and modification belong to the application claim and Within the scope of its equivalent technologies, then the application is also intended to comprise these change and modification.

Claims (1)

1. the installation method of a cylinder foundation trestle work structure, it is characterised in that described method includes:
Four cylinders are hung on platform for lining under water according to trestle spacing and trestle position;Wherein, after the soft soil foundation of one piece of rectangular area is specifically made smooth process by described platform for lining under water, the platform that place mat metalling and/or concrete slab are formed;
Lift four groups to be correspondingly placed on the ring bracket structure inside four barrel top with the circular abutment prefabricated all-in-one-piece plate part of bracket structure by cylinder top cover plate and side, top, and four groups of cylinder top bridge weldings are connected on the ring bracket structure of correspondence;
Lift two crossbeams to be placed on two groups of respective bracket structures of circular abutment, and process that every crossbeam and corresponding bracket structure are rigidly connected, to constitute two groups of structures;
By connecting with dismountable shaped steel between two groups of structures, constitute trestle bridge pier structure;
Inflate in described four cylinders, so that described trestle bridge pier structure is floating;
Described trestle bridge pier structure is hauled to infield, then pulls out the gas in described four cylinders, make described four cylinders be lowered in described soft soil foundation;
Adding ballast makes described four cylinders sink, until the downside of cylinder top cover plate contacts with described soft soil foundation;
Described two crossbeams pour a layer concrete respectively, so that described two cross rail top are smooth and reach identical height;
Lifting floorings are shelved and are fixed between two crossbeams, and wherein, described cylinder foundation trestle work structure includes:
Barrel assemblies, cylinder top cover plate assembly, circular abutment assembly, transverse beam assembly, floorings;
Described barrel assemblies is made up of described four cylinders, and described four cylinders are parallel and in constituting rectangle, and are all reinforced concrete structures;Wherein, each cylinder is hollow type, and inside top wall is both provided with described ring bracket structure, and described ring bracket structure is for placing the cylinder top cover plate of correspondence;
Described cylinder top cover plate assembly is made up of four cylinder top cover plates, and each cylinder top cover plate is individually positioned on the ring bracket structure of correspondence;
Circular abutment assembly is made up of four circular abutments, and each circular abutment and corresponding cylinder top cover plate constitute one group of plate part;Wherein, the side, top of each circular abutment is both provided with bracket structure;The bracket structure of four circular abutment sides is divided into two groups, and two the bracket structure opposition often organized are arranged, and are used for placing crossbeam;
Described transverse beam assembly is made up of two crossbeams, and each crossbeam is rigidly attached on two bracket structures of each group respectively;
Described floorings fixed placement is on two crossbeams.
CN201410397891.9A 2014-08-13 2014-08-13 A kind of installation method of cylinder foundation trestle work structure Active CN104294749B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410397891.9A CN104294749B (en) 2014-08-13 2014-08-13 A kind of installation method of cylinder foundation trestle work structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410397891.9A CN104294749B (en) 2014-08-13 2014-08-13 A kind of installation method of cylinder foundation trestle work structure

Publications (2)

Publication Number Publication Date
CN104294749A CN104294749A (en) 2015-01-21
CN104294749B true CN104294749B (en) 2016-08-31

Family

ID=52314679

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410397891.9A Active CN104294749B (en) 2014-08-13 2014-08-13 A kind of installation method of cylinder foundation trestle work structure

Country Status (1)

Country Link
CN (1) CN104294749B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105780796A (en) * 2016-03-17 2016-07-20 王燏斌 Underwater multi-foundation combination integral construction method
CN107323619B (en) * 2017-05-24 2019-01-18 中国建筑第六工程局有限公司 A kind of Large-diameter Steel cylinder sea land conveyer method
CN107476199B (en) * 2017-08-24 2019-08-13 温州顺创智能科技有限公司 A kind of bridge construction facility
CN108342984B (en) * 2018-01-15 2020-08-04 中铁大桥局集团有限公司 Soft foundation trestle for mudflat and installation and sedimentation method thereof
CN111604643B (en) * 2020-05-08 2021-06-15 友联船厂(蛇口)有限公司 Manufacturing and mounting process of crane upright column for ship and ocean engineering
CN114283562B (en) * 2021-12-08 2023-12-22 江苏科技大学 Marine trestle early warning system and early warning method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001254319A (en) * 2000-03-09 2001-09-21 Nkk Corp Upper structure of bridge and its construction method
CN2567270Y (en) * 2002-08-28 2003-08-20 天津大学 Movable cylinder foundation breakwater structure
CN201195820Y (en) * 2008-05-15 2009-02-18 中国石油天然气股份有限公司 Barrel type foundation offshore trestle structural member
CN101691751A (en) * 2009-08-31 2010-04-07 中建三局第三建设工程有限责任公司 Construction method for making ultra-long artificial excavating pile penetrate cave and ultra-long pile penetrating cave
KR101026014B1 (en) * 2010-11-25 2011-03-30 (주) 한국비계 Bridge deck construction method by means of pulling jack on the water
CN103669284A (en) * 2013-12-04 2014-03-26 天津港(集团)有限公司 Box-barrel-type foundation breakwater structure assembled over water and assembling method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001254319A (en) * 2000-03-09 2001-09-21 Nkk Corp Upper structure of bridge and its construction method
CN2567270Y (en) * 2002-08-28 2003-08-20 天津大学 Movable cylinder foundation breakwater structure
CN201195820Y (en) * 2008-05-15 2009-02-18 中国石油天然气股份有限公司 Barrel type foundation offshore trestle structural member
CN101691751A (en) * 2009-08-31 2010-04-07 中建三局第三建设工程有限责任公司 Construction method for making ultra-long artificial excavating pile penetrate cave and ultra-long pile penetrating cave
KR101026014B1 (en) * 2010-11-25 2011-03-30 (주) 한국비계 Bridge deck construction method by means of pulling jack on the water
CN103669284A (en) * 2013-12-04 2014-03-26 天津港(集团)有限公司 Box-barrel-type foundation breakwater structure assembled over water and assembling method thereof

Also Published As

Publication number Publication date
CN104294749A (en) 2015-01-21

Similar Documents

Publication Publication Date Title
CN104294749B (en) A kind of installation method of cylinder foundation trestle work structure
US8251002B2 (en) Pontoon-type floating structure
US20220002961A1 (en) Suction Anchors and Their Methods of Manufacture
GB2493720A (en) Gravity foundation for an offshore structure
CN104210627B (en) Build the device and method of lower water for jack-up unit level land
CN101806053B (en) Integral installation method of cantilever beams of self lifting type well drilling platform
US4808036A (en) Mobile marine operations structure
CN201649036U (en) Pipe pile platform used for building dock
CN104313999A (en) Bridge pier structure
CN107905112A (en) A kind of not contour steel suspended box cofferdam base arrangement
CN102206938A (en) Novel method for installing upper part block of offshore platform
WO2013157958A1 (en) Floating and submersible platform
CN104973210B (en) Artificial structure's facility construction technology waterborne
KR102376885B1 (en) Buoyant Structure for Cofferdam with Sponson
KR101252708B1 (en) Offshore floating-type structure constructing method having underwater space
CN101487228A (en) Floating bank apparatus
JP5458441B2 (en) Environmentally friendly offshore structure and its construction method
KR101934895B1 (en) Floating body
CN212896122U (en) Assembly type high-pile ore wharf structure
US4695194A (en) Mobile marine operations structure
CN104975590B (en) The vertical assembling technique waterborne of prestressed concrete fixed platform waterborne
CN206859164U (en) A kind of light concrete floating wharf
CN115045232B (en) High pile wharf structure suitable for embedded boarding corridor bridge and construction method thereof
JP2008082095A (en) Construction method of caisson skeleton
JP5588929B2 (en) Offshore structure construction method and offshore structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20170214

Address after: 100007 Dongcheng District, Dongzhimen, China, North Street, No. 9 Oil Mansion, No.

Patentee after: China National Petroleum Corporation

Patentee after: China Petroleum Pipeline Bureau Engineering Co., Ltd.

Patentee after: Tianjin Dagang Oilfield Group Engineering Construction Co., Ltd.

Address before: 100007 Beijing, Dongzhimen, North Street, No. 9, No.

Patentee before: China National Petroleum Corporation

Patentee before: China Petroleum and Natural Gas Pipeline Bureau

Patentee before: Tianjin Dagang Oilfield Group Engineering Construction Co., Ltd.