CN104268177A - Grouting data processing system - Google Patents

Grouting data processing system Download PDF

Info

Publication number
CN104268177A
CN104268177A CN201410470027.7A CN201410470027A CN104268177A CN 104268177 A CN104268177 A CN 104268177A CN 201410470027 A CN201410470027 A CN 201410470027A CN 104268177 A CN104268177 A CN 104268177A
Authority
CN
China
Prior art keywords
mud jacking
handling system
data handling
module
supplemental characteristic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410470027.7A
Other languages
Chinese (zh)
Inventor
叶阳升
蔡德钩
张千里
朱宏伟
韩自力
李子春
陈锋
马伟斌
史存林
闫宏业
姚建平
闫鑫
刘杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy of Railway Sciences Corp Ltd CARS
Railway Engineering Research Institute of CARS
Original Assignee
Railway Engineering Research Institute of CARS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Railway Engineering Research Institute of CARS filed Critical Railway Engineering Research Institute of CARS
Priority to CN201410470027.7A priority Critical patent/CN104268177A/en
Publication of CN104268177A publication Critical patent/CN104268177A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/40Data acquisition and logging

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Data Mining & Analysis (AREA)
  • Databases & Information Systems (AREA)
  • Mathematical Physics (AREA)
  • Software Systems (AREA)
  • General Physics & Mathematics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

The invention discloses a grouting data processing system and belongs to the technical field of grouting. The grouting data processing system is used for solving the technical problem that the prior art is disadvantageous for integration, analysis and invoking of parameter data of grouting. The grouting data processing system comprises an acquisition module for acquiring the parameter data of grouting, a database for storing the parameter data acquired by the acquisition module, and an analysis module for analyzing the parameter data in the database according to a predetermined condition. The grouting data processing system can be applied to railways, highways, bridges, housing construction and municipal engineering.

Description

Mud jacking data handling system
Technical field
The present invention relates to Grouting Technology field, specifically, relate to a kind of mud jacking data handling system.
Background technology
Pile foundation post-grouting technology is an important technology in railway, highway, science of bridge building, is the key factor determining railway construction quality.Pile foundation post jacking can improve bearing capacity of single pile, and its principle of work is, after completing drilled pile filling concrete, after concrete piles reaches predetermined strength, with grouting pump by grout, by the Grouting Pipe pipeline laid along steel reinforcement cage border at the bottom of being preset at, carry out secondary splitting grouting.Make in grout jacked pile end soil layer, thus improve the load-bearing capacity of stake.
Parameters data in mud jacking process and squeezing quality in close relations, but at present for collection and the record of these supplemental characteristics, major part all has staff to carry out at the construction field (site), is unfavorable for the integration of the supplemental characteristic of mud jacking, analyzes, calls.
Summary of the invention
The object of the present invention is to provide a kind of mud jacking data handling system, to solve the integration that prior art is unfavorable for the supplemental characteristic of mud jacking, the technical matters analyzed, call.
The invention provides a kind of mud jacking data handling system, comprise
Acquisition module, for gathering the supplemental characteristic of mud jacking;
Database, for storing the supplemental characteristic that described acquisition module collects;
Analysis module, for according to predetermined condition, analyzes the supplemental characteristic in described database.
Further, this mud jacking data handling system also comprises the flow sensor and pressure unit that are connected with described acquisition module.
Further, this mud jacking data handling system also comprises the density sensor be connected with described acquisition module.
Further, this mud jacking data handling system also comprises transport module, and the supplemental characteristic for being collected by described acquisition module transfers to described database.
Preferably, described predetermined condition comprises construction line, commencement date, unit in charge of construction.
Further, this mud jacking data handling system also comprises display module, for showing the analysis result of supplemental characteristic in described database or described analysis module.
Further, this mud jacking data handling system also comprises report generation module, for generating mud jacking report according to the analysis result of described analysis module.
Further, this mud jacking data handling system also comprises communication module and some terminals, and described terminal checks the analysis result of supplemental characteristic in described database or described analysis module by described communication module.
Preferably, described terminal is mobile phone, computer or panel computer.
Present invention offers following beneficial effect: in mud jacking data handling system provided by the invention, automatically the parameters data in mud jacking process are gathered by acquisition module, and these data are stored in a database, then by analysis module, the supplemental characteristic in database is analyzed.Such as, by predetermined conditions such as construction line, commencement date, units in charge of construction, lateral comparison and longitudinal comparison can be carried out to supplemental characteristic, and generate mud jacking report.Therefore, mud jacking data handling system provided by the invention be conducive to the supplemental characteristic of mud jacking integration, analyze, call.
Other features and advantages of the present invention will be set forth in the following description, and, partly become apparent from instructions, or understand by implementing the present invention.Object of the present invention and other advantages realize by structure specifically noted in instructions, claims and accompanying drawing and obtain.
Accompanying drawing explanation
In order to be illustrated more clearly in the technical scheme in the embodiment of the present invention, accompanying drawing required in describing is done simple introduction below to embodiment:
Fig. 1 is the schematic diagram of the mud jacking data handling system that the embodiment of the present invention provides;
Fig. 2 is the schematic diagram of acquisition module in the mud jacking data handling system that provides of the embodiment of the present invention.
Embodiment
Describe embodiments of the present invention in detail below with reference to drawings and Examples, to the present invention, how application technology means solve technical matters whereby, and the implementation procedure reaching technique effect can fully understand and implement according to this.It should be noted that, only otherwise form conflict, each embodiment in the present invention and each feature in each embodiment can be combined with each other, and the technical scheme formed is all within protection scope of the present invention.
The mud jacking data handling system that the embodiment of the present invention provides, can be used in the mud jacking operation of the engineerings such as railway, highway, bridge.As shown in Figure 1, this mud jacking data handling system mainly comprises acquisition module 1, database 2 and analysis module 3.
Acquisition module 1 is for gathering the supplemental characteristic of mud jacking.Usually many places flow sensor 41 and pressure unit 42 can be set on the pipeline of conveying slurries, and be connected with acquisition module 1, to measure flow and the pressure of slurries.In addition, the density sensor 43 be connected with acquisition module 1 can also be set on pipeline, to measure the density of slurries.
As shown in Figure 2, in the present embodiment, acquisition module 1 comprises central processing unit 10, and the part such as the RS485 communication interface 11 to be connected with central processing unit 10, AD analog acquisition interface 12, usb 13, real-time clock (Real-Time Clock is called for short RTC) generator 14, local flash memory 15, GPRS data transmission unit 16.Wherein, RS485 communication interface 11 is for gathering the data of flow, AD analog acquisition interface 12 for gathering the data of pressure, and can arrange sample frequency by usb 13, so just can the supplemental characteristic such as flow, pressure, density of timing acquiring slurries.The collection of supplemental characteristic, by real-time clock generator 14 setup times stamp, upload the data to database with fixed time interval by GPRS data transmission unit 16.When interrupting with DataBase combining, the supplemental characteristic gathered will be kept in local flash memory 15, and after recovering with DataBase combining, the supplemental characteristic preserved in local flash memory 15 will be automatically uploaded to database.
As shown in Figure 1, as a preferred version, also comprise transport module 5 in the mud jacking data handling system that the present embodiment provides, the supplemental characteristic for being collected by acquisition module 1 transfers to database 2.In transport module 5, can sort out supplemental characteristic, compress, the operation such as packing, suitable transmission frequency can also be set, thus the transmission of supplemental characteristic timing is stored to database 2.
Analysis module 3, for according to predetermined condition, is analyzed the various supplemental characteristics in database 2.Concrete predetermined condition can be construction line, commencement date, unit in charge of construction etc., and analysis module 3 carries out lateral comparison and longitudinal comparison with these conditions to supplemental characteristic.Such as, lateral comparison can be carried out to the supplemental characteristic in the construction of different bid section in July; Or, longitudinal comparison can be carried out to the supplemental characteristic of same bid section respectively in the construction in May, June, July.
Report generation module 6 is can further include, for generating mud jacking report according to the analysis result of analysis module 3 in mud jacking data handling system.Such as, lateral comparison is carried out to the supplemental characteristic in the construction of different bid section in July, and the mud jacking amount of each bid section, pressure, density is generated histogram respectively, so that staff can compare these parameters intuitively.And for example, to same bid section in one day (or in a period of time) construction in supplemental characteristic carry out longitudinal comparison, and by the supplemental characteristics such as mud jacking amount, pressure, density formation curve figure respectively, thus demonstrate the situation of change of these parameters intuitively.
In the present embodiment, mud jacking data handling system also comprises display module 7, for showing the content such as supplemental characteristic, the analysis result of analysis module 3, the mud jacking report of report generation module 6 generation in database 2.
As a preferred version, also comprise communication module 8 and some terminals 9 in the mud jacking data handling system that the embodiment of the present invention provides, terminal 9 is specifically as follows mobile phone, computer or panel computer etc.In use, in these terminals 9, application software can be installed, terminal 9 can be browsed by communication module 9, the content such as mud jacking report that the analysis result of the supplemental characteristic checked in database 2, analysis module 3, report generation module 6 generate.
Although embodiment disclosed in this invention is as above, the embodiment that described content just adopts for the ease of understanding the present invention, and be not used to limit the present invention.Technician in any the technical field of the invention; under the prerequisite not departing from spirit and scope disclosed in this invention; any amendment and change can be done what implement in form and in details; but scope of patent protection of the present invention, the scope that still must define with appending claims is as the criterion.

Claims (9)

1. a mud jacking data handling system, is characterized in that, comprises
Acquisition module, for gathering the supplemental characteristic of mud jacking;
Database, for storing the supplemental characteristic that described acquisition module collects;
Analysis module, for according to predetermined condition, analyzes the supplemental characteristic in described database.
2. mud jacking data handling system as claimed in claim 1, is characterized in that, also comprise the flow sensor and pressure unit that are connected with described acquisition module.
3. mud jacking data handling system as claimed in claim 2, is characterized in that, also comprise the density sensor be connected with described acquisition module.
4. the mud jacking data handling system as described in any one of claims 1 to 3, is characterized in that, also comprise transport module, the supplemental characteristic for being collected by described acquisition module transfers to described database.
5. mud jacking data handling system as claimed in claim 4, it is characterized in that, described predetermined condition comprises construction line, commencement date, unit in charge of construction.
6. the mud jacking data handling system as described in any one of claim 1 to 5, is characterized in that, also comprise display module, for showing the analysis result of supplemental characteristic in described database or described analysis module.
7. the mud jacking data handling system as described in any one of claim 1 to 6, is characterized in that, also comprises report generation module, for generating mud jacking report according to the analysis result of described analysis module.
8. the mud jacking data handling system as described in any one of claim 1 to 7, is characterized in that, also comprises communication module and some terminals, and described terminal checks the analysis result of supplemental characteristic in described database or described analysis module by described communication module.
9. mud jacking data handling system as claimed in claim 8, it is characterized in that, described terminal is mobile phone, computer or panel computer.
CN201410470027.7A 2014-09-15 2014-09-15 Grouting data processing system Pending CN104268177A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410470027.7A CN104268177A (en) 2014-09-15 2014-09-15 Grouting data processing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410470027.7A CN104268177A (en) 2014-09-15 2014-09-15 Grouting data processing system

Publications (1)

Publication Number Publication Date
CN104268177A true CN104268177A (en) 2015-01-07

Family

ID=52159699

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410470027.7A Pending CN104268177A (en) 2014-09-15 2014-09-15 Grouting data processing system

Country Status (1)

Country Link
CN (1) CN104268177A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105758457A (en) * 2016-03-24 2016-07-13 中山市拓维电子科技有限公司 Pipeline construction monitoring system
CN107479466A (en) * 2017-08-24 2017-12-15 北京融通智慧科技有限公司 The high-supported formwork deformation real-time monitoring system and monitoring method of wisdom building site control platform

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011054213A1 (en) * 2009-11-03 2011-05-12 成都盛特石油装备模拟技术开发有限公司 High-pressure manifold for drilling simulator
CN102304894A (en) * 2011-07-01 2012-01-04 李跃军 Method and device for controlling grouting quality of bridge prestressing force pore path
CN102359280A (en) * 2011-10-10 2012-02-22 湖南联智桥隧技术有限公司 Intelligent mud jacking measurement and control system of large-circulation prestress pipeline
US20120132425A1 (en) * 2010-11-29 2012-05-31 Kim Kue-Young System and method of controlling fluid temperature for improving injectivity of supercritical carbon dioxide into stratum

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011054213A1 (en) * 2009-11-03 2011-05-12 成都盛特石油装备模拟技术开发有限公司 High-pressure manifold for drilling simulator
US20120132425A1 (en) * 2010-11-29 2012-05-31 Kim Kue-Young System and method of controlling fluid temperature for improving injectivity of supercritical carbon dioxide into stratum
CN102304894A (en) * 2011-07-01 2012-01-04 李跃军 Method and device for controlling grouting quality of bridge prestressing force pore path
CN102359280A (en) * 2011-10-10 2012-02-22 湖南联智桥隧技术有限公司 Intelligent mud jacking measurement and control system of large-circulation prestress pipeline

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘亚昌: "智能张拉和智能压浆***在桥梁建设中的应用", 《交通标准化》 *
湖南省交通科学研究院长沙市慧科信息科技有限公司: ""智桥"ZQ2000桥梁预应力管道智能压浆控制***操作说明书", 《HTTP://WWW.DOCIN.COM/P-769602765.HTML》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105758457A (en) * 2016-03-24 2016-07-13 中山市拓维电子科技有限公司 Pipeline construction monitoring system
CN107479466A (en) * 2017-08-24 2017-12-15 北京融通智慧科技有限公司 The high-supported formwork deformation real-time monitoring system and monitoring method of wisdom building site control platform

Similar Documents

Publication Publication Date Title
CN204059332U (en) A kind of concrete precast pipe pile and piling prepressing Soft Ground device
CN103866754B (en) It is applied to the combined vacuum and surcharge preloading constructional method of Soft Ground
CN204989175U (en) Assembled soil and water conservation runoff district monitoring system
CN106950070A (en) Experimental rig for rectangular top pipe jacking construction Whole Process Simulation
CN103645061A (en) Lattice anchoring technology large-scale physical model test method
CN103981861A (en) Pile foundation theory, lime soil pile carrying capacity and lime soil pile stirring impacting operation system
CN110658332B (en) Concrete lining pre-pressure measurement test device and test method thereof
CN115758671B (en) Surrounding rock roadway reinforcement anchor grouting support full life cycle management method, system and application
CN105178280A (en) Complex dynamic compactor operation parameter collecting system and working method thereof
CN104268177A (en) Grouting data processing system
CN205617349U (en) Foundation soil compactness of filling height detects and monitored control system in succession
CN114036625B (en) Intelligent construction method and system suitable for in-situ reinforcement of large-area soft foundation
CN105297753B (en) A kind of determination method of the hydrogeological parameter under water-stop curtain effect
CN201653865U (en) Experimental facility for compression and permeability characteristics of filling slurry of overburden separate-layer zone
CN102704937B (en) Method for identifying settlement pattern during shield tunnel construction
CN103196599B (en) System and method for monitoring soil body inner stress variation of loess field under soaking condition
CN103257082B (en) Method of reducing sample disturbances of direct shear test and cutting ring
CN107675693A (en) The soft base comprehensive processing method of road peat soil
CN203982667U (en) Ribbing geomembrane composite pad system model test unit
CN113866065A (en) Deep mine gas-water mixed penetration test system and test method thereof
CN206772297U (en) A kind of simple observation pier of GPS for high-precision distortion measurement
CN103498467B (en) High-bearing-capacity foundation pile and processing method for high-bearing-capacity foundation pile and foundation
CN207727542U (en) Rock earth model test assembled steel component dies molding box
CN208072369U (en) A kind of dynamic compaction machinery construction monitoring system
CN204944873U (en) A kind of modified cutting ring assembly

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CHINA ACADEMY OF RAILWAY SCIENCES

Effective date: 20150617

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20150617

Address after: 100081 Beijing City, Haidian District Road No. 2 Daliushu railway cars attached to the floor rock Room 202

Applicant after: Railway Construction Institute of China Academy of Railway Sciences

Applicant after: China Academy of Railway Sciences

Address before: 100081 Beijing City, Haidian District Road No. 2 Daliushu railway cars attached to the floor rock Room 202

Applicant before: Railway Construction Institute of China Academy of Railway Sciences

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150107