Mud jacking data handling system
Technical field
The present invention relates to Grouting Technology field, specifically, relate to a kind of mud jacking data handling system.
Background technology
Pile foundation post-grouting technology is an important technology in railway, highway, science of bridge building, is the key factor determining railway construction quality.Pile foundation post jacking can improve bearing capacity of single pile, and its principle of work is, after completing drilled pile filling concrete, after concrete piles reaches predetermined strength, with grouting pump by grout, by the Grouting Pipe pipeline laid along steel reinforcement cage border at the bottom of being preset at, carry out secondary splitting grouting.Make in grout jacked pile end soil layer, thus improve the load-bearing capacity of stake.
Parameters data in mud jacking process and squeezing quality in close relations, but at present for collection and the record of these supplemental characteristics, major part all has staff to carry out at the construction field (site), is unfavorable for the integration of the supplemental characteristic of mud jacking, analyzes, calls.
Summary of the invention
The object of the present invention is to provide a kind of mud jacking data handling system, to solve the integration that prior art is unfavorable for the supplemental characteristic of mud jacking, the technical matters analyzed, call.
The invention provides a kind of mud jacking data handling system, comprise
Acquisition module, for gathering the supplemental characteristic of mud jacking;
Database, for storing the supplemental characteristic that described acquisition module collects;
Analysis module, for according to predetermined condition, analyzes the supplemental characteristic in described database.
Further, this mud jacking data handling system also comprises the flow sensor and pressure unit that are connected with described acquisition module.
Further, this mud jacking data handling system also comprises the density sensor be connected with described acquisition module.
Further, this mud jacking data handling system also comprises transport module, and the supplemental characteristic for being collected by described acquisition module transfers to described database.
Preferably, described predetermined condition comprises construction line, commencement date, unit in charge of construction.
Further, this mud jacking data handling system also comprises display module, for showing the analysis result of supplemental characteristic in described database or described analysis module.
Further, this mud jacking data handling system also comprises report generation module, for generating mud jacking report according to the analysis result of described analysis module.
Further, this mud jacking data handling system also comprises communication module and some terminals, and described terminal checks the analysis result of supplemental characteristic in described database or described analysis module by described communication module.
Preferably, described terminal is mobile phone, computer or panel computer.
Present invention offers following beneficial effect: in mud jacking data handling system provided by the invention, automatically the parameters data in mud jacking process are gathered by acquisition module, and these data are stored in a database, then by analysis module, the supplemental characteristic in database is analyzed.Such as, by predetermined conditions such as construction line, commencement date, units in charge of construction, lateral comparison and longitudinal comparison can be carried out to supplemental characteristic, and generate mud jacking report.Therefore, mud jacking data handling system provided by the invention be conducive to the supplemental characteristic of mud jacking integration, analyze, call.
Other features and advantages of the present invention will be set forth in the following description, and, partly become apparent from instructions, or understand by implementing the present invention.Object of the present invention and other advantages realize by structure specifically noted in instructions, claims and accompanying drawing and obtain.
Accompanying drawing explanation
In order to be illustrated more clearly in the technical scheme in the embodiment of the present invention, accompanying drawing required in describing is done simple introduction below to embodiment:
Fig. 1 is the schematic diagram of the mud jacking data handling system that the embodiment of the present invention provides;
Fig. 2 is the schematic diagram of acquisition module in the mud jacking data handling system that provides of the embodiment of the present invention.
Embodiment
Describe embodiments of the present invention in detail below with reference to drawings and Examples, to the present invention, how application technology means solve technical matters whereby, and the implementation procedure reaching technique effect can fully understand and implement according to this.It should be noted that, only otherwise form conflict, each embodiment in the present invention and each feature in each embodiment can be combined with each other, and the technical scheme formed is all within protection scope of the present invention.
The mud jacking data handling system that the embodiment of the present invention provides, can be used in the mud jacking operation of the engineerings such as railway, highway, bridge.As shown in Figure 1, this mud jacking data handling system mainly comprises acquisition module 1, database 2 and analysis module 3.
Acquisition module 1 is for gathering the supplemental characteristic of mud jacking.Usually many places flow sensor 41 and pressure unit 42 can be set on the pipeline of conveying slurries, and be connected with acquisition module 1, to measure flow and the pressure of slurries.In addition, the density sensor 43 be connected with acquisition module 1 can also be set on pipeline, to measure the density of slurries.
As shown in Figure 2, in the present embodiment, acquisition module 1 comprises central processing unit 10, and the part such as the RS485 communication interface 11 to be connected with central processing unit 10, AD analog acquisition interface 12, usb 13, real-time clock (Real-Time Clock is called for short RTC) generator 14, local flash memory 15, GPRS data transmission unit 16.Wherein, RS485 communication interface 11 is for gathering the data of flow, AD analog acquisition interface 12 for gathering the data of pressure, and can arrange sample frequency by usb 13, so just can the supplemental characteristic such as flow, pressure, density of timing acquiring slurries.The collection of supplemental characteristic, by real-time clock generator 14 setup times stamp, upload the data to database with fixed time interval by GPRS data transmission unit 16.When interrupting with DataBase combining, the supplemental characteristic gathered will be kept in local flash memory 15, and after recovering with DataBase combining, the supplemental characteristic preserved in local flash memory 15 will be automatically uploaded to database.
As shown in Figure 1, as a preferred version, also comprise transport module 5 in the mud jacking data handling system that the present embodiment provides, the supplemental characteristic for being collected by acquisition module 1 transfers to database 2.In transport module 5, can sort out supplemental characteristic, compress, the operation such as packing, suitable transmission frequency can also be set, thus the transmission of supplemental characteristic timing is stored to database 2.
Analysis module 3, for according to predetermined condition, is analyzed the various supplemental characteristics in database 2.Concrete predetermined condition can be construction line, commencement date, unit in charge of construction etc., and analysis module 3 carries out lateral comparison and longitudinal comparison with these conditions to supplemental characteristic.Such as, lateral comparison can be carried out to the supplemental characteristic in the construction of different bid section in July; Or, longitudinal comparison can be carried out to the supplemental characteristic of same bid section respectively in the construction in May, June, July.
Report generation module 6 is can further include, for generating mud jacking report according to the analysis result of analysis module 3 in mud jacking data handling system.Such as, lateral comparison is carried out to the supplemental characteristic in the construction of different bid section in July, and the mud jacking amount of each bid section, pressure, density is generated histogram respectively, so that staff can compare these parameters intuitively.And for example, to same bid section in one day (or in a period of time) construction in supplemental characteristic carry out longitudinal comparison, and by the supplemental characteristics such as mud jacking amount, pressure, density formation curve figure respectively, thus demonstrate the situation of change of these parameters intuitively.
In the present embodiment, mud jacking data handling system also comprises display module 7, for showing the content such as supplemental characteristic, the analysis result of analysis module 3, the mud jacking report of report generation module 6 generation in database 2.
As a preferred version, also comprise communication module 8 and some terminals 9 in the mud jacking data handling system that the embodiment of the present invention provides, terminal 9 is specifically as follows mobile phone, computer or panel computer etc.In use, in these terminals 9, application software can be installed, terminal 9 can be browsed by communication module 9, the content such as mud jacking report that the analysis result of the supplemental characteristic checked in database 2, analysis module 3, report generation module 6 generate.
Although embodiment disclosed in this invention is as above, the embodiment that described content just adopts for the ease of understanding the present invention, and be not used to limit the present invention.Technician in any the technical field of the invention; under the prerequisite not departing from spirit and scope disclosed in this invention; any amendment and change can be done what implement in form and in details; but scope of patent protection of the present invention, the scope that still must define with appending claims is as the criterion.