CN104267310A - 一种基于扰动功率方向的电压暂降源定位方法 - Google Patents

一种基于扰动功率方向的电压暂降源定位方法 Download PDF

Info

Publication number
CN104267310A
CN104267310A CN201410456576.9A CN201410456576A CN104267310A CN 104267310 A CN104267310 A CN 104267310A CN 201410456576 A CN201410456576 A CN 201410456576A CN 104267310 A CN104267310 A CN 104267310A
Authority
CN
China
Prior art keywords
disturbance
delta
voltage
cmi
bmi
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410456576.9A
Other languages
English (en)
Other versions
CN104267310B (zh
Inventor
唐轶
陈奎
文雷
黄巧娜
韩冬
方永丽
刘昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XUYI POWER SUPPLY Co OF JIANGSU ELECTRIC POWER Co
China University of Mining and Technology CUMT
State Grid Corp of China SGCC
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201410456576.9A priority Critical patent/CN104267310B/zh
Publication of CN104267310A publication Critical patent/CN104267310A/zh
Application granted granted Critical
Publication of CN104267310B publication Critical patent/CN104267310B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Measurement Of Current Or Voltage (AREA)

Abstract

一种基于扰动功率方向的电压暂降源定位方法,属于电网电压暂降源定位的自动监测方法。该方法依据线性电路的叠加原理,得到电网故障过程中在扰动电压的作用下,用扰动有功功率流的方向准确定位电压暂降源;扰动有功功率为正时,扰动源在监测点的上游;扰动有功功率为负时,扰动源在监测点的下游;给出了相应扰动功率的算法。该电压暂降源定位方法能确定性地定位由各种电网故障引起的电压暂降,适用于辐射式、环式、单回路、双回路、单电源和多电源网架结构电网,也适用于电容投切、变压器投切、大电机启动扰动引起的电压暂降源定位;该电压暂降源定位方法需要对监测点的电压和电流进行同步采样。

Description

一种基于扰动功率方向的电压暂降源定位方法
技术领域
本发明涉及一种电网电压暂降源定位的自动监测方法,特别是一种基于扰动功率方向的电压暂降源定位方法。
背景技术
电压暂降,是指供电电压均方根值在短时间突然下降至额定电压幅值的90%~10%,其典型持续时间为10ms~1min的一种现象。一些高度自动化设备很容易受到电压暂降的影响,几个周期的电压暂降都会对工业生产造成巨大经济损失,据国外调查,电能质量问题中电压暂降已成为主要的投诉原因,甚至占到投诉比重的80%。然而,电能是一种由电力部门向电力用户提供,并由供、用电双方共同保证质量的特殊产品。在导致电能质量下降的责任上,供用电双方往往因为缺少对电能质量下降原因的判断而存在分歧甚至陷入经济纠纷。对电压暂降源诊断、定位,可界定供用电双方责任,也为制定缓和策略提供参考和依据,为此,近年来暂降源定位引起了国内外研究者的关注。
电压暂降源定位,就是确定引起电压暂降的扰动源位于监测装置的哪一侧。现有暂降源定位方法主要来自国外的研究者,国内的研究大多是对国外研究的定位方法的分析比较和综述或是已有定位方法的综合,鲜见有新定位方法的提出。从定位原理来分大致可分为以下两类。第一类有:一种利用扰动能量和扰动功率初始峰值定位方法,第二种是将此法改进推广到注入***能量的扰动源定位,第三种是引入扰动无功功率和无功能量,使该方法得到了扩展。此类方法当扰动能量和扰动功率不吻合时,可信度大大减小,且对接地性故障定位不可靠。第二类可归纳为基于阻抗的方法,判定***轨迹斜率和电流实部极性的方法,较适用于对称故障定位。等效阻抗实部极性的方法受故障周期选择的影响较大。距离阻抗继电器法适用于双侧电源供电***。这些定位方法对对称性故障引起的电压暂降定位准确率比较高,而对非对称故障引起的电压暂降定位的准确率较低,并且,只适用于单回路放射式电网。
发明内容
本发明的目的是针对已有技术中存在的问题,提供一种基于扰动功率方向的电压暂降源定位方法,实现对电网电压暂降源的自动监测,应用于各种电网电能质量污染源的分析仪器和自动监测装置。
实现本发明目的的技术方案:本发明依据线性电路的叠加原理,得到电网故障过程中在扰动电压的作用下,用扰动有功功率流的方向准确定位电压暂降源;扰动有功功率为正时,扰动源在监测点的上游;扰动有功功率为负时,扰动源在监测点的下游;
具体步骤如下:
步骤a.设锁相环,电网正常运行时,即电压暂降发生前,在监测点对三相电压和电流分别以每基波周期同步采样N个点得:uami(n)、ubmi(n)、ucmi(n)和iami(n)、ibmi(n)、icmi(n);对中性点有效接地电网,由式(1)计算各相对地电压的均方根值;对中性点非有效接地电网,由式(2)计算各相对电网中性点电压的均方根值;当任何一相电压的均方根值小于90%的额定相电压时,电压暂降扰动发生;
U ami = 1 N Σ n = 0 N - 1 [ u ami ( n ) ] 2 U bmi = 1 N Σ n = 0 N - 1 [ u bmi ( n ) ] 2 U cmi = 1 N Σ n = 0 N - 1 [ u cmi ( n ) ] 2 - - - ( 1 )
U ami = 1 N Σ n = 0 N - 1 [ u ami ( n ) - u mi 0 ( n ) ] 2 U bmi = 1 N Σ n = 0 N - 1 [ u bmi ( n ) - u mi 0 ( n ) ] 2 U cmi = 1 N Σ n = 0 N - 1 [ u cmi ( n ) - u mi 0 ( n ) ] 2 - - - ( 2 )
式中,Uami,Ubmi,Ucmi分别是监测点mi测得的三相电压uami(n)、ubmi(n)、ucmi(n)的均方根值, u mi 0 ( n ) = [ u ami ( n ) + u bmi ( n ) + u cmi ( n ) ] / 3 是电网的零序电压;
电压暂降发生后,向前推K·N个采样点,取电压暂降扰动前三相电压电流采样值:uapmi(n-KN)、ubpmi(n-KN)、ucpmi(n-KN)和iapmi(n-KN)、ibpmi(n-KN)、icpmi(n-KN),并继续采样扰动期间的三相电压、电流得:uadmi(n)、ubdmi(n)、ucdmi(n)和iadmi(n)、ibdmi(n)、icdmi(n),求得扰动电压和电流:
Δu ami ( n ) = u admi ( n ) - u apmi ( n - KN ) Δ u bmi ( n ) = u bdmi ( n ) - u bpmi ( n - KN ) Δ u cmi ( n ) = u cdmi ( n ) - u cpmi ( n - KN ) - - - ( 3 )
Δi ami ( n ) = i admi ( n ) - i apmi ( n - KN ) Δ i bmi ( n ) = i bdmi ( n ) - i bpmi ( n - KN ) Δ i cmi ( n ) = i cdmi ( n ) - i cpmi ( n - KN ) - - - ( 4 )
式中,Δu为扰动电压,Δi为扰动电流;n是采样点的编号,是序数,n=0,1,…;N是基波一个周期的采样点数;K取一正整数,K=1或2,或3,是扰动期间采样点滞后扰动前采样点的基波周期数;下标p表示电压暂降发生前,即电网正常运行时;下标d表示扰动期间;下标mi为第i个监测点,i为序数,i=1,2,…;下标a、b、c分别表示a、b、c三相;下标顺序:相(a、b或c)-扰动前p或期间d-监测点mi;
步骤b.求mi点的扰动有功功率ΔPmi,它等于mi点的αβ扰动电压矢量Δuαβmi(n)和αβ扰动电流矢量Δiαβmi(n)的内积,并取一个基波周期的移窗积分值,见式(5)
Δ p mi ( n ) = Δ i αβmi ( n ) T · Δ u αβmi ( n ) Δ P mi ( n ) = 1 N Σ j = n - N n Δ p mi ( j ) - - - ( 5 )
式(5)中,j是序数;αβ扰动电压矢量和扰动电流矢量为:
Δu αβmi ( n ) = Δu αmi ( n ) Δu βmi ( n ) = C · Δu mi ( n ) Δi αβmi ( n ) = Δi αmi ( n ) Δi βmi ( n ) = C · Δi mi ( n ) - - - ( 6 )
其中: C = 2 3 1 - 1 / 2 - 1 / 2 0 3 / 2 - 3 / 2
式(7)为扰动电压矢量和扰动电流矢量:
Δu mi ( n ) = [ Δu ami ( n ) , Δu bmi ( n ) , Δu cmi ( n ) ] T Δi mi ( n ) = [ Δi ami ( n ) , Δi bmi ( n ) , Δi cmi ( n ) ] T - - - ( 7 )
步骤c.依据基波一个周波扰动有功功率的平均值ΔPmi(n)定位电压暂降源;可以任意定义一个参考方向,这个定义是由电压和电流互感器的同名端决定的,一般定义负荷消耗有功功率为“正”;当扰动功率ΔPmi(n)为正时,电压暂降源,即扰动源在参考方向的相反方向,也称上游;当扰动功率ΔPmi(n)为负时,电压暂降源在参考方向的相同方向,也称下游。
有益效果,由于采用了上述方案,本发明提供了一种电网中电压暂降扰动源定位的新方法。电压暂降源定位,就是确定引起电压暂降的扰动源位于监测装置的哪一侧。本发明依据线性电路的叠加原理,将故障扰动(其他电网扰动也同样)分解为电网正常运行和仅有扰动源激励的2个电网。一般说来,在电力***中同时出现两个以上的短路故障的概率还是很低的,因此,同一时间只需考虑电力***中只有一个扰动源。当电网中仅有一个扰动电压源激励时,扰动有功功率流在电网中的分布是确定性的,因此,它的方向就确定性地确定了引起电压暂降的扰动源位于监测装置的哪一侧。通过同一电力网模型的仿真试验证明,它能确定性地定位电压暂降源,即定位正确率100%,而现有方法定位正确率一般只有80%左右,对不对称电压暂降扰动源的判断正确率更低,或不能判断。因此,是一种很有实用价值的电压暂降源定位方法。该电压暂降源定位方法需要对监测点的电压和电流进行同步采样。
优点:该电压暂降源定位方法能确定性地定位由各种电网故障引起的电压暂降,适用于辐射式、环式、单回路、双回路、单电源和多电源网架结构电网,也适用于电容投切、变压器投切、大电机启动扰动引起的电压暂降源定位。
附图说明
图1为本发明故障前后同步采样示意图。
图2(a)为本发明f点故障时供电网等值电路的f点短路故障图。
图2(b)为本发明f点故障时供电网等值电路的f点短路故障等值电路图。
图3(a)为本发明发生扰动期间等值电路的故障扰动前(即电网正常运行)等效电路图。
图3(b)本发明发生扰动期间等值电路的扰动源等值电路图。
具体实施方式
实施例1:本发明依据线性电路的叠加原理,得到电网故障过程中在扰动电压的作用下,用扰动有功功率流的方向准确定位电压暂降源;扰动有功功率为正时,扰动源在监测点的上游;扰动有功功率为负时,扰动源在监测点的下游;
具体步骤如下:
步骤a.设锁相环,电网正常运行时,即电压暂降发生前,在监测点对三相电压和电流分别以每基波周期同步采样N个点得:uami(n)、ubmi(n)、ucmi(n)和iami(n)、ibmi(n)、icmi(n);对中性点有效接地电网,由式(1)计算各相对地电压的均方根值;对中性点非有效接地电网,由式(2)计算各相对电网中性点电压的均方根值;当任何一相电压的均方根值小于90%的额定相电压时,电压暂降扰动发生;
U ami = 1 N Σ n = 0 N - 1 [ u ami ( n ) ] 2 U bmi = 1 N Σ n = 0 N - 1 [ u bmi ( n ) ] 2 U cmi = 1 N Σ n = 0 N - 1 [ u cmi ( n ) ] 2 - - - ( 1 )
U ami = 1 N Σ n = 0 N - 1 [ u ami ( n ) - u mi 0 ( n ) ] 2 U bmi = 1 N Σ n = 0 N - 1 [ u bmi ( n ) - u mi 0 ( n ) ] 2 U cmi = 1 N Σ n = 0 N - 1 [ u cmi ( n ) - u mi 0 ( n ) ] 2 - - - ( 2 )
式中,Uami,Ubmi,Ucmi分别是监测点mi测得的三相电压uami(n)、ubmi(n)、ucmi(n)的均方根值, u mi 0 ( n ) = [ u ami ( n ) + u bmi ( n ) + u cmi ( n ) ] / 3 是电网的零序电压;
电压暂降发生后,向前推K·N个采样点,见图1,取电压暂降扰动前三相电压电流采样值:uapmi(n-KN)、ubpmi(n-KN)、ucpmi(n-KN)和iapmi(n-KN)、ibpmi(n-KN)、icpmi(n-KN),并继续采样扰动期间的三相电压、电流得:uadmi(n)、ubdmi(n)、ucdmi(n)和iadmi(n)、ibdmi(n)、icdmi(n),求得扰动电压和电流:
Δu ami ( n ) = u admi ( n ) - u apmi ( n - KN ) Δ u bmi ( n ) = u bdmi ( n ) - u bpmi ( n - KN ) Δ u cmi ( n ) = u cdmi ( n ) - u cpmi ( n - KN ) - - - ( 3 )
Δi ami ( n ) = i admi ( n ) - i apmi ( n - KN ) Δ i bmi ( n ) = i bdmi ( n ) - i bpmi ( n - KN ) Δ i cmi ( n ) = i cdmi ( n ) - i cpmi ( n - KN ) - - - ( 4 )
式中,Δu为扰动电压,Δi为扰动电流;n是采样点的编号,是序数,n=0,1,…;N是基波一个周期的采样点数;K取一正整数,K=1或2,或3,是扰动期间采样点滞后扰动前采样点的基波周期数;下标p表示电压暂降发生前,即电网正常运行时;下标d表示扰动期间;下标mi为第i个监测点,i为序数,i=1,2,…;下标a、b、c分别表示a、b、c三相;下标顺序:相(a、b或c)-扰动前p或期间d-监测点mi;
在监测点mi监测到的扰动电压矢量和电流矢量为:
Δu mi ( t ) = [ Δu ami ( t ) , Δu bmi ( t ) , Δu cmi ( t ) ] T Δi mi ( t ) = [ Δi ami ( t ) , Δi bmi ( t ) , Δi cmi ( t ) ] T
式中: Δu ami ( t ) = u admi ( t ) - u apmi ( t ) Δu bmi ( t ) = u bdmi ( t ) - u bpmi ( t ) Δu cmi ( t ) = u cdmi ( t ) - u cpmi ( t ) , Δi ami ( t ) = i admi ( t ) - i apmi ( t ) Δ i bmi ( t ) = i bdmi ( t ) - i bpmi ( t ) Δi cmi ( t ) = i cdmi ( t ) - i cpmi ( t )
由于扰动发生前mi监测点电压uapmi(m)、ubpmi(m)、ucpmi(m)、电流iapmi(m)、ibpmi(m)、icpmi(m),m也是采样点的编号,是序数,m=0,1,…;和扰动期间mi监测点电压uadmi(n)、ubdmi(n)、ucdmi(n)、电流iadmi(n)、ibdmi(n)、icdmi(n)是2个不同时刻的值,为求得扰动电压和电流量,设锁相环,对电压和电流各周期同步采样,如图1所示,求得监测点mi的扰动电压和扰动电流:
Δu ami ( n ) = u admi ( n ) - u apmi ( n - KN ) Δ u bmi ( n ) = u bdmi ( n ) - u bpmi ( n - KN ) Δ u cmi ( n ) = u cdmi ( n ) - u cpmi ( n - KN ) - - - ( 3 )
Δi ami ( n ) = i admi ( n ) - i apmi ( n - KN ) Δ i bmi ( n ) = i bdmi ( n ) - i bpmi ( n - KN ) Δ i cmi ( n ) = i cdmi ( n ) - i cpmi ( n - KN ) - - - ( 4 )
式中,Δu为扰动电压,Δi为扰动电流;n是采样点的编号,是序数,n=0,1,…;N是基波一个周期的采样点数;m=n-KN;K取一正整数,K=1或2,或3,是扰动期间采样点滞后扰动前采样点的基波周期数;下标p表示电压暂降发生前,即电网正常运行时;下标d表示扰动期间;下标mi为第i个监测点,i为序数,i=1,2,…;下标a、b、c分别表示a、b、c三相;下标顺序:相(a、b或c)-扰动前p或期间d-监测点mi;
步骤b.求mi点的扰动有功功率ΔPmi,它等于mi点的αβ扰动电压矢量Δuαβmi(n)和αβ扰动电流矢量Δiαβmi(n)的内积,并取一个基波周期的移窗积分值,见式(5)
Δ p mi ( n ) = Δ i αβmi ( n ) T · Δ u αβmi ( n ) Δ P mi ( n ) = 1 N Σ j = n - N n Δ p mi ( j ) - - - ( 5 )
式(5)中,j是序数;αβ扰动电压矢量和扰动电流矢量为:
Δu αβmi ( n ) = Δu αmi ( n ) Δu βmi ( n ) = C · Δu mi ( n ) Δi αβmi ( n ) = Δi αmi ( n ) Δi βmi ( n ) = C · Δi mi ( n ) - - - ( 6 )
其中: C = 2 3 1 - 1 / 2 - 1 / 2 0 3 / 2 - 3 / 2
式(7)为扰动电压矢量和扰动电流矢量:
Δu mi ( n ) = [ Δu ami ( n ) , Δu bmi ( n ) , Δu cmi ( n ) ] T Δi mi ( n ) = [ Δi ami ( n ) , Δi bmi ( n ) , Δi cmi ( n ) ] T - - - ( 7 )
获得三相扰动电压(式(3))和扰动电流(式(4))后,可得到扰动电压矢量和扰动电流矢量式(7):
Δu mi ( n ) = [ Δu ami ( n ) , Δu bmi ( n ) , Δu cmi ( n ) ] T Δi mi ( n ) = [ Δi ami ( n ) , Δi bmi ( n ) , Δi cmi ( n ) ] T - - - ( 7 )
对式(7)进行克拉克变换得αβ扰动电压矢量和扰动电流矢量式(6):
Δu αβmi ( n ) = Δu αmi ( n ) Δu βmi ( n ) = C · Δu mi ( n ) Δi αβmi ( n ) = Δi αmi ( n ) Δi βmi ( n ) = C · Δi mi ( n ) - - - ( 6 )
αβ扰动电压矢量Δuαβmi(n)和αβ扰动电流矢量Δiαβmi(n)求内积,并取一个基波周期的移窗积分值,得mi点的扰动有功功率ΔPmi
Δ p mi ( n ) = Δ i αβmi ( n ) T · Δ u αβmi ( n ) Δ P mi ( n ) = 1 N Σ j = n - N + 1 n Δ p mi ( j ) - - - ( 5 )
步骤c.依据基波一个周波扰动有功功率的平均值ΔPmi(n)定位电压暂降源;可以任意定义一个参考方向,这个定义是由电压和电流互感器的同名端决定的,一般定义负荷消耗有功功率为“正”;当扰动功率ΔPmi(n)为正时,电压暂降源(即扰动源)在参考方向的相反方向,也称上游;当扰动功率ΔPmi(n)为负时,电压暂降源在参考方向的相同方向,也称下游。
在电力***中,电压暂降是因为电网中扰动(如:短路故障、大电机启动、电容的投切等)引起的。以最典型的电力***短路故障扰动为例,一般说来,在电力***中同时出现两个以上的短路故障的概率还是很低的,因此,这里只考虑电力***中只有一个短路故障,并且认为电力***中的元件是线性的,简化等值电路如图2(a)所示,可等效为如图2(b)电路。图中:uS1(t)=[uaS1(t),ubS1(t),ucS1(t)]T,ZS1为供电侧等效电源和内阻抗,uS2(t)=[uaS2(t),ubS2(t),ubdmi(t),ucdmi(t)]T,ZS2为用电侧等效电源和内阻抗,下方“→”表示该监测点mi的参考方向。下标d表示扰动期间;mi为第i个监测点,Li表示第i条线路,Si表示电源,i为序数词,i=1,2,…;a,b,c分别表示a、b、c三相。下标顺序:相(a、b或c)-扰动前p或期间d-监测点mi。
在图2(b)中,udf(t)=[uadf(t),ubdf(t),ucdf(t)]T是故障期间故障点的电压。可分解为upf(t)=[uapf(t),ubpf(t),ucpf(t)]T扰动前f点电压和故障扰动电压Δuf(t)=udf(t)-upf(t)=[Δuaf(t),Δubf(t),Δucf(t)]T两部分,因此,依据线性电路的叠加原理,用图3(a)与(b)的和来等效。图3(a)是故障扰动前(即电网正常运行)的等效电路,图3(b)则是仅有扰动电压源激励下的等值电路。
图3说明,当电网发生扰动时,可以由一个扰动前的等值电路和一个仅在扰动电压源激励下的等值电路的叠加来替代。仅在扰动电压源的激励下,由图3(b)可直观看出,若以从左向右,即mi下方“→”为正功率流方向,则当扰动功率流为正时,电压暂降源(即扰动源)在上游,当扰动功率流为负时,电压暂降源在下游。这就是本文对电压暂降源定位的理论依据。
由于图3(b)中监测点的功率流的方向和大小仅与扰动源在网架结构的位置和网架结构及网架中各支路的阻抗有关,与电源、实际潮流方向和用电负荷无关,因此,这一判断依据适用于任何网架结构(单电源辐射式、双电源辐射式、环形电网等)。这里的“功率流从左向右为正参考”也不再是扰动前的“实际潮流”方向,而是可以任意定义的参考方向,实际上是由电压和电流互感器的同名端决定的,一般定义负荷消耗有功功率流为“正”。

Claims (1)

1.一种基于扰动功率方向的电压暂降源定位方法,其特征是:依据线性电路的叠加原理,得到电网故障过程中在扰动电压的作用下,用扰动有功功率流的方向准确定位电压暂降源;扰动有功功率为正时,扰动源在监测点的上游;扰动有功功率为负时,扰动源在监测点的下游;
具体步骤如下:
步骤a.设锁相环,电网正常运行时,即电压暂降发生前,在监测点对三相电压和电流分别以每基波周期同步采样N个点得:uami(n)、ubmi(n)、ucmi(n)和iami(n)、ibmi(n)、icmi(n);对中性点有效接地电网,由式(1)计算各相对地电压的均方根值;对中性点非有效接地电网,由式(2)计算各相对电网中性点电压的均方根值;当任何一相电压的均方根值小于90%的额定相电压时,电压暂降扰动发生;
U ami = 1 N Σ n = 0 N - 1 [ u ami ( n ) ] 2 U bmi = 1 N Σ n = 0 N - 1 [ u bmi ( n ) ] 2 U cmi = 1 N Σ n = 0 N - 1 [ u cmi ( n ) ] 2 - - - ( 1 )
U ami = 1 N Σ n = 0 N - 1 [ u ami ( n ) - u mi 0 ( n ) ] 2 U bmi = 1 N Σ n = 0 N - 1 [ u bmi ( n ) - u mi 0 ( n ) ] 2 U cmi = 1 N Σ n = 0 N - 1 [ u cmi ( n ) - u mi 0 ( n ) ] 2 - - - ( 2 )
式中,Uami,Ubmi,Ucmi分别是监测点mi测得的三相电压uami(n)、ubmi(n)、ucmi(n)的均方根值, u mi 0 ( n ) = [ u ami ( n ) + u bmi ( n ) + u cmi ( n ) ] / 3 是电网的零序电压;
电压暂降发生后,向前推K·N个采样点,取电压暂降扰动前三相电压电流采样值:uapmi(n-KN)、ubpmi(n-KN)、ucpmi(n-KN)和iapmi(n-KN)、ibpmi(n-KN)、icpmi(n-KN),并继续采样扰动期间的三相电压、电流得:uadmi(n)、ubdmi(n)、ucdmi(n)和iadmi(n)、ibdmi(n)、icdmi(n),求得扰动电压和电流:
Δu ami ( n ) = u admi ( n ) - u apmi ( n - KN ) Δ u bmi ( n ) = u bdmi ( n ) - u bpmi ( n - KN ) Δ u cmi ( n ) = u cdmi ( n ) - u cpmi ( n - KN ) - - - ( 3 )
Δi ami ( n ) = i admi ( n ) - i apmi ( n - KN ) Δ i bmi ( n ) = i bdmi ( n ) - i bpmi ( n - KN ) Δ i cmi ( n ) = i cdmi ( n ) - i cpmi ( n - KN ) - - - ( 4 )
式中,Δu为扰动电压,Δi为扰动电流;n是采样点的序号,是序数,n=0,1,…;N是基波一个周期的采样点数;K取一正整数,K=1或2,或3,是扰动期间采样点滞后扰动前采样点的基波周期数;下标p表示电压暂降发生前,即电网正常运行时;下标d表示扰动期间;下标mi为第i个监测点,i为序数,i=1,2,…;下标a、b、c分别表示a、b、c三相;下标顺序:相(a、b或c)-扰动前p或期间d-监测点mi;
步骤b.求mi点的扰动有功功率ΔPmi,它等于mi点的αβ扰动电压矢量Δuαβmi(n)和αβ扰动电流矢量Δiαβmi(n)的内积,并取一个基波周期的积分值,见式(5)
Δ p mi ( n ) = Δ i αβmi ( n ) T · Δ u αβmi ( n ) Δ P mi ( n ) = 1 N Σ j = n - N n Δ p mi ( j ) - - - ( 5 )
式(5)中,j是序数;αβ扰动电压矢量和扰动电流矢量为:
Δu αβmi ( n ) = Δu αmi ( n ) Δu βmi ( n ) = C · Δu mi ( n ) Δi αβmi ( n ) = Δi αmi ( n ) Δi βmi ( n ) = C · Δi mi ( n ) - - - ( 6 )
其中: C = 2 3 1 - 1 / 2 - 1 / 2 0 3 / 2 - 3 / 2
式(7)为扰动电压矢量和扰动电流矢量:
Δu mi ( n ) = [ Δu ami ( n ) , Δu bmi ( n ) , Δu cmi ( n ) ] T Δi mi ( n ) = [ Δi ami ( n ) , Δi bmi ( n ) , Δi cmi ( n ) ] T - - - ( 7 )
步骤c.依据基波一个周波扰动有功功率的平均值ΔPmi(n)定位电压暂降源。可以任意定义一个参考方向,这个定义是由电压和电流互感器的同名端决定的,一般定义负荷消耗有功功率为“正”;当扰动功率ΔPmi(n)为正时,电压暂降源,即扰动源在参考方向的相反方向,也称上游;当扰动功率ΔPmi(n)为负时,电压暂降源在参考方向的相同方向,也称下游。
CN201410456576.9A 2014-09-09 2014-09-09 一种基于扰动功率方向的电压暂降源定位方法 Expired - Fee Related CN104267310B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410456576.9A CN104267310B (zh) 2014-09-09 2014-09-09 一种基于扰动功率方向的电压暂降源定位方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410456576.9A CN104267310B (zh) 2014-09-09 2014-09-09 一种基于扰动功率方向的电压暂降源定位方法

Publications (2)

Publication Number Publication Date
CN104267310A true CN104267310A (zh) 2015-01-07
CN104267310B CN104267310B (zh) 2017-03-08

Family

ID=52158850

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410456576.9A Expired - Fee Related CN104267310B (zh) 2014-09-09 2014-09-09 一种基于扰动功率方向的电压暂降源定位方法

Country Status (1)

Country Link
CN (1) CN104267310B (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105182176A (zh) * 2015-07-15 2015-12-23 中国矿业大学 基于序空间矢量特性阻抗实部极性的电压暂降源的方向判断方法
CN105223452A (zh) * 2015-11-02 2016-01-06 武汉阿迪克电子股份有限公司 实现电能质量监测及污染源定位的电能质量监测仪和方法
CN105388396A (zh) * 2015-11-04 2016-03-09 中国矿业大学 一种用序有功增量电流方向追溯电压暂降源的方法
CN105785230A (zh) * 2016-05-10 2016-07-20 浙江工业大学 一种具有容错性的电压暂降源定位方法
CN105842580A (zh) * 2015-11-20 2016-08-10 武汉大学 一种适用于智能配电网的电压暂降源精确定位优化方法
CN107942191A (zh) * 2017-09-22 2018-04-20 国网上海市电力公司 基于灵敏度分析的区域地区直流波动源定位方法
CN109307795A (zh) * 2018-11-30 2019-02-05 广东电网有限责任公司 波形点检测方法及装置
CN111580008A (zh) * 2020-04-16 2020-08-25 华北电力大学 一种基于相位跳变下扰动功率分析的短路故障选线方法
CN113189444A (zh) * 2021-04-25 2021-07-30 国网江苏省电力有限公司苏州供电分公司 一种电压暂降源判定方法和装置

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5886429A (en) * 1997-12-11 1999-03-23 Board Of Regents, The University Of Texas System Voltage sag/swell testing station
US20030230937A1 (en) * 2002-06-12 2003-12-18 Mceachern Alexander Sag generator with plurality of switch technologies
CN101566663A (zh) * 2009-06-04 2009-10-28 山东大学 一种配电***电压跌落源定位方法
CN101738551A (zh) * 2009-12-15 2010-06-16 西南交通大学 基于联网的暂态电能质量扰动智能分析方法
CN103018537A (zh) * 2012-11-28 2013-04-03 西南交通大学 基于cwd谱峭度的暂态电能质量扰动分类识别方法
CN103487682A (zh) * 2013-09-13 2014-01-01 深圳供电局有限公司 一种电压暂降扰动下敏感客户电能体验质量的预警方法
CN103995178A (zh) * 2014-05-20 2014-08-20 江苏大学 一种基于时频聚集特性准则s变换的电压暂降检测方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5886429A (en) * 1997-12-11 1999-03-23 Board Of Regents, The University Of Texas System Voltage sag/swell testing station
US20030230937A1 (en) * 2002-06-12 2003-12-18 Mceachern Alexander Sag generator with plurality of switch technologies
CN101566663A (zh) * 2009-06-04 2009-10-28 山东大学 一种配电***电压跌落源定位方法
CN101738551A (zh) * 2009-12-15 2010-06-16 西南交通大学 基于联网的暂态电能质量扰动智能分析方法
CN103018537A (zh) * 2012-11-28 2013-04-03 西南交通大学 基于cwd谱峭度的暂态电能质量扰动分类识别方法
CN103487682A (zh) * 2013-09-13 2014-01-01 深圳供电局有限公司 一种电压暂降扰动下敏感客户电能体验质量的预警方法
CN103995178A (zh) * 2014-05-20 2014-08-20 江苏大学 一种基于时频聚集特性准则s变换的电压暂降检测方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
吕干云等: "电压暂降源定位的优化综合判据法", 《电力***保护与控制》 *
高洪霞等: "配电***电压跌落源定位新方法", 《山东大学学报(工学版)》 *

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105182176A (zh) * 2015-07-15 2015-12-23 中国矿业大学 基于序空间矢量特性阻抗实部极性的电压暂降源的方向判断方法
CN105182176B (zh) * 2015-07-15 2018-03-09 中国矿业大学 基于序空间矢量特性阻抗实部极性的电压暂降源的方向判断方法
CN105223452A (zh) * 2015-11-02 2016-01-06 武汉阿迪克电子股份有限公司 实现电能质量监测及污染源定位的电能质量监测仪和方法
CN105223452B (zh) * 2015-11-02 2018-04-10 武汉阿迪克电子股份有限公司 实现电能质量监测及污染源定位的电能质量监测仪和方法
CN105388396A (zh) * 2015-11-04 2016-03-09 中国矿业大学 一种用序有功增量电流方向追溯电压暂降源的方法
CN105388396B (zh) * 2015-11-04 2018-10-26 中国矿业大学 一种用序有功增量电流方向追溯电压暂降源的方法
CN105842580B (zh) * 2015-11-20 2018-11-13 武汉大学 一种适用于智能配电网的电压暂降源精确定位优化方法
CN105842580A (zh) * 2015-11-20 2016-08-10 武汉大学 一种适用于智能配电网的电压暂降源精确定位优化方法
CN105785230B (zh) * 2016-05-10 2018-08-21 浙江工业大学 一种具有容错性的电压暂降源定位方法
CN105785230A (zh) * 2016-05-10 2016-07-20 浙江工业大学 一种具有容错性的电压暂降源定位方法
CN107942191A (zh) * 2017-09-22 2018-04-20 国网上海市电力公司 基于灵敏度分析的区域地区直流波动源定位方法
CN107942191B (zh) * 2017-09-22 2020-02-07 国网上海市电力公司 基于灵敏度分析的区域地区直流波动源定位方法
CN109307795A (zh) * 2018-11-30 2019-02-05 广东电网有限责任公司 波形点检测方法及装置
CN109307795B (zh) * 2018-11-30 2020-11-06 广东电网有限责任公司 波形点检测方法及装置
CN111580008A (zh) * 2020-04-16 2020-08-25 华北电力大学 一种基于相位跳变下扰动功率分析的短路故障选线方法
CN111580008B (zh) * 2020-04-16 2021-04-27 华北电力大学 一种基于相位跳变下扰动功率分析的短路故障选线方法
CN113189444A (zh) * 2021-04-25 2021-07-30 国网江苏省电力有限公司苏州供电分公司 一种电压暂降源判定方法和装置

Also Published As

Publication number Publication date
CN104267310B (zh) 2017-03-08

Similar Documents

Publication Publication Date Title
CN104267310A (zh) 一种基于扰动功率方向的电压暂降源定位方法
CN104215881A (zh) 一种基于序扰动有功电流方向的电压暂降源定位方法
CN103675605B (zh) 一种基于故障信号暂态相关分析的配电网小电流接地故障选线方法
CN104198884B (zh) 基于差动原理的大规模电网智能故障诊断方法
US20150073735A1 (en) Method for adaptive fault location in power system networks
CN104215882A (zh) 一种基于有源单端口网络电阻极性的电压暂降源定位方法
CN103454555B (zh) 基于参数识别的配电网单相接地故障区段定位方法
CN108254657A (zh) 基于暂态能量分析的配电网小电流接地故障区段定位方法
Jia et al. Ground fault location using the low-voltage-side recorded data in distribution systems
CN104181442A (zh) 基于相关分析的配电网单相接地故障区段定位方法
Cordova et al. Fault location identification in smart distribution networks with distributed generation
CN102590703B (zh) 基于零序暂态电荷的谐振接地***单相接地故障选线方法
CN109507529B (zh) 基于故障指示器的小电流接地故障判别定位方法
CN105388396A (zh) 一种用序有功增量电流方向追溯电压暂降源的方法
CN110297154A (zh) 基于零模电流暂态能量的小电流接地故障选线方法及装置
CN105071362A (zh) 一种应用于ftu的分布式馈线自动化保护新方法
CN104181441A (zh) 基于模型误差的配电网单相接地故障区段定位方法
CN104764981B (zh) 基于标准化偏移度的配网线路故障区段定位方法
Anandan et al. Wide area monitoring system for an electrical grid
Zuhaib et al. PMU installation in power grid for enhanced situational awareness: Challenges, issues and application
CN101943738A (zh) 单相接地测距方法和测距装置
Ghosh et al. Performance simulation of phasor measurement unit for wide area measurement system
CN105182176A (zh) 基于序空间矢量特性阻抗实部极性的电压暂降源的方向判断方法
Muneshwar et al. A new adaptive PMU based protection scheme for interconnected transmission network system
Gomathi et al. Optimal location of PMUs for complete observability of power system network

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA XUYI POWER SUPPLY

Effective date: 20150710

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20150710

Address after: 221116 Research Institute, China University of Mining and Technology, Xuzhou University, Jiangsu, China,

Applicant after: China University of Mining & Technology

Applicant after: State Grid Corporation of China

Applicant after: Xuyi Power Supply Company of Jiangsu Electric Power Company

Address before: 221116 Research Institute, China University of Mining and Technology, Xuzhou University, Jiangsu, China,

Applicant before: China University of Mining & Technology

CB02 Change of applicant information

Address after: 221116 Research Institute of China University of Mining and Technology,, Jiangsu

Applicant after: China Mining Technology Univ.

Applicant after: State Power Networks Co

Applicant after: Xuyi Power Supply Company of Jiangsu Electric Power Company

Address before: 221116 Research Institute, China University of Mining and Technology, Xuzhou University, Jiangsu, China,

Applicant before: China Mining Technology Univ.

Applicant before: State Power Networks Co

Applicant before: Xuyi Power Supply Company of Jiangsu Electric Power Company

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170308

Termination date: 20200909