CN104266480A - Gas supply device of smelting reverberating furnace - Google Patents

Gas supply device of smelting reverberating furnace Download PDF

Info

Publication number
CN104266480A
CN104266480A CN201410582459.7A CN201410582459A CN104266480A CN 104266480 A CN104266480 A CN 104266480A CN 201410582459 A CN201410582459 A CN 201410582459A CN 104266480 A CN104266480 A CN 104266480A
Authority
CN
China
Prior art keywords
gas
reverberatory furnace
pipe
smelting
furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410582459.7A
Other languages
Chinese (zh)
Inventor
李荣鹏
侯千驹
雷兴国
胡波
曹咏梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YONGXING COUNTY RONGPENG METAL Co Ltd
Original Assignee
YONGXING COUNTY RONGPENG METAL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YONGXING COUNTY RONGPENG METAL Co Ltd filed Critical YONGXING COUNTY RONGPENG METAL Co Ltd
Priority to CN201410582459.7A priority Critical patent/CN104266480A/en
Publication of CN104266480A publication Critical patent/CN104266480A/en
Pending legal-status Critical Current

Links

Landscapes

  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)

Abstract

The invention discloses a gas supply device of a smelting reverberating furnace. A waste gas pipe is arranged at the left end of the reverberating furnace. One end of a bending pipe extends into the reverberating furnace from the right upper part of the reverberating furnace, and the other end of the bending pipe is communicated with a flow dividing pipe. A gas pipe and an intake pipe are arranged on a gas furnace, the gas pipe is communicated with the flow dividing pipe, a valve is mounted on the intake pipe, and then the intake pipe is connected with a blower.

Description

Smelting reverberatory furnace coal gas feeder
Technical field
The present invention relates to smelting reverberatory furnace coal gas feeder.
 
Background technology
At present, the smelting reverberatory furnace that known smelting enterprise uses, its coal gas enters from one end of smelting reverberatory furnace, and waste gas is discharged from the other end of smelting reverberatory furnace.This working method, because gas inlet and waste gas outlet are directly corresponding, after coal gas enters smelting reverberatory furnace, to discharge from waste gas outlet with waste gas very soon, coal gas holdup time in smelting reverberatory furnace is short, incomplete combustion; Cause gas consumption amount large, production cost is high.
?
Summary of the invention
In order to overcome existing smelting enterprise use smelting reverberatory furnace produce time, the gas consumption amount occurred is large, and the deficiency that production cost is high, the invention provides smelting reverberatory furnace coal gas feeder, use this device that the coal gas entering smelting reverberatory furnace can be made to burn completely, reduce enterprise's production cost.
In order to achieve the above object, the technical solution adopted for the present invention to solve the technical problems is following design:
The left end of reverberatory furnace has flue gas leading, and one end of swan-neck is stretched in reverberatory furnace from the upper right quarter of reverberatory furnace, and the other end of swan-neck is communicated with isocon.Gas burner has gas pipe, air inlet pipe, gas pipe is communicated with isocon, and air inlet pipe is connected with air blast after loading onto valve.
Before using, with tracheae flue gas leading and exhaust-gas treatment room inlet communication.
During work, start the air exhauster of exhaust-gas treatment room, open reverberatory furnace, gas burner; Subsequently, open valve, start air blast.The coal gas that gas burner produces enters in reverberatory furnace through gas pipe, isocon, swan-neck, and coal gas under the effect of exhaust-gas treatment room air exhauster, then enters exhaust-gas treatment room through flue gas leading, tracheae after burning completely in reverberatory furnace.
Because coal gas is not enter from reverberatory furnace right-hand member, but enter from the upper right quarter of reverberatory furnace, coal gas holdup time in reverberatory furnace is long, and the burning of coal gas in reverberatory furnace is more complete.Experiment proves that this device makes the coal charge consumption of gas burner reduce to 2.3-2.9 ton every day by every day 5 tons, saves coal charge and reaches more than 50%.
The invention has the beneficial effects as follows: 1, coal gas enters from the upper right quarter of reverberatory furnace, coal gas holdup time in reverberatory furnace is long, and the burning of coal gas in reverberatory furnace is more complete, reduces gas consumption amount.2, economize energy.The coal charge of gas burner consumption reduces to 2.3-2.8 ton every day from every day 5 tons.3, enterprise's production cost is low.4, structure cylinder list, easy to use.
Accompanying drawing explanation
Below in conjunction with drawings and embodiments, the present invention is further described.
Fig. 1 is the front view of smelting reverberatory furnace coal gas feeder.
Fig. 2 is the top view of Fig. 1.
In figure
1, flue gas leading 2, reverberatory furnace 3, swan-neck 4, isocon
5, gas pipe 6, air inlet pipe 7, valve 8, air blast
9, gas burner.
Detailed description of the invention
In the embodiment shown in Fig. 1, Fig. 2, the left end of reverberatory furnace 2 has flue gas leading 1, and one end of swan-neck 3 is stretched in reverberatory furnace 2 from the upper right quarter of reverberatory furnace 2, and the other end of swan-neck 3 is communicated with isocon 4.Gas burner 9 has gas pipe 5, air inlet pipe 6, gas pipe 5 is communicated with isocon 4, and air inlet pipe 6 is connected with air blast 8 after loading onto valve 7.
Before using, with tracheae flue gas leading 1 and exhaust-gas treatment room inlet communication.
During work, start the air exhauster of exhaust-gas treatment room, open reverberatory furnace 2, gas burner 9; Subsequently, open valve 7, start air blast 8.The coal gas that gas burner 9 produces enters in reverberatory furnace 2 through gas pipe 5, isocon 4, swan-neck 3, and coal gas under the effect of exhaust-gas treatment room air exhauster, then enters exhaust-gas treatment room through flue gas leading 1, tracheae after burning completely in reverberatory furnace 2.
Because coal gas is not enter from reverberatory furnace 2 right-hand member, but enter from the upper right quarter of reverberatory furnace 2, coal gas holdup time in reverberatory furnace 2 is long, and the burning of coal gas in reverberatory furnace 2 is more complete.Experiment proves that this device makes the coal charge consumption of gas burner reduce to 2.3-2.9 ton every day by every day 5 tons, and gas burner 9 is saved coal charge and reached more than 50%.

Claims (1)

1. smelting reverberatory furnace coal gas feeder, it is characterized in that: the left end of reverberatory furnace (2) has flue gas leading (1), and one end of swan-neck (3) is stretched in reverberatory furnace (2) from the upper right quarter of reverberatory furnace (2), and the other end of swan-neck (3) is communicated with isocon (4); Gas burner (9) has gas pipe (5), air inlet pipe (6), gas pipe (5) is communicated with isocon (4), and air inlet pipe (6) is loaded onto valve (7) and is connected with air blast (8) afterwards.
CN201410582459.7A 2014-10-28 2014-10-28 Gas supply device of smelting reverberating furnace Pending CN104266480A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410582459.7A CN104266480A (en) 2014-10-28 2014-10-28 Gas supply device of smelting reverberating furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410582459.7A CN104266480A (en) 2014-10-28 2014-10-28 Gas supply device of smelting reverberating furnace

Publications (1)

Publication Number Publication Date
CN104266480A true CN104266480A (en) 2015-01-07

Family

ID=52158022

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410582459.7A Pending CN104266480A (en) 2014-10-28 2014-10-28 Gas supply device of smelting reverberating furnace

Country Status (1)

Country Link
CN (1) CN104266480A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2389287Y (en) * 1999-09-13 2000-07-26 青岛索具厂 Gas heating furnace
US20030037714A1 (en) * 2001-08-22 2003-02-27 Kabushiki Kaisha Kobe Seiko Sho (Kobe Steel, Ltd) Method for combustion treatment of combustible waste and apparatus therefor
CN101196301A (en) * 2006-12-04 2008-06-11 许兴义 Reverberator for recovery processing waste lead acid accumulator
CN201133762Y (en) * 2007-12-05 2008-10-15 河南省伊思特有色合金有限公司 Single-chamber energy-saving burnt gas reverberatory furnace
CN101565173A (en) * 2009-05-31 2009-10-28 孔凡逸 Semi-vertical reverberatory furnace for preparing sodium sulfide and process thereof
CN202626128U (en) * 2012-04-16 2012-12-26 广东兴辉陶瓷集团有限公司 Conveying pipeline of coal gas producer
CN204177182U (en) * 2014-10-28 2015-02-25 永兴县荣鹏金属有限公司 Smelting reverberatory furnace coal gas feeder

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2389287Y (en) * 1999-09-13 2000-07-26 青岛索具厂 Gas heating furnace
US20030037714A1 (en) * 2001-08-22 2003-02-27 Kabushiki Kaisha Kobe Seiko Sho (Kobe Steel, Ltd) Method for combustion treatment of combustible waste and apparatus therefor
CN101196301A (en) * 2006-12-04 2008-06-11 许兴义 Reverberator for recovery processing waste lead acid accumulator
CN201133762Y (en) * 2007-12-05 2008-10-15 河南省伊思特有色合金有限公司 Single-chamber energy-saving burnt gas reverberatory furnace
CN101565173A (en) * 2009-05-31 2009-10-28 孔凡逸 Semi-vertical reverberatory furnace for preparing sodium sulfide and process thereof
CN202626128U (en) * 2012-04-16 2012-12-26 广东兴辉陶瓷集团有限公司 Conveying pipeline of coal gas producer
CN204177182U (en) * 2014-10-28 2015-02-25 永兴县荣鹏金属有限公司 Smelting reverberatory furnace coal gas feeder

Similar Documents

Publication Publication Date Title
CN204460186U (en) Biomass fuel boiler
CN204177182U (en) Smelting reverberatory furnace coal gas feeder
CN104266480A (en) Gas supply device of smelting reverberating furnace
CN205748010U (en) A kind of rubber energy-saving device of boiler
CN104338633B (en) Energy-saving spray gun device for kiln
CN202947447U (en) Jet flow type hot blast stove with preheating device and drying system
CN203687013U (en) Steam combustion supporting type combustor
CN202417753U (en) Air inlet tube of engine
CN202768047U (en) Adit assistant ventilation device
CN109751864A (en) Smelting reverberatory furnace coal gas feeder
CN101897363B (en) Air-returning decompression type high temperature hot blast stove capable of dedusting and removing smoke with calandria
CN203116508U (en) Hot slag blow-in device for fluidized bed
CN205775722U (en) A kind of asphalt mixing plant coal-fired heating furnace apparatus
CN104457254A (en) Ceramic part production device combining sintering kiln and de-waxing kiln
CN204665906U (en) The lower water jacket of modified air blast smelting furnace
CN104864706B (en) The lower water jacket of modified blasting smelting stove
CN103884012B (en) Furnace drying method
PL127838U1 (en) Combustion chamber for white phosphorus
CN203893599U (en) Insertion type drum dryer
CN202861396U (en) Feed system of forming machine
CN204063149U (en) A kind of cooking environmental protection, energy-saving gas range
CN110849144A (en) High-efficient environmental protection noble metal smelting furnace
CN104515133A (en) Premixed adjustable gas burner and method
CN206410516U (en) A kind of energy-saving type high-temperature industrial furnace
CN203857810U (en) Efficient heating furnace

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150107