CN104260198A - Concrete prefabricated wall body and vertical pouring hole remaining method thereof - Google Patents

Concrete prefabricated wall body and vertical pouring hole remaining method thereof Download PDF

Info

Publication number
CN104260198A
CN104260198A CN201410575387.3A CN201410575387A CN104260198A CN 104260198 A CN104260198 A CN 104260198A CN 201410575387 A CN201410575387 A CN 201410575387A CN 104260198 A CN104260198 A CN 104260198A
Authority
CN
China
Prior art keywords
concrete
wall body
wall
core mold
rubber core
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410575387.3A
Other languages
Chinese (zh)
Inventor
李哲龙
李晓亮
索屹楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201410575387.3A priority Critical patent/CN104260198A/en
Publication of CN104260198A publication Critical patent/CN104260198A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Moulds, Cores, Or Mandrels (AREA)

Abstract

The invention relates to a concrete prefabricated wall body and a vertical pouring hole remaining method thereof. A through vertical pouring hole is formed in the concrete prefabricated wall body corresponding to a cast-in-site section. The vertical pouring hole remaining method comprises producing an inflatable rubber core mold which is matched with the vertical pouring hole in diameter and length, drawing the rubber core mold to penetrate a tied wall body reinforced cage through a rope and enabling an inflatable nozzle to be placed externally; inflating the rubber core mold through an air pump, controlling the monitoring air pressure trough a pressure gauge during inflation and inflating to the specified pressure; fixing the upper side, the lower side, the left side and the right side of the rubber core mold when wall body concrete is poured; performing vibration from the bilateral sides of the rubber core mold simultaneously during concrete vibration to prevent the rubber core mold from moving laterally; deflating the rubber core mold and pulling out the rubber core mold after the concrete is finally set. According to the concrete prefabricated wall body, the design requirements can be met, the total weight of the wall body can be reduced, the wall body vertical pouring hole is reserved in the rubber core mold, the operation is simple, and the labor, the time and materials are saved.

Description

Concrete prefabricated body of wall and vertical pouring hole placement method thereof
Technical field
The present invention relates to concrete prefabricated shear wall, specifically a kind of concrete prefabricated body of wall and vertical pouring hole placement method thereof.
Background technology
At present, when after the installation of precast shear wall body of wall, bottom reserved steel bar overlapping part concrete cast-in-situ section is built, the bubble of generation not easily discharges, and there is the shortcoming that speed of application is slow, quality is wayward, be difficult to guarantee cast-in-place position concrete turgor bottom body of wall.
Summary of the invention
The present invention is intended to solve existing prefabricated shear wall body and installs the problems referred to above existed, and provides a kind of and be convenient to quality control, is convenient to concrete prefabricated body of wall that the later stage builds and vertical pouring hole placement method thereof.
The technical scheme that the present invention solves the employing of described problem is:
A kind of concrete prefabricated body of wall, comprise the Cast-in-Situ Segment of body of wall body, body of wall body bottom portion, in described body of wall body, corresponding described Cast-in-Situ Segment is provided with the vertical plug hole of up/down perforation.
Further, described vertical plug hole is that one or interval arrange 2-3.
The placement method of the vertical plug hole of above-mentioned concrete prefabricated body of wall, carries out in the steps below:
A. mould is entered: make the inflating rubber core be applicable to the vertical plug hole diameter matches in body of wall, length, with wire saws, described rubber mandrel is penetrated in the good wall steel bar cage of colligation, and make charging connector be in outer placement, avoid sharp-pointed hard object to puncture rubber mandrel;
B. inflate: use air pump to inflate rubber mandrel, control monitoring air pressure with Pressure gauge during inflation, be inflated to the pressure of regulation;
Rubber mandrel upper and lower, left and right, for preventing rubber mandrel from floating, all be fixed by c. casting concrete: when building walls concrete; During concrete vibrating, to vibrate from rubber mandrel both sides simultaneously, prevent rubber mandrel from moving left and right;
D. form removal: after concrete final set, exits rubber mandrel, extracts rubber mandrel out.
Adopt the present invention of technique scheme, compared with prior art, its beneficial effect is:
1. the prefabricated or concrete prefabricated body of wall of cast in situs finished product out, can meet design requirement;
2. with the concrete prefabricated body of wall of vertical plug hole, component gross weight is alleviated;
3. adopt rubber mandrel to reserve the vertical plug hole of body of wall, simple to operate, saving of labor, save time, economize material.
Accompanying drawing explanation
Fig. 1 is the reserved vertical pouring hole schematic diagram of the present invention;
Fig. 2 is reserved two the vertical pouring hole schematic diagrames of the present invention;
Fig. 3 is reserved three the vertical pouring hole schematic diagrames of the present invention;
In figure: 1-body of wall body, 2-rubber mandrel, 3-wall steel bar cage, 4-dry wall mould, 5-Cast-in-Situ Segment.
Detailed description of the invention
Below by way of accompanying drawing illustrated embodiment in detail the present invention is described in detail, the cited case only for technical scheme of the present invention is clearly described, and not limits the scope of the invention.
Embodiment 1:
See Fig. 1, the body of wall body 1 width 1600mm of concrete prefabricated shear wall, remove supporting leg, the Cast-in-Situ Segment width L=1200mm of bottom reserved steel bar overlapping part, the middle part of wall steel bar cage 3 by placement rubber mandrel 2, a reserved corresponding Cast-in-Situ Segment 5, the vertical pouring hole of up/down perforation.
Embodiment 2:
See Fig. 2, the body of wall body 1 width 2400mm of concrete prefabricated shear wall, remove supporting leg, the Cast-in-Situ Segment width L=2000mm of bottom reserved steel bar overlapping part, the middle part of wall steel bar cage 3 by placing two rubber mandrels 2 in a distance, reserved two corresponding Cast-in-Situ Segments 5, the vertical pouring hole of up/down perforation.
Embodiment 3:
See Fig. 3, the body of wall body 1 width 3200mm of concrete prefabricated shear wall, remove supporting leg, the Cast-in-Situ Segment width L=2800mm of bottom reserved steel bar overlapping part, three rubber mandrels 2 of certain distance are placed by interval in the middle part of wall steel bar cage 3, reserved three corresponding Cast-in-Situ Segments 5, the vertical pouring hole of up/down perforation.
Concrete prefabricated body of wall described in embodiment 1-3, build shaping as follows:
(1) enter mould: colligation wall steel bar cage 3 in dry wall mould 4, make the rubber mandrel 2 be applicable to the vertical plug hole diameter matches in body of wall body 1, length in advance; Then with wire saws, rubber mandrel 2 is penetrated in the good wall steel bar cage 3 of colligation, and make charging connector be in outer placement, avoid sharp-pointed hard object to puncture rubber mandrel 2;
(2) inflate: use air pump to inflate rubber mandrel 2, control monitoring air pressure with Pressure gauge during inflation, be inflated to the pressure of regulation;
(3) rubber mandrel 2 upper and lower, left and right, for preventing rubber mandrel 2 from floating, all be fixed by casting concrete: when building the concrete of body of wall body 1; During concrete vibrating, to vibrate from rubber mandrel 2 both sides simultaneously, prevent rubber mandrel 2 from moving left and right;
(4) form removal: after concrete final set (10 ~ 14h), exitted by rubber mandrel 2, extracts rubber mandrel 2 out, then completes the making of concrete prefabricated body of wall.

Claims (3)

1. a concrete prefabricated body of wall, comprises the Cast-in-Situ Segment of body of wall body, body of wall body bottom portion, it is characterized in that, in described body of wall body, corresponding described Cast-in-Situ Segment is provided with the vertical plug hole of up/down perforation.
2. concrete prefabricated body of wall according to claim 1, is characterized in that, described vertical plug hole is that one or interval arrange 2-3.
3. a placement method for the vertical plug hole of concrete prefabricated body of wall as claimed in claim 1, is characterized in that, carry out in the steps below:
A. mould is entered: make the inflating rubber core be applicable to the vertical plug hole diameter matches in body of wall, length, with wire saws, described rubber mandrel is penetrated in the good wall steel bar cage of colligation, and make charging connector be in outer placement, avoid sharp-pointed hard object to puncture rubber mandrel;
B. inflate: use air pump to inflate rubber mandrel, control monitoring air pressure with Pressure gauge during inflation, be inflated to the pressure of regulation;
Rubber mandrel upper and lower, left and right, for preventing rubber mandrel from floating, all be fixed by c. casting concrete: when building walls concrete; During concrete vibrating, to vibrate from rubber mandrel both sides simultaneously, prevent rubber mandrel from moving left and right;
D. form removal: after concrete final set, exits rubber mandrel, extracts rubber mandrel out.
CN201410575387.3A 2014-10-25 2014-10-25 Concrete prefabricated wall body and vertical pouring hole remaining method thereof Pending CN104260198A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410575387.3A CN104260198A (en) 2014-10-25 2014-10-25 Concrete prefabricated wall body and vertical pouring hole remaining method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410575387.3A CN104260198A (en) 2014-10-25 2014-10-25 Concrete prefabricated wall body and vertical pouring hole remaining method thereof

Publications (1)

Publication Number Publication Date
CN104260198A true CN104260198A (en) 2015-01-07

Family

ID=52151842

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410575387.3A Pending CN104260198A (en) 2014-10-25 2014-10-25 Concrete prefabricated wall body and vertical pouring hole remaining method thereof

Country Status (1)

Country Link
CN (1) CN104260198A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104847014A (en) * 2015-05-19 2015-08-19 杨文琳 Vertical connection structure for precast concrete shear walls and construction method
CN106426523A (en) * 2016-12-05 2017-02-22 南通联泷建筑材料有限公司 Multifunctional stereoscopic combined transformation die
CN109252619A (en) * 2017-07-14 2019-01-22 李聪 A kind of open tubular column and its construction method with top pillar
CN109281423A (en) * 2017-07-20 2019-01-29 李聪 A kind of Linear shear wall and its construction method with top pillar
CN109551625A (en) * 2018-11-16 2019-04-02 江苏新光环保工程有限公司 A kind of preparation method of nonmetallic acoustic board
CN110424566A (en) * 2019-07-17 2019-11-08 姚攀峰 Reinforced precast concrete wall panel, concrete walls, structural system and engineering method are poured in one kind
CN111877640A (en) * 2020-09-09 2020-11-03 河南工业大学 Assembled steel-concrete composite beam connected by perforated steel plates and manufacturing method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1349027A (en) * 2001-12-10 2002-05-15 邱则有 Hollow and steel bar reinforced concrete building member
CN2723599Y (en) * 2004-08-28 2005-09-07 青岛吉尔工程橡胶有限公司 Irregular rubber inflation core mold
WO2007008827A1 (en) * 2005-07-11 2007-01-18 Upkon Wall Systems, Inc. Cast wall with modular units
CN102425310A (en) * 2011-12-15 2012-04-25 中国二十二冶集团有限公司 Assembly-type residential shear wall structural wall body vertical connection construction method
CN202241547U (en) * 2011-10-27 2012-05-30 中国葛洲坝集团股份有限公司 Hollow mould for concrete precast plate girder

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1349027A (en) * 2001-12-10 2002-05-15 邱则有 Hollow and steel bar reinforced concrete building member
CN2723599Y (en) * 2004-08-28 2005-09-07 青岛吉尔工程橡胶有限公司 Irregular rubber inflation core mold
WO2007008827A1 (en) * 2005-07-11 2007-01-18 Upkon Wall Systems, Inc. Cast wall with modular units
CN202241547U (en) * 2011-10-27 2012-05-30 中国葛洲坝集团股份有限公司 Hollow mould for concrete precast plate girder
CN102425310A (en) * 2011-12-15 2012-04-25 中国二十二冶集团有限公司 Assembly-type residential shear wall structural wall body vertical connection construction method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104847014A (en) * 2015-05-19 2015-08-19 杨文琳 Vertical connection structure for precast concrete shear walls and construction method
CN106426523A (en) * 2016-12-05 2017-02-22 南通联泷建筑材料有限公司 Multifunctional stereoscopic combined transformation die
CN106426523B (en) * 2016-12-05 2019-05-10 南通联泷装配式建筑科技有限公司 A kind of multifunctional stereo combined transformation mold
CN109252619A (en) * 2017-07-14 2019-01-22 李聪 A kind of open tubular column and its construction method with top pillar
CN109281423A (en) * 2017-07-20 2019-01-29 李聪 A kind of Linear shear wall and its construction method with top pillar
CN109551625A (en) * 2018-11-16 2019-04-02 江苏新光环保工程有限公司 A kind of preparation method of nonmetallic acoustic board
CN110424566A (en) * 2019-07-17 2019-11-08 姚攀峰 Reinforced precast concrete wall panel, concrete walls, structural system and engineering method are poured in one kind
CN111877640A (en) * 2020-09-09 2020-11-03 河南工业大学 Assembled steel-concrete composite beam connected by perforated steel plates and manufacturing method

Similar Documents

Publication Publication Date Title
CN104260198A (en) Concrete prefabricated wall body and vertical pouring hole remaining method thereof
CN102121310B (en) Double column constructional template for large-section ultrahigh steel reinforced clear water concrete and construction method thereof
CN105201106B (en) Deformation joint double shear wall form formwork construction method
CN105216101B (en) A kind of self-propelled hydraulic T-type beam prefabricated form device and its release method
CN105696599A (en) Pressurizing grouting method utilizing air bag blockage device
CN107143136B (en) Aerated core chamber blocks rear pouring tape construction method
CN113235472A (en) Concrete placement platform truck is contained to apron
CN105298111A (en) Open tunnel lining construction template and construction device and construction method of same
CN106120584A (en) A kind of box culvert slip form construction device and method
CN106217639A (en) Ladder-type sleepers prefabricated construction device and method
CN105538488A (en) Pipe gallery box culvert pouring mould
CN109339089A (en) A kind of rim of a cup isolated footing cup core forming method
CN103114753A (en) Prestressed cylindrical silo with concealed anchoring end and processing method of stretch opening thereof
CN102744773A (en) Rapid forming mould for building block
CN109025293B (en) Thick plate side mold post-cast strip supporting method
CN108032413B (en) Forming die and forming method for slit type drain pipe
CN203066101U (en) Combined prefabricated column foundation core die
CN103628684B (en) A kind of construction method of simultaneously watering build floor and shear wall
CN202241547U (en) Hollow mould for concrete precast plate girder
CN202480227U (en) Gypsum block moulding machine adopting pneumatized rubber core-pulling core rod
CN206015540U (en) A kind of box culvert slip form construction device
CN202622993U (en) Side mold plugging device at hoop position of wall concrete prefabricated member
CN201873921U (en) Inflatable rubber mold for drainage ditch
CN104975878B (en) tunnel drainage ditch construction method
CN202685070U (en) Trapezoid inflating core die

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150107