CN104260198A - Concrete prefabricated wall body and vertical pouring hole remaining method thereof - Google Patents
Concrete prefabricated wall body and vertical pouring hole remaining method thereof Download PDFInfo
- Publication number
- CN104260198A CN104260198A CN201410575387.3A CN201410575387A CN104260198A CN 104260198 A CN104260198 A CN 104260198A CN 201410575387 A CN201410575387 A CN 201410575387A CN 104260198 A CN104260198 A CN 104260198A
- Authority
- CN
- China
- Prior art keywords
- concrete
- wall body
- wall
- core mold
- rubber core
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/02—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Moulds, Cores, Or Mandrels (AREA)
Abstract
The invention relates to a concrete prefabricated wall body and a vertical pouring hole remaining method thereof. A through vertical pouring hole is formed in the concrete prefabricated wall body corresponding to a cast-in-site section. The vertical pouring hole remaining method comprises producing an inflatable rubber core mold which is matched with the vertical pouring hole in diameter and length, drawing the rubber core mold to penetrate a tied wall body reinforced cage through a rope and enabling an inflatable nozzle to be placed externally; inflating the rubber core mold through an air pump, controlling the monitoring air pressure trough a pressure gauge during inflation and inflating to the specified pressure; fixing the upper side, the lower side, the left side and the right side of the rubber core mold when wall body concrete is poured; performing vibration from the bilateral sides of the rubber core mold simultaneously during concrete vibration to prevent the rubber core mold from moving laterally; deflating the rubber core mold and pulling out the rubber core mold after the concrete is finally set. According to the concrete prefabricated wall body, the design requirements can be met, the total weight of the wall body can be reduced, the wall body vertical pouring hole is reserved in the rubber core mold, the operation is simple, and the labor, the time and materials are saved.
Description
Technical field
The present invention relates to concrete prefabricated shear wall, specifically a kind of concrete prefabricated body of wall and vertical pouring hole placement method thereof.
Background technology
At present, when after the installation of precast shear wall body of wall, bottom reserved steel bar overlapping part concrete cast-in-situ section is built, the bubble of generation not easily discharges, and there is the shortcoming that speed of application is slow, quality is wayward, be difficult to guarantee cast-in-place position concrete turgor bottom body of wall.
Summary of the invention
The present invention is intended to solve existing prefabricated shear wall body and installs the problems referred to above existed, and provides a kind of and be convenient to quality control, is convenient to concrete prefabricated body of wall that the later stage builds and vertical pouring hole placement method thereof.
The technical scheme that the present invention solves the employing of described problem is:
A kind of concrete prefabricated body of wall, comprise the Cast-in-Situ Segment of body of wall body, body of wall body bottom portion, in described body of wall body, corresponding described Cast-in-Situ Segment is provided with the vertical plug hole of up/down perforation.
Further, described vertical plug hole is that one or interval arrange 2-3.
The placement method of the vertical plug hole of above-mentioned concrete prefabricated body of wall, carries out in the steps below:
A. mould is entered: make the inflating rubber core be applicable to the vertical plug hole diameter matches in body of wall, length, with wire saws, described rubber mandrel is penetrated in the good wall steel bar cage of colligation, and make charging connector be in outer placement, avoid sharp-pointed hard object to puncture rubber mandrel;
B. inflate: use air pump to inflate rubber mandrel, control monitoring air pressure with Pressure gauge during inflation, be inflated to the pressure of regulation;
Rubber mandrel upper and lower, left and right, for preventing rubber mandrel from floating, all be fixed by c. casting concrete: when building walls concrete; During concrete vibrating, to vibrate from rubber mandrel both sides simultaneously, prevent rubber mandrel from moving left and right;
D. form removal: after concrete final set, exits rubber mandrel, extracts rubber mandrel out.
Adopt the present invention of technique scheme, compared with prior art, its beneficial effect is:
1. the prefabricated or concrete prefabricated body of wall of cast in situs finished product out, can meet design requirement;
2. with the concrete prefabricated body of wall of vertical plug hole, component gross weight is alleviated;
3. adopt rubber mandrel to reserve the vertical plug hole of body of wall, simple to operate, saving of labor, save time, economize material.
Accompanying drawing explanation
Fig. 1 is the reserved vertical pouring hole schematic diagram of the present invention;
Fig. 2 is reserved two the vertical pouring hole schematic diagrames of the present invention;
Fig. 3 is reserved three the vertical pouring hole schematic diagrames of the present invention;
In figure: 1-body of wall body, 2-rubber mandrel, 3-wall steel bar cage, 4-dry wall mould, 5-Cast-in-Situ Segment.
Detailed description of the invention
Below by way of accompanying drawing illustrated embodiment in detail the present invention is described in detail, the cited case only for technical scheme of the present invention is clearly described, and not limits the scope of the invention.
Embodiment 1:
See Fig. 1, the body of wall body 1 width 1600mm of concrete prefabricated shear wall, remove supporting leg, the Cast-in-Situ Segment width L=1200mm of bottom reserved steel bar overlapping part, the middle part of wall steel bar cage 3 by placement rubber mandrel 2, a reserved corresponding Cast-in-Situ Segment 5, the vertical pouring hole of up/down perforation.
Embodiment 2:
See Fig. 2, the body of wall body 1 width 2400mm of concrete prefabricated shear wall, remove supporting leg, the Cast-in-Situ Segment width L=2000mm of bottom reserved steel bar overlapping part, the middle part of wall steel bar cage 3 by placing two rubber mandrels 2 in a distance, reserved two corresponding Cast-in-Situ Segments 5, the vertical pouring hole of up/down perforation.
Embodiment 3:
See Fig. 3, the body of wall body 1 width 3200mm of concrete prefabricated shear wall, remove supporting leg, the Cast-in-Situ Segment width L=2800mm of bottom reserved steel bar overlapping part, three rubber mandrels 2 of certain distance are placed by interval in the middle part of wall steel bar cage 3, reserved three corresponding Cast-in-Situ Segments 5, the vertical pouring hole of up/down perforation.
Concrete prefabricated body of wall described in embodiment 1-3, build shaping as follows:
(1) enter mould: colligation wall steel bar cage 3 in dry wall mould 4, make the rubber mandrel 2 be applicable to the vertical plug hole diameter matches in body of wall body 1, length in advance; Then with wire saws, rubber mandrel 2 is penetrated in the good wall steel bar cage 3 of colligation, and make charging connector be in outer placement, avoid sharp-pointed hard object to puncture rubber mandrel 2;
(2) inflate: use air pump to inflate rubber mandrel 2, control monitoring air pressure with Pressure gauge during inflation, be inflated to the pressure of regulation;
(3) rubber mandrel 2 upper and lower, left and right, for preventing rubber mandrel 2 from floating, all be fixed by casting concrete: when building the concrete of body of wall body 1; During concrete vibrating, to vibrate from rubber mandrel 2 both sides simultaneously, prevent rubber mandrel 2 from moving left and right;
(4) form removal: after concrete final set (10 ~ 14h), exitted by rubber mandrel 2, extracts rubber mandrel 2 out, then completes the making of concrete prefabricated body of wall.
Claims (3)
1. a concrete prefabricated body of wall, comprises the Cast-in-Situ Segment of body of wall body, body of wall body bottom portion, it is characterized in that, in described body of wall body, corresponding described Cast-in-Situ Segment is provided with the vertical plug hole of up/down perforation.
2. concrete prefabricated body of wall according to claim 1, is characterized in that, described vertical plug hole is that one or interval arrange 2-3.
3. a placement method for the vertical plug hole of concrete prefabricated body of wall as claimed in claim 1, is characterized in that, carry out in the steps below:
A. mould is entered: make the inflating rubber core be applicable to the vertical plug hole diameter matches in body of wall, length, with wire saws, described rubber mandrel is penetrated in the good wall steel bar cage of colligation, and make charging connector be in outer placement, avoid sharp-pointed hard object to puncture rubber mandrel;
B. inflate: use air pump to inflate rubber mandrel, control monitoring air pressure with Pressure gauge during inflation, be inflated to the pressure of regulation;
Rubber mandrel upper and lower, left and right, for preventing rubber mandrel from floating, all be fixed by c. casting concrete: when building walls concrete; During concrete vibrating, to vibrate from rubber mandrel both sides simultaneously, prevent rubber mandrel from moving left and right;
D. form removal: after concrete final set, exits rubber mandrel, extracts rubber mandrel out.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410575387.3A CN104260198A (en) | 2014-10-25 | 2014-10-25 | Concrete prefabricated wall body and vertical pouring hole remaining method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410575387.3A CN104260198A (en) | 2014-10-25 | 2014-10-25 | Concrete prefabricated wall body and vertical pouring hole remaining method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104260198A true CN104260198A (en) | 2015-01-07 |
Family
ID=52151842
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410575387.3A Pending CN104260198A (en) | 2014-10-25 | 2014-10-25 | Concrete prefabricated wall body and vertical pouring hole remaining method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104260198A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104847014A (en) * | 2015-05-19 | 2015-08-19 | 杨文琳 | Vertical connection structure for precast concrete shear walls and construction method |
CN106426523A (en) * | 2016-12-05 | 2017-02-22 | 南通联泷建筑材料有限公司 | Multifunctional stereoscopic combined transformation die |
CN109252619A (en) * | 2017-07-14 | 2019-01-22 | 李聪 | A kind of open tubular column and its construction method with top pillar |
CN109281423A (en) * | 2017-07-20 | 2019-01-29 | 李聪 | A kind of Linear shear wall and its construction method with top pillar |
CN109551625A (en) * | 2018-11-16 | 2019-04-02 | 江苏新光环保工程有限公司 | A kind of preparation method of nonmetallic acoustic board |
CN110424566A (en) * | 2019-07-17 | 2019-11-08 | 姚攀峰 | Reinforced precast concrete wall panel, concrete walls, structural system and engineering method are poured in one kind |
CN111877640A (en) * | 2020-09-09 | 2020-11-03 | 河南工业大学 | Assembled steel-concrete composite beam connected by perforated steel plates and manufacturing method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1349027A (en) * | 2001-12-10 | 2002-05-15 | 邱则有 | Hollow and steel bar reinforced concrete building member |
CN2723599Y (en) * | 2004-08-28 | 2005-09-07 | 青岛吉尔工程橡胶有限公司 | Irregular rubber inflation core mold |
WO2007008827A1 (en) * | 2005-07-11 | 2007-01-18 | Upkon Wall Systems, Inc. | Cast wall with modular units |
CN102425310A (en) * | 2011-12-15 | 2012-04-25 | 中国二十二冶集团有限公司 | Assembly-type residential shear wall structural wall body vertical connection construction method |
CN202241547U (en) * | 2011-10-27 | 2012-05-30 | 中国葛洲坝集团股份有限公司 | Hollow mould for concrete precast plate girder |
-
2014
- 2014-10-25 CN CN201410575387.3A patent/CN104260198A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1349027A (en) * | 2001-12-10 | 2002-05-15 | 邱则有 | Hollow and steel bar reinforced concrete building member |
CN2723599Y (en) * | 2004-08-28 | 2005-09-07 | 青岛吉尔工程橡胶有限公司 | Irregular rubber inflation core mold |
WO2007008827A1 (en) * | 2005-07-11 | 2007-01-18 | Upkon Wall Systems, Inc. | Cast wall with modular units |
CN202241547U (en) * | 2011-10-27 | 2012-05-30 | 中国葛洲坝集团股份有限公司 | Hollow mould for concrete precast plate girder |
CN102425310A (en) * | 2011-12-15 | 2012-04-25 | 中国二十二冶集团有限公司 | Assembly-type residential shear wall structural wall body vertical connection construction method |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104847014A (en) * | 2015-05-19 | 2015-08-19 | 杨文琳 | Vertical connection structure for precast concrete shear walls and construction method |
CN106426523A (en) * | 2016-12-05 | 2017-02-22 | 南通联泷建筑材料有限公司 | Multifunctional stereoscopic combined transformation die |
CN106426523B (en) * | 2016-12-05 | 2019-05-10 | 南通联泷装配式建筑科技有限公司 | A kind of multifunctional stereo combined transformation mold |
CN109252619A (en) * | 2017-07-14 | 2019-01-22 | 李聪 | A kind of open tubular column and its construction method with top pillar |
CN109281423A (en) * | 2017-07-20 | 2019-01-29 | 李聪 | A kind of Linear shear wall and its construction method with top pillar |
CN109551625A (en) * | 2018-11-16 | 2019-04-02 | 江苏新光环保工程有限公司 | A kind of preparation method of nonmetallic acoustic board |
CN110424566A (en) * | 2019-07-17 | 2019-11-08 | 姚攀峰 | Reinforced precast concrete wall panel, concrete walls, structural system and engineering method are poured in one kind |
CN111877640A (en) * | 2020-09-09 | 2020-11-03 | 河南工业大学 | Assembled steel-concrete composite beam connected by perforated steel plates and manufacturing method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104260198A (en) | Concrete prefabricated wall body and vertical pouring hole remaining method thereof | |
CN102121310B (en) | Double column constructional template for large-section ultrahigh steel reinforced clear water concrete and construction method thereof | |
CN105201106B (en) | Deformation joint double shear wall form formwork construction method | |
CN105216101B (en) | A kind of self-propelled hydraulic T-type beam prefabricated form device and its release method | |
CN105696599A (en) | Pressurizing grouting method utilizing air bag blockage device | |
CN107143136B (en) | Aerated core chamber blocks rear pouring tape construction method | |
CN113235472A (en) | Concrete placement platform truck is contained to apron | |
CN105298111A (en) | Open tunnel lining construction template and construction device and construction method of same | |
CN106120584A (en) | A kind of box culvert slip form construction device and method | |
CN106217639A (en) | Ladder-type sleepers prefabricated construction device and method | |
CN105538488A (en) | Pipe gallery box culvert pouring mould | |
CN109339089A (en) | A kind of rim of a cup isolated footing cup core forming method | |
CN103114753A (en) | Prestressed cylindrical silo with concealed anchoring end and processing method of stretch opening thereof | |
CN102744773A (en) | Rapid forming mould for building block | |
CN109025293B (en) | Thick plate side mold post-cast strip supporting method | |
CN108032413B (en) | Forming die and forming method for slit type drain pipe | |
CN203066101U (en) | Combined prefabricated column foundation core die | |
CN103628684B (en) | A kind of construction method of simultaneously watering build floor and shear wall | |
CN202241547U (en) | Hollow mould for concrete precast plate girder | |
CN202480227U (en) | Gypsum block moulding machine adopting pneumatized rubber core-pulling core rod | |
CN206015540U (en) | A kind of box culvert slip form construction device | |
CN202622993U (en) | Side mold plugging device at hoop position of wall concrete prefabricated member | |
CN201873921U (en) | Inflatable rubber mold for drainage ditch | |
CN104975878B (en) | tunnel drainage ditch construction method | |
CN202685070U (en) | Trapezoid inflating core die |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150107 |