CN104249239A - Manufacture method of inner sleeve of lime sleeve kiln - Google Patents

Manufacture method of inner sleeve of lime sleeve kiln Download PDF

Info

Publication number
CN104249239A
CN104249239A CN201310264859.9A CN201310264859A CN104249239A CN 104249239 A CN104249239 A CN 104249239A CN 201310264859 A CN201310264859 A CN 201310264859A CN 104249239 A CN104249239 A CN 104249239A
Authority
CN
China
Prior art keywords
inner sleeve
welding
sleeve
assembling
cylindrical shell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310264859.9A
Other languages
Chinese (zh)
Other versions
CN104249239B (en
Inventor
张丹
符根旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Metallurgy Engineering Co Ltd
Original Assignee
Shanghai Baoye Construction Industrial Furnace Engineering & Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Construction Industrial Furnace Engineering & Technology Co Ltd filed Critical Shanghai Baoye Construction Industrial Furnace Engineering & Technology Co Ltd
Priority to CN201310264859.9A priority Critical patent/CN104249239B/en
Publication of CN104249239A publication Critical patent/CN104249239A/en
Application granted granted Critical
Publication of CN104249239B publication Critical patent/CN104249239B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2/00Lime, magnesia or dolomite
    • C04B2/10Preheating, burning calcining or cooling
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P40/00Technologies relating to the processing of minerals
    • Y02P40/40Production or processing of lime, e.g. limestone regeneration of lime in pulp and sugar mills

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Furnace Housings, Linings, Walls, And Ceilings (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The invention relates to lime sleeve kilns, in particular to a manufacture method of an inner sleeve of a lime sleeve kiln. The manufacture method comprises the following steps: firstly, previous preparation: compiling manufacture processes and schemes according to drawings, manufacture standards and requirements, setting types of components, such as flanges, so as to determine reasonable plate order sizes, secondly, blanking: determining blanking sizes, milling edges of jointed positions of steel plates through an edge milling machine after multiple flame numerical control cutting is performed, thirdly, barrel rolling: performing head pressing through a special head pressing template, and then performing tube rolling operation through a hoist with a special jig, and fourthly: assembly of the inner sleeve: performing assembly of the lower part of a lower section of the inner sleeve, the assembly of the upper part of the lower section of the inner sleeve, the assembly of the middle section of the inner sleeve and the assembly of the upper section of the inner sleeve, performing welding correction after the assembly of each part, and then performing sand blasting and painting numbers and bearing lines. The method ensures that users can directly know difficulties and certain key control points in manufacture, thereby guaranteeing the manufacture quality of the inner sleeve of the lime sleeve kiln.

Description

The preparation method of sleeve lime kiln inner sleeve
Technical field
The present invention relates to the core position equipment that sleeve lime kiln is produced, particularly relate to the preparation method of sleeve lime kiln inner sleeve non-standard equipment.
Background technology
Sleeve kiln have employed the special construction of the bitubular inside and outside kiln shell and inner sleeve, makes raw material and flow calcination process to carry out in a kiln body, and floor space is fewer than two thorax kiln, and the activity of lime of production is high, and raw burn and burn-off phenomenon less.Bed rearrangement kiln adopts the mode recycling heat energy such as recyclegas, high-temp waste gas heat exchange, so the energy consumption needed for product significantly reduces, is a kind of energy-saving limekiln.Inner sleeve is in the core position of this sleeve kiln, and be the container of limekiln calcining, it makes the quality of quality, directly affects the quality of lime and the service life of inner sleeve.
The content that sleeve lime kiln inner sleeve makes contains and is welded H profile steel, non-standard equipment making etc., because inner sleeve is positioned at the high temperature position of lime calcining, play the effect that directing gas flow carries out heat exchange, version is complicated, and inner sleeve design technology has air-tightness requirement, this proposes high-level requirement to the making of inner sleeve.
Summary of the invention
The present invention is intended to the above-mentioned difficult problem solving prior art, provides a kind of preparation method of sleeve lime kiln inner sleeve, and the present invention makes user can be directly acquainted with difficult point and some CCPs of existence in making, thus ensures the quality that inner sleeve for lime kiln makes.
The present invention is achieved in that a kind of preparation method of sleeve lime kiln inner sleeve, and it comprises the steps:
Step one, early-stage preparations:
According to drawing and production standard and requirement establishment manufacture craft, scheme; Typesetting is carried out to components such as flanges, determines rational sheet material order size;
Step 2, blanking:
Determine through numerical control multiple tracks gas flame cuttiug after blank size, use edge milling machines to the groove milling limit of steel plate joint;
Step 3, shell rolling:
With special pressure head template pressure head, more special frock is coordinated to carry out pipe crimping operation with crane;
Step 4, inner sleeve assembles:
It comprises pars infrasegmentalis assembling under inner sleeve, the assembling of inner sleeve lower section upper portion, the assembling of inner sleeve stage casing and inner sleeve epimere and assembles four parts; Every part has been assembled rear welding and has been corrected, then sandblasting paint rhumb line delivering.
The preparation method of described sleeve lime kiln inner sleeve, described step 2 comprises the following steps:
2.1, determine blanking accurate dimension, the wide and long deviation of plate of plate is ± 3mm, and diagonal deviation is 0-2mm;
2.2, the blanking of numerical control multiple tracks flame cutting machine is adopted;
2.3, utilize edge milling machines by bevel for welding machine-shaping;
3. the preparation method of sleeve lime kiln inner sleeve according to claim 1, is characterized in that: described step 3 comprises the following steps:
3.1, pressure head: select material to be that radian plate that Q345B, t=25mm are thick is as special pressure head template;
3.2, shell rolling: adopt crane to coordinate special frock to carry out pipe crimping operation, after roll-forming, joint spot welding is fixed;
The preparation method of described sleeve lime kiln inner sleeve, described step 4 comprises following process:
4.1, pars infrasegmentalis assembling under inner sleeve: first inner barrel and shrouding spot welding are fixed, and interim jig is set in inner barrel upper end, circumferentially eight equal portions are arranged, then four suspension centres be set on outer cylinder body and winched to directly over inner barrel with four isometric steel wire ropes, then coordinating crowbar to attach it to design height;
4.1.1, welding: the outside stiffener of cylindrical shell and cylindrical shell adopt intermittent weld, and consistent and uniform is answered at fusion length and interval, adopts two people to be symmetrically welded when cylindrical shell and seal plate welding, and in, welds outward simultaneously;
4.2, inner sleeve lower section upper portion assembling: respectively monomer assembling is carried out to upper and lower flange seat, by superimposed for two flange seats assembled, insertion tubing string is also in place, with driving, upper flange seat is promoted again, according to the center line put well in advance and position line, upper and lower flange seat is positioned, be connected and fixed by temporary support;
4.2.1, weld: cylindrical shell welds with flange seat, avoids vertical position welding and overhead welding;
4.2.2, correct: after up and down the erection welding of flange base monomer completes, carry out flame straightening, check its flatness with guiding ruler and steel ruler to the flange face of flange seat, control errors is at ± 2mm; Set up temporary support between inner sleeve lower section upper portion 7 endowel, after integral solder completes, coordinate chain block to adjust the perpendicularity of 7 tube banks with theodolite, control errors is at ± 2mm; Simultaneously make the center of circle at upper flange seat center and by the overall concentricity of plumb bob adjustment inner sleeve lower section upper portion structure, control errors is at ± 2mm.
4.3, inner sleeve stage casing urceolus assembling: in conjunction with the design feature in stage casing, be divided into by urceolus upper, middle and lower three to save monomer assembled, carries and holds in the palm on the basis of turn-taking making full use of cylindrical shell, set up interim flange reinforce in the end often saving cylindrical shell;
4.3.1, welding: cylindrical shell joint offers internal groove, three joint cylindrical shell monomers are assembled complete after, inner barrel adopts CO 2gas shielded arc welding welds; After cylindrical shell exterior carbon plane back chipping, gas protects weldering bottoming, submerged-arc welding capping;
4.4, inner sleeve stage casing inner core assembling: due to the particularity of stage casing inner core, be divided into 7 parts to carry out fissure of displacement assembling according to baffle arrangement inner core;
4.4.1, weld: interior cylinder adopts CO 2gas shielded arc welding welds;
4.5, inner sleeve epimere assembling: inner sleeve epimere version is the same with inner sleeve stage casing, therefore does not describe in detail;
4.6, air-tight test: leakage inspection is carried out to all welding points and connecting portion with hairbrush, suds, require to keep 0.01Mpa pressure, it is qualified that the maximum pressure declined in 30 minutes is less than 0.001MPa pressure;
4.7, sandblasting paint: inner sleeve for lime kiln adopts hand cleaning, and barrel outer surface process should perform by standard GB/T 8923-88 " before application steel surface rusting grade and derusting grade ", reaches more than St2 level (containing); Inner barrel forbids oil paint coating, and has not allowed the impurity such as welding slag, crator, ensures interior smooth; Coating uniform should be ensured, without obvious elephant skin, stream pendant, pinprick and bubble etc. during barrel outer surface application;
4.8, numbering packaging: inner sleeve outer cylinder body makes axis markers according to drawing.
The preparation method of described sleeve lime kiln inner sleeve, in described step 2 when inner sleeve hypomere flange and shrouding blanking, the manhole on inner sleeve hypomere flange and shrouding and centre bore complete by Numerical control cutting; Flange and shrouding adopt semi-automatic numerical control cutting machine to cut formation 7 tube bank hole after assembled welding completes, prevent first perforate more assembled welding cause pitch-row deviation comparatively large, thus the assembly quality of impact tube bank and efficiency;
The preparation method of described sleeve lime kiln inner sleeve, when in described step 4, under inner sleeve, pars infrasegmentalis assembles, for improving efficiency of assembling, overall assembling again after being divided into two parts to complete respectively inner sleeve hypomere bottom, carry out levelling to assembly platform before overall assembling, flatness controls at ± 2mm; Adopt two people to be symmetrically welded when cylindrical shell and seal plate welding, in one, one welds outward simultaneously;
The preparation method of described sleeve lime kiln inner sleeve, in described step 4 during the assembling of inner sleeve lower section upper portion, in order to ensure the perpendicularity of the overall concentricity of inner sleeve lower section upper portion structure and 7 endowels, according to technological requirement, temporary support is set up before welding, to reach the object controlling welding deformation between 7 endowels;
The preparation method of described sleeve lime kiln inner sleeve, in described step 4 during the assembling of inner sleeve stage casing urceolus, inner sleeve urceolus is in conjunction with own structural characteristics, be divided into upper, middle and lower three to save cylindrical shell monomer is assembled complete after integral assembling again, within cylindrical shell joint faulting of slab ends control 2mm, ovality controls at ± 6mm;
The preparation method of described sleeve lime kiln inner sleeve, in described step 4 during the assembling of inner sleeve stage casing inner core, is divided into 7 parts to carry out fissure of displacement assembling according to baffle arrangement inner core, avoids cross weld seam;
The present invention adopts special pressure head template pressure head, then coordinates pipe crimping operation by special frock, ensure that the ovality of cylindrical shell entirety; The assembly technology that employing cylindrical shell monomer assembling etc. are scientific and reasonable, improves efficiency and the precision of assembling; Adopt special welding procedure to reduce welding deformation, ensure inner sleeve integral manufacturing precision and overall concentricity; Adopt the assembling of the inner core segmentation fissure of displacement, avoid cross crotch, improve inner sleeve total quality and life-span, thus ensure that the workmanship of sleeve lime kiln inner sleeve.
Detailed description of the invention
Provide the specific embodiment of the present invention below
A preparation method for sleeve lime kiln inner sleeve, it comprises subordinate's step:
Step one, early-stage preparations:
According to drawing and production standard and requirement establishment manufacture craft, scheme; Typesetting is carried out to components such as flanges, determines rational sheet material order size;
Step 2, blanking:
Determine through numerical control multiple tracks gas flame cuttiug after blank size, use edge milling machines to the groove milling limit of steel plate joint;
Step 3, shell rolling:
With special pressure head template pressure head, more special frock is coordinated to carry out pipe crimping operation with crane;
Step 4, inner sleeve assembles:
It comprises pars infrasegmentalis assembling under inner sleeve, the assembling of inner sleeve lower section upper portion, the assembling of inner sleeve stage casing and inner sleeve epimere and assembles four parts; Every part has been assembled rear welding and has been corrected, then sandblasting paint rhumb line delivering.
2. the preparation method of sleeve lime kiln inner sleeve according to claim 1, is characterized in that: described step 2 comprises the following steps:
2.1, determine blanking accurate dimension, the wide and long deviation of plate of plate is ± 3mm, and diagonal deviation is 0-2mm;
2.2, the blanking of numerical control multiple tracks flame cutting machine is adopted;
2.3, utilize edge milling machines by bevel for welding machine-shaping;
3. the preparation method of sleeve lime kiln inner sleeve according to claim 1, is characterized in that: described step 3 comprises the following steps:
3.1, pressure head: select material to be that radian plate that Q345B, t=25mm are thick is as special pressure head template;
3.2, shell rolling: adopt crane to coordinate special frock to carry out pipe crimping operation, after roll-forming, joint spot welding is fixed;
4. the preparation method of sleeve lime kiln inner sleeve according to claim 1, is characterized in that: described step 4 comprises following process:
4.1, pars infrasegmentalis assembling under inner sleeve: first inner barrel and shrouding spot welding are fixed, and interim jig is set in inner barrel upper end, circumferentially eight equal portions are arranged, then four suspension centres be set on outer cylinder body and winched to directly over inner barrel with four isometric steel wire ropes, then coordinating crowbar to attach it to design height;
4.1.1, welding: the outside stiffener of cylindrical shell and cylindrical shell adopt intermittent weld, and consistent and uniform is answered at fusion length and interval, adopts two people to be symmetrically welded when cylindrical shell and seal plate welding, and in, welds outward simultaneously;
4.2, inner sleeve lower section upper portion assembling: respectively monomer assembling is carried out to upper and lower flange seat, by superimposed for two flange seats assembled, insertion tubing string is also in place, with driving, upper flange seat is promoted again, according to the center line put well in advance and position line, upper and lower flange seat is positioned, be connected and fixed by temporary support;
4.2.1, weld: cylindrical shell welds with flange seat, avoids vertical position welding and overhead welding;
4.2.2, correct: after up and down the erection welding of flange base monomer completes, carry out flame straightening, check its flatness with guiding ruler and steel ruler to the flange face of flange seat, control errors is at ± 2mm; Set up temporary support between inner sleeve lower section upper portion 7 endowel, after integral solder completes, coordinate chain block to adjust the perpendicularity of 7 tube banks with theodolite, control errors is at ± 2mm; Simultaneously make the center of circle at upper flange seat center and by the overall concentricity of plumb bob adjustment inner sleeve lower section upper portion structure, control errors is at ± 2mm.
4.3, inner sleeve stage casing urceolus assembling: in conjunction with the design feature in stage casing, be divided into by urceolus upper, middle and lower three to save monomer assembled, carries and holds in the palm on the basis of turn-taking making full use of cylindrical shell, set up interim flange reinforce in the end often saving cylindrical shell;
4.3.1, welding: cylindrical shell joint offers internal groove, three joint cylindrical shell monomers are assembled complete after, inner barrel adopts CO 2gas shielded arc welding welds; After cylindrical shell exterior carbon plane back chipping, gas protects weldering bottoming, submerged-arc welding capping;
4.4, inner sleeve stage casing inner core assembling: due to the particularity of stage casing inner core, be divided into 7 parts to carry out fissure of displacement assembling according to baffle arrangement inner core;
4.4.1, weld: interior cylinder adopts CO 2gas shielded arc welding welds;
4.5, inner sleeve epimere assembling: inner sleeve epimere version is the same with inner sleeve stage casing, therefore does not describe in detail;
4.6, air-tight test: leakage inspection is carried out to all welding points and connecting portion with hairbrush, suds, require to keep 0.01Mpa pressure, it is qualified that the maximum pressure declined in 30 minutes is less than 0.001MPa pressure;
4.7, sandblasting paint: inner sleeve for lime kiln adopts hand cleaning, and barrel outer surface process should perform by standard GB/T 8923-88 " before application steel surface rusting grade and derusting grade ", reaches more than St2 level (containing); Inner barrel forbids oil paint coating, and has not allowed the impurity such as welding slag, crator, ensures interior smooth; Coating uniform should be ensured, without obvious elephant skin, stream pendant, pinprick and bubble etc. during barrel outer surface application;
4.8, numbering packaging: inner sleeve outer cylinder body makes axis markers, cylindrical shell non-packed according to drawing.

Claims (9)

1. a preparation method for sleeve lime kiln inner sleeve, it comprises the steps:
Step one, early-stage preparations:
According to drawing and production standard and requirement establishment manufacture craft, scheme; Typesetting is carried out to components such as flanges, determines rational sheet material order size;
Step 2, blanking:
Determine through numerical control multiple tracks gas flame cuttiug after blank size, use edge milling machines to the groove milling limit of steel plate joint;
Step 3, shell rolling:
With special pressure head template pressure head, more special frock is coordinated to carry out pipe crimping operation with crane;
Step 4, inner sleeve assembles:
It comprises pars infrasegmentalis assembling under inner sleeve, the assembling of inner sleeve lower section upper portion, the assembling of inner sleeve stage casing and inner sleeve epimere and assembles four parts; Every part has been assembled rear welding and has been corrected, and then sandblasting paint rhumb line can complete the making of inner sleeve.
2. the preparation method of sleeve lime kiln inner sleeve according to claim 1, is characterized in that: described step 2 comprises the following steps:
2.1, determine blanking accurate dimension, the wide and long deviation of plate of plate is ± 3mm, and diagonal deviation is 0-2mm;
2.2, the blanking of numerical control multiple tracks flame cutting machine is adopted;
2.3, utilize edge milling machines by bevel for welding machine-shaping.
3. the preparation method of sleeve lime kiln inner sleeve according to claim 1, is characterized in that: described step 3 comprises the following steps:
3.1, pressure head: select material to be that radian plate that Q345B, t=25mm are thick is as special pressure head template;
3.2, shell rolling: adopt crane to coordinate special frock to carry out pipe crimping operation, after roll-forming, joint spot welding is fixed.
4. the preparation method of sleeve lime kiln inner sleeve according to claim 1, is characterized in that: described step 4 comprises following process:
4.1, pars infrasegmentalis assembling under inner sleeve: first inner barrel and shrouding spot welding are fixed, and interim jig is set in inner barrel upper end, circumferentially eight equal portions are arranged, then four suspension centres be set on outer cylinder body and winched to directly over inner barrel with four isometric steel wire ropes, then coordinating crowbar to attach it to design height;
4.11, weld: the outside stiffener of cylindrical shell and cylindrical shell adopt intermittent weld, and consistent and uniform is answered at fusion length and interval, adopts two people to be symmetrically welded when cylindrical shell and seal plate welding, and in one, one welds outward simultaneously;
4.2, inner sleeve lower section upper portion assembling: respectively monomer assembling is carried out to upper and lower flange seat, by superimposed for two flange seats assembled, insertion tubing string is also in place, with driving, upper flange seat is promoted again, according to the center line put well in advance and position line, upper and lower flange seat is positioned, be connected and fixed by temporary support;
4.2.1, weld: cylindrical shell welds with flange seat, avoids vertical position welding and overhead welding;
4.2.2, correct: after up and down the erection welding of flange base monomer completes, carry out flame straightening, check its flatness with guiding ruler and steel ruler to the flange face of flange seat, control errors is at ± 2mm; Set up temporary support between inner sleeve lower section upper portion seven endowel, after integral solder completes, coordinate chain block to adjust the perpendicularity of seven tube banks with theodolite, control errors is at ± 2mm; Simultaneously make the center of circle at upper flange seat center and by the overall concentricity of plumb bob adjustment inner sleeve lower section upper portion structure, control errors is at ± 2mm;
4.3, inner sleeve stage casing urceolus assembling: in conjunction with the design feature in stage casing, be divided into by urceolus upper, middle and lower three to save monomer assembled, carries and holds in the palm on the basis of turn-taking making full use of cylindrical shell, set up interim flange reinforce in the end often saving cylindrical shell;
4.3.1, welding: cylindrical shell joint offers internal groove, three joint cylindrical shell monomers are assembled complete after, inner barrel adopts CO 2gas shielded arc welding welds; After cylindrical shell exterior carbon plane back chipping, gas protects weldering bottoming, submerged-arc welding capping;
4.4, inner sleeve stage casing inner core assembling: due to the particularity of stage casing inner core, inner core is carried out fissure of displacement assembling according to baffle arrangement;
4.41, weld: interior cylinder adopts CO 2gas shielded arc welding welds;
4.5, inner sleeve epimere assembling: inner sleeve epimere version is the same with inner sleeve stage casing;
4.6, air-tight test: leakage inspection is carried out to all welding points and connecting portion with hairbrush, suds, require to keep 0.01Mpa pressure, it is qualified that the maximum pressure declined in 30 minutes is less than 0.001MPa pressure;
4.7, sandblasting paint: inner sleeve for lime kiln adopts hand cleaning, and barrel outer surface process should perform by standard GB/T 8923-88 " before application steel surface rusting grade and derusting grade ", reaches St2 level or more; Inner barrel forbids oil paint coating, and has not allowed the impurity such as welding slag, crator, ensures interior smooth; Coating uniform should be ensured, without obvious elephant skin, stream pendant, pinprick and bubble etc. during barrel outer surface application;
4.8, numbering packaging: inner sleeve outer cylinder body makes axis markers according to drawing.
5. the preparation method of sleeve lime kiln inner sleeve according to claim 1 and 2, is characterized in that, described step 2 comprises manhole on inner sleeve hypomere flange and shrouding and centre bore completes by Numerical control cutting; Flange and shrouding adopt semi-automatic numerical control cutting machine to cut formation 7 tube bank hole after assembled welding completes, prevent first perforate more assembled welding cause pitch-row deviation comparatively large, thus the assembly quality of impact tube bank and efficiency.
6. the preparation method of the sleeve lime kiln inner sleeve according to claim 1 or 4, it is characterized in that, in described step 4, for improving efficiency of assembling, overall assembling again after being divided into two parts to complete respectively inner sleeve hypomere bottom, carry out levelling to assembly platform before overall assembling, flatness controls at ± 2mm; Adopt two people to be symmetrically welded when cylindrical shell and seal plate welding, in one, one welds outward simultaneously.
7. the preparation method of the sleeve lime kiln inner sleeve according to claim 1 or 4, it is characterized in that, in described step 4, in order to ensure the perpendicularity of the overall concentricity of inner sleeve lower section upper portion structure and 7 endowels, according to technological requirement, temporary support is set up before welding, to reach the object controlling welding deformation between 7 endowels.
8. the preparation method of the sleeve lime kiln inner sleeve according to claim 1 or 4, is characterized in that, in described step 4, three joint cylindrical shell integral assemblings, within cylindrical shell joint faulting of slab ends control 2mm, ovality controls at ± 6mm.
9. the preparation method of the sleeve lime kiln inner sleeve according to claim 1 or .4, is characterized in that, in described step 4, is divided into 7 parts to carry out the fissure of displacement assembling inner core, avoids cross weld seam according to baffle arrangement.
CN201310264859.9A 2013-06-28 2013-06-28 The preparation method of sleeve lime kiln inner sleeve Expired - Fee Related CN104249239B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310264859.9A CN104249239B (en) 2013-06-28 2013-06-28 The preparation method of sleeve lime kiln inner sleeve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310264859.9A CN104249239B (en) 2013-06-28 2013-06-28 The preparation method of sleeve lime kiln inner sleeve

Publications (2)

Publication Number Publication Date
CN104249239A true CN104249239A (en) 2014-12-31
CN104249239B CN104249239B (en) 2017-06-16

Family

ID=52184673

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310264859.9A Expired - Fee Related CN104249239B (en) 2013-06-28 2013-06-28 The preparation method of sleeve lime kiln inner sleeve

Country Status (1)

Country Link
CN (1) CN104249239B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106698977A (en) * 2015-11-17 2017-05-24 上海宝冶建设工业炉工程技术有限公司 Method for manufacturing angle ring equipment of dual-hearth lime kiln
CN107755971A (en) * 2016-08-18 2018-03-06 上海宝冶建设工业炉工程技术有限公司 The nonstandard ash discharge system preparation method of double-hearth lime kiln
CN108188550A (en) * 2018-02-09 2018-06-22 浙江同力重型机械制造有限公司 A kind of large-size cylinder body welding procedure
CN109894765A (en) * 2019-03-29 2019-06-18 山西阳煤化工机械(集团)有限公司 A kind of inner cylinder is production and the pressure-measuring method of the jacketed vessel of internal groove
CN114227156A (en) * 2021-12-10 2022-03-25 中国水电四局(酒泉)新能源装备有限公司 Assembly construction method of wind power foundation steel pipe piles
CN114619205A (en) * 2022-03-08 2022-06-14 中国葛洲坝集团机械船舶有限公司 Manufacturing method of large steel structure with multiple flange connections

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1957608A1 (en) * 1968-11-15 1970-07-23 Rolls Royce Process for the formation of clampable holders on workpieces for the purpose of machining them
CN101381200A (en) * 2007-09-04 2009-03-11 上海宝冶建设有限公司 Tin pot base production method of float glass production line
CN102303956A (en) * 2011-07-22 2012-01-04 石家庄市新华工业炉有限公司 Sleeve-type lime kiln
CN202297393U (en) * 2011-07-29 2012-07-04 上海宝冶集团有限公司 Inner sleeve for lime kiln
CN102564148A (en) * 2012-02-29 2012-07-11 石家庄市新华工业炉有限公司 Heat exchange system of sleeve kiln
CN102627417A (en) * 2012-04-26 2012-08-08 石家庄市新华工业炉有限公司 Lime cooling equipment of sleeve kiln
CN102627418A (en) * 2012-04-26 2012-08-08 石家庄市新华工业炉有限公司 Compound lime kiln

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1957608A1 (en) * 1968-11-15 1970-07-23 Rolls Royce Process for the formation of clampable holders on workpieces for the purpose of machining them
CN101381200A (en) * 2007-09-04 2009-03-11 上海宝冶建设有限公司 Tin pot base production method of float glass production line
CN102303956A (en) * 2011-07-22 2012-01-04 石家庄市新华工业炉有限公司 Sleeve-type lime kiln
CN202297393U (en) * 2011-07-29 2012-07-04 上海宝冶集团有限公司 Inner sleeve for lime kiln
CN102564148A (en) * 2012-02-29 2012-07-11 石家庄市新华工业炉有限公司 Heat exchange system of sleeve kiln
CN102627417A (en) * 2012-04-26 2012-08-08 石家庄市新华工业炉有限公司 Lime cooling equipment of sleeve kiln
CN102627418A (en) * 2012-04-26 2012-08-08 石家庄市新华工业炉有限公司 Compound lime kiln

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106698977A (en) * 2015-11-17 2017-05-24 上海宝冶建设工业炉工程技术有限公司 Method for manufacturing angle ring equipment of dual-hearth lime kiln
CN107755971A (en) * 2016-08-18 2018-03-06 上海宝冶建设工业炉工程技术有限公司 The nonstandard ash discharge system preparation method of double-hearth lime kiln
CN107755971B (en) * 2016-08-18 2019-11-26 上海宝冶建设工业炉工程技术有限公司 The nonstandard ash discharge system production method of double-hearth lime kiln
CN108188550A (en) * 2018-02-09 2018-06-22 浙江同力重型机械制造有限公司 A kind of large-size cylinder body welding procedure
CN109894765A (en) * 2019-03-29 2019-06-18 山西阳煤化工机械(集团)有限公司 A kind of inner cylinder is production and the pressure-measuring method of the jacketed vessel of internal groove
CN114227156A (en) * 2021-12-10 2022-03-25 中国水电四局(酒泉)新能源装备有限公司 Assembly construction method of wind power foundation steel pipe piles
CN114619205A (en) * 2022-03-08 2022-06-14 中国葛洲坝集团机械船舶有限公司 Manufacturing method of large steel structure with multiple flange connections

Also Published As

Publication number Publication date
CN104249239B (en) 2017-06-16

Similar Documents

Publication Publication Date Title
CN104249239A (en) Manufacture method of inner sleeve of lime sleeve kiln
CN100493799C (en) Method of welding the plug in type connection tube and the un-orthogonal crossed connection joint of the cylinder
CN105081595A (en) Fillet weld welding structure for K-type grooves of moderately-thick plate without back chipping and welding technology of fillet weld welding structure
CN102489947B (en) Bottom chord tube manufacturing process of girder of steel tube concrete truss beam bridge
CN105252158A (en) Welding construction method for bottom plate of large storage tank
CN105057855A (en) Erecting welding technological method for single-upper-ring type large segmented stand ring with sole plates
CN103008844B (en) Assembly welding process of muffle pipe double-layer flange
CN110576939A (en) Construction method for large conical cylinder segments
CN104801836A (en) Offshore wind power generation jacket foundation flange installation method
CN110238489A (en) A kind of production of high-temperature heat-exchanging and welding procedure
CN104878732B (en) A kind of drilling platform leg wedge bracket and its processing technology
CN103252563B (en) T-type joint single-side-welding double-side-forming groove machining technology method
CN103244136B (en) Shield tunneling machine drive box and production method thereof
CN108890092B (en) Method for single-side welding and double-side forming of fusion electrode MAG welding tube plate
CN103949783A (en) Welding method of maritime crane barrel neck opening
CN102922096A (en) On-site assembly welding method for large aluminum tower
CN106698977B (en) Manufacturing method of double-chamber lime kiln angle ring equipment
CN102896456B (en) Metal mixed lorry furnace shell down-warping correction and repair method
CN101961811A (en) Welding method of pipes on marine diesel engine
CN104677091A (en) Local deformation masonry method in barrel of rotary cement kiln
CN103752994A (en) Circular seam welding process of thin-wall container
CN203333683U (en) Butt assembly device for air blowing pipe of blast furnace
CN104594421B (en) A kind of installation method of cutter suction dredger reamer beam length axis hole twisted branch frame
CN209532458U (en) A kind of pre-processing system with non-centripetal canals
CN202037398U (en) Special welding machine for valve build up welding

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 200941, No. 8, building 168, four Yuan Road, Shanghai, Baoshan District

Patentee after: SHANGHAI BAOYE METALLURGY ENGINEERING Co.,Ltd.

Address before: 200941, No. four, 168 yuan Road, Shanghai, Baoshan District

Patentee before: SHANGHAI BAOYE CONSTRUCTION INDUSTRIAL FURNACE ENGINEERING TECHNOLOGY Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170616