CN104234442A - 用玄武岩纤维布加固水泥电杆的加固方法 - Google Patents

用玄武岩纤维布加固水泥电杆的加固方法 Download PDF

Info

Publication number
CN104234442A
CN104234442A CN201410445529.4A CN201410445529A CN104234442A CN 104234442 A CN104234442 A CN 104234442A CN 201410445529 A CN201410445529 A CN 201410445529A CN 104234442 A CN104234442 A CN 104234442A
Authority
CN
China
Prior art keywords
basalt fiber
electric pole
concrete pole
fiber reinforced
polymer sheet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410445529.4A
Other languages
English (en)
Inventor
许黄芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Haining Anjie Composite Material Co., Ltd.
Original Assignee
JIAXING ANLIDE CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIAXING ANLIDE CONSTRUCTION ENGINEERING Co Ltd filed Critical JIAXING ANLIDE CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201410445529.4A priority Critical patent/CN104234442A/zh
Publication of CN104234442A publication Critical patent/CN104234442A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)
  • Chemical Or Physical Treatment Of Fibers (AREA)

Abstract

本发明提供了一种用玄武岩纤维布加固水泥电杆的加固方法,包括以下步骤:第一步、对受损的水泥电杆先进行凿毛处理,打磨去水泥电杆碳化的表层,剔打水泥电杆受损皲裂、脱落、龟裂的水泥层直至坚实的部位;第二步、对暴露锈蚀的钢筋、铁箍进行打磨除锈,除锈完毕后涂刷阻锈环氧树脂,裂缝部位用裂缝修补胶屏蔽填实;第三步、涂刷树脂胶,沿水泥电杆纵向粘贴一层玄武岩纤维布将整个水泥电杆环包,再粘帖玄武岩纤维布环箍;第四步、待胶粘剂完全稳定后在玄武岩纤维布表面涂刷一层环氧树脂将粗沙粘在玄武岩纤维布表面,涂刷保护漆。抗老化、耐高温、耐酸碱、阻燃性能和绝缘性能良好,玄武岩纤维布与水泥电杆和树脂的结合力强,环保无污染,强度高。

Description

用玄武岩纤维布加固水泥电杆的加固方法
技术领域
本发明涉及一种用玄武岩纤维布加固水泥电杆的加固方法。
背景技术
水泥电线杆分为预应力水泥电线杆和非预应力水泥电线杆,此种水泥电线杆结构简单、工程造价低,在110-220kW架空送电线路的直线杆中被广泛采用DL/T741-2001《架空送电线路运行规程》规定:预应力水泥电线杆出现裂纹,非预应力水泥电线杆出现纵、横向裂纹,宽度超过0.2mm时应进行处理。目前已有不少送电线路进入老龄期,水泥电线杆裂纹现象严重,急需修补。
发明内容
本发明所要解决的技术问题在于提供一种用玄武岩纤维布加固水泥电杆的加固方法,抗老化、耐高温、耐酸碱、阻燃性能和绝缘性能良好,玄武岩纤维布与水泥电杆和树脂的结合力强,环保无污染,强度高。
为解决上述现有的技术问题,本发明采用如下方案:用玄武岩纤维布加固水泥电杆的加固方法,包括以下步骤:
第一步、对受损的水泥电杆先进行凿毛处理,用打磨机打磨去水泥电杆碳化的表层直至露出新的水泥层,剔打水泥电杆受损皲裂、脱落、龟裂的水泥层直至坚实的部位;
第二步、对暴露锈蚀的钢筋、铁箍进行打磨除锈,除锈完毕后涂刷阻锈环氧树脂,将水泥电杆缺陷的部位用环氧砂浆填补找平,裂缝部位用裂缝修补胶屏蔽填实;
第三步、涂刷树脂胶,沿水泥电杆纵向粘贴一层玄武岩纤维布将整个水泥电杆环包,再粘帖玄武岩纤维布环箍;
第四步、待胶粘剂完全稳定后在玄武岩纤维布表面涂刷一层环氧树脂将粗沙粘在玄武岩纤维布表面,粘帖完毕后在水泥电杆外部涂刷一层保护漆。
有益效果:
本发明采用上述技术方案提供的用玄武岩纤维布加固水泥电杆的加固方法,抗老化、耐高温、耐酸碱、与混凝土和树脂的结合力强、阻燃性能和绝缘性良好,玄武岩纤维布取自天然矿石而无任何添加剂,环保无污染,强度高。
具体实施方式
用玄武岩纤维布加固水泥电杆的加固方法,包括以下步骤:第一步、对受损的水泥电杆先进行凿毛处理,用打磨机打磨去水泥电杆碳化的表层直至露出新的水泥层,剔打水泥电杆受损皲裂、脱落、龟裂的水泥层直至坚实的部位;第二步、对暴露锈蚀的钢筋、铁箍进行打磨除锈,除锈完毕后涂刷阻锈环氧树脂,将水泥电杆缺陷的部位用环氧砂浆填补找平,裂缝部位用裂缝修补胶屏蔽填实;第三步、涂刷树脂胶,沿水泥电杆纵向粘贴一层玄武岩纤维布将整个水泥电杆环包,再环形粘帖宽200mm玄武岩纤维布环箍,相邻环箍间距500mm;第四步、待胶粘剂完全稳定后在玄武岩纤维布表面涂刷一层环氧树脂将粗沙粘在玄武岩纤维布表面,粘帖完毕后在水泥电杆外部涂刷一层保护漆。
玄武岩纤维布的弹性模量(Gpa)为91-110,单丝直径达到(μm)7-15,密度(g/cm3)2.63-2.65,拉伸强度(Mpa)为3000-4800,价格便宜。用玄武岩纤维布加固水泥电杆后,抗老化、耐高温、耐酸碱、与混凝土和树脂的结合力强、阻燃性能和绝缘性良好,玄武岩纤维布取自天然矿石而无任何添加剂,环保无污染,强度高。

Claims (1)

1.用玄武岩纤维布加固水泥电杆的加固方法,其特征在于:包括以下步骤:第一步、对受损的水泥电杆先进行凿毛处理,用打磨机打磨去水泥电杆碳化的表层直至露出新的水泥层,剔打水泥电杆受损皲裂、脱落、龟裂的水泥层直至坚实的部位;第二步、对暴露锈蚀的钢筋、铁箍进行打磨除锈,除锈完毕后涂刷阻锈环氧树脂,将水泥电杆缺陷的部位用环氧砂浆填补找平,裂缝部位用裂缝修补胶屏蔽填实;第三步、涂刷树脂胶,沿水泥电杆纵向粘贴一层玄武岩纤维布将整个水泥电杆环包,再粘帖玄武岩纤维布环箍;第四步、待胶粘剂完全稳定后在玄武岩纤维布表面涂刷一层环氧树脂将粗沙粘在玄武岩纤维布表面,粘帖完毕后在水泥电杆外部涂刷一层保护漆。
CN201410445529.4A 2014-09-03 2014-09-03 用玄武岩纤维布加固水泥电杆的加固方法 Pending CN104234442A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410445529.4A CN104234442A (zh) 2014-09-03 2014-09-03 用玄武岩纤维布加固水泥电杆的加固方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410445529.4A CN104234442A (zh) 2014-09-03 2014-09-03 用玄武岩纤维布加固水泥电杆的加固方法

Publications (1)

Publication Number Publication Date
CN104234442A true CN104234442A (zh) 2014-12-24

Family

ID=52223265

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410445529.4A Pending CN104234442A (zh) 2014-09-03 2014-09-03 用玄武岩纤维布加固水泥电杆的加固方法

Country Status (1)

Country Link
CN (1) CN104234442A (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105257013A (zh) * 2015-08-24 2016-01-20 汤跃超 输变电等构支架高分子织物膜加固方法及加固后构支架
CN105257012A (zh) * 2015-08-24 2016-01-20 汤跃超 输变电等钢混构支架芳纶纤维加固方法及加固后构支架
CN105545062A (zh) * 2015-12-14 2016-05-04 广东电网有限责任公司电力科学研究院 一种缠绕纤维束纱加固混凝土变电构架的实施方法
CN106643850A (zh) * 2016-10-27 2017-05-10 中国电建集团贵阳勘测设计研究院有限公司 一种水力学仪器底座
CN107013048A (zh) * 2017-03-01 2017-08-04 国网浙江平湖市供电公司 一种法兰电杆的除锈加固方法
CN109779280A (zh) * 2019-01-24 2019-05-21 奥泰利新技术集团有限公司 水泥杆加固防腐防水方法
CN114293806A (zh) * 2021-12-29 2022-04-08 贵州电网有限责任公司 一种电杆修复方法
CN114635579A (zh) * 2021-12-29 2022-06-17 贵州电网有限责任公司 一种电杆修复结构及其施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005194768A (ja) * 2004-01-07 2005-07-21 Murata Mach Ltd コンクリート柱補修および/又は補強工法及び補修および/又は補強部材
KR100943211B1 (ko) * 2009-05-21 2010-02-22 (주)클립이엔지 콘크리트 전주의 균열보수장치 및 방법
CN101748901A (zh) * 2009-12-29 2010-06-23 江苏省电力试验研究院有限公司 在役变电站环形混凝土电杆加固方法
CN101769077A (zh) * 2008-12-29 2010-07-07 上海市电力公司 用玄武岩纤维布加固运行变电站中混凝土梁的方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005194768A (ja) * 2004-01-07 2005-07-21 Murata Mach Ltd コンクリート柱補修および/又は補強工法及び補修および/又は補強部材
CN101769077A (zh) * 2008-12-29 2010-07-07 上海市电力公司 用玄武岩纤维布加固运行变电站中混凝土梁的方法
KR100943211B1 (ko) * 2009-05-21 2010-02-22 (주)클립이엔지 콘크리트 전주의 균열보수장치 및 방법
CN101748901A (zh) * 2009-12-29 2010-06-23 江苏省电力试验研究院有限公司 在役变电站环形混凝土电杆加固方法

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105257013A (zh) * 2015-08-24 2016-01-20 汤跃超 输变电等构支架高分子织物膜加固方法及加固后构支架
CN105257012A (zh) * 2015-08-24 2016-01-20 汤跃超 输变电等钢混构支架芳纶纤维加固方法及加固后构支架
CN105257012B (zh) * 2015-08-24 2019-01-11 汤跃超 输变电钢混构支架芳纶纤维加固方法及加固后构支架
CN105545062B (zh) * 2015-12-14 2017-03-22 广东电网有限责任公司电力科学研究院 一种缠绕纤维束纱加固混凝土变电构架的实施方法
CN105545062A (zh) * 2015-12-14 2016-05-04 广东电网有限责任公司电力科学研究院 一种缠绕纤维束纱加固混凝土变电构架的实施方法
CN106643850A (zh) * 2016-10-27 2017-05-10 中国电建集团贵阳勘测设计研究院有限公司 一种水力学仪器底座
CN106643850B (zh) * 2016-10-27 2019-05-14 中国电建集团贵阳勘测设计研究院有限公司 一种水力学仪器底座
CN107013048A (zh) * 2017-03-01 2017-08-04 国网浙江平湖市供电公司 一种法兰电杆的除锈加固方法
CN109779280A (zh) * 2019-01-24 2019-05-21 奥泰利新技术集团有限公司 水泥杆加固防腐防水方法
CN114293806A (zh) * 2021-12-29 2022-04-08 贵州电网有限责任公司 一种电杆修复方法
CN114635579A (zh) * 2021-12-29 2022-06-17 贵州电网有限责任公司 一种电杆修复结构及其施工方法
CN114293806B (zh) * 2021-12-29 2023-11-14 贵州电网有限责任公司 一种电杆修复方法
CN114635579B (zh) * 2021-12-29 2024-01-12 贵州电网有限责任公司 一种电杆修复结构及其施工方法

Similar Documents

Publication Publication Date Title
CN104234442A (zh) 用玄武岩纤维布加固水泥电杆的加固方法
CN104179128B (zh) 混凝土桥墩的加固方法
CN107246158A (zh) 碳纤维布加固技术的施工工艺
KR101058157B1 (ko) 염해방지용 침투식 방수제를 이용한 철근콘크리트 구조물 보수 보강공법
CN102464861B (zh) 一种修复管道碳纤维复合材料体系及应用
CN102561412A (zh) 一种纤维增强复合塑料和混凝土之间的加固方法
CN102086112A (zh) 一种混凝土修补材料及其制备方法
CN105650400A (zh) Pccp断丝管内部补强加固方法及补强组合结构
CN110284724A (zh) Grc板块修补方法
CN104179205A (zh) 一种输电线路杆塔基础的防腐加固方法
CN104005407A (zh) 一种部分预应力混凝土结构基础桩
CN1262785C (zh) 管道大修复合外防腐层
CN103011741A (zh) 一种钢筋混凝土结构的防锈修补方法
CN205476795U (zh) 水泥线杆修复装置
CN101551049B (zh) 架空混凝土管道补强加固方法
CN102563284A (zh) 一种pvc管接头渗水裂缝修补方法
CN104975563A (zh) 一种钢桥面板桥面铺装结构及其铺装方法
CN110863670A (zh) 一种输电钢制杆塔塔脚腐蚀的修复方法
CN106122616A (zh) 内衬式预应力钢筒混凝土管的一种长效防腐蚀方法
CN202467233U (zh) 环形杆裂缝加固机构
CN104612398A (zh) 砌体后埋线管部位裂缝防治施工方法
CN105621998A (zh) 一种修补桥涵损坏病害的建筑干混砂浆技术领域
CN107989392A (zh) 一种输变电钢筋水泥杆破损损伤加固方法
CN103806630B (zh) 金属地砖安装工艺
CN207500646U (zh) 一种加强型管道

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160928

Address after: Jiaxing City, Zhejiang province 314414 Haining City Ding Qiao Zhen Li Qun Cun Yan Jia No. 15, Yongfeng group

Applicant after: Haining Anjie Composite Material Co., Ltd.

Address before: Jiaxing City, Zhejiang province 314414 Haining City Ding Qiao Zhen Li Qun Cun Yan Jia No. 15, Yongfeng group

Applicant before: JIAXING ANLIDE CONSTRUCTION ENGINEERING CO., LTD.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20141224