CN104217307A - Achievement structured management and quality monitoring method for full information construction process - Google Patents

Achievement structured management and quality monitoring method for full information construction process Download PDF

Info

Publication number
CN104217307A
CN104217307A CN201410489267.1A CN201410489267A CN104217307A CN 104217307 A CN104217307 A CN 104217307A CN 201410489267 A CN201410489267 A CN 201410489267A CN 104217307 A CN104217307 A CN 104217307A
Authority
CN
China
Prior art keywords
achievement
service
function
design
interface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410489267.1A
Other languages
Chinese (zh)
Other versions
CN104217307B (en
Inventor
王志英
陈丰
詹卫许
于晓义
董灿
吴方权
郑刚强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Southern Power Grid Co Ltd
Tongfang Technology of Yunnan Power Grid Co Ltd
Original Assignee
China Southern Power Grid Co Ltd
Tongfang Technology of Yunnan Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Southern Power Grid Co Ltd, Tongfang Technology of Yunnan Power Grid Co Ltd filed Critical China Southern Power Grid Co Ltd
Priority to CN201410489267.1A priority Critical patent/CN104217307B/en
Publication of CN104217307A publication Critical patent/CN104217307A/en
Application granted granted Critical
Publication of CN104217307B publication Critical patent/CN104217307B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides an achievement structured management and quality monitoring method for full information construction process. The method comprises the following steps: structuring the achievement, namely, structuring the achievement of each stage in the construction process of an information project according to the requirement; 2, monitoring the achievement, namely, monitoring the structured achievement of each stage in the construction process of an information project according to the requirement. With the adoption of the method, the information construction achievement can be standardized and unified to be managed and even can be managed in a form of assets; therefore, the achievement management can be more transparent, the project management can be more standard, and the final delivery of the system is completely consistent with the original demand.

Description

A kind of informatization overall process achievement structured management and quality control method
Technical field
The invention belongs to informatization management-control method technical field.
Background technology
Informatization process is an organic whole, achievement directly has certain idea, the value that has outwardness, in process of construction, outcomes are output objects of correlated activation, for the quality of Safeguard Informatization Establishment better, can revise according to the relevant expertise from service layer, technological layer again, make all kinds of achievements in informatization process really meet business demand, reach re-set target.
The management system adopting in Information-based Item construction at present mainly contains the China Project managerial knowledge system (C-PMBOK) of CMMI, PMBOK, Princes2 and domestic issue.What these a few class management systems stressed is all the process management of project, perfect not to the result's management in process of construction, is especially short of the management to the incidence relation between achievement.This has caused the front and back of project construction to disconnect, and real demand is realized and had deviation with final payment; In project management, also have that achievement is opaque, the difficult control of progress, quality owes situation about ensureing, brings thus audit risk, managing risk.
Summary of the invention
The present invention is in order to solve an above-mentioned difficult problem: the shortcoming of incidence relation management between the weakness of result's management and achievement in Information-based Item construction.A kind of informatization overall process achievement structured management and quality control method have been proposed.
The present invention adopts following technical scheme to realize:
Step 1: achievement structuring, the achievement in each stage in Information-based Item process of construction is carried out to structuring as requested, specifically comprise:
1. business model achievement structuring: business model achievement key element comprises: operation flow, flow nodes, flow nodes is comprised of " business object, business form, service management and risk point ";
2. demand analysis achievement structuring: demand analysis achievement key element comprises: function items, function subitem; Function items comprises function coding, function title and functional description, and sets up incidence relation with operation flow; Function subitem comprises coding, title, description, regular algorithm, business object and function use-case, and sets up incidence relation with flow nodes;
3. Outline Design achievement structuring: Outline Design achievement key element comprises: one-level application function, secondary application function, comprise respectively coding, title and functional description, and set up administrative relationships with appellative function subitem;
4. detailed design achievement structuring: detailed design achievement key element comprises: interface, Service Design, data modeling; Interface comprises interface coding, interface title, interface type, source, interface, reference interface, interface element and service call relation; I/O entity, flow process/algorithm logic that Service Design comprises service coding, service code, service name, service describing, performance expection, design constraint, comprises, and set up component call relation, entity associated relation and interface element incidence relation; Data modeling comprises entity code, entity title, entity description and field information, and sets up incidence relation with the service relating to;
5. development structuring: development key element comprises: front end code, backstage code, database file, difference include file title, file size, code annex, and the incidence relation of setting up and applying;
Step 2: achievement monitoring, the achievement in monitor message project construction process after each stage structures, specifically comprises:
In monitoring demand analysis achievement function items to the accepting of operation flow in business model achievement, the accept situation of function subitem to flow nodes;
2. in monitoring Outline Design, one-level application function, secondary application function are accepted function subitem in demand analysis achievement, guarantee that design phase achievement is for the degree of conformity of demand achievement;
3. monitor detailed design achievement median surface, service and data modeling accepting Outline Design;
4. monitoring structure result of design, in the situation of landing of development phase, comprising: client for the realization of interface, background service program for the realization of Service Design and database table the situation that realizes for data modeling.
The present invention has following technique effect:
1. realize the standardization unified management of informatization achievement, and can form assets and manage;
2. result's management is more transparent, and project management is standardized more, and then guarantees progress monitoring and quality control;
3. by the incidence relation between achievement, monitoring business demand is the situation of accepting between a stage in building life cycle, guarantees that system finally pays to realize with original demands to be consistent and not depart from.
Embodiment
Informatization overall process achievement structured management and a quality control method, the present invention adopts following technical scheme to realize:
Step 1: achievement structuring, the achievement in each stage in Information-based Item process of construction is carried out to structuring as requested, specifically comprise:
1. business model achievement structuring: business model achievement key element comprises: operation flow, flow nodes, flow nodes is comprised of " business object, business form, service management and risk point ";
2. demand analysis achievement structuring: demand analysis achievement key element comprises: function items, function subitem.Function items comprises function coding, function title and functional description, and sets up incidence relation with operation flow; Function subitem comprises coding, title, description, regular algorithm, business object and function use-case, and sets up incidence relation with flow nodes;
3. Outline Design achievement structuring: Outline Design achievement key element comprises: one-level application function, secondary application function.Comprise respectively coding, title and functional description, and set up administrative relationships with appellative function subitem;
4. detailed design achievement structuring: detailed design achievement key element comprises: interface, Service Design, data modeling; Interface comprises interface coding, interface title, interface type, source, interface, reference interface, interface element and service call relation; I/O entity, flow process/algorithm logic that Service Design comprises service coding, service code, service name, service describing, performance expection, design constraint, comprises, and set up component call relation, entity associated relation and interface element incidence relation; Data modeling comprises entity code, entity title, entity description and field information, and sets up incidence relation with the service relating to;
5. development structuring: development key element comprises: front end code, backstage code, database file.Difference include file title, file size, code annex, and the incidence relation of setting up and applying;
Step 2: achievement monitoring, the achievement in monitor message project construction process after each stage structures, specifically comprises:
In monitoring demand analysis achievement function items to the accepting of operation flow in business model achievement, the accept situation of function subitem to flow nodes;
2. in monitoring Outline Design, one-level application function, secondary application function are accepted function subitem in demand analysis achievement, guarantee that design phase achievement is for the degree of conformity of demand achievement;
3. monitor detailed design achievement median surface, service and data modeling accepting Outline Design;
4. monitoring structure result of design, in the situation of landing of development phase, comprising: client for the realization of interface, background service program for the realization of Service Design and database table the situation that realizes for data modeling.

Claims (1)

1. informatization overall process achievement structured management and a quality control method, is characterized in that, step is:
Step 1: achievement structuring, the achievement in each stage in Information-based Item process of construction is carried out to structuring as requested, comprising:
1) business model achievement structuring: business model achievement key element comprises, operation flow, flow nodes, flow nodes is comprised of " business object, business form, service management and risk point ";
2) demand analysis achievement structuring: demand analysis achievement key element comprises: function items, function subitem; Function items comprises function coding, function title and functional description, and sets up incidence relation with operation flow; Function subitem comprises coding, title, description, regular algorithm, business object and function use-case, and sets up incidence relation with flow nodes;
3) Outline Design achievement structuring: Outline Design achievement key element comprises: one-level application function, secondary application function, comprise respectively coding, title and functional description, and set up administrative relationships with appellative function subitem;
4) detailed design achievement structuring: detailed design achievement key element comprises: interface, Service Design, data modeling; Interface comprises interface coding, interface title, interface type, source, interface, reference interface, interface element and service call relation; I/O entity, flow process/algorithm logic that Service Design comprises service coding, service code, service name, service describing, performance expection, design constraint, comprises, and set up component call relation, entity associated relation and interface element incidence relation; Data modeling comprises entity code, entity title, entity description and field information, and sets up incidence relation with the service relating to;
5) development structuring: development key element comprises: front end code, backstage code, database file, difference include file title, file size, code annex, and the incidence relation of setting up and applying;
Step 2: achievement monitoring, the achievement in monitor message project construction process after each stage structures, comprising:
1) in monitoring demand analysis achievement function items to the accepting of operation flow in business model achievement, the accept situation of function subitem to flow nodes;
2) in monitoring Outline Design, one-level application function, secondary application function are accepted function subitem in demand analysis achievement, guarantee that design phase achievement is for the degree of conformity of demand achievement;
3) monitoring detailed design achievement median surface, service and data modeling accepting Outline Design;
4) monitoring structure result of design, in the situation of landing of development phase, comprising: client for the realization of interface, background service program for the realization of Service Design and database table the situation that realizes for data modeling.
CN201410489267.1A 2014-09-23 2014-09-23 A kind of informatization overall process achievement structured management and quality control method Active CN104217307B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410489267.1A CN104217307B (en) 2014-09-23 2014-09-23 A kind of informatization overall process achievement structured management and quality control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410489267.1A CN104217307B (en) 2014-09-23 2014-09-23 A kind of informatization overall process achievement structured management and quality control method

Publications (2)

Publication Number Publication Date
CN104217307A true CN104217307A (en) 2014-12-17
CN104217307B CN104217307B (en) 2016-04-13

Family

ID=52098766

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410489267.1A Active CN104217307B (en) 2014-09-23 2014-09-23 A kind of informatization overall process achievement structured management and quality control method

Country Status (1)

Country Link
CN (1) CN104217307B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107423920A (en) * 2017-09-18 2017-12-01 安徽蓝杰鑫信息科技有限公司 A kind of method of Power Project process management and the analysis of stage degree of conformity
CN107480188A (en) * 2017-07-11 2017-12-15 中国建设银行股份有限公司 A kind of audit operations data processing method and computer equipment
CN109858792A (en) * 2019-01-23 2019-06-07 中广核工程有限公司 A kind of nuclear power station debugging test task management method and system based on test procedure
CN113254423A (en) * 2021-06-09 2021-08-13 中航机载***共性技术有限公司 System file generation method, device, equipment and medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101551882A (en) * 2008-12-31 2009-10-07 东莞市天新企业管理咨询有限公司 Engineering management monitoring system and method
CN102254251A (en) * 2011-07-18 2011-11-23 广东省电力设计研究院 Power grid three-dimensional design result data management system and digital management method thereof
CN103279832A (en) * 2013-06-04 2013-09-04 国家电网公司 Transformer substation engineering construction quality supervision analysis system
CN103400226A (en) * 2013-07-31 2013-11-20 湖南省烟草公司永州市公司 Integrated tobacco industry information security, operation and maintenance application platform system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101551882A (en) * 2008-12-31 2009-10-07 东莞市天新企业管理咨询有限公司 Engineering management monitoring system and method
CN102254251A (en) * 2011-07-18 2011-11-23 广东省电力设计研究院 Power grid three-dimensional design result data management system and digital management method thereof
CN103279832A (en) * 2013-06-04 2013-09-04 国家电网公司 Transformer substation engineering construction quality supervision analysis system
CN103400226A (en) * 2013-07-31 2013-11-20 湖南省烟草公司永州市公司 Integrated tobacco industry information security, operation and maintenance application platform system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
程志华等: "企业级非结构化数据管理平台研究及实践", 《ELECTRIC POWER IT》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107480188A (en) * 2017-07-11 2017-12-15 中国建设银行股份有限公司 A kind of audit operations data processing method and computer equipment
CN107480188B (en) * 2017-07-11 2020-12-04 中国建设银行股份有限公司 Audit service data processing method and computer equipment
CN107423920A (en) * 2017-09-18 2017-12-01 安徽蓝杰鑫信息科技有限公司 A kind of method of Power Project process management and the analysis of stage degree of conformity
CN109858792A (en) * 2019-01-23 2019-06-07 中广核工程有限公司 A kind of nuclear power station debugging test task management method and system based on test procedure
CN113254423A (en) * 2021-06-09 2021-08-13 中航机载***共性技术有限公司 System file generation method, device, equipment and medium
CN113254423B (en) * 2021-06-09 2022-02-11 中航机载***共性技术有限公司 System file generation method, device, equipment and medium

Also Published As

Publication number Publication date
CN104217307B (en) 2016-04-13

Similar Documents

Publication Publication Date Title
CN111190730B (en) Heterogeneous cloud management platform
US8978032B2 (en) Host naming application programming interface
CN104217307B (en) A kind of informatization overall process achievement structured management and quality control method
EP2238533B1 (en) Managing component programs within a service application
CN105164660A (en) Cloud based service design inheritance
US20150052095A1 (en) Model-based approach to intelligent automation in a computing domain
CN109683911B (en) System for realizing automatic application deployment and influence analysis
TW202305681A (en) Domain module computation unit, system containing a model of an enterprise, single board computational unit, grid of computational units, method to provide propagation traceability, and non-transitory computer program product
CN102546796A (en) Data updating system and method of service server
CN104580446A (en) Cloud service real-time charging and managing system oriented to OpenStack open source cloud platform
CN103780686A (en) Method and system for customizing application approval procedure in cloud organization
CN103164337B (en) Based on the cloud computing method for testing software of finite state machine
KR20090125468A (en) The intergrated enterprise management method and system
CN105574135A (en) Universal access method and universal access system for supporting heterogeneous services
US10296376B2 (en) Planning for manufacturing environments
US8856155B2 (en) Management of configuration data structures in multi-layer data models
CN103729742B (en) A kind of Data Resources Management System based on SOA framework and executing model drive structure
CN105117446A (en) Railway main data full life circle management method and railway main data full life circle management system
CN108108986A (en) A kind of design method of CRM system, device and electronic equipment
CN105573774A (en) Application parameter managing and configuring method
CN103942046A (en) Unified model developing method based on objects
CN105373631A (en) SQLSever-based automatic upgrading method for database structure
CN103281210A (en) Version management system for configuration files of network equipment
CN109981792A (en) A kind of method and device for business processing based on cloud platform
CN104901998A (en) Integrated cloud service monitoring method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant