CN104213921A - 基于水力割缝的冻结式石门揭煤方法 - Google Patents

基于水力割缝的冻结式石门揭煤方法 Download PDF

Info

Publication number
CN104213921A
CN104213921A CN201410387934.5A CN201410387934A CN104213921A CN 104213921 A CN104213921 A CN 104213921A CN 201410387934 A CN201410387934 A CN 201410387934A CN 104213921 A CN104213921 A CN 104213921A
Authority
CN
China
Prior art keywords
coal
freezing
water injection
hole
coal seam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410387934.5A
Other languages
English (en)
Other versions
CN104213921B (zh
Inventor
翟成
林柏泉
余旭
彭深
向贤伟
徐吉钊
倪冠华
李全贵
杨威
许彦明
汤宗情
武世亮
仲超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201410387934.5A priority Critical patent/CN104213921B/zh
Publication of CN104213921A publication Critical patent/CN104213921A/zh
Priority to PCT/CN2015/085654 priority patent/WO2016019826A1/zh
Priority to AU2015299588A priority patent/AU2015299588B2/en
Application granted granted Critical
Publication of CN104213921B publication Critical patent/CN104213921B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C45/00Methods of hydraulic mining; Hydraulic monitors
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F7/00Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Earth Drilling (AREA)

Abstract

一种基于水力割缝的冻结式石门揭煤方法,适用于高瓦斯突出煤层石门揭煤作业。在揭煤工作面距煤层的最小法向距离大于或等于7m位置处,在揭煤工作面施工多个注水孔,采用常规水力割缝技术对注水孔进行水力割缝,割缝结束后,将注水孔与瓦斯抽采管网连接进行瓦斯抽采,当煤层瓦斯含量小于8m3/t时,停止抽采。然后在注水孔两侧分别施工冻结孔和测温孔,采用胶囊封孔器封孔,将水通过注水孔注入煤层,注水结束后关闭阀门,注入煤层的水逐渐渗流进入煤体微裂隙;采用常规冻结技术将注水孔周围的煤层冻结,冻结过程中煤层裂隙中的自由水逐渐由液态转化为固态,提高了煤体的强度和抗冲击能力,达到固化煤层的效果,然后按照常规揭煤方法揭开煤层。

Description

基于水力割缝的冻结式石门揭煤方法
技术领域
本发明涉及一种抽采瓦斯方法,尤其是一种适用于高瓦斯低透气性煤层瓦斯突出的基于水力割缝的冻结式石门揭煤方法。
技术背景
煤与瓦斯突出是威胁煤矿安全生产的主要灾害之一,尤其是石门揭穿煤层时突出强度最大、最危险。揭煤工作面前方煤岩应力状态易发生突然变化,岩石、煤层的弹性潜能以及瓦斯能量大量释放而发生高强度突出。石门揭煤突出的平均强度为其他各类巷道突出强度的6倍以上,80%以上的特大型突出都发生在石门揭煤过程中。由于石门揭煤施工工艺的特殊性,揭穿突出煤层全过程都有突出危险,并可能发生连续突出、延期突出和自行揭开突出,比一般类型突出防治难度更大。
目前,高瓦斯突出煤层石门揭煤方法主要从卸压和加固两个方面实施,在煤层卸压增透方面主要有水力冲孔、松动***和水力割缝等措施,在煤体加固方面主要有金属骨架和注浆加固等措施。这些措施在石门揭煤防突工作中取得了一定的成效,但是也存在很大的局限性,水力割缝等措施能有效卸除地应力和瓦斯压力,但同时破坏了煤体完整性,揭煤区域煤体强度降低;注浆加固能有效提高煤体强度,但是水泥砂浆只能在裂隙中渗透扩散,由于煤体裂隙开度小,水泥浆扩散半径有限,只能小范围的实现揭煤区域煤体强度,无法实现区域性加固。因此,迫切需要提供一种石门揭煤方法,既能满足卸压增透高效抽采煤体瓦斯,又能强化加固揭煤区煤体强度,实现安全快速揭煤。
发明内容
技术问题:本发明的目的是针对已有技术中存在的问题,提供一种方法简单、安全性高、揭煤效果好的基于水力割缝的冻结式石门揭煤方法。
技术方案:本发明的基于水力割缝的冻结式石门揭煤方法,包括以下步骤:
a.在揭煤工作面距煤层的最小法向距离大于或等于7m的位置处,穿过保护岩柱向煤层方向间隔施工多个注水孔;
b.采用常规水力割缝技术依次对每个注水孔进行水力割缝,并对水力割缝后的注水孔进行注浆封孔;
c.将所有注水孔与瓦斯抽采管网连接进行抽采,当煤层瓦斯含量小于8m3/t时,停止抽采;
d.在每个注水孔的两侧分别施工一个冻结孔,冻结孔距离注水孔孔口距离为0.2~0.5m,终孔距离为5~10m,然后在两个冻结孔与注水孔中间分别施工一个测温孔;
e.在测温孔中送入温度传感器,采用注浆封孔的方式对测温孔进行封孔,将冻结管送入冻结孔内,送入深度为不小于冻结孔深度的80%;
f.将高压注水管与注水孔相连接,采用高压注水泵通过高压注水管向注水孔中注入高压水,注水的压力为3-15MPa,待注水孔周围煤壁出现渗水现象、或注水压力突然降低、或持续注水压力无明显变化时停止注水;
g.将冻结孔内的冻结管与井下冻结***相连接,通过冻结管对煤层进行冻结,冻结过程中,设在测温孔内的温度传感器分别经数据线将煤层内的温度信号传输给数字温度显示仪,通过数字温度显示仪实时监测测温孔内煤层的温度,当所有测温孔内煤层的温度均达到-3℃时,则判断揭煤区域内的煤层已经冻结;
h.按照常规揭煤方法揭开煤层。
有益效果:由于采用了上述技术方案,本发明利用水力割缝技术,通过高压泵站产生的高压水射流对钻孔周围煤体进行切割,对目标煤层进行了卸压,同时增加了揭煤区域煤体的透气性,在煤体内形成复杂裂隙网,增加煤层内瓦斯流动通道,提高瓦斯抽采效果,同时利用水的相变作用,结合煤层注水与冻结技术,通过水的相变对揭煤区域进行冻结,进一步消除石门揭煤过程中的突出危险性。水力割缝技术形成的高压水射流对钻孔周围煤体进行切割,形成具有一定厚度和高度的扁平缝槽,增加了瓦斯在煤层中的流动通道,改变了煤体力学性质,提高了高瓦斯煤层的透气性,改善了煤层中的瓦斯流动状态;钻孔瓦斯抽采影响半径达10~40m,与普通抽采钻孔相比,单孔有效抽采影响半径扩大5~20倍,瓦斯抽采钻孔数减少20%~60%,能够高效的降低煤层瓦斯含量,降低石门揭煤的突出危险性。同时,煤层注水技术和冻结技术的结合,实现揭煤区域周围煤体冻结,提高了目标煤体的强度和抗冲击能力,进一步降低石门揭煤区域的突出危险。
附图说明
图1是本发明的揭煤工作面水力割缝技术的冻结式石门揭煤示意图。
图2是图1的A-A揭煤工作面冻结单元布置示意图。
图3是本发明的注水孔连接注水***示意图。
图4是本发明的测温孔连接测温***示意图。
图5是本发明的冻结孔连接冻结***示意图。
图中:1-煤层,2—揭煤工作面,3—岩巷,4—保护岩柱,5—注水孔,6—测温孔,7—冻结孔,8—高压注水泵,9—高压注水管,10—截止阀,11—抽采管,12—胶囊封孔器,13—数字温度显示仪,14—数据线,15—钻孔封孔段,16—温度传感器,17—冻结管,18—冻结***,19—钻机,20—钻杆。
具体实施方式
下面结合附图对本发明的一个实施例作进一步的描述:
本发明的基于水力割缝的冻结式石门揭煤方法,具体步骤如下:
a.在岩巷3揭煤工作面2距煤层1的最小法向距离大于或等于7m的位置处,穿过保护岩柱4向煤层1方向间隔施工多个注水孔5,完全贯穿目标煤层1,孔径75~130mm;
b.用钻机19带动有高压密封的通孔钻杆20送至割缝钻孔5设定位置,同时启动钻机19和高压注水泵8,通过钻孔5孔内有高压密封的通孔钻杆20将一定压力和流量的高压射流对钻孔周围煤体边退钻边切割,形成一定高度和宽度的扁平缝槽,注水压力为25~30Mpa,流量为40~80L/min,钻孔周围形成扁缝槽半径为400~700mm,缝宽为20~30mm,采用常规水力割缝技术依次对每个注水孔5进行水力割缝,并对水力割缝后的注水孔5进行注浆封孔,采用现有的胶囊封孔器12对注水孔5进行封孔;
c.割缝结束后,将所有注水孔5与瓦斯抽采管网连接,按已有的常规技术在割缝影响区域内进行瓦斯抽采,当煤层瓦斯含量小于8m3/t时,停止瓦斯抽采;
d.穿过保护岩柱在石门巷道内向目标煤层1分组依次实施相变致裂,在每个注水孔5的两侧分别施工一个冻结孔7,冻结孔7距离注水孔5孔口距离为0.2~0.5m,终孔距离为5~10m,然后在两个冻结孔7与注水孔5中间分别施工一个测温孔6;
e.在测温孔6中送入温度传感器16,对测温孔6进行注浆封孔,封孔段15的长度不小于5m,将冻结管17送入冻结孔7内,送入深度为不小于冻结孔7深度的80%;
f.将高压注水管9与注水孔5内的抽采管11相连接,采用高压注水泵8通过高压注水管9向注水孔5中注入高压水,注水的压力为3-15MPa,待注水孔5周围煤壁出现渗水现象、或注水压力突然降低、或持续注水压力无明显变化时停止注水,并关闭注水孔5孔口的截止阀10;
g.将冻结孔7内的冻结管17与井下冻结***18相连接,通过冻结管17对煤层1进行冻结,冻结过程中,设在测温孔6内的温度传感器16分别经数据线14将煤层1内的温度信号传输给数字温度显示仪13,通过数字温度显示仪13实时监测测温孔6内煤层的温度,当所有测温孔6内煤层的温度均达到-3℃时,则判断揭煤区域内的煤层1已经冻结;
h.按照常规揭煤方法揭开煤层。

Claims (1)

1.一种基于水力割缝的冻结式石门揭煤方法,其特征在于,包括以下步骤:
a.在揭煤工作面(2)距煤层(1)的最小法向距离大于或等于7m的位置处,穿过保护岩柱(4)向煤层(1)方向间隔施工多个注水孔(5);
b.采用常规水力割缝技术依次对每个注水孔(5)进行水力割缝,并对水力割缝后的注水孔(5)进行注浆封孔; 
c.将所有注水孔(5)与瓦斯抽采管网连接进行抽采,当煤层瓦斯含量小于8m3/t时,停止抽采;
d.在每个注水孔(5)的两侧分别施工一个冻结孔(7),冻结孔(7)距离注水孔(5)孔口距离为0.2~0.5m,终孔距离为5~10m,然后在两个冻结孔(7)与注水孔(5)中间分别施工一个测温孔(6);
e.在测温孔(6)中送入温度传感器(16),采用注浆封孔的方式对测温孔(6)进行封孔,将冻结管(17)送入冻结孔(7)内,送入深度为不小于冻结孔(7)深度的80%;
f.将高压注水管(9)与注水孔(5)相连接,采用高压注水泵(8)通过高压注水管(9)向注水孔(5)中注入高压水,注水的压力为3-15MPa,待注水孔(5)周围煤壁出现渗水现象、或注水压力突然降低、或持续注水压力无明显变化时停止注水;
g.将冻结孔(7)内的冻结管(17)与井下冻结***(18)相连接,通过冻结管(17)对煤层(1)进行冻结,冻结过程中,设在测温孔(6)内的温度传感器(16)分别经数据线(14)将煤层(1)内的温度信号传输给数字温度显示仪(13),通过数字温度显示仪(13)实时监测测温孔(6)内煤层的温度,当所有测温孔(6)内煤层的温度均达到-3℃时,则判断揭煤区域内的煤层(1)已经冻结;
h.按照常规揭煤方法揭开煤层。
CN201410387934.5A 2014-08-07 2014-08-07 基于水力割缝的冻结式石门揭煤方法 Active CN104213921B (zh)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201410387934.5A CN104213921B (zh) 2014-08-07 2014-08-07 基于水力割缝的冻结式石门揭煤方法
PCT/CN2015/085654 WO2016019826A1 (zh) 2014-08-07 2015-07-31 基于水力割缝的冻结式石门揭煤方法
AU2015299588A AU2015299588B2 (en) 2014-08-07 2015-07-31 Freezing cross-cut coal cutting method based on hydraulic seam-cutting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410387934.5A CN104213921B (zh) 2014-08-07 2014-08-07 基于水力割缝的冻结式石门揭煤方法

Publications (2)

Publication Number Publication Date
CN104213921A true CN104213921A (zh) 2014-12-17
CN104213921B CN104213921B (zh) 2016-03-30

Family

ID=52095788

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410387934.5A Active CN104213921B (zh) 2014-08-07 2014-08-07 基于水力割缝的冻结式石门揭煤方法

Country Status (3)

Country Link
CN (1) CN104213921B (zh)
AU (1) AU2015299588B2 (zh)
WO (1) WO2016019826A1 (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105221150A (zh) * 2015-09-22 2016-01-06 中国矿业大学 一种水平旋喷桩加固式石门揭煤的方法
WO2016019826A1 (zh) * 2014-08-07 2016-02-11 翟成 基于水力割缝的冻结式石门揭煤方法
CN107130998A (zh) * 2017-07-12 2017-09-05 贵州大学 一种发热电缆加热煤层温度监控***
CN107605484A (zh) * 2017-08-28 2018-01-19 中国矿业大学 一种液氮冻结式石门揭煤方法
CN108894786A (zh) * 2018-08-07 2018-11-27 中国恩菲工程技术有限公司 岩石定向致裂***
CN109252861A (zh) * 2018-09-11 2019-01-22 中国矿业大学 一种电脉冲辅助液氮冻结式石门揭煤方法
CN109751075A (zh) * 2019-03-08 2019-05-14 湖南科技大学 中硬煤层顺层钻孔瓦斯治理方法
CN110056355A (zh) * 2019-04-24 2019-07-26 河南理工大学 冻融循环增透促抽安全高效石门揭煤方法
CN110953016A (zh) * 2019-12-27 2020-04-03 煤炭科学技术研究院有限公司 一种卸压消能与冻结固化协同防控煤与瓦斯突出方法
WO2021184694A1 (zh) * 2020-03-16 2021-09-23 翟成 一种煤矿采空区坚硬顶板低温致裂放顶方法

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111058839B (zh) * 2019-12-13 2022-06-28 太原理工大学 一种工作面采空区裂隙带钻孔透气性分段测试装置及测试方法
CN112983420A (zh) * 2021-03-31 2021-06-18 神华神东煤炭集团有限责任公司 一种采煤方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU1783116C (ru) * 1990-08-06 1992-12-23 Институт Физики И Механики Горных Пород Ан Киргсср Способ безлюдной выемки крутых пластов угл
CN101105138A (zh) * 2007-08-15 2008-01-16 湖南科技大学 抑制煤与瓦斯突出的方法
CN101598030A (zh) * 2009-07-14 2009-12-09 中国矿业大学 突出危险煤层石门快速揭煤方法
CN102536243A (zh) * 2012-02-28 2012-07-04 重庆市能源投资集团科技有限责任公司 煤层冻结式石门揭煤法
CN103195467A (zh) * 2013-04-02 2013-07-10 重庆市能源投资集团科技有限责任公司 一种水力压裂与注浆固化相结合的石门揭煤方法
CN103510957A (zh) * 2013-10-08 2014-01-15 中国矿业大学 一种组合式石门揭煤方法

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1424240A (en) * 1973-02-26 1976-02-11 Shell Int Research Method of hydraulically mining underground materials
US7775281B2 (en) * 2006-05-10 2010-08-17 Kosakewich Darrell S Method and apparatus for stimulating production from oil and gas wells by freeze-thaw cycling
CN102409997A (zh) * 2011-12-09 2012-04-11 中国矿业大学 竖井揭煤与瓦斯突出煤层帷幕注浆防突方法
CN103510958B (zh) * 2013-10-08 2016-08-10 中国矿业大学 一种缓倾斜特厚煤层石门揭煤方法
CN104213921B (zh) * 2014-08-07 2016-03-30 中国矿业大学 基于水力割缝的冻结式石门揭煤方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU1783116C (ru) * 1990-08-06 1992-12-23 Институт Физики И Механики Горных Пород Ан Киргсср Способ безлюдной выемки крутых пластов угл
CN101105138A (zh) * 2007-08-15 2008-01-16 湖南科技大学 抑制煤与瓦斯突出的方法
CN101598030A (zh) * 2009-07-14 2009-12-09 中国矿业大学 突出危险煤层石门快速揭煤方法
CN102536243A (zh) * 2012-02-28 2012-07-04 重庆市能源投资集团科技有限责任公司 煤层冻结式石门揭煤法
CN103195467A (zh) * 2013-04-02 2013-07-10 重庆市能源投资集团科技有限责任公司 一种水力压裂与注浆固化相结合的石门揭煤方法
CN103510957A (zh) * 2013-10-08 2014-01-15 中国矿业大学 一种组合式石门揭煤方法

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016019826A1 (zh) * 2014-08-07 2016-02-11 翟成 基于水力割缝的冻结式石门揭煤方法
CN105221150A (zh) * 2015-09-22 2016-01-06 中国矿业大学 一种水平旋喷桩加固式石门揭煤的方法
CN107130998A (zh) * 2017-07-12 2017-09-05 贵州大学 一种发热电缆加热煤层温度监控***
CN107605484A (zh) * 2017-08-28 2018-01-19 中国矿业大学 一种液氮冻结式石门揭煤方法
CN108894786A (zh) * 2018-08-07 2018-11-27 中国恩菲工程技术有限公司 岩石定向致裂***
CN109252861B (zh) * 2018-09-11 2020-06-26 中国矿业大学 一种电脉冲辅助液氮冻结式石门揭煤方法
CN109252861A (zh) * 2018-09-11 2019-01-22 中国矿业大学 一种电脉冲辅助液氮冻结式石门揭煤方法
CN109751075A (zh) * 2019-03-08 2019-05-14 湖南科技大学 中硬煤层顺层钻孔瓦斯治理方法
CN109751075B (zh) * 2019-03-08 2020-05-08 湖南科技大学 中硬煤层顺层钻孔瓦斯治理方法
CN110056355A (zh) * 2019-04-24 2019-07-26 河南理工大学 冻融循环增透促抽安全高效石门揭煤方法
CN110056355B (zh) * 2019-04-24 2020-09-18 河南理工大学 冻融循环增透促抽安全高效石门揭煤方法
CN110953016A (zh) * 2019-12-27 2020-04-03 煤炭科学技术研究院有限公司 一种卸压消能与冻结固化协同防控煤与瓦斯突出方法
WO2021184694A1 (zh) * 2020-03-16 2021-09-23 翟成 一种煤矿采空区坚硬顶板低温致裂放顶方法

Also Published As

Publication number Publication date
AU2015299588A1 (en) 2017-03-23
CN104213921B (zh) 2016-03-30
WO2016019826A1 (zh) 2016-02-11
AU2015299588B2 (en) 2018-08-02

Similar Documents

Publication Publication Date Title
CN104213921B (zh) 基于水力割缝的冻结式石门揭煤方法
CN104213932B (zh) 一种突出煤层水力相变致裂石门揭煤方法
AU2015299587B2 (en) Enhanced phase-change fracking gas extraction method for low-permeability coal bed
CN105134284B (zh) 一种基于水平定向钻孔液氮循环冻融增透抽采瓦斯方法
CN102852506B (zh) 一种高压气动***卸压增透方法
CN104389631B (zh) 一种低透气性煤层割缝与压裂协同网络化增透方法
CN101586441B (zh) 高压水射流煤层钻扩孔***和方法
CN102140901B (zh) 一种耐高压钻孔密封方法
CN107605498B (zh) 富水砂卵石地层盾构隧道端头水平注浆加固结构施工方法
CN105422069A (zh) 一种高瓦斯突出煤层“钻-冲-割”耦合卸压增透方法
CN106988719B (zh) 向煤层循环注入热水和液氮的增透***和增透方法
CN110056355B (zh) 冻融循环增透促抽安全高效石门揭煤方法
CN103133028A (zh) 井下煤层水力压裂裂缝导向扩展的方法
CN102628352B (zh) 一种多段式定点水力压裂方法
CN104389559B (zh) 一种防治厚煤层开采过程中瓦斯超限的方法及装置
CN207363665U (zh) 一种多功能隧道钻孔管道
CN105003296A (zh) 一种处理低透气性煤层瓦斯排放的方法
CN108194125A (zh) 一种煤层协同逐级增透方法
CN110195580A (zh) 一种气液两相联合作用煤层增透方法
CN105804786A (zh) 一种松软煤层底板穿层钻孔压冲增透方法
CN108180002B (zh) 一种煤矿井下煤层水力压-割耦合增透方法
CN103741723A (zh) 地下变电站地下连续墙接缝防水结构
CN203639952U (zh) 地下变电站地下连续墙接缝防水结构
CN105507939A (zh) 一种注浆置换式钻孔固化密封及瓦斯无管抽采的方法
CN207143915U (zh) 一种双管环形注浆冻结管

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant