CN104192339A - Double-channel paper money packaging assembly line system - Google Patents

Double-channel paper money packaging assembly line system Download PDF

Info

Publication number
CN104192339A
CN104192339A CN201410402250.8A CN201410402250A CN104192339A CN 104192339 A CN104192339 A CN 104192339A CN 201410402250 A CN201410402250 A CN 201410402250A CN 104192339 A CN104192339 A CN 104192339A
Authority
CN
China
Prior art keywords
cylinder
bank note
transfer passage
note
press
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410402250.8A
Other languages
Chinese (zh)
Other versions
CN104192339B (en
Inventor
李新利
张恒
林格致
袁艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yuan Yan
Original Assignee
Shenzhen Zhong Xinchuanda Science And Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Zhong Xinchuanda Science And Technology Ltd filed Critical Shenzhen Zhong Xinchuanda Science And Technology Ltd
Priority to CN201410402250.8A priority Critical patent/CN104192339B/en
Publication of CN104192339A publication Critical patent/CN104192339A/en
Application granted granted Critical
Publication of CN104192339B publication Critical patent/CN104192339B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Basic Packing Technique (AREA)

Abstract

A double-channel paper money packaging assembly line system comprises paper money sorting and binding machines, stamping mechanisms, lifting mechanisms, front-and-back flow separating mechanisms, a conveying channel A, a conveying channel B, a double stacking and bundling mechanism, an automatic sealing and contracting mechanism and a labeling mechanism, wherein the conveying channel A and the conveying channel B are arranged in parallel. The double stacking and bundling mechanism is located at the tail end of the conveying channel A and the tail end of the conveying channel B and conducts packing on paper money. Sealing and contracting are conducted on the packed paper money through the automatic sealing and contracting machine, and then the sealed and contracted paper money enters the labeling mechanism to be labeled. Mechanical operation is adopted in the double-channel paper money packaging assembly line system, sorting and binding and automatic stamping are conducted on the paper money, distinguishing and separating are conducted on ATM rolls and circulation rolls, the front channel and the rear channel are used for conducting conveying at the same time, the paper money is packed in the double stacking and bundling mechanism, and then sealing and labeling are conducted on the paper money through the automatic sealing and contracting mechanism and the labeling mechanism.

Description

Binary channel bank note package pipeline system
Technical field
The present invention relates to financial mechanical equipment field, particularly a kind of binary channel bank note package pipeline system for bank and financial institution.
Background technology
Along with the development of national economy, automation of industry technology is widely applied in financial machine and tool industry, as Self-service type receipt cabinet, cleaning-sorting machine, automatic money packer, type automatic bundling machine, the application of these technology has greatly reduced human cost, improve work efficiency, for financial sector has been made very large contribution.Along with going deep into of socioeconomic development and international commerce arbitration, no matter be financial industry or large scale business, though banking institution promotes electronic transaction as possible, but large paper money transaction still can not be exempted from, emission of banknotes and circulate increasing, banking system becomes very heavy to the processing of bank note, there is every day a large amount of Renminbi to wait for currency examine, counting, arrange, sorting, tie up, and these work are high to requirements for quality, in order to alleviate financial sector staff's labour intensity, design more practical, rationally, failure-free financial machine and tool, what become is extremely important.
At present, the bank note of financial sector paper currency sorting center after to sorting binding, is to lead to volume and ATM involves in row sorting by forced convection, and sorting is good is that a bundle stacking is neat according to every 10 bank note afterwards again, by putting in semiautomatic bank-note bundling machine and tie up by hand.Which adopts pure manual operation, and the automatic stacking function that cannot complete bank note cannot realize again pipelining, and it exists following shortcoming: one, inefficiency, and the amount of labour used is large, and personnel directly contact banknote, have certain potential safety hazard; Two, cannot realize automatic assembly line operation with front end paper currency sorting equipment and rear end packaging container; Three, cannot automatically distinguish piling, automatically enter strapper and tie up bale packing ATM volume and circulation volume.
Along with national financial sector is to the original bundling method of bank note and bale packing standard reform, and the higher bale packing requirement of proposition, therefore sorting processing is carried out to the bank note steaming again in paper currency sorting center, realize that paper money automatic clearing divides, binding, affix one's seal, piling, tie up, and circulation volume and ATM volume banknote are distinguished to bale packing, except automatic sorting bundling device, also need automatic assembly line and corresponding dicode buttress automatic flexible strapping machine, require this occupation area of equipment little, processing capacity is strong simultaneously.Thereby a kind of to involve in for ATM volume and circulation the dicode buttress automatic flexible strapping machine that row difference piling ties up be the novel product of financial sector paper currency sorting center indispensability.
For the financial services industry that more and more needs automation, intelligent development, providing a kind of ATM of realization volume and circulation to twist in to complete on same packaging container automatic stacking is very crucial technical scheme with tying up, and it can rationally avoid manually carrying out the defect of bank note bale packing existence.Adopt dicode buttress automatic flexible strapping machine directly circulation volume and ATM coil paper coin to be distinguished piling and automatically to be tied up, therefore, need a kind of dock with sorting bundling device automatically, can realize ATM volume and twist in the new technique equipment of work such as completing automatic stacking on same packaging container and tie up with circulating.In addition, for currency examine, the counting of bank note, the facility such as arrange and tie up research and development many, most of energy is put in counting and ties up, seldom with respect to the automatic sealing link to bank note, generally affix one's seal and need manual operation, the efficiency of manually affixing one's seal is low, labour intensity is large, therefore needs to invent a kind of bank note intelligence package wire system that bank note is affixed one's seal.
Along with the reform and development that deepen constantly of financial industry, Yin Chao factory and bank inside is in order to reduce cost of labor, improves degree of automation, extends the service life of bank note, more and more urgent for promoting the demand of safe processing system of bill handling consolidated storage.It is a very crucial technical scheme that a kind of bale packing automatically and automatic plastic seal integrated packaging container, because quality and the stability requirement of financial sector to equipment is more and more higher, equipment requirement accomplishes to meet standard-required, for this reason, relevant design personnel also need conscientious research and development further.
Summary of the invention
For the deficiencies in the prior art part, technical matters to be solved of the present invention is to provide a kind of binary channel bank note package pipeline system, can be simultaneously to bank note carry out sorting, affix one's seal, front and back shunting and bale packing, sealing contraction and seal labeling.
In order to solve the problems of the technologies described above, the present invention can realize by following technical measures: a kind of binary channel bank note package pipeline system, comprise the paper currency sorting bundling device setting gradually, stamping mechanism, lift system, front and back diversion mechanism, article two, the transfer passage A be arrangeding in parallel and transfer passage B, dicode buttress banding mechanism, automatic sealing contracting mechanism and tag labeling mechanism, described binary channel bank note package pipeline system arranges many paper currency sorting bundling devices, a stamping mechanism of every paper currency sorting bundling device configuration, a lift system and a front and back diversion mechanism, described paper currency sorting bundling device, stamping mechanism, lift system and front and back diversion mechanism form a whole, and be evenly distributed on the transporting direction of described transfer passage A and transfer passage B, bank note is after sorting bundling device binding, and stamping mechanism is affixed one's seal to bank note, and the bank note that has covered chapter is transported to described front and back diversion mechanism by lift system, and front and back diversion mechanism is pushed into the bank note after shunting respectively on described transfer passage A and transfer passage B, described dicode buttress banding mechanism is positioned at the end of described transfer passage A and transfer passage B, transfer passage A and transfer passage B are sent to described dicode buttress banding mechanism by bank note and pack, bank note after having packed is piled up neatly banding mechanism cash dispensing port by dicode is connected with described automatic sealing contracting mechanism, and the bank note after sealing is shunk enters into tag labeling mechanism and carries out seal labeling, also comprise the control system of controlling each mechanism action.
As the improvement of technique scheme, described stamping mechanism comprises to be accepted conveying mechanism, accept the two-sided stamping mechanism of conveying mechanism top described in being positioned at, bank note is blocked in to the first press-note cylinder that stops cylinder and bank note is compressed of described two-sided stamping mechanism below, the described conveying mechanism of accepting comprises two conveying side plates that be arranged in parallel, the first belt conveyor and the rebound between described conveying side plate and the first driver train that drives described the first belt conveyor to move, and described rebound is lower than the surface of described the first belt conveyor; Describedly stop that cylinder is arranged on the below of described conveying side plate, described the first press-note cylinder is fixed on the top of described the first belt conveyor by cylinder fixed support, described cylinder fixed support is arranged on described conveying side plate, and the first money pressing plate for bank note is compressed is installed on the cylinder axis of described the first press-note cylinder.
As the improvement of technique scheme, described lift system comprises the side plate being oppositely arranged, the belt elevator between described side plate and the second driver train that drives described belt elevator to move, described side plate comprises oblique side plate and horizontal side plate, seamless link between described oblique side plate and horizontal side plate, lift block for bank note is promoted is installed on described belt elevator, and the other oblique side plate of described lift block is provided with the signal supervisory instrument that detects bank note and whether enter into lift block; Bank note enters into described lift block, energizing signal detecting device, and the second driver train drives described belt elevator to rotate within one week, to stop, waiting for that next bank note enters on described lift block again described in described control system control.
Preferably, described front and back diversion mechanism comprises support, is positioned at the conveying shunting machine of described transfer passage A and transfer passage B top, described conveying shunting machine comprise shunting cylinder A, shunting cylinder B and with described transfer passage A and the vertically disposed delivery track of transfer passage B, described shunting cylinder A and shunting cylinder B lay respectively at described transfer passage A and transfer passage B directly over, described shunting cylinder A is identical with shunting cylinder B structure, the second money-pushing plate that includes cylinder rod, is connected with described cylinder rod;
Described transfer passage A and transfer passage B include the second belt conveyor, are positioned at the passage side plate of described the second belt conveyor both sides, and described shunting cylinder A is connected with the passage side plate on transfer passage B with transfer passage A respectively by cylinder mounting plate with shunting cylinder B; The action of shunting cylinder A and shunting cylinder B described in described control system control, is pushed into the bank note on delivery track in transfer passage A and transfer passage B.
Further, described dicode buttress banding mechanism comprises frame, charging supply unit, direct pushing machine structure, the A of Mo Juan mechanism, press-note banding mechanism, discharging supply unit, the B of Mo Juan mechanism, thruster mechanism, the A of automatic stacking mechanism, the B of automatic stacking mechanism; Described charging supply unit is fixed in described frame, and docks with the described automatic stacking A of mechanism and the B of automatic stacking mechanism;
The described automatic stacking A of mechanism and the B of automatic stacking mechanism are fixed in described frame by base plate, the A of automatic stacking mechanism and the B of automatic stacking mechanism be arranged in parallel and are all positioned at the lower floor of described frame, and the A of automatic stacking mechanism and the B of automatic stacking mechanism involve in row automatic stacking to ATM volume with circulation respectively;
Described press-note banding mechanism and described direct pushing machine structure are fixed in described frame, described press-note banding mechanism and described direct pushing machine structure be arranged in parallel, and described press-note banding mechanism is positioned at the left side of described direct pushing machine structure, described press-note banding mechanism and described direct pushing machine structure are positioned at the upper strata of the described automatic stacking A of mechanism;
The described Mo Juan A of mechanism is positioned at the upper strata of described direct pushing machine structure, and described thruster mechanism is positioned at the upper strata of the described automatic stacking B of mechanism, and with described direct pushing machine structure before and after be arranged in parallel; The described automatic stacking A of mechanism is all connected with described press-note banding mechanism with the B of automatic stacking mechanism; Described discharging supply unit is positioned at the left side of press-note banding mechanism, and is arranged in described frame by support;
The described Mo Juan B of mechanism is positioned at the below of described discharging supply unit, and is fixed on the lower-left side of described frame; Described control system and described direct pushing machine structure, the A of Mo Juan mechanism, press-note banding mechanism, the B of Mo Juan mechanism, thruster mechanism, the A of automatic stacking mechanism and the B of automatic stacking mechanism are electrically connected.
As the preferred implementation of binary channel bank note package pipeline system of the present invention, described cylinder fixed support comprises the column that is installed on described conveying side plate, is fixed in the cylinder mounting plate between described column, and described the first press-note cylinder is arranged on described cylinder mounting plate; Described two-sided stamping mechanism comprise affix one's seal drive cylinder, with described in affix one's seal both sides guide rod the first name chapter and the second name chapter that are connected of driving cylinder, described affixing one's seal drives cylinder to be arranged on described cylinder mounting plate, and is positioned at the left side of described the first press-note cylinder; Described the first name chapter and the second name chapter respectively by the first permanent seat and the second permanent seat with described in affix one's seal and drive the both sides guide rod of cylinder to be connected, described the first name chapter and the second name chapter are fixed by locating dowel pin and the first permanent seat and the second permanent seat.
As the improvement of technique scheme, between described delivery track and described shunting cylinder A and shunting cylinder B, be provided with signal switch; Described the second money-pushing plate is L-shaped, and wherein an end face is connected with described cylinder rod, and the other end is used for stopping bank note.
In one embodiment of the present invention, the described Mo Juan A of mechanism and the B of Mo Juan mechanism include film volume adapter plate, film spool, resting barrel, press mold cylinder, press mold cylinder, machine control valve, line slideway, slip cylinder, brake cylinder, stage clip, brake roller, brake facing and fork; Described film spool is arranged on the front side of described film volume adapter plate by bearing seat and bearing, described film spool is mechanical expansion shaft, on described film spool, scale graduation is installed, described resting barrel is arranged on above the side of described film volume adapter plate near film spool, described line slideway is vertically mounted on the side of described film volume adapter plate near resting barrel, described slip cylinder is arranged on the sliding shoe of line slideway, and described slip cylinder can move up and down; Described machine control valve is arranged on the side top of line slideway, and described press mold cylinder and described press mold cylinder are arranged on the side of described line slideway simultaneously, and described press mold cylinder is above described press mold cylinder; Described brake cylinder is arranged on the rear side of described film volume adapter plate, described brake rod is arranged on the projecting shaft of described film spool rear end, and described brake facing is arranged on described fork, and described fork can rotate, one side of fork is provided with stage clip, and the output shaft of opposite side and described brake cylinder is close.
Preferably, described press-note banding mechanism comprises heat-sealing cylinder, upper hot knife, the second money pressing plate, the second press-note cylinder, lower hot knife, lower heat-sealing cylinder, heat-sealing platform and air cylinder support; Described upper hot knife is fixed on described upper heat-sealing cylinder, described the second money pressing plate is fixed on described the second press-note cylinder, described upper heat-sealing cylinder and the second press-note cylinder are fixed on described air cylinder support side by side, described the second press-note cylinder is positioned at described upper heat-sealing cylinder left side, and described the second money pressing plate and upper hot knife are in sustained height; Described air cylinder support and described vertical connection of heat-sealing platform, described heat-sealing platform is fixed in described frame, be arranged in parallel, and be positioned at the described left side that is directly bulldozed platform with the described platform that is directly bulldozed; Described lower hot knife is fixed on described lower heat-sealing cylinder, and described lower heat-sealing cylinder is fixed on below described heat-sealing platform by support, and described lower hot knife is heated blade, with described upper hot knife consistency from top to bottom.
In one embodiment of the present invention, every paper currency sorting bundling device side is also provided with a bench board, in the time not using paper currency sorting bundling device, can use and manually carry out sorting binding.
Implement technical scheme of the present invention and there is following beneficial effect: binary channel bank note package pipeline system of the present invention adopts mechanized operation, bank note is carried out to sorting binding, automatic sealing, and ATM volume and circulation are involved in to row and distinguish and shunt, be divided into former and later two passages carries simultaneously, in dicode buttress banding mechanism, bank note is packed, then by automatic sealing contracting mechanism and tag labeling mechanism, bank note is sealed and seal labeling.The bank note of stamping mechanism of the present invention after to sorting binding carries out two-sided affixing one's seal, improve the work efficiency that bank note is affixed one's seal, the conveying mechanism of accepting of the present invention is horizontally disposed with, bank note in the time affixing one's seal in flat condition, employing is affixed one's seal and is driven cylinder to carry out horizontal direction from bank note both sides and affix one's seal, and utilization stops that cylinder and the first press-note cylinder block bank note below two-sided stamping mechanism and by bank note and compress, ensured the stability of affixing one's seal and the reliability of impressing, stamping mechanism of the present invention also can be affixed one's seal to bank note one side simultaneously, lift system of the present invention is arranged between stamping mechanism and front and back diversion mechanism, automatically diversion mechanism before and after the bank note that has covered chapter being transported to, to bank note is carried out to triage operator, on the other oblique side plate of lift block, signal supervisory instrument is installed, energizing signal detecting device when bank note enters into lift block, signal supervisory instrument sends signal to control system, control system control the second driver train drives described belt elevator to rotate, diversion mechanism before and after bank note is delivered to, after rotating, within one week, stop, next bank note is transported in wait, can bank note be risen in the diversion mechanism of front and back accurately every, front and back of the present invention diversion mechanism can involve in row shunting to circulation volume and ATM, and by control system, the action of shunting cylinder A and shunting cylinder B is controlled, in the transfer passage A and transfer passage B be arrangeding in parallel before and after bank note is pushed into, realize the front and back shunting action of bank note.At the end of transfer passage A and transfer passage B, dicode buttress banding mechanism is set, transfer passage A and transfer passage B are sent to described dicode buttress banding mechanism by bank note and pack, bank note after having packed is piled up neatly banding mechanism cash dispensing port by dicode is connected with described automatic sealing contracting mechanism, and the bank note after sealing is shunk enters into tag labeling mechanism and carries out seal labeling.
Above-mentioned explanation is only the general introduction of technical solution of the present invention, in order to better understand technological means of the present invention, and can be implemented according to the content of specification sheets, and for above and other object of the present invention, feature and advantage can be become apparent, below in conjunction with preferred embodiment, and coordinate accompanying drawing, be described in detail as follows.
Brief description of the drawings
The invention will be further described to utilize accompanying drawing, but embodiment in accompanying drawing does not form any limitation of the invention.
Fig. 1 is the structural representation of the preferred embodiment of binary channel bank note package pipeline system of the present invention.
Fig. 2 is the stamping mechanism structural representation of the binary channel bank note package pipeline system of the preferred embodiment of the present invention.
Fig. 3 is the plan structure schematic diagram of Fig. 2.
Fig. 4 is the lift system structural representation of the binary channel bank note package pipeline system of the preferred embodiment of the present invention.
Fig. 5 is the left TV structure schematic diagram of Fig. 4.
Fig. 6 is the front and back diversion mechanism structural representation of the binary channel bank note package pipeline system of the preferred embodiment of the present invention.
Fig. 7 is the dicode buttress banding mechanism structural representation of the binary channel bank note package pipeline system of the preferred embodiment of the present invention.
Fig. 8 is the right TV structure schematic diagram of Fig. 7.
Fig. 9 is the structural representation of the Mo Juan mechanism of the preferred embodiment of the present invention.
Figure 10 is the backsight structural representation of Fig. 9.
Figure 11 is the structural representation of the press-note banding mechanism of the preferred embodiment of the present invention.
Figure 12 is the structural representation of the thermal-shrinkage furnace mechanism of the preferred embodiment of the present invention.
Detailed description of the invention
Describe the specific embodiment of the present invention in detail below in conjunction with accompanying drawing, it illustrates principle of the present invention as the part of this specification sheets by embodiment, and other aspects of the present invention, feature and advantage thereof will become very clear by this detailed description.In the accompanying drawing of institute's reference, in different figure, same or analogous parts represent by identical drawing reference numeral.For making the present invention easier to understand, will further set forth specific embodiments of the invention below.
As shown in Figure 1, a kind of binary channel bank note package pipeline system of the present invention is by paper currency sorting bundling device 100 bindings, after paper currency sorting binding, stamping mechanism 200 is affixed one's seal to bank note, and the bank note having covered after chapter is transported to front and back diversion mechanism 400 by lift system 300, bank note enters into respectively two transfer passage A600 that be arranged in parallel and transfer passage B610 after shunting, then bank note enters into dicode buttress banding mechanism 500, dicode buttress banding mechanism 500 carries out bale packing to bank note, then by automatic sealing contracting mechanism 700 and tag labeling mechanism 800, bank note is sealed and seal labeling.
When concrete enforcement, the preferred embodiment of binary channel bank note package pipeline system of the present invention comprises the paper currency sorting bundling device 100 setting gradually, stamping mechanism 200, lift system 300, front and back diversion mechanism 400, article two, the transfer passage A600 be arrangeding in parallel and transfer passage B610, dicode buttress banding mechanism 500, automatic sealing contracting mechanism 700 and tag labeling mechanism 800, also comprise the control system of controlling each mechanism action, described binary channel bank note package pipeline system arranges many paper currency sorting bundling devices 100, every paper currency sorting bundling device 100 configures a stamping mechanism 200, a lift system 300 and a front and back diversion mechanism 400, described paper currency sorting bundling device 100, stamping mechanism 200, lift system 300 and front and back diversion mechanism 400 form a whole, and be evenly distributed on the transporting direction of described transfer passage A600 and transfer passage B610, bank note is after sorting bundling device 100 bindings, stamping mechanism 200 is affixed one's seal to bank note, the bank note that has covered chapter is transported to described front and back diversion mechanism 400 by lift system 300, and front and back diversion mechanism 400 is pushed into the bank note after shunting respectively on described transfer passage A600 and transfer passage B610, described dicode buttress banding mechanism 500 is positioned at the end of described transfer passage A600 and transfer passage B610, transfer passage A600 and transfer passage B610 are sent to described dicode buttress banding mechanism 500 by bank note and pack, bank note after having packed is piled up neatly banding mechanism 500 cash dispensing port by dicode is connected with described automatic sealing contracting mechanism 700, and the bank note after sealing is shunk enters into tag labeling mechanism 800 and carries out seal labeling.Preferably, every paper currency sorting bundling device 100 sides are also provided with a bench board 900, in the time not using paper currency sorting bundling device 100, can use and manually carry out sorting binding.The present invention involves in row differentiation mainly for the ATM volume in bank note and circulation, and ATM volume and circulation volume are carried by former and later two passages simultaneously, and in dicode buttress banding mechanism 500, ATM volume and circulation are involved in to row bale packing, and carry out seal labeling in automatic sealing contracting mechanism 700 and tag labeling mechanism 800.
Wherein, as shown in Figures 2 and 3, described stamping mechanism 200 comprises accepts conveying mechanism 210, described in being positioned at, accept the two-sided stamping mechanism 220 of conveying mechanism 210 tops, what bank note was blocked in to described two-sided stamping mechanism 220 belows stops cylinder 230, and the first press-note cylinder 240 that bank note is compressed, described two-sided stamping mechanism 220 and accept between the strap surface of conveying mechanism 210 and have certain distance, can be by one bank note, after paper currency sorting binding, be automatically slipped to and accept on conveying mechanism 210, then under the drive of accepting conveying mechanism 210, be transported to two-sided stamping mechanism 220 places, stop that cylinder 230 first stops bank note, the first press-note cylinder 240 compresses bank note, then two-sided stamping mechanism 220 carries out automatic sealing from bank note both sides to bank note, after having affixed one's seal, stop that cylinder 230 lets pass, wait for again next bank note.The described conveying mechanism 210 of accepting comprises two conveying side plates 211 that be arranged in parallel, the first belt conveyor 212 and the rebound 213 between described conveying side plate 211 and the first driver train 214 that drives described the first belt conveyor 212 to move, described rebound 213 is arranged on the end of the first belt conveyor 212, and rebound 213, lower than the surface of described the first belt conveyor 212, is convenient to bank note and is entered into rebound 213 from the first belt conveyor 212.Preferably, the flower wheel that described the first driver train 214 comprises the first conveying motor, is connected driving wheel and is in transmission connection by belt and described driving wheel with described the first conveying motor, described first carries motor to be arranged on the below of carrying side plate 211 by motor mounting plate 215, the first driver train 214 is positioned at the below of the first belt conveyor 212, does not affect and accepts conveying mechanism 210 transporting bank note.
Describedly stop that cylinder 230 is arranged on the below of described conveying side plate 211, and be positioned at the end of described the first belt conveyor 212, when bank note is when running to the end of the first belt conveyor 212, stop that the cylinder rod of cylinder 230 stretches out, bank note is blocked below two-sided stamping mechanism 220.Described the first press-note cylinder 240 is fixed on the top of described the first belt conveyor 212 by cylinder fixed support 250, described cylinder fixed support 250 is arranged on described conveying side plate 211, the first money pressing plate 241 for bank note is compressed is installed on the cylinder axis of described the first press-note cylinder 240, in the time stopping that cylinder 230 blocks bank note below two-sided stamping mechanism 220, the cylinder axis of the first press-note cylinder 240 stretches out, by the first money pressing plate 241, bank note is compressed, so that two-sided stamping mechanism 220 is affixed one's seal to bank note.
Further, described cylinder fixed support 250 comprises the column 251 that is installed on described conveying side plate 211, is fixed in the cylinder mounting plate 252 between described column 251, described the first press-note cylinder 240 is arranged on described cylinder mounting plate 252, the first press-note cylinder 240 is positioned at the top of described the first belt conveyor 212, facilitates the first press-note cylinder 240 directly from the top of bank note, bank note to be compressed.Described two-sided stamping mechanism 220 comprises the driving cylinder 221 of affixing one's seal, with described the first name chapter 222 and the second name chapter 223 of affixing one's seal and driving the both sides guide rod of cylinder 221 to be connected, preferably, described affixing one's seal drives cylinder 221 for wide type gas pawl, both sides band guide rod, can step up simultaneously or loosen, described the first name chapter 222 and the second name chapter 223 respectively by the first permanent seat and the second permanent seat with described in affix one's seal and drive the both sides guide rod of cylinder 221 to be connected, wherein, described the first name chapter 222 and the second name chapter 223 are fixed by locating dowel pin and the first permanent seat and the second permanent seat, when the first name chapter 222 and the second name chapter 223 need to change while maybe needing to dip in ink, only locating dowel pin need be extracted from the first permanent seat and the second permanent seat, the first name chapter 222 and the second name chapter 223 can be taken off, Assembly &Disassembly is convenient and swift, in addition, when only carrying out one side while affixing one's seal to bank note, can cancel the first name chapter 222 or the second name chapter 223, can realize one side affixes one's seal, when the first name chapter 222 and the second name chapter 223 are arranged on by locating dowel pin, the first permanent seat and the second permanent seat on the both sides guide rod of the driving cylinder 221 of affixing one's seal, can realize two-sided affixing one's seal, bank note is affixed one's seal flexibly and easily.Preferably, described in affix one's seal drive cylinder 221 be arranged on described cylinder mounting plate 252, be oppositely arranged with described the first press-note cylinder 240, and be positioned at the left side of described the first press-note cylinder 240.In addition, on the conveying side plate 211 of described rebound 213 side above, be provided with and bank note is released to first of described rebound 213 push away paper money cylinder 260, described first pushes away on the cylinder axis of paper money cylinder 260 the first money-pushing plate 261 is installed, when after the complete chapter of bank note lid, stop that cylinder 230 lets pass, bank note enters and has been on cab apron 213 from the first belt conveyor 212, and first pushes away paper money cylinder 260 releases rebound 213 by the first money-pushing plate 261 by bank note, enters into lift system 300.Preferably, the top of described rebound 213 tail ends is provided with control described first and pushes away the first signal switch 270 that paper money cylinder 260 moves, whether first signal switch 270 enters into rebound 213 for detection of bank note, after bank note is affixed one's seal, enter and be cab apron 213, and trigger first signal switch 270, the first cylinder axis that pushes away paper money cylinder 260 stretches out, and drives the first money-pushing plate 261 bank note to be pushed into the lift system 300 of bank note.
While using the stamping mechanism 200 of binary channel bank note package pipeline system of the present invention, paper currency sorting bundling device 100 by paper currency sorting binding after, bank note is slipped to automatically to be accepted on conveying mechanism 210, first column 251 is arranged on and carries on side plate 211, cylinder mounting plate 252 is fixed between column 251, then the first press-note cylinder 240 is arranged on described cylinder mounting plate 252, while is at the opposite side of cylinder mounting plate 252, affix one's seal and drive cylinder 221 to be fixed on described cylinder mounting plate 252, pass through locating dowel pin, the first permanent seat and the second permanent seat are arranged on the first name chapter 222 and the second name chapter 223 on the both sides guide rod of the driving cylinder 221 of affixing one's seal, and ensureing two-sided stamping mechanism 220 and accepting between the first belt conveyor face of conveying mechanism 210 has certain distance, can be by one bank note.In the time that bank note is sent on the first belt conveyor 212 of accepting conveying mechanism 210, start and be positioned at the conveying of first under conveyor side plate 211 motor, first carries driven by motor the first belt conveyor 212 to move, then the first belt conveyor 212 drives bank note to travel forward, in the time that bank note moves to two-sided stamping mechanism 220 below, the cylinder rod that stops cylinder 230 stretches out, bank note is blocked in to the below of two-sided stamping mechanism 220, then the first press-note cylinder 240 compresses bank note by the first money pressing plate 241 on cylinder axis, the guide rod motion of two-sided cylinder 220 both sides of affixing one's seal, drive the first name chapter 222 and the second name chapter 223 from the both sides of bank note, bank note to be affixed one's seal, cover after chapter, the cylinder rod that stops cylinder 230 is regained, allow bank note continue to move forward, in the time that bank note enters into rebound 213 from the first belt conveyor 212, the front end of bank note triggers first signal switch 270, the first cylinder axis that pushes away paper money cylinder 260 stretches out, drive the first money-pushing plate 261 bank note to be pushed into the lift system 300 of bank note.When the first name chapter 222 and the second name chapter 223 need to change while maybe needing to dip in ink, only locating dowel pin need be extracted from the first permanent seat and the second permanent seat, the first name chapter 222 and the second name chapter 223 can be taken off, Assembly &Disassembly is convenient and swift, in addition, when only carrying out one side while affixing one's seal to bank note, can cancel the first name chapter 222 or the second name chapter 223, can realize one side affixes one's seal, when the first name chapter 222 and the second name chapter 223 are passed through to locating dowel pin, the first permanent seat and the second permanent seat are arranged on to affix one's seal and drive on the both sides guide rod of cylinder 221, can realize two-sided affixing one's seal, bank note is affixed one's seal flexibly and easily.Binary channel bank note package pipeline system of the present invention is carried out two-sided affixing one's seal to bank note, more improve the work efficiency that bank note is affixed one's seal, the conveying mechanism 210 of accepting of the present invention is horizontally disposed with, bank note in the time affixing one's seal in flat condition, employing is affixed one's seal and is driven cylinder 221 to carry out horizontal direction from bank note both sides and affix one's seal, and utilization stops that cylinder 230 and the first press-note cylinder 240 block bank note below two-sided stamping mechanism 220 and by bank note and compress, and have ensured the stability of affixing one's seal and the reliability of impressing; Stamping mechanism 200 of the present invention adopts first to push away paper money cylinder 260 bank note that has covered chapter is released from rebound 213, enters into lift system 300, to playing the effect of forming a connecting link in the whole operating system of bank note.
Preferably, as shown in Figure 4 and Figure 5, lift system 300 of the present invention comprises the side plate 310 being oppositely arranged, belt elevator 320 between described side plate 310, and the second driver train 330 that drives described belt elevator to move, described side plate 310 comprises oblique side plate 311 and horizontal side plate 312, seamless link between described oblique side plate 311 and horizontal side plate 312, angular range between described oblique side plate 311 and horizontal side plate 312 is 0-90 degree, the angle of the oblique side plate 311 of lift system 300 of the present invention regulates according to the height of paper currency sorting bundling device cash dispensing port and front and back diversion mechanism 400, setting range is 0-90 degree.Lift block 340 for bank note is promoted is installed on described belt elevator 320, preferably, described lift block 340 is two, parallel is arranged on described belt elevator 320, distance between described two lift blocks 340 is less than the length of bank note, be convenient to more stable bank note being transported in the diversion mechanism 400 of front and back, described lift block 340 other oblique side plates 311 are provided with the signal supervisory instrument 350 that detects bank note and whether enter into lift block 340, described in described control system control, the second driver train 330 drives described belt elevator 320 to rotate after one week to stop, bank note enters into described lift block 340, energizing signal detecting device 350, signal supervisory instrument 350 sends signal to control system, described in described control system control, the second driver train 330 drives described belt elevator 320 to rotate to stop for one week, in the process of rotating at belt elevator 320, diversion mechanism 400 before and after bank note is risen to, and send into next operation, after belt elevator 320 rotates and stops for one week, wait for that next bank note enters on described lift block 340 again.The driving wheel that described the second driver train 330 comprises the first drive motor 331, be connected with described the first drive motor 331 and the flower wheel 333 being connected with described driving wheel by belt 332, described the first drive motor 331 is fixed on the junction of described oblique side plate 311 and horizontal side plate 312 by motor mounting plate 360.Described the first drive motor 331 is by control system control, when each lifting bank note, the first drive motor 331 receives that signal starts to start, drive flower wheel 333 to rotate by belt 332, flower wheel 333 drives belt elevator 320 to rotate, lift block 340 will rotate bank note will be risen to front and back diversion mechanism 400 with belt elevator 320, and lift block 340 will rotate a circle and stop with belt elevator 320, lift block 340 is still in initial position, until next bank note enters into lift block 340, energizing signal detecting device 350, signal supervisory instrument 350 sends signal to control system, described in control system control, the first drive motor 331 rotates again, diversion mechanism 400 before and after one one being delivered to bank note, carry accurately bank note.
In the embodiment that the present invention is; on described side plate 310, case 370 is installed; described case 370 is made up of framework and organism glass or PC plate; be convenient to the protection to bank note lift system; and described case 370 is also provided with openable door above, the convenient care and maintenance to bank note lift system.
Use the lift system 300 of binary channel bank note package pipeline system of the present invention, regulate the angle between oblique side plate 311 and horizontal side plate 312 according to the height between the cash dispensing port of paper currency sorting bundling device 100 and front and back diversion mechanism 400, then the low side of lift system 300 is accepted to carry by stamping mechanism 200 and paper currency sorting bundling device 100 and be connected, the bank note of having affixed one's seal enters into lift block 340, energizing signal detecting device 350, signal supervisory instrument 350 sends signal to control system, control system control the first drive motor 331 rotates, drive belt elevator 320 to rotate by belt 332 and flower wheel 333, lift block 340 will rotate bank note will be risen in the diversion mechanism 400 of front and back with belt elevator 320, lift block 340 rotates a circle and stops with belt elevator 320, lift block 340 is still in initial position, until next bank note enters into lift block 340, again next bank note is transported in the diversion mechanism 400 of front and back.Bank note lift system 300 of the present invention is reasonable in design, simple to operate, automatically bank note is transported in the diversion mechanism 400 of front and back, lift system 300 adopts oblique side plate 311 and horizontal side plate 312, and tiltedly the angular range between side plate 311 and horizontal side plate 312 is 0-90 degree, and this angle regulates according to the height between the cash dispensing port of paper currency sorting bundling device 100 and front and back diversion mechanism 400; On the other oblique side plate 311 of lift block 340, signal supervisory instrument 350 is installed, energizing signal detecting device 350 when bank note enters into lift block, signal supervisory instrument 350 sends signal to control system, control system control the second driver train 330 drives described belt elevator 320 to rotate, diversion mechanism 400 before and after bank note is delivered to, after rotating, within one week, stop, waiting for and transport next bank note, can bank note be risen in the diversion mechanism 400 of front and back accurately every.
Preferably, as shown in Figure 6, front and back of the present invention diversion mechanism 400 can be shunted the bank note of the difference volume of paper currency sorter binding kind, taking ATM volume and circulation volume as example, ATM volume and circulation volume can be divided into former and later two passages and carry simultaneously.Particularly, the front and back diversion mechanism 400 of the preferred embodiment of the present invention comprises support, is positioned at the conveying shunting machine 410 of described transfer passage A600 and transfer passage B610 top, ATM volume and circulation are permed out signal to control system, control system control carries shunting machine 410 that ATM volume and circulation volume are separated, carry by transfer passage A600 and transfer passage B610 respectively simultaneously, thereby complete ATM volume and circulate the shunting action of rolling up.
Particularly, described conveying shunting machine 410 comprises shunting cylinder A420, shunting cylinder B430 and with described transfer passage A600 and the vertically disposed delivery track 440 of transfer passage B610, described shunting cylinder A420 and shunting cylinder B430 lay respectively at described transfer passage A600 and transfer passage B610 directly over, described shunting cylinder A420 is identical with shunting cylinder B430 structure, include cylinder rod 421, the second money-pushing plate 422 being connected with described cylinder rod 421, preferably, described the second money-pushing plate 422 is L-shaped, wherein an end face is connected with described cylinder rod 421, the other end is used for stopping bank note.Wherein, in the present invention, shunt cylinder A420 different with the initial condition of shunting cylinder B430, cylinder rod 421 initial conditions of shunting cylinder A420 are for stretching out state, cylinder rod 421 initial conditions of shunting cylinder B430 are retracted mode, and cylinder rod 421 initial conditions of shunting cylinder A420 are when stretching out state, between cylinder rod 421 and delivery track 440, leave interval, bank note can pass through in this interval.Shunting cylinder A420 is identical with the direction that described transfer passage A600 and transfer passage B610 transport with the flexible direction of the cylinder rod 421 of shunting cylinder B430, bank note transports on delivery track 440, in the time arriving shunting cylinder A420 or shunting cylinder B430 place, the action of the cylinder rod 421 of shunting cylinder A420 or shunting cylinder B430, is pushed into bank note in transfer passage A600 and transfer passage B610 by the second money-pushing plate 422.For example, ATM volume and circulation volume need be carried by transfer passage A600 and transfer passage B610 respectively, when the inner ATM volume of sorting bundling device and circulation volume binding, can give signal of control system, when ATM volume enters on delivery track 440, when ATM volume reaches the position of shunting cylinder A420, control system can be controlled shunting cylinder A420 action, the cylinder rod 421 of shunting cylinder A420 is retracted, the second money-pushing plate 422 being connected with cylinder rod 421 just stops ATM volume, then cylinder rod 421 stretches out, by the second money-pushing plate 422, ATM volume is pushed in transfer passage A600, when circulation volume enters on delivery track 440, control system control shunting cylinder A420 is failure to actuate, circulation volume from the cylinder rod 421 of shunting cylinder A420 below by, while reaching shunting cylinder B430 place, the second money-pushing plate 422 of shunting cylinder B430 directly stops circulation volume, control system control shunting cylinder B430 action, the cylinder rod 421 of shunting cylinder B430 stretches out, and then by the second money-pushing plate 422, circulation volume is pushed in transfer passage B610.Similarly, circulation volume and ATM volume need be carried by transfer passage A600 and transfer passage B610 respectively, when ATM volume enters on delivery track 440, control system control shunting cylinder A420 is failure to actuate, ATM volume from the cylinder rod 421 of shunting cylinder A420 below by, while reaching shunting cylinder B430 place, the second money-pushing plate 422 of shunting cylinder B430 directly stops ATM volume, control system control shunting cylinder B430 action, the cylinder rod 421 of shunting cylinder B430 stretches out, and then by the second money-pushing plate 422, ATM volume is pushed in transfer passage B610; When circulation volume enters on delivery track 440, when circulation volume reaches the position of shunting cylinder A420, control system can be controlled shunting cylinder A420 action, the cylinder rod 421 of shunting cylinder A420 is retracted, the second money-pushing plate 422 being connected with cylinder rod 421 just stops circulation volume, then cylinder rod 421 stretches out, and by the second money-pushing plate 422, circulation volume is pushed in transfer passage A600.Certainly, ATM volume,, only need to be set according to actual conditions without necessarily entering transfer passage A600 and transfer passage B610 with circulation volume in program, controls respectively the priority action of shunting cylinder A420 and shunting cylinder B430 by control system.
Further, described transfer passage A600 and transfer passage B610 include the second belt conveyor 620, are positioned at the passage side plate 630 of described the second belt conveyor 620 both sides, described shunting cylinder A420 is connected with the passage side plate 630 on transfer passage B610 with transfer passage A600 respectively by cylinder mounting plate 450 with shunting cylinder B430, shunting cylinder A420 and shunting cylinder B430 lay respectively at transfer passage A600 and transfer passage B610 directly over so that shunting cylinder A420 and shunting cylinder B430 are pushed into bank note in transfer passage A600 and transfer passage B610.
In order to allow ATM volume and circulation volume slide into more smoothly in transfer passage A600 and transfer passage B610, in an embodiment of the invention, between described delivery track 440 and described transfer passage A600 and transfer passage B610, be provided with slide plate 460, one end of slide plate 460 is connected with the edge of delivery track 440, and relative with shunting cylinder B430 with described shunting cylinder A420, the other end of slide plate 460 is connected with the passage side plate 630 of transfer passage A600 and transfer passage B610, and ensure that slide plate 460 and the second belt conveyor 620 maintain a certain distance, ensure the normal operation of transfer passage A600 and transfer passage B610.
In one embodiment of this invention, preferably, between described delivery track 440 and described shunting cylinder A420 and shunting cylinder B430, be provided with signal switch 470, in the time that bank note enters on delivery track 440, while arriving the position at shunting cylinder A420 or shunting cylinder B430 place, energizing signal switch 470, signal is passed to control system by signal switch 470, control system is controlled shunting cylinder A420 or shunting cylinder B430 action again, be pushed in transfer passage A600 and transfer passage B610 to reach the bank note that difference volume is planted, thereby the object of shunting before and after arriving, and adopt between delivery track 440 and described shunting cylinder A420 and shunting cylinder B430 and be provided with signal switch 470, make the control of control system more accurate.
Use in the time of the diversion mechanism 400 of front and back of the present invention, bank note directly drops into the delivery track 440 of carrying shunting machine 410 from lift system 300, control system is according to the signal of accepting, judge that bank note is ATM volume or circulation volume, and then according to predefined program, control the priority action of shunting cylinder A420 and shunting cylinder B430, to complete the front and back shunting to ATM volume or circulation volume.For example, need and circulate ATM volume and roll up while conveying by transfer passage A600 and transfer passage B610 respectively, when ATM volume enters on delivery track 440, when ATM volume reaches the position of shunting cylinder A420, trigger the other signal switch 470 of shunting cylinder A420, signal is passed to control system by signal switch 470, control system can be controlled shunting cylinder A420 action, the cylinder rod 421 of shunting cylinder A420 is retracted, the second money-pushing plate 422 being connected with cylinder rod 421 just stops ATM volume, then cylinder rod 421 stretches out, by the second money-pushing plate 422, ATM volume is pushed in transfer passage A600, when circulation volume enters on delivery track 440, control system control shunting cylinder A420 is failure to actuate, circulation volume from the cylinder rod 421 of shunting cylinder A420 below by, while reaching shunting cylinder B430 place, the second money-pushing plate 422 of shunting cylinder B430 directly stops circulation volume, and circulation volume triggers the other signal switch 470 of shunting cylinder B430, signal is passed to control system by signal switch 470, control system control shunting cylinder B430 action, the cylinder rod 421 of shunting cylinder B430 stretches out, then by the second money-pushing plate 422, circulation volume is pushed in transfer passage B610, thereby realize, ATM volume and circulation volume are carried by transfer passage A600 and transfer passage B610 respectively, realize ATM volume and the front and back shunting of circulation volume to bank note.Front and back of the present invention diversion mechanism 400 compact conformations, reasonable in design, can involve in row shunting to the circulation volume after sorting binding and ATM; The shunting machine 410 of carrying is set above transfer passage A600 and transfer passage B610, and by control system, the action of shunting cylinder A420 and shunting cylinder B430 is controlled, in the transfer passage A600 and transfer passage B610 be arrangeding in parallel before and after bank note is pushed into, realize the front and back shunting action of bank note.Between delivery track 440 and shunting cylinder A420 and shunting cylinder B430, be provided with signal switch 470, make the control of control system more accurate, in addition, each is simple in structure for front and back of the present invention diversion mechanism 400, can ensure easy to assembly fast.
Further, as shown in Figure 7 and Figure 8, described dicode buttress banding mechanism 500 comprises frame 510, the A540 of Mo Juan mechanism, press-note banding mechanism 550, direct pushing machine structure 530, charging supply unit 520, plastic packaging film mechanism 20, reshaping device 10, discharging supply unit 560, thermal-shrinkage furnace mechanism 40, print unit 30, the B541 of Mo Juan mechanism, receiving mechanism 60, thruster mechanism 570, enclosed mechanism 80, stacking mechanism A580, stacking mechanism B581.
Wherein, the described Mo Juan A540 of mechanism is positioned at the upper strata of described direct pushing machine structure 530, and described thruster mechanism 570 is positioned at the upper strata of described stacking mechanism B581, and be arranged in parallel with described direct pushing machine structure 530 front and back; Press-note banding mechanism 550 is fixed in described frame 510 with described direct pushing machine structure 530, described press-note banding mechanism 550 be arranged in parallel with described direct pushing machine structure 530, and described press-note banding mechanism 550 is positioned at the left side of described direct pushing machine structure 530, described press-note banding mechanism 550 and described direct pushing machine structure 530 are positioned at the upper strata of described stacking mechanism A580; Described stacking mechanism A580 is all connected with described press-note banding mechanism 550 with stacking mechanism B581; Described enclosed mechanism 80 is positioned at the centre of described plastic packaging film mechanism 20 and receiving mechanism 60, described thermal-shrinkage furnace mechanism 40 be positioned at described enclosed mechanism 80 after; Described enclosed mechanism 80 is fixed in frame 510 by support, and between reshaping device 10 and receiving mechanism 60, reshaping device 10 by upper lower clapboard by plastic packaging film levels separately, bank note just can enter in plastic packaging film, in described reshaping device 10, be provided with second and push away paper money cylinder, described second pushes away paper money cylinder pushes bank note in enclosed mechanism 80; Described print unit 30 is thermal transfer printer; The described Mo Juan B541 of mechanism is positioned at the below of described discharging supply unit 560, and is fixed on the lower-left side of described frame 510; Stacking mechanism A580 and stacking mechanism B581 are fixed in described frame 510 by base plate, dock respectively with described charging supply unit 520, and stacking mechanism A580 and stacking mechanism B581 be arranged in parallel and be all positioned at the lower floor of described frame 510.Described discharging supply unit 560 is positioned at the left side of press-note banding mechanism 550, and is arranged in described frame 510 by support; Control system and described direct pushing machine structure 530, the A540 of Mo Juan mechanism, press-note banding mechanism 550, reshaping device 10, thermal-shrinkage furnace mechanism 40, print unit 30, the B541 of Mo Juan mechanism, receiving mechanism 60, enclosed mechanism 80, thruster mechanism 570, stacking mechanism A580 and stacking mechanism B581 are electrically connected.Described stacking mechanism A580 and stacking mechanism B581 are arranged on the lower floor of frame 510, and stacking mechanism A580 and stacking mechanism B581 be arranged in parallel, a charging supply unit 520 of each docking, charging supply unit 520 is positioned at one end of described frame 510, ATM volume enters respectively the automatic stacking mechanism of docking with circulation volume through charging supply unit 520, and stacking mechanism A580 and stacking mechanism B581 involve in row automatic stacking to ATM volume with circulation respectively.Described plastic packaging film mechanism 20, enclosed mechanism 80, receiving mechanism 60 and thermal-shrinkage furnace mechanism 40 carry out plastic packaging to bank note, described enclosed mechanism 80 is positioned at the centre of described plastic packaging film mechanism 20 and receiving mechanism 60, and bank note enters thermal-shrinkage furnace mechanism 40 again and carries out shrink process after enclosed mechanism 80 sealings; Described print unit 30 is thermal transfer printer, control by control system, before bank note bale packing, print What can be set in man-machine interface, when print unit 30 is received after control system instruction, automatically on bale packing film, print and comprise the effective informations such as bank's line number, Currency Type, operator, quantity, date, after printing, again bank note is carried out to bale packing.Described thruster mechanism 570 is arranged on the upper strata of stacking mechanism B581, and be arranged in parallel with direct pushing machine structure 530 front and back, thruster mechanism 570 for the bank note that stacking mechanism B581 piling is completed push direct pushing machine structure 530 before, then by direct pushing machine structure 530, bank note is pushed to press-note banding mechanism 550 and carries out film and tie up; Direct pushing machine structure 530 is arranged on the upper strata of stacking mechanism A580 and is fixedly connected with frame 510, and be arranged in parallel with thruster mechanism 570 front and back, and the A540 of Mo Juan mechanism is arranged on the upper strata of direct pushing machine structure 530, ties up film for installing; On press-note banding mechanism 550 fixed frames 510 and be arranged on the left side of direct pushing machine structure 530, and press-note banding mechanism 550 and direct pushing machine structure 530 be arranged in parallel, and keep line of centers consistent, press-note banding mechanism 550 is positioned at the upper strata of described stacking mechanism A580, direct pushing machine structure 530 pushes press-note banding mechanism 550 by the good bank note of piling and ties up, and this is tied up and adopts the film of certain width and intensity to wrap up in bag to 10 bank note.Discharging supply unit 560 is arranged in described frame 510 by support, discharging supply unit 560 is arranged on the left side of press-note banding mechanism 550, wherein dock with press-note banding mechanism 550 one end, the height of discharging supply unit 560 is lower than the heat-sealing platform 557 of press-note banding mechanism 550, after bank note has been tied up in press-note banding mechanism 550, by direct pushing machine structure 530, bank note is pushed on discharging supply unit 560.The lower-left layer of the B541 of Mo Juan mechanism installation frame 510, is positioned at the below of discharging supply unit 560, ties up film for installing.Stacking mechanism A580 and the equal complete independently bank note of stacking mechanism B581 piling, and share a press-note banding mechanism 550, by the control of control system, sequentially the good bank note of piling is sent into press-note banding mechanism 550 and carried out film and tie up.
In an enforcement of the present invention, as shown in Figure 9 and Figure 10, the A540 of Mo Juan mechanism is the same with each structure of the B541 of Mo Juan mechanism, include film volume adapter plate 542, film spool 543, resting barrel 544, press mold cylinder 548, press mold cylinder 545, machine control valve 546, line slideway 547, slip cylinder 512, brake cylinder 549, stage clip 513, brake roller, brake facing 514, fork 515, film spool 543 is arranged on the front side of film volume adapter plate 542 by bearing seat and bearing, film spool 543 is mechanical expansion shaft, can make the expanding block that is arranged on main axis of dilatation inside stretch out by rotary handle, thereby play the effect of fixedly tying up film.On film spool 543, scale graduation is installed, for measuring, the position of tying up film is installed.Resting barrel 544 is arranged on above the side of film volume adapter plate 542 near film spool 543, for leading film.Line slideway 547 is vertically mounted on the side of film volume adapter plate 542 near resting barrel 544, and slip cylinder 512 is arranged on the sliding shoe of line slideway 547, ties up film and drive slip cylinder 512 to move up and down while tying up.Machine control valve 546 is arranged on the side top of line slideway 547, trigger unit control valve 546 switches while moving up for the cylinder 512 that slides, and machine control valve 546 is controlled brake cylinder 549 ventilation work, thereby plays the effect of checking film spool 543.Press mold cylinder 545 and press mold cylinder 548 are arranged on the side of line slideway 547 simultaneously, and press mold cylinder 545, above press mold cylinder 548, is lived mould when tying up, makes bill binding firm.Brake cylinder 549 is arranged on the rear side of film volume adapter plate 542, control by machine control valve 546, for propping up fork 515, brake facing 514 tightly check brake rod, thereby film spool 543 cannot be rotated.Brake rod is arranged on film spool 543 rear end projecting shafts, and brake facing 514 is arranged on fork 515, and fork 515 can rotate, and a side of fork 515 is provided with stage clip 513, and the output shaft axle of opposite side and brake cylinder 549 is close.
Wherein, as shown in figure 11, press-note banding mechanism 550 comprises heat-sealing cylinder 551, upper hot knife 552, the second money pressing plate 553, the second press-note cylinder 554, lower hot knife 556, lower heat-sealing cylinder 555, heat-sealing platform 557 and air cylinder support 558, upper hot knife 552 is fixed on heat-sealing cylinder 551, the second money pressing plate 553 is fixed on the second press-note cylinder 554, upper heat-sealing cylinder 551 and the second press-note cylinder 554 are fixed on air cylinder support 558 side by side, the second press-note cylinder 554 is positioned at heat-sealing cylinder 551 left sides, the second money pressing plate 553 and upper hot knife 552 are in sustained height, all exceed the height of 10 bank note.The second press-note cylinder 554, for 10 bank note being pressed on to heat-sealing platform 557, is convenient to film and is tied up sealing.Platform 557 is vertical is connected with heat-sealing for air cylinder support 558, seals platform 557 and is fixed in frame 510, be arranged in parallel with being directly bulldozed platform, and in being directly bulldozed the left side of platform 360.Lower hot knife 556 is fixed on lower heat-sealing cylinder 555, and lower heat-sealing cylinder 555 is fixed on below heat-sealing platform 557 by support, and preferably, lower hot knife 556 is heated blade, with upper hot knife 552 consistencies from top to bottom.In the time that direct pushing machine structure 530 is shifted onto below the second money pressing plate 553 by bank note, the second press-note cylinder 554 drives the second money pressing plate 553 that bank note is compressed, money-pushing plate is return original position, upper heat-sealing cylinder 551 drives upper hot knife 552 to start working, upper hot knife 552 moves from top to bottom, drive film volume to rotate simultaneously, paper money bundle is wrapped up in to film, upper hot knife 552 drops on heat-sealing platform 557, packaging film is compressed simultaneously, lower heat-sealing cylinder 555 drives lower hot knife 556 to start, after being sealed and cut off, packaging film returns, upper heat-sealing cylinder 551 drives upper hot knife 552 to return subsequently, thereby complete, paper money bundle is wrapped up in to film, heat-sealing and bale packing.Money-pushing plate in direct pushing machine structure 530 pushes away the sealing part of paper money to press-note banding mechanism 550 for the first time, then returns, and press-note banding mechanism 550 is tied up bank note, after, money-pushing plate pushes away paper money for the second time, and the bank note of tying up is pushed to discharging supply unit 560, then returns.
During of the present invention another implemented, as shown in figure 12, for the structural representation of the thermal-shrinkage furnace mechanism of the preferred embodiment of the present invention, thermal-shrinkage furnace mechanism 40 is fixed in frame 510, and be positioned at below described plastic packaging film mechanism 20, thermal-shrinkage furnace mechanism 40 comprises thermal-shrinkage furnace guard shield 41, heating pipe 42, chain 43, carry drive roll 44, second carry motor 45, motor B46 and fan 47.Wherein, above-mentioned heating pipe 42 is two groups, is arranged on respectively in the two side wall panels of thermal-shrinkage furnace guard shield 41, and heating pipe 42 is connected with thermal module simultaneously, and thermal module temperature height is controlled and set by control system.Chain 43 is provided with three rows, be positioned in the middle of thermal-shrinkage furnace guard shield 41, chain 43 carries motor 45 to be connected with carrying drive roll 44 and second, and drive by the second conveying motor 45, after bank note is by enclosed mechanism 80 plastic packagings, enter chain 43, chain 43 drives the bank note after plastic packaging to enter in thermal-shrinkage furnace to heat, and plastic packaging film 202 shrinks, last tightly be wrapped in bank note outside, after by shrink oven outlet output.Fan 47 is driven by motor B46, and it is arranged on below lower chain 43, can guarantee that in thermal-shrinkage furnace, temperature stabilization is uniformly distributed when fan 47 rotates.
Binary channel bank note package pipeline system of the present invention adopts mechanized operation, bank note is carried out to sorting binding, automatic sealing, and ATM volume and circulation are involved in to row and distinguish and shunt, be divided into former and later two passages carries simultaneously, in dicode buttress banding mechanism 500, bank note is packed, then by automatic sealing contracting mechanism 700 and tag labeling mechanism 800, bank note is sealed and seal labeling.The bank note of stamping mechanism 200 of the present invention after to sorting binding carries out two-sided affixing one's seal, improve the work efficiency that bank note is affixed one's seal, the conveying mechanism 210 of accepting of the present invention is horizontally disposed with, bank note in the time affixing one's seal in flat condition, employing is affixed one's seal and is driven cylinder 221 to carry out horizontal direction from bank note both sides and affix one's seal, and utilization stops that cylinder 230 and the first press-note cylinder 240 block bank note below two-sided stamping mechanism 220 and by bank note and compress, ensured the stability of affixing one's seal and the reliability of impressing, stamping mechanism 200 of the present invention also can be affixed one's seal to bank note one side simultaneously, lift system 300 of the present invention is arranged between stamping mechanism 200 and front and back diversion mechanism 400, automatically diversion mechanism 400 before and after the bank note that has covered chapter being transported to, to bank note is carried out to triage operator, on the other oblique side plate 311 of lift block 340, signal supervisory instrument 350 is installed, energizing signal detecting device 350 when bank note enters into lift block 340, signal supervisory instrument 350 sends signal to control system, control system control the second driver train 330 drives described belt elevator 320 to rotate, diversion mechanism 400 before and after bank note is delivered to, after rotating, within one week, stop, next bank note is transported in wait, can bank note be risen in the diversion mechanism 400 of front and back accurately every, the shunting machine 410 of carrying is set above transfer passage A600 and transfer passage B610, and by control system, the action of shunting cylinder A420 and shunting cylinder B430 is controlled, in the transfer passage A600 and transfer passage B610 be arrangeding in parallel before and after bank note is pushed into, realize the front and back shunting action of bank note.At the end of transfer passage A600 or transfer passage B610, dicode buttress banding mechanism 500 is set, transfer passage A600 and transfer passage B610 are sent to described dicode buttress banding mechanism 500 by bank note and pack, bank note after having packed is piled up neatly banding mechanism 500 cash dispensing port by dicode is connected with described automatic sealing contracting mechanism 700, and the bank note after sealing is shunk enters into tag labeling mechanism 800 and carries out seal labeling.
Last institute should be noted that; above embodiment is only in order to illustrate technical scheme of the present invention but not limiting the scope of the invention; although the present invention is explained in detail with reference to preferred embodiment; those of ordinary skill in the art is to be understood that; can modify or be equal to replacement technical scheme of the present invention, and not depart from essence and the scope of technical solution of the present invention.

Claims (10)

1. binary channel bank note package pipeline system, it is characterized in that, comprise the paper currency sorting bundling device setting gradually, stamping mechanism, lift system, front and back diversion mechanism, article two, the transfer passage A be arrangeding in parallel and transfer passage B, dicode buttress banding mechanism, automatic sealing contracting mechanism and tag labeling mechanism, described binary channel bank note package pipeline system arranges many paper currency sorting bundling devices, a stamping mechanism of every paper currency sorting bundling device configuration, a lift system and a front and back diversion mechanism, described paper currency sorting bundling device, stamping mechanism, lift system and front and back diversion mechanism form a whole, and be evenly distributed on the transporting direction of described transfer passage A and transfer passage B, bank note is after sorting bundling device binding, and stamping mechanism is affixed one's seal to bank note, and the bank note that has covered chapter is transported to described front and back diversion mechanism by lift system, and front and back diversion mechanism is pushed into the bank note after shunting respectively on described transfer passage A and transfer passage B, described dicode buttress banding mechanism is positioned at the end of described transfer passage A and transfer passage B, transfer passage A and transfer passage B are sent to described dicode buttress banding mechanism by bank note and pack, bank note after having packed is piled up neatly banding mechanism cash dispensing port by dicode is connected with described automatic sealing contracting mechanism, and the bank note after sealing is shunk enters into tag labeling mechanism and carries out seal labeling, also comprise the control system of controlling each mechanism action.
2. binary channel bank note package pipeline system according to claim 1, it is characterized in that, described stamping mechanism comprises accepts conveying mechanism, described in being positioned at, accept the two-sided stamping mechanism of conveying mechanism top, bank note is blocked in to the cylinder that stops of described two-sided stamping mechanism below, and the first press-note cylinder that bank note is compressed, the described conveying mechanism of accepting comprises two conveying side plates that be arranged in parallel, the first belt conveyor and rebound between described conveying side plate, and the first driver train that drives described the first belt conveyor to move, described rebound is lower than the surface of described the first belt conveyor, describedly stop that cylinder is arranged on the below of described conveying side plate, described the first press-note cylinder is fixed on the top of described the first belt conveyor by cylinder fixed support, described cylinder fixed support is arranged on described conveying side plate, and the first money pressing plate for bank note is compressed is installed on the cylinder axis of described the first press-note cylinder.
3. binary channel bank note package pipeline system according to claim 1, it is characterized in that, described lift system comprises the side plate being oppositely arranged, the belt elevator between described side plate and the second driver train that drives described belt elevator to move, described side plate comprises oblique side plate and horizontal side plate, seamless link between described oblique side plate and horizontal side plate, lift block for bank note is promoted is installed on described belt elevator, and the other oblique side plate of described lift block is provided with the signal supervisory instrument that detects bank note and whether enter into lift block; Bank note enters into described lift block, energizing signal detecting device, and the second driver train drives described belt elevator to rotate within one week, to stop, waiting for that next bank note enters on described lift block again described in described control system control.
4. binary channel bank note package pipeline system according to claim 1, it is characterized in that, described front and back diversion mechanism comprises support, be positioned at the conveying shunting machine of described transfer passage A and transfer passage B top, described conveying shunting machine comprises shunting cylinder A, shunting cylinder B and with described transfer passage A and the vertically disposed delivery track of transfer passage B, described shunting cylinder A and shunting cylinder B lay respectively at described transfer passage A and transfer passage B directly over, described shunting cylinder A is identical with shunting cylinder B structure, include cylinder rod, the second money-pushing plate being connected with described cylinder rod,
Described transfer passage A and transfer passage B include the second belt conveyor, are positioned at the passage side plate of described the second belt conveyor both sides, and described shunting cylinder A is connected with the passage side plate on transfer passage B with transfer passage A respectively by cylinder mounting plate with shunting cylinder B; The action of shunting cylinder A and shunting cylinder B described in described control system control, is pushed into the bank note on delivery track in transfer passage A and transfer passage B.
5. binary channel bank note package pipeline system according to claim 1, it is characterized in that, described dicode buttress banding mechanism comprises frame, charging supply unit, direct pushing machine structure, the A of Mo Juan mechanism, press-note banding mechanism, discharging supply unit, the B of Mo Juan mechanism, thruster mechanism, the A of automatic stacking mechanism, the B of automatic stacking mechanism; Described charging supply unit is fixed in described frame, and docks with the described automatic stacking A of mechanism and the B of automatic stacking mechanism;
The described automatic stacking A of mechanism and the B of automatic stacking mechanism are fixed in described frame by base plate, the A of automatic stacking mechanism and the B of automatic stacking mechanism be arranged in parallel and are all positioned at the lower floor of described frame, and the A of automatic stacking mechanism and the B of automatic stacking mechanism involve in row automatic stacking to ATM volume with circulation respectively;
Described press-note banding mechanism and described direct pushing machine structure are fixed in described frame, described press-note banding mechanism and described direct pushing machine structure be arranged in parallel, and described press-note banding mechanism is positioned at the left side of described direct pushing machine structure, described press-note banding mechanism and described direct pushing machine structure are positioned at the upper strata of the described automatic stacking A of mechanism;
The described Mo Juan A of mechanism is positioned at the upper strata of described direct pushing machine structure, and described thruster mechanism is positioned at the upper strata of the described automatic stacking B of mechanism, and with described direct pushing machine structure before and after be arranged in parallel; The described automatic stacking A of mechanism is all connected with described press-note banding mechanism with the B of automatic stacking mechanism; Described discharging supply unit is positioned at the left side of press-note banding mechanism, and is arranged in described frame by support;
The described Mo Juan B of mechanism is positioned at the below of described discharging supply unit, and is fixed on the lower-left side of described frame; Described control system and described direct pushing machine structure, the A of Mo Juan mechanism, press-note banding mechanism, the B of Mo Juan mechanism, thruster mechanism, the A of automatic stacking mechanism and the B of automatic stacking mechanism are electrically connected.
6. binary channel bank note package pipeline system according to claim 2, it is characterized in that, described cylinder fixed support comprises the column that is installed on described conveying side plate, is fixed in the cylinder mounting plate between described column, and described the first press-note cylinder is arranged on described cylinder mounting plate; Described two-sided stamping mechanism comprise affix one's seal drive cylinder, with described in affix one's seal both sides guide rod the first name chapter and the second name chapter that are connected of driving cylinder, described affixing one's seal drives cylinder to be arranged on described cylinder mounting plate, and is positioned at the left side of described the first press-note cylinder; Described the first name chapter and the second name chapter respectively by the first permanent seat and the second permanent seat with described in affix one's seal and drive the both sides guide rod of cylinder to be connected, described the first name chapter and the second name chapter are fixed by locating dowel pin and the first permanent seat and the second permanent seat.
7. binary channel bank note package pipeline system according to claim 4, is characterized in that, between described delivery track and described shunting cylinder A and shunting cylinder B, is provided with signal switch; Described the second money-pushing plate is L-shaped, and wherein an end face is connected with described cylinder rod, and the other end is used for stopping bank note.
8. binary channel bank note package pipeline system according to claim 5, it is characterized in that, the described Mo Juan A of mechanism and the B of Mo Juan mechanism include film volume adapter plate, film spool, resting barrel, press mold cylinder, press mold cylinder, machine control valve, line slideway, slip cylinder, brake cylinder, stage clip, brake roller, brake facing and fork; Described film spool is arranged on the front side of described film volume adapter plate by bearing seat and bearing, described film spool is mechanical expansion shaft, on described film spool, scale graduation is installed, described resting barrel is arranged on above the side of described film volume adapter plate near film spool, described line slideway is vertically mounted on the side of described film volume adapter plate near resting barrel, described slip cylinder is arranged on the sliding shoe of line slideway, and described slip cylinder can move up and down; Described machine control valve is arranged on the side top of line slideway, and described press mold cylinder and described press mold cylinder are arranged on the side of described line slideway simultaneously, and described press mold cylinder is above described press mold cylinder; Described brake cylinder is arranged on the rear side of described film volume adapter plate, described brake rod is arranged on the projecting shaft of described film spool rear end, and described brake facing is arranged on described fork, and described fork can rotate, one side of fork is provided with stage clip, and the output shaft of opposite side and described brake cylinder is close.
9. binary channel bank note package pipeline system according to claim 5, it is characterized in that, described press-note banding mechanism comprises heat-sealing cylinder, upper hot knife, the second money pressing plate, the second press-note cylinder, lower hot knife, lower heat-sealing cylinder, heat-sealing platform and air cylinder support; Described upper hot knife is fixed on described upper heat-sealing cylinder, described the second money pressing plate is fixed on described the second press-note cylinder, described upper heat-sealing cylinder and the second press-note cylinder are fixed on described air cylinder support side by side, described the second press-note cylinder is positioned at described upper heat-sealing cylinder left side, and described the second money pressing plate and upper hot knife are in sustained height; Described air cylinder support and described vertical connection of heat-sealing platform, described heat-sealing platform is fixed in described frame, be arranged in parallel, and be positioned at the described left side that is directly bulldozed platform with the described platform that is directly bulldozed; Described lower hot knife is fixed on described lower heat-sealing cylinder, and described lower heat-sealing cylinder is fixed on below described heat-sealing platform by support, and described lower hot knife is heated blade, with described upper hot knife consistency from top to bottom.
10. binary channel bank note package pipeline system according to claim 1, is characterized in that, every other bench board that is also provided with of paper currency sorting bundling device.
CN201410402250.8A 2014-08-15 2014-08-15 Double-channel paper money packaging assembly line system Expired - Fee Related CN104192339B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410402250.8A CN104192339B (en) 2014-08-15 2014-08-15 Double-channel paper money packaging assembly line system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410402250.8A CN104192339B (en) 2014-08-15 2014-08-15 Double-channel paper money packaging assembly line system

Publications (2)

Publication Number Publication Date
CN104192339A true CN104192339A (en) 2014-12-10
CN104192339B CN104192339B (en) 2017-02-15

Family

ID=52077770

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410402250.8A Expired - Fee Related CN104192339B (en) 2014-08-15 2014-08-15 Double-channel paper money packaging assembly line system

Country Status (1)

Country Link
CN (1) CN104192339B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108033086A (en) * 2018-01-12 2018-05-15 道真仡佬族苗族自治县顺豪纸品加工厂 It is a kind of to take out packing device used for paper processing
CN114313388A (en) * 2021-12-29 2022-04-12 维融科技股份有限公司 Exchequer assembly line dot plastic packaging packer

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002080014A (en) * 2000-09-07 2002-03-19 Takara Pakku:Kk Automatic envelope set replacing and collating band applying machine
JP2009086715A (en) * 2007-09-27 2009-04-23 Oki Electric Ind Co Ltd Bill sorting device
CN202573334U (en) * 2012-05-30 2012-12-05 河北汇金机电股份有限公司 Automatic sealing system for marking bundled bank notes
CN202593949U (en) * 2012-05-30 2012-12-12 河北汇金机电股份有限公司 Automatic paper currency sorting and packaging device with stamping mechanism
CN203602000U (en) * 2013-12-10 2014-05-21 北京人银文化科技有限公司 Double-channel banknote bundle distributing and stacking system
CN203681922U (en) * 2014-01-24 2014-07-02 深圳市中鑫创达科技有限公司 Paper currency bundling packaging and plastic packaging all-in-one machine
CN103979128A (en) * 2014-05-13 2014-08-13 深圳市中鑫创达科技有限公司 Double-stacking paper money strapping and plastic-enveloping machine
CN204137365U (en) * 2014-08-15 2015-02-04 深圳市中鑫创达科技有限公司 Binary channel bank note package pipeline system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002080014A (en) * 2000-09-07 2002-03-19 Takara Pakku:Kk Automatic envelope set replacing and collating band applying machine
JP2009086715A (en) * 2007-09-27 2009-04-23 Oki Electric Ind Co Ltd Bill sorting device
CN202573334U (en) * 2012-05-30 2012-12-05 河北汇金机电股份有限公司 Automatic sealing system for marking bundled bank notes
CN202593949U (en) * 2012-05-30 2012-12-12 河北汇金机电股份有限公司 Automatic paper currency sorting and packaging device with stamping mechanism
CN203602000U (en) * 2013-12-10 2014-05-21 北京人银文化科技有限公司 Double-channel banknote bundle distributing and stacking system
CN203681922U (en) * 2014-01-24 2014-07-02 深圳市中鑫创达科技有限公司 Paper currency bundling packaging and plastic packaging all-in-one machine
CN103979128A (en) * 2014-05-13 2014-08-13 深圳市中鑫创达科技有限公司 Double-stacking paper money strapping and plastic-enveloping machine
CN204137365U (en) * 2014-08-15 2015-02-04 深圳市中鑫创达科技有限公司 Binary channel bank note package pipeline system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108033086A (en) * 2018-01-12 2018-05-15 道真仡佬族苗族自治县顺豪纸品加工厂 It is a kind of to take out packing device used for paper processing
CN108033086B (en) * 2018-01-12 2024-05-14 德州胜港纸业有限公司 Packaging device for tissue processing
CN114313388A (en) * 2021-12-29 2022-04-12 维融科技股份有限公司 Exchequer assembly line dot plastic packaging packer

Also Published As

Publication number Publication date
CN104192339B (en) 2017-02-15

Similar Documents

Publication Publication Date Title
CN103979128B (en) Dicode buttress paper money bundle bag plastic packaging machine
CN104192337B (en) Binary channels bank note intelligence package linear system system
CN105564748B (en) A kind of Automatic Plastic sealing machine and its package method
CN103625678B (en) Automatic paper currency stacking and binding integrated machine
CN102627157B (en) Splitting system and splitting method of paper currency packaging bag production line
CN102730227B (en) Full-automatic paper money clearing and packaging assembly line
CN204150314U (en) A kind of Automatic Plastic sealing machine
CN102582869B (en) Full-automatic film banknote bundling machine
CN104150040B (en) Full-automatic banknote sorting package streamline
CN202593949U (en) Automatic paper currency sorting and packaging device with stamping mechanism
CN102616405B (en) Integration device for stacking, bundling and labeling bank notes and tickets
CN103738523A (en) Bundling and plastically-enveloping AIO (all-in-one) machine for paper currency
CN110775382B (en) Automatic stacking and packaging line for copper pipes
CN102897340A (en) Banknote plastic packaging machine and banknote packaging method
CN103507987B (en) Paper sheet processing apparatus
CN204137364U (en) Binary channel bank note intelligence package wire system
CN203832775U (en) Double-stacking paper money binding laminator
CN104192338B (en) Single channel automatic stacking packs plastic packaging system
CN104691821B (en) Double-stacking automatic money binder
CN205906330U (en) Full -automatic teaching material packing production line
CN104670552B (en) Banknote pre-enveloping and plastic-packaging mechanism and control method thereof
CN104192339B (en) Double-channel paper money packaging assembly line system
CN202481359U (en) Note stacking, banding and labeling integrated device
CN204137365U (en) Binary channel bank note package pipeline system
CN203832805U (en) Automatic double-stacking money binder

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190904

Address after: 410000 First Bay of Sifangping, Kaifu District, Changsha City, Hunan Province

Patentee after: Yuan Yan

Address before: 518118 Guangdong province Shenzhen City Pingshan Pingshan biling Street Community Xinsha Road No. 29-1C

Patentee before: SHENZHEN ZHONGXIN CHUANGDA SCIENCE & TECHNOLOGY CO.,LTD.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170215