CN104182828A - Method for carrying out secondary equipment whole life cycle management by electronic label - Google Patents

Method for carrying out secondary equipment whole life cycle management by electronic label Download PDF

Info

Publication number
CN104182828A
CN104182828A CN201410398271.7A CN201410398271A CN104182828A CN 104182828 A CN104182828 A CN 104182828A CN 201410398271 A CN201410398271 A CN 201410398271A CN 104182828 A CN104182828 A CN 104182828A
Authority
CN
China
Prior art keywords
relay protection
information
management
equipment
stage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410398271.7A
Other languages
Chinese (zh)
Inventor
黄毅
张永伍
李大勇
房亚囡
徐和炎
宋国旺
杨畅
曹志伟
王洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410398271.7A priority Critical patent/CN104182828A/en
Publication of CN104182828A publication Critical patent/CN104182828A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a method for carrying out secondary equipment whole life cycle management by an electronic label. The method comprises the following stages of: building an electronic label recognition system; building relay protection factory information; building a relay protection standing book; importing the relay protection standing book; initializing electronic label codes; pasting labels; carrying out operation maintenance information maintenance an in operation maintenance management unit; carrying out patrol and examination management; and sharing information among systems, and the like. The method for carrying out the secondary equipment whole life cycle management by the electronic label provided by the invention has the advantages that the unified management of the standing book-card-object standing book and operation and transformation information of relay protection equipment is realized through building a relay protection equipment management system on the basis of RFID (Radio Frequency Identification) label unique marks; the information fine management to equipment plug-ins is realized; and the effective management of the whole life cycle including equipment installation, commissioning, operation and maintenance, unusual action and return is realized.

Description

A kind of applying electronic label carries out the method for secondary device life cycle management management
Technical field
The invention belongs to substation relay protection device asset management and operation management technical field, particularly relate to a kind of method that applying electronic label carries out the management of secondary device life cycle management.
Background technology
Along with transformer station's quantity increases, secondary device assets investment is huge.The administrative relationships of asset of equipments are arrived to the rate of return on investment of enterprise and the Effective Operation of equipment.Adopt at present the mode of labor management, exist workload greatly, easily make mistakes, the problem of discrepancy between accounts and actual resources.
Need to introduce new technological means, set up a set of scientific and reasonable technological system and management regulation, realization is to the dynamic real-time follow-up Centralized Monitoring management of the intellectuality of asset life-cycle (increase newly, allot, leave unused, safeguard, scrap etc.) process, and whole management process need not manual intervention.For Investment Decision-making, assets rational allocation provide reference data accurately, effectively improved asset utilization ratio, reduce meaningless equipment investment and idle waste.By system, realize the effective supervision to routine work, alleviate the pressure of transformer station's assets daily management.
Summary of the invention
In order to address the above problem, the object of the present invention is to provide a kind of applying electronic label to carry out the method for secondary device life cycle management management.
In order to achieve the above object, the method that applying electronic label provided by the invention carries out the management of secondary device life cycle management comprises the following step of carrying out in order:
Step 1) set up the S01 stage of electronic label identification system: set up the electronic label identification system based on RFID technology, it comprises: electronic tag, mobile handheld terminal and client-server; Wherein: mobile handheld terminal carries out communication by electromagnetic induction and electronic tag; Described mobile handheld terminal is to have the palm PC that electronic tag is carried out to read-write capability, for realizing initialization and the Card read/write operation of electronic tag; Client-server is the computing machine of an operation operation management system software, and it is connected with mobile handheld terminal by USB wired mode;
Step 2) set up the S02 stage of relay protection producer information: the equipment raw information providing according to relay protection device producer, the initial excel electrical form information of apparatus for establishing, and imported among client-server;
Step 3) set up the S03 stage of relay protection account: in client-server, for each relay protection device, set up the relay protection account that comprises equipment initial information;
Step 4) the S04 stage that relay protection account imports: in client-server, every relay protection account data maintenance corresponding in relay protection account is complete, be that manual maintenance completes after complete relay protection account data, then relay protection account is downloaded among mobile handheld terminal;
Step 5) electronic tag is encoded the initialized S05 stage: for each relay protection device, set up an electronic tag for correspondence with it, and utilize apparatus for initializing to its initialization of encoding;
Step 6) labelled S06 stage again: electronic tag is pasted on relay protection device on the other side;
The S07 stage of step 7) safeguarding at fortune management O&M unit information: after relay protection device puts into operation, when there is equipment deficiency and need more exchange device plug-in unit, when the plugin information of equipment is safeguarded, by mobile handheld terminal, scan the electronic tag that need to update the equipment, confirmation need to be upgraded the equipment of plug-in unit, the plugin name of the plug-in unit of updating the equipment, plug-in unit model, software version, installed date information;
Step 8) the S08 stage of inspection management: when relay protection device is patrolled and examined, by client-server, will comprise that the content of patrolling and examining of making an inspection tour template, tour task downloads among mobile handheld terminal, staff holds mobile handheld terminal scanning and sticks on the electronic tag on equipment, now, mobile handheld terminal is patrolled and examined content by automatic spring, staff patrols and examines according to patrolling and examining content, then will specifically patrol and examine Data Enter among mobile handheld terminal, to realize, patrol and examine archival of information;
Step 9) between system, share the S09 stage of information: by client-server, the operation maintenance of all relay protection devices is patrolled and examined to information, by network, realize the operation maintenance information of sharing relay protection device with external system.
At S01, in the stage, described client-server utilizes existing computing machine in operation management system, and client-server is connected with mobile handheld terminal by USB interface.
At S03, in the stage, described relay protection account comprises two parts content: the initial excel information of a part for setting up according to the information of dispatching from the factory of relay protection device producer, and its information field has: protection classification, manufacturing firm, protection model; The safeguard relay protection account information of another part for manually setting up on client-server; its information field has: organization, thread, plant stand title, interval title; the relay protection account information of two parts complete, wherein a corresponding relay protection device of relay protection information.
At S05, in the stage, the initialized content of described coding comprises: plant stand title, interval title, RFID coding, plugin information.
In step 8) in, described tour content creates manually on client-server, then by usb data line, downloads to mobile handheld terminal.
Applying electronic label provided by the invention carries out the method for secondary device life cycle management management; by setting up based on RFID label uniquely identified relay protection device management system; realize the unified management of " the account card thing " machine account of relay protection device and operation, transformation information; information fine-grained management is to equipment plug-in unit, realizes equipment is installed, put into operation, O&M, unusual fluctuation, moves back effective management of transporting whole life cycle.
This method adopts high-frequency RF ID label, and necessary assets information and the operation information of its memory protection equipment, be associated with protection equipment, realizes the unique sign to protection equipment, realizes protection asset of equipments information fast, efficiently, accurately gather.
Relay protection device life cycle management management system application is after secondary device asset management; can (1) realize the whole network secondary device uniqueness sign; realize relay protection device from manufacturing, debug examination, operation maintenance, technological transformation overhaul until the Whole Course Management of scrapping improves equipment control standardization.(2) carry out associatedly with relay protection device production information, realize the management to details such as board model, production batch, equipment control is goed deep into board level from device level, improves the lean level of equipment control; And move back available plug-in unit in fortune equipment by record queries, and realize secondary utilization, avoided the idle waste of device resource; (3) utilize electronic tag to realize the front verifying function of equipment operating, preventing from going to the wrong way interval occurs, prevent from touching the generation that causes power outage by mistake, and provide equipment routing inspection, checking function to manage, normalized template and standard are provided, improve standardization and the on-the-spot management and control level of secondary device operation maintenance.
Accompanying drawing explanation
Fig. 1 is the method flow diagram that applying electronic label provided by the invention carries out the management of secondary device life cycle management.
Fig. 2 is the composition frame chart of electronic label identification system.
Embodiment
The method of applying electronic label provided by the invention being carried out to the management of secondary device life cycle management below in conjunction with the drawings and specific embodiments is elaborated.
As shown in Figure 1, the method that applying electronic label provided by the invention carries out the management of secondary device life cycle management comprises the following step of carrying out in order:
Step 1) set up the S01 stage of electronic label identification system: set up the electronic label identification system based on RFID technology as shown in Figure 2, it comprises: electronic tag 1, mobile handheld terminal 2 and client-server 3; Wherein: mobile handheld terminal 2 carries out communication by electromagnetic induction and electronic tag 1; Described mobile handheld terminal 2 is for having the palm PC that electronic tag 1 is carried out to read-write capability, for realizing the operations such as the initialization of electronic tag 1 and Card read/write; Client-server 3 is the computing machine of an operation operation management system software, and it is connected with mobile handheld terminal 2 by USB wired mode;
Step 2) set up the S02 stage of relay protection producer information: the equipment raw information providing according to relay protection device producer, the initial excel electrical form information of apparatus for establishing, and imported among client-server 3;
Step 3) set up the S03 stage of relay protection account: in client-server 3, for each relay protection device, set up the relay protection account that comprises equipment initial information;
Step 4) the S04 stage that relay protection account imports: in client-server 3, every relay protection account data maintenance corresponding in relay protection account is complete, be that manual maintenance completes after complete relay protection account data, then relay protection account is downloaded among mobile handheld terminal 2;
Step 5) electronic tag is encoded the initialized S05 stage: for each relay protection device, set up an electronic tag 1 for correspondence with it, and utilize apparatus for initializing 3 to its initialization of encoding;
Step 6) labelled S06 stage again: electronic tag 1 is pasted on relay protection device on the other side;
The S07 stage of step 7) safeguarding at fortune management O&M unit information: after relay protection device puts into operation, when there is equipment deficiency and need more exchange device plug-in unit, when the plugin information of equipment is safeguarded, the electronic tag 1 that need to update the equipment by mobile handheld terminal 2 scannings, confirmation need to be upgraded the equipment of plug-in unit, the information such as the plugin name of the plug-in unit of updating the equipment, plug-in unit model, software version, installed date;
Step 8) the S08 stage of inspection management: when relay protection device is patrolled and examined, by client-server 3, will comprise that the content of patrolling and examining of making an inspection tour template, tour task downloads among mobile handheld terminal 2, staff holds mobile handheld terminal 2 scannings and sticks on the electronic tag 1 on equipment, now, mobile handheld terminal 2 is patrolled and examined content by automatic spring, staff patrols and examines according to patrolling and examining content, then will specifically patrol and examine Data Enter among mobile handheld terminal 2, to realize, patrol and examine archival of information;
Step 9) between system, share the S09 stage of information: by client-server 3, the operation maintenance of all relay protection devices is patrolled and examined to information, by network, realize the operation maintenance information of sharing relay protection device with external system.
At S01, in the stage, described client-server 3 can utilize existing computing machine in operation management system, and client-server 3 is connected with mobile handheld terminal 2 by USB interface.
At S03, in the stage, described relay protection account comprises two parts content: the initial excel information of a part for setting up according to the information of dispatching from the factory of relay protection device producer, and its information field has: protection classification, manufacturing firm, protection model etc.; The safeguard relay protection account information of another part for manually setting up on client-server 3; its information field has: organization, thread, plant stand title, interval title etc.; the relay protection account information of two parts complete, wherein a corresponding relay protection device of relay protection information.
At S05, in the stage, the initialized content of described coding comprises: plant stand title, interval title, RFID coding, plugin information etc.
In step 8) in, described tour template, tour task dispatching are maked an inspection tour content by creating manually at client-server 3, then by usb data line, download to mobile handheld terminal 2.
In step 8) in, the described detailed process of patrolling and examining is:
First (making an inspection tour template is the particular content that should make an inspection tour a kind equipment in the upper establishment of client-server 1 (client), to make an inspection tour template, the tour content template of the standard of manual creation), (tour task comprises the tour time to tour task, tour equipment, the mission bit streams such as perambulator), then mobile handheld terminal 2 is connected to client-server 3 by usb data line, and will make an inspection tour template, tour task downloads in mobile handheld terminal 2, staff holds mobile handheld terminal 2 scannings and sticks on the electronic tag 1 on relay protection device, on the display of mobile handheld terminal 2 by the required tour content of automatic spring institute tour equipment, staff makes an inspection tour equipment one by one according to making an inspection tour content, as whole normal devices selected normal condition radio boxs, if unit exception, the abnormal radio box of devices selected, and recording exceptional information, now a relay protection device is maked an inspection tour complete, then scan next electronic tag 1, until complete all tasks of download, finally tour object information is uploaded to client-server 3 by USB interface.

Claims (5)

1. applying electronic label carries out a method for secondary device life cycle management management, it is characterized in that: described method comprises the following step of carrying out in order:
Step 1) set up the S01 stage of electronic label identification system: set up the electronic label identification system based on RFID technology, it comprises: electronic tag (1), mobile handheld terminal (2) and client-server (3); Wherein: mobile handheld terminal (2) carries out communication by electromagnetic induction and electronic tag (1); Described mobile handheld terminal (2) is for having the palm PC that electronic tag (1) is carried out to read-write capability, for realizing initialization and the Card read/write operation of electronic tag (1); Client-server (3) is the computing machine of an operation operation management system software, and it is connected with mobile handheld terminal (2) by USB wired mode;
Step 2) set up the S02 stage of relay protection producer information: the equipment raw information providing according to relay protection device producer, the initial excel electrical form information of apparatus for establishing, and imported among client-server (3);
Step 3) set up the S03 stage of relay protection account: in client-server (3), for each relay protection device, set up the relay protection account that comprises equipment initial information;
Step 4) the S04 stage that relay protection account imports: in client-server (3), every relay protection account data maintenance corresponding in relay protection account is complete, be that manual maintenance completes after complete relay protection account data, then relay protection account is downloaded among mobile handheld terminal (2);
Step 5) electronic tag is encoded the initialized S05 stage: for each relay protection device, set up an electronic tag (1) for correspondence with it, and utilize apparatus for initializing (3) to its initialization of encoding;
Step 6) labelled S06 stage again: electronic tag (1) is pasted on relay protection device on the other side;
The S07 stage of step 7) safeguarding at fortune management O&M unit information: after relay protection device puts into operation, when there is equipment deficiency and need more exchange device plug-in unit, when the plugin information of equipment is safeguarded, the electronic tag (1) that need to update the equipment by mobile handheld terminal (2) scanning, confirmation need to be upgraded the equipment of plug-in unit, the plugin name of the plug-in unit of updating the equipment, plug-in unit model, software version, installed date information;
Step 8) the S08 stage of inspection management: when relay protection device is patrolled and examined, by client-server (3), will comprise that the content of patrolling and examining of making an inspection tour template, tour task downloads among mobile handheld terminal (2), staff holds mobile handheld terminal (2) scanning and sticks on the electronic tag (1) on equipment, now, mobile handheld terminal (2) is patrolled and examined content by automatic spring, staff patrols and examines according to patrolling and examining content, then will specifically patrol and examine Data Enter among mobile handheld terminal (2), to realize, patrol and examine archival of information;
Step 9) between system, share the S09 stage of information: by client-server 3, the operation maintenance of all relay protection devices is patrolled and examined to information, by network, realize the operation maintenance information of sharing relay protection device with external system.
2. the method that applying electronic label according to claim 1 carries out the management of secondary device life cycle management, it is characterized in that: at S01 in the stage, described client-server (3) utilizes existing computing machine in operation management system, and client-server (3) is connected with mobile handheld terminal (2) by USB interface.
3. the method that applying electronic label according to claim 1 carries out the management of secondary device life cycle management, it is characterized in that: at S03 in the stage, described relay protection account comprises two parts content: the initial excel information of a part for setting up according to the information of dispatching from the factory of relay protection device producer, and its information field has: protection classification, manufacturing firm, protection model; Another part is the relay protection account information of safeguarding in the upper manual foundation of client-server (3); its information field has: organization, thread, plant stand title, interval title; the relay protection account information of two parts complete, wherein a corresponding relay protection device of relay protection information.
4. the method that applying electronic label according to claim 1 carries out the management of secondary device life cycle management, is characterized in that: at S05, in the stage, the initialized content of described coding comprises: plant stand title, interval title, RFID coding, plugin information.
5. the method that applying electronic label according to claim 1 carries out the management of secondary device life cycle management, it is characterized in that: in step 8) in, described tour content creates manually on client-server (3), then by usb data line, downloads to mobile handheld terminal (2).
CN201410398271.7A 2014-08-14 2014-08-14 Method for carrying out secondary equipment whole life cycle management by electronic label Pending CN104182828A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410398271.7A CN104182828A (en) 2014-08-14 2014-08-14 Method for carrying out secondary equipment whole life cycle management by electronic label

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410398271.7A CN104182828A (en) 2014-08-14 2014-08-14 Method for carrying out secondary equipment whole life cycle management by electronic label

Publications (1)

Publication Number Publication Date
CN104182828A true CN104182828A (en) 2014-12-03

Family

ID=51963850

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410398271.7A Pending CN104182828A (en) 2014-08-14 2014-08-14 Method for carrying out secondary equipment whole life cycle management by electronic label

Country Status (1)

Country Link
CN (1) CN104182828A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105096050A (en) * 2015-08-12 2015-11-25 中国南方电网有限责任公司 Asset whole life cycle management system and method
CN105427048A (en) * 2015-11-28 2016-03-23 国网河南省电力公司郑州供电公司 Intelligent substation secondary equipment information collection method
CN105469225A (en) * 2016-01-12 2016-04-06 国网上海市电力公司 Power equipment maintenance coding management system in transformer substation
CN106230905A (en) * 2016-07-22 2016-12-14 国网辽宁省电力有限公司鞍山供电公司 Method based on intelligent terminal's copy reading electric power meter parameter system
CN106227831A (en) * 2016-07-25 2016-12-14 广州供电局有限公司 Power system relay protection automatization's plugin information acquisition methods and management system thereof
CN108764409A (en) * 2018-05-31 2018-11-06 国网河南省电力公司检修公司 Secondary device machine account management system
CN109728940A (en) * 2018-12-17 2019-05-07 中国联合网络通信集团有限公司 Method for inspecting, device and storage medium
CN111860710A (en) * 2020-06-23 2020-10-30 国网山东省电力公司淄博供电公司 RFID relay protection device full life cycle management system and use method thereof
CN112003234A (en) * 2020-09-02 2020-11-27 广西电网有限责任公司河池供电局 Intelligent calibration system and method for relay protection equipment fixed value information
CN112862050A (en) * 2021-01-26 2021-05-28 南通重矿金属新材料有限公司 Safety helmet management system and method based on electronic tag
CN113222197A (en) * 2021-07-09 2021-08-06 国网浙江省电力有限公司 Precise multidimensional material linkage utilization method of power system based on Internet of things
CN113570014A (en) * 2021-07-30 2021-10-29 国能浙江北仑第一发电有限公司 Method for unique identity coding, replacement and upgrade management of relay protection board card

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102054223A (en) * 2010-12-25 2011-05-11 深圳市科陆电子科技股份有限公司 Power transmission and distribution equipment full-life cycle management system based on Internet of Things technology
CN102496129A (en) * 2011-11-25 2012-06-13 天津市翔晟远电力设备实业有限公司 Transmission and distribution line equipment management system and management method based on RFID (Radio Frequency Identification Devices)

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102054223A (en) * 2010-12-25 2011-05-11 深圳市科陆电子科技股份有限公司 Power transmission and distribution equipment full-life cycle management system based on Internet of Things technology
CN102496129A (en) * 2011-11-25 2012-06-13 天津市翔晟远电力设备实业有限公司 Transmission and distribution line equipment management system and management method based on RFID (Radio Frequency Identification Devices)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张庚 等: "基于RFID的电力设备资产管理***", 《2011电力通信管理暨智能电网通信技术论坛论文集》 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105096050A (en) * 2015-08-12 2015-11-25 中国南方电网有限责任公司 Asset whole life cycle management system and method
CN105427048A (en) * 2015-11-28 2016-03-23 国网河南省电力公司郑州供电公司 Intelligent substation secondary equipment information collection method
CN105469225A (en) * 2016-01-12 2016-04-06 国网上海市电力公司 Power equipment maintenance coding management system in transformer substation
CN106230905B (en) * 2016-07-22 2019-08-27 国网辽宁省电力有限公司鞍山供电公司 Method based on intelligent terminal copy reading electric energy metering device parameter
CN106230905A (en) * 2016-07-22 2016-12-14 国网辽宁省电力有限公司鞍山供电公司 Method based on intelligent terminal's copy reading electric power meter parameter system
CN106227831A (en) * 2016-07-25 2016-12-14 广州供电局有限公司 Power system relay protection automatization's plugin information acquisition methods and management system thereof
CN108764409A (en) * 2018-05-31 2018-11-06 国网河南省电力公司检修公司 Secondary device machine account management system
CN109728940A (en) * 2018-12-17 2019-05-07 中国联合网络通信集团有限公司 Method for inspecting, device and storage medium
CN111860710A (en) * 2020-06-23 2020-10-30 国网山东省电力公司淄博供电公司 RFID relay protection device full life cycle management system and use method thereof
CN112003234A (en) * 2020-09-02 2020-11-27 广西电网有限责任公司河池供电局 Intelligent calibration system and method for relay protection equipment fixed value information
CN112862050A (en) * 2021-01-26 2021-05-28 南通重矿金属新材料有限公司 Safety helmet management system and method based on electronic tag
CN113222197A (en) * 2021-07-09 2021-08-06 国网浙江省电力有限公司 Precise multidimensional material linkage utilization method of power system based on Internet of things
CN113570014A (en) * 2021-07-30 2021-10-29 国能浙江北仑第一发电有限公司 Method for unique identity coding, replacement and upgrade management of relay protection board card

Similar Documents

Publication Publication Date Title
CN104182828A (en) Method for carrying out secondary equipment whole life cycle management by electronic label
CN106815681B (en) Transformer substation secondary equipment closed-loop management platform based on two-dimensional code and management system thereof
CN103810563A (en) RFID based electric power asset entire life-cycle management system
CN104135069A (en) Method for configuring operating parameters of secondary equipment of intelligent substation
CN103489078A (en) Intelligent charging and battery-swapping service network asset life-cycle management method based on RFID
CN102938129A (en) Routing management method of electricity information machine accounts
CN101286216A (en) Assets management method and system based on RFID technology
CN208126425U (en) A kind of electric power computer room grid equipment monitoring management system
CN101661581A (en) Remote movable property management system based on RFID technology
CN110909830A (en) Transformer substation secondary equipment information maintenance system based on RFID
CN103632245A (en) Cloud service-based intelligent production system and implementation method
CN104252632A (en) UHF RFID electronic label device with sensing function, and application method thereof
CN110930111A (en) APP (application) for unified management of physical assets and mobile operation
CN105117860A (en) Internet work attendance system and method on the basis of a facial recognition device
CN202948294U (en) Machining production line
CN103489229A (en) Handheld positioning and polling machine for power grid machine room based on RFID (radio-frequency identification device) technology
CN109919268A (en) A kind of unattended automation inventory management system
CN101086763B (en) A collaborative working method between RFID reader
CN201741274U (en) Dynamic data acquisition unit used in manufacture industry production process
CN201247475Y (en) System for dynamically managing telecom industry asset physical goods based on RFID technology
CN203786739U (en) Centralized decoding system through network for identity card recognizer
CN202306597U (en) RFID-based production-type enterprise real-time data wireless collection system
CN202383743U (en) Asset management system on basis of bar codes and RFID (radio frequency identification devices) technology
CN103944271A (en) Intelligent transformer substation system based on Internet of Things technology and control method thereof
CN203520401U (en) Multifunctional intelligent acquisition terminal

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 300010 Tianjin city Hebei District Wujing Road No. 39

Applicant after: State Grid Corporation of China

Applicant after: State Grid Tianjin Electric Power Company

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant before: State Grid Corporation of China

Applicant before: State Grid Tianjin Electric Power Company

WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20141203

WD01 Invention patent application deemed withdrawn after publication