CN104179220A - Leakage-resisting square tunnel for prestressed concrete flexible sockets - Google Patents

Leakage-resisting square tunnel for prestressed concrete flexible sockets Download PDF

Info

Publication number
CN104179220A
CN104179220A CN201410404625.4A CN201410404625A CN104179220A CN 104179220 A CN104179220 A CN 104179220A CN 201410404625 A CN201410404625 A CN 201410404625A CN 104179220 A CN104179220 A CN 104179220A
Authority
CN
China
Prior art keywords
square
concrete body
leakage
hornblock
steel wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410404625.4A
Other languages
Chinese (zh)
Other versions
CN104179220B (en
Inventor
李全民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Airuike Intelligent Technology Group Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410404625.4A priority Critical patent/CN104179220B/en
Publication of CN104179220A publication Critical patent/CN104179220A/en
Application granted granted Critical
Publication of CN104179220B publication Critical patent/CN104179220B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The invention relates to a leakage-resisting square tunnel for prestressed concrete flexible sockets. The leakage-resisting square tunnel comprises a square concrete body, a square steel wire mesh is arranged inside the square concrete body along the lengthwise direction of the square concrete body, a plurality of prestressed steel bars are evenly welded to the square steel wire mesh at intervals along the lengthwise direction of the square steel wire mesh, and a plurality of reinforcing ribs identical to the square concrete body in length and thickness are evenly arranged on the square steel wire mesh at intervals. Concrete members have prestressing force, so that leakage-resisting effect is good, connecting performance is high, vibration resistance is high, and waterproofness is good; the square steel wire mesh is arranged inside the square concrete body, the prestressed steel bars are welded to the square steel wire mesh, and the reinforcing ribs are arranged on the square steel wire mesh, so that the square concrete body is high in bending performance, less prone to cracking down and extruding to deform by soil, long in service life, fast in assembling, efficient and good in quality, and labor cost is greatly lowered.

Description

A kind of prestressed concrete flexible insert mouth anti-leakage Fang Han
Technical field:
The present invention relates to a kind of prestressed concrete flexible insert mouth anti-leakage Fang Han.
Background technology:
Existing underground urban operating mechanism is subordinate to all departments, all departments do things in his own way, road belly breaking, pipeline or be buried in the earth, or penetrate in underground little culvert pipe, easily be subject to soil extruding, earth subsidence sedimentation and cause pipeline built on stilts, sink, cracking or pipe leakage, a lot of potential safety hazards leak etc., especially the leakage of gas pipeline, be not easy to check, be not easy to maintenance, when transformation, increase-volume, maintenance, often destroyed road hardened ground, caused environment pollution, the wasting of resources, be currently obstructed, businessman's business is impaired, also brings very large pressure to road traffic.In addition, pipeline is short application life, maintenance, long construction period, construction cost is high, construction quality also can not be guaranteed, and is especially subject to weather effect, rain to be difficult to construction, workman's operating environment also very poor, efficiency is low, accident easily meets accident.Moreover to relate to department many in construction, road, traffic, municipal administration, greening etc., road surface is repeated excavation, is repeated to repair the roads, secondary pollution, secondary hidden danger are many.
Summary of the invention:
The present invention is in order to make up the deficiencies in the prior art, a kind of prestressed concrete flexible insert mouth anti-leakage Fang Han is provided, and its reasonable in design, adopts the square concrete body being made into integration, anti-leakage is effective, switching performance is good, shock resistance is high, water resistance is good, and anti-bending strength is high, is not easy cracking and sinks, be not easy by native crimp, long service life, assembling speed is fast, efficiency is high, Functionality, quality and appealing design, has solved problems of the prior art.
The present invention solves the problems of the technologies described above adopted technical scheme to be:
A kind of prestressed concrete flexible insert mouth anti-leakage Fang Han, comprise a square concrete body, in square concrete body inside, along square concrete body length direction, be provided with a square gauze wire cloth, at the even interval of square steel wire top line of the net square gauze wire cloth length direction, be welded with some prestressed steel bars, on square gauze wire cloth, be evenly interval with the reinforcement bar of some length and square concrete body consistency of thickness, in one end of square concrete body, be provided with taper bellmouth, the other end is provided with socket, taper bellmouth with on socket inwall, along square concrete body inner surface circumferencial direction, be evenly interval with respectively the relative embedded nut in several positions, weld mutually with square gauze wire cloth respectively the inner of embedded nut, one side by bolt and several the first hornblocks on the embedded nut of taper bellmouth inner surface is connected, the another side of the first hornblock is towards taper bellmouth outside and which is provided with the first through hole, one side by bolt and several the second hornblocks on the embedded nut of socket inner surface is connected, the another side of the second hornblock is towards socket outside and which is provided with the second through hole, the first hornblock and the second hornblock are symmetrical arranged, two first hornblocks that position is relative and the first through hole and the second lead to the hole site on the second hornblock align setting, outer surface at socket is fixed with a flexible rubber lagging matching with taper bellmouth by tapping screw.
Outer surface at flexible rubber lagging is provided with one deck adhesive-layer.
The present invention adopts such scheme, and reasonable in design adopts the square concrete body being made into integration, high by steam curing of concrete intensity, more than C60, concrete component has prestressing force, anti-leakage is effective, and switching performance is good, shock resistance is high, water resistance is good; In square concrete body inside, be provided with square gauze wire cloth, on square gauze wire cloth, be welded with prestressed steel bar, on square gauze wire cloth, be provided with reinforcement bar, make square concrete body anti-bending strength high, be not easy cracking and sink, be not easy by native crimp, long service life, assembling speed is fast, efficiency is high, Functionality, quality and appealing design, greatly reduces cost of labor.
Accompanying drawing explanation:
Fig. 1 is side-looking structural representation of the present invention.
Fig. 2 is the sectional structure schematic diagram of overlooking of the present invention.
Fig. 3 is use state reference map of the present invention.
In figure, 1, square concrete body, 2, square gauze wire cloth, 3, prestressed steel bar, 4, reinforcement bar, 5, embedded nut, 6, bolt, the 7, first hornblock, the 8, first through hole, the 9, second hornblock, the 10, second through hole, 11, flexible rubber lagging.
The specific embodiment:
For clearly demonstrating the technical characterstic of this programme, below by the specific embodiment, and in conjunction with its accompanying drawing, the present invention will be described in detail.
As Figure 1-3, a kind of prestressed concrete flexible insert mouth anti-leakage Fang Han, comprise a square concrete body 1, in square concrete body 1 inside, along square concrete body 1 length direction, be provided with a square gauze wire cloth 2, on square gauze wire cloth 2, along the square gauze wire cloth 2 even intervals of length direction, be welded with some prestressed steel bars 3, on square gauze wire cloth 2, be evenly interval with the reinforcement bar 4 of some length and square concrete body consistency of thickness, in one end of square concrete body 1, be provided with taper bellmouth, the other end is provided with socket, taper bellmouth with on socket inwall, along square concrete body 1 inner surface circumferencial direction, be evenly interval with respectively the relative embedded nut in several positions 5, weld mutually with square gauze wire cloth 2 respectively the inner of embedded nut 5, on the embedded nut 5 of taper bellmouth inner surface, by bolt 6 and one side of several the first hornblocks 7, be connected, the another side of the first hornblock 7 is towards taper bellmouth outside and which is provided with the first through hole 8, on the embedded nut 5 of socket inner surface, by bolt 6 and one side of several the second hornblocks 9, be connected, the another side of the second hornblock 9 is towards socket outside and which is provided with the second through hole 10, the first hornblock 7 and the second hornblock 9 are symmetrical arranged, two first hornblocks 7 that position is relative and the first through hole 8 on the second hornblock 9 and the second through hole 10 positions align setting, outer surface at socket is fixed with a flexible rubber lagging 11 matching with taper bellmouth by tapping screw, outer surface at flexible rubber lagging 11 is provided with one deck adhesive-layer.
During construction, the ground trench bottom of excavation keeps smooth and compacting, lower slightly several centimeters of square concrete body 1 joint, so that square concrete body 1 socket end is put into, socket end at square concrete body 1 before docking puts flexible rubber lagging 11, and flexible rubber lagging 11 is fixed on to square concrete body 1 socket end outer surface in case flexible rubber lagging 11 displacements with tapping screw is fixing, loosening, during docking, keep adjacent two square concrete bodies 1 on a horizontal linear, two square concrete body 1 positions are not offset, flexible rubber lagging 11 does not damage, moreover, can be on flexible rubber lagging 11 brushing one deck adhesive-layer, to strengthen the sealing function of two square concrete body 1 joints.And at bellmouth and 5 places of the embedded nut on socket of square concrete body 1, the first hornblock 7 and the second hornblock 9 are installed, with high-strength connecting bolt 6, the first through hole 8 of adjacent the first hornblock 7 and the second hornblock 9 and the second through hole 10 are tightened up again, in one week direction symmetry of square concrete body 1 inwall, tighten up fastening, make 1 sealing of square concrete body more reliable, reach anti-leakage effect.
Square concrete body 1 has the various structures such as straight joint, elbow, threeway, four-way, five-way, is convenient to Fang Han branch, the maintenance that collects, goes into the well, widely applicable.The numerous municipal water supply pipelines in city, drainage pipe, heat distribution pipeline, gas pipeline, chemical pipeline, power cable, communication cable, network cable etc. can be installed concentratedly in Fang Han, be aided with automatic monitoring sniffer, personnel can easily enter walking, small-sized construction machinery can enter wiring comb, be not subject to inside even from weather, the inspection from now on of being more convenient for, maintenance, maintenance, dilatation etc.; Easy construction, duration be short, can reduce accident frequency rate.
The present invention does not describe part in detail, is those skilled in the art of the present technique's known technology.

Claims (2)

1. a prestressed concrete flexible insert mouth anti-leakage Fang Han, it is characterized in that: comprise a square concrete body, in square concrete body inside, along square concrete body length direction, be provided with a square gauze wire cloth, at the even interval of square steel wire top line of the net square gauze wire cloth length direction, be welded with some prestressed steel bars, on square gauze wire cloth, be evenly interval with the reinforcement bar of some length and square concrete body consistency of thickness, in one end of square concrete body, be provided with taper bellmouth, the other end is provided with socket, taper bellmouth with on socket inwall, along square concrete body inner surface circumferencial direction, be evenly interval with respectively the relative embedded nut in several positions, weld mutually with square gauze wire cloth respectively the inner of embedded nut, one side by bolt and several the first hornblocks on the embedded nut of taper bellmouth inner surface is connected, the another side of the first hornblock is towards taper bellmouth outside and which is provided with the first through hole, one side by bolt and several the second hornblocks on the embedded nut of socket inner surface is connected, the another side of the second hornblock is towards socket outside and which is provided with the second through hole, the first hornblock and the second hornblock are symmetrical arranged, two first hornblocks that position is relative and the first through hole and the second lead to the hole site on the second hornblock align setting, outer surface at socket is fixed with a flexible rubber lagging matching with taper bellmouth by tapping screw.
2. a kind of prestressed concrete flexible insert mouth anti-leakage Fang Han according to claim 1, is characterized in that: the outer surface at flexible rubber lagging is provided with one deck adhesive-layer.
CN201410404625.4A 2014-08-15 2014-08-15 A kind of prestressed concrete flexible insert mouth anti-leakage Fang Han Active CN104179220B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410404625.4A CN104179220B (en) 2014-08-15 2014-08-15 A kind of prestressed concrete flexible insert mouth anti-leakage Fang Han

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410404625.4A CN104179220B (en) 2014-08-15 2014-08-15 A kind of prestressed concrete flexible insert mouth anti-leakage Fang Han

Publications (2)

Publication Number Publication Date
CN104179220A true CN104179220A (en) 2014-12-03
CN104179220B CN104179220B (en) 2015-09-09

Family

ID=51960539

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410404625.4A Active CN104179220B (en) 2014-08-15 2014-08-15 A kind of prestressed concrete flexible insert mouth anti-leakage Fang Han

Country Status (1)

Country Link
CN (1) CN104179220B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104790504A (en) * 2015-04-27 2015-07-22 海盐水泥制管有限公司 Manufacturing method for annular concrete pipeline

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04136335A (en) * 1990-09-26 1992-05-11 Ishikawajima Constr Materials Co Ltd Prestress introduction method for box segment
KR20030040874A (en) * 2001-11-16 2003-05-23 주식회사 토암산업 Dual Directional Prestressed Tendon Anchoring Apparatus, Precast Concrete Box Culvert Using the Same, Assembling Structure and Method in Precast Concrete Box Culvert
CN1837666A (en) * 2005-03-25 2006-09-27 衡水长江预应力有限公司 Shock-resistant culvert pipe with large section and circumferential stress and preparation process thereof
CN202247950U (en) * 2011-08-31 2012-05-30 沈阳市政地铁管片有限公司 Quadrate culvert member
CN202559382U (en) * 2012-04-24 2012-11-28 王改清 Concrete prefabricated combined duct with stepped conical spigot and socket
CN204112406U (en) * 2014-08-15 2015-01-21 李全民 A kind of prestressed concrete flexible insert mouth anti-leakage Fang Han

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04136335A (en) * 1990-09-26 1992-05-11 Ishikawajima Constr Materials Co Ltd Prestress introduction method for box segment
KR20030040874A (en) * 2001-11-16 2003-05-23 주식회사 토암산업 Dual Directional Prestressed Tendon Anchoring Apparatus, Precast Concrete Box Culvert Using the Same, Assembling Structure and Method in Precast Concrete Box Culvert
CN1837666A (en) * 2005-03-25 2006-09-27 衡水长江预应力有限公司 Shock-resistant culvert pipe with large section and circumferential stress and preparation process thereof
CN202247950U (en) * 2011-08-31 2012-05-30 沈阳市政地铁管片有限公司 Quadrate culvert member
CN202559382U (en) * 2012-04-24 2012-11-28 王改清 Concrete prefabricated combined duct with stepped conical spigot and socket
CN204112406U (en) * 2014-08-15 2015-01-21 李全民 A kind of prestressed concrete flexible insert mouth anti-leakage Fang Han

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104790504A (en) * 2015-04-27 2015-07-22 海盐水泥制管有限公司 Manufacturing method for annular concrete pipeline

Also Published As

Publication number Publication date
CN104179220B (en) 2015-09-09

Similar Documents

Publication Publication Date Title
CN204898721U (en) Steel construction city utility tunnel
CN204098065U (en) A kind of can the precast assembly pipe gallery of stretch-draw in body
CN204040062U (en) Prefabricated wedge shape flexible interface assembling piping lane
CN103437417B (en) Part repair structure for steel lining of drainage pipeline
CN105507346A (en) Prefabricated underground pipe gallery
CN205776342U (en) A kind of prefabricated pipe gallery tube coupling attachment structure
CN105401593A (en) Assembly type square underground pipe gallery
CN105756087A (en) Assembling-type anchoring structure for adjacent plates of prefabricated comprehensive pipe rack
CN101575859B (en) Anti-seepage joint of underground continuous walls and construction method thereof
CN214362655U (en) Can have enough to meet need assembled road system
CN105735353A (en) Prefabricated comprehensive pipe gallery
CN110629792B (en) Splicing construction method for corrugated steel pipe gallery
CN110685234B (en) Construction method of corrugated steel pipe culvert
CN102864833A (en) Application of finished plastic inspection well in outdoor drainage system
CN105065040A (en) Top-plate-prefabricated underground space underground excavation building method
CN205839796U (en) Utility tunnel internode connection structure
CN104179220B (en) A kind of prestressed concrete flexible insert mouth anti-leakage Fang Han
CN204112406U (en) A kind of prestressed concrete flexible insert mouth anti-leakage Fang Han
KR20100086110A (en) Temporary composite pipe and pipeline and tunnel unexcavation laying method using the same
CN105971016A (en) Utility tunnel internode connection structure
CN110541433A (en) Assembled underground pipe gallery
CN211285692U (en) Corrugated steel pipe gallery based on prestressed tendons
CN205348225U (en) Prefabricated assembled underground pipe gallery
CN204098067U (en) Side's culvert formula underground pipe gallery
CN212427206U (en) Assembled underground pipe gallery

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230816

Address after: Room 404-32, Building 4, Yintan Cultural and Creative Park, No. 88 Yapeng Road, Jianye District, Nanjing City, Jiangsu Province, 210000

Patentee after: Jiangsu Airuike Intelligent Technology Group Co.,Ltd.

Address before: Room 9-201, Yannan Garden, Yanming Mountain Villa, Xianlin, Qixia District, Nanjing City, Jiangsu Province, 210000

Patentee before: Li Quanmin

TR01 Transfer of patent right