CN104176988A - Organic/inorganic composite material for rapidly repairing pit slots of bituminous pavement and preparation method thereof - Google Patents

Organic/inorganic composite material for rapidly repairing pit slots of bituminous pavement and preparation method thereof Download PDF

Info

Publication number
CN104176988A
CN104176988A CN201410417601.2A CN201410417601A CN104176988A CN 104176988 A CN104176988 A CN 104176988A CN 201410417601 A CN201410417601 A CN 201410417601A CN 104176988 A CN104176988 A CN 104176988A
Authority
CN
China
Prior art keywords
parts
component
preparation
uniformly mixed
composite material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410417601.2A
Other languages
Chinese (zh)
Other versions
CN104176988B (en
Inventor
王畅铭
姚亮
于泳潭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Zhongke Antu Transportation Technology Co., Ltd
Original Assignee
BEIJING AISHIMU TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING AISHIMU TECHNOLOGY Co Ltd filed Critical BEIJING AISHIMU TECHNOLOGY Co Ltd
Priority to CN201410417601.2A priority Critical patent/CN104176988B/en
Publication of CN104176988A publication Critical patent/CN104176988A/en
Application granted granted Critical
Publication of CN104176988B publication Critical patent/CN104176988B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Compositions Of Macromolecular Compounds (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses an organic/inorganic composite material for rapidly repairing pit slots of a bituminous pavement, which is prepared from the following main raw materials of polymethylene polyphenyl polyisocyanates, a polyurethane prepolymer, polyether polyol, petroleum asphalt, a catalyst, sodium silicate powder, carborundum and the like. The composition material comprises components A, B and C, wherein the components A and the component B are blended with the component C after being mixed, and can be quickly solidified after being cast into the pit slots at room temperature, so that the composite material has strong caking property and similar rigidity with an original bituminous pavement, and the travelling stationarity and comfortableness are achieved after restoration. The composite material is simple and convenient to construct, rapid, efficient and environmentally friendly, the setting time is smaller than or equal to 30 minutes, and the bituminous pavement can be opened after 90 minutes, so that the rapid repairing purpose is achieved, and the effect on traffic jam caused by pavement rehabilitation is greatly relieved. The composite material has excellent water tolerance, weather fastness, abrasive resistance and compressive shear resistance, is a novel green material for rapidly repairing pit slots of a pavement, and has positive promotion action and a good application effect on development of a preventive maintenance technology of highways.

Description

Organic/inorganic composite material of a kind of quick reparation asphalt pavement pit and preparation method thereof
Technical field
The present invention relates to a kind of asphalt pavement pit repair materials and preparation method thereof, belong to highway material and applied technical field, relate in particular to organic/inorganic composite material of a kind of quick reparation asphalt pavement pit and preparation method thereof.
Technical background
Asphaltic road-mix surface course has the features such as construction speed is fast, maintenance simple, it is comfortable to drive a vehicle, surfacing, widely applies in China.But after bituminous pavement experience certain hour, due to high loading driving for a long time, extreme climate environment, temperature variation, rain erosion etc., all can damage bituminous pavement in various degree, cause cohesive force between pitch and base-material to reduce, under automotive wheel dynamic load repeated action, pitch comes off from base-material surface, pavement destruction is damaged to profound structure deteriorate development from shallow table gradually, destroys development from the local damage of small area to large-area monoblock.In order to ensure quick, safe, comfortable, the efficient Characteristics of Transportation of motorway, extend the work-ing life of motorway, make the economic and social benefit that its performance is larger, thereby need road pavement to carry out the maintenance and repair of normalization, the generation of the normal operation of guaranteeing highway to try to forestall traffic accidents.
Traditional repair materials is mainly hot-mix asphalt mixture, but this repair materials exists the defect that pollution is high, cost is large, and in addition, the impact of hot-mix asphalt mixture climate condition is larger,, should not construct because temperature is compared with low unsuitable compacting in cold season.Using in recent years more is asphalt cold repairing repair materials, as Emulsified Asphalt Mixture.Asphalt cold repairing repair materials has overcome the defect that hot-mix asphalt mixture low temperature should not be constructed, but in the time using cold repairing asphalt mixture redeck, after needing equal solvent to evaporate completely, just can play the effect of enhancing, so cold repairing asphalt mixture exist initial strength low, strengthen shortcoming slowly, can not reach the object that quick reparation is open to traffic fast, larger to traffic impact.Therefore novel material, new approaches, the novel process that proposes a kind of quick reparation asphalt pavement pit is very meaningful and is necessary.
Publication number is that CN101993222A discloses " a kind of pitch that is exclusively used in redeck and preparation method thereof ", mainly, taking plain asphalt, styrene-butadiene rubber(SBR), wilkinite, vibrin, gasoline, kerosene, talcum powder as raw material, prepare and be exclusively used in the pitch that redeck is used.This pitch is applicable to redeck and uses, can with the good combination of former pavement asphalt, extended work-ing life of highway.
Publication number is that CN102701787A discloses " a kind of bituminous pavement anti-freezing ice injury repairing material and preparation method thereof ", can solve existing maintenance and cannot resist the destruction problem that multigelation produces, its repair materials is made up of road oil hard pitch, coal-tar heavy oil and viscosity reduction permeate agent.
Publication number is that CN1970491A discloses " a kind of cement for quick reparing sill of Asphalt Pavement Semi-rigid Base ", its component is quick-setting and rapid-hardening cement, sand, stone, water reducer, fiber, specialist additive, water etc., can make foreshorten to 4 ~ 8h the repair time of bituminous pavement, alleviate to a certain extent road surface and repaired the impact on traffic congestion.
In addition, Zhang Wenjing, Wang Hui etc. are at " express highway pavement is repaired the research with polyurethane concrete fast " concrete, 2011(5), taking hard polyurethane foam as base mateiral, prepare polyurethane concrete material in conjunction with normal concrete technique, can realize the quick reparation of expressway surface in 2h.
Li Li, Wang Hongbin etc. " the synthetic and performance study of urethane/silicon carbide matrix material " New Chemical Materials, 2014, in 42 (3), with toluene diisocynate and the synthetic performed polymer of diphenylmethanediisocyanate, taking E300 as chainextender synthesis of polyurethane elastomerics, repair as base material road pavement hole groove, can realize the quick reparation of bituminous pavement in 2h.
Although above-mentioned disclosed method, has accelerated the reparation of bituminous pavement to a certain extent, also has some problems, the one, contain organic solvent as gasoline, kerosene, coal tar wet goods, environment is had to pollution, affect operative employee's physical and mental health; The 2nd, the repair materials construction speed taking cement as main base material is slow, and setting rate is slow, and the road closure time is long; The 3rd, after repair materials sclerosis, does not mate with the rigidity of bituminous pavement, split away off from road surface after rolling through vehicle after a while.
Summary of the invention
The present invention is directed to asphalt pavement pit and repair problem, a kind of organic/inorganic composite material of quick reparation bituminous pavement is provided, this type material at normal temperatures just can fast setting, not only bituminous pavement is had to very strong cohesiveness, and do not contain low volatilization and poisonous organic solvent, be a kind of Cost of New Type Asphalt Pavement hole groove material for quickly repairing of environment-friendly type.This type material mixes after cast liquid mixture can flowing time≤10min, ambient cure time≤30min, and 90min has enough loading strengths to be open to traffic, and can guarantee the driving safety of vehicle, reaches the object of quick reparation.The present invention has not only solved the problems such as process complexity problem, curing speed that prior art repairs asphalt pavement pit be slow, and material after repairing has the performances such as good resistance to compression, anti-shearing, water erosion resistent, heat resistanceheat resistant be cold.
 
For achieving the above object, organic/inorganic composite material of a kind of quick reparation asphalt pavement pit of the present invention and preparation method thereof technical scheme is as follows:
An organic/inorganic composite material for quick reparation asphalt pavement pit, is characterized in that: described matrix material is made up of A, B and C component, and its composition and mass content thereof are as follows:
A component: 82~90 parts of poly methylene poly phenyl poly isocyanates;
10~5 parts of base polyurethane prepolymer for use as;
8~5 parts of propylene glycol carbonates;
B component: 4,450 66~80 parts of type polyether glycols
500 10~7 parts of type polyether glycols;
10~5 parts of dipropylene glycol dibenzoates;
3-chloro-3 '-ethyl-4,4 '2.5~1 parts of-diaminodiphenylmethane;
90 #5~3 parts, petroleum pitch;
1~0.5 part of catalyzer;
5~3 parts of instantly-soluble water glass micro mists;
0.5 part of BYK-A535 defoamer;
C component: 400 parts, silicon carbide;
0~700 part of stone chippings.
For a preparation method for the organic/inorganic composite material of a kind of quick reparation asphalt pavement pit described above, described in it, according to the mass fraction, step is as follows for preparation method:
The preparation of A component
Get 82~90 parts of poly methylene poly phenyl poly isocyanates and be placed in a band stirring mixer, then add 10~5 parts of base polyurethane prepolymer for use as, 8~5 parts of propylene glycol carbonates, are uniformly mixed under normal temperature, obtain A component, and inflated with nitrogen sealing is preserved;
The preparation of B component
By 90 #5~3 parts, petroleum pitch joins in 10~5 parts of dipropylene glycol dibenzoates, stand-by after heating for dissolving;
Get 66~80 parts of 4450 type polyether glycols and be placed in a band and be uniformly mixed container, then add successively 10~7 parts of 500 type polyether glycols, 3-chloro-3 '-ethyl-4,4 '2.5~1 parts of-diaminodiphenylmethane, 0.5 part of 1~0.5 part of catalyzer and BYK-A535 defoamer, after being uniformly mixed, add again petroleum pitch dipropylene glycol dibenzoate mixing solutions, further be uniformly mixed, and then 5~3 parts of instantly-soluble water glass micro mists are added to stir be dispersed in system, obtaining B component, sealing is preserved;
Above-mentioned A component and B component are mixed and stir rapidly after add again 300 parts, silicon carbide in C component, after being further uniformly mixed rapidly, be poured in the asphalt pavement pit that cleaned purging is clean, and strike off with scraper plate, then evenly sprinkle again 100 parts, silicon carbide on surface, if hole groove is darker, can in advance 0~700 part of stone chippings be laid on to bottom as aggregate, and then pour into a mould, according to hole groove depth and also graded cast of size, when graded casting, A component and B component are mixed with mass ratio 1:1.
The technical scheme of organic/inorganic composite material based on above-mentioned quick reparation asphalt pavement pit and preparation method thereof, technical scheme is as follows further:
According to the mass fraction, preparation method is as follows for the charging capacity of described base polyurethane prepolymer for use as:
100 parts of polyether glycol N220 that is 2000 by average molecular mass add in reactor at 120 DEG C, dewater 2 hours under 0.08Mpa vacuum condition, after dehydration, add 37.1 parts of tolylene diisocyanates to stir in reactor, temperature is controlled in 80 DEG C of reaction 2h, react rear deaeration to bright, obtain the Polyether-Polyol Polyurethane Prepolymer that 137.1 parts-NCO group mass content is 10%, performed polymer is packed to inflated with nitrogen and preserve.
Described poly methylene poly phenyl poly isocyanate-NCO group mass content is 30%~32%.
The modulus of described instantly-soluble water glass micro mist is 2.3~2.5, and fineness is 120 orders.
The hydroxyl value of described 4450 type polyether glycols is 350 ± 20mgKOH/g.
The hydroxyl value of described 500 type polyether glycols is 335 ± 20mgKOH/g.
Described catalyzer is PC-150 catalyzer, or organo-bismuth KRBi-A1.
In described C component: the particle diameter of stone chippings is 10~40mm; The particle diameter of silicon carbide is 0.5~2mm.
Realize organic/inorganic composite material of the above-mentioned a kind of quick reparation asphalt pavement pit of the present invention and preparation method thereof, compared with prior art, its advantage and positively effect are as follows.
This matrix material has raw material and is easy to get, and solidification process does not foam, and speed is fast, intensity is high, cold-curing operation at normal temperatures, and preparation of construction is simple, and operation renovation technique is easy, and reparation speed is fast, saves labor, pollution-free, clean environment firendly.
This matrix material short period after reparation can recover to be open to traffic, at 25 DEG C, recovery time≤the 90min that is open to traffic, can reduce the inconvenience impact that congestion in road brings, the original road surface of matrix material and pitch base material has good cohesiveness and rigidity similarity, after reparation, reach stationarity and the comfortableness of driving, also can not spend work-ing life soft or really up to the mark and after impact reparation because of matrix material.
This composite material by adopting poly methylene poly phenyl poly isocyanate and base polyurethane prepolymer for use as are used in conjunction with, and make matrix material have good cohesiveness, rigidity and toughness.Polyethers 4450 and polyethers 500 can be given desirable degree of crosslinking and the mechanical property of matrix material.The use of quick dissolved sodium silicate micro mist, that it is dispersed in polymerization system as mineral filler on the one hand, be conducive to the dispersion of counter stress, its carbonic acid gas discharging in can absorption system on the other hand, the defect foaming when this matrix material runs into micro-moisture in solidification process be can effectively overcome, planarization and aesthetic property after repairing strengthened.
Compare with hole, traditional road surface groove recovery technique there is quick, efficient, environmental protection, economic feature, right
The development of Preventive maintenance for highway technology has positive contribution and pushing effect.The present invention has not only solved the problems such as process complexity problem, curing speed that prior art repairs asphalt pavement pit be slow, and material after repairing has good resistance to compression, anti-shearing, water erosion resistent, weathering resistance, wear resistance.
This composite repair hole groove after fixing thing has higher frictional coefficient, has improved the adherence properties of tire, has guaranteed the security of driving.
A component described in the inventive method, 300 parts of mixing cured rear and A components of silicon carbide in B component and C component, B component is directly and after stone chippings mix, after 24 hours with reference to GB1040/92, HG2/167-65, JTJ052-2000, JTJ073.1-2001, GB/T10807-2006, the relevant test methods such as GB/T1843-2008, this matrix material and building stones cohesiveness can reach 5 grades, meet the requirement of motorway cohesiveness degree >=4 grade, tensile strength >=8 Mpa of matrix material, elongation at break is≤5%, tear strength >=10kN/m, compressive strength >=35Mpa, bending intensity >=6.2 Mpa, after progressive flooding 48h, record mechanical property and do not occur considerable change.Can meet quick reparation and the operating requirement of asphalt pavement of highway hole groove completely.
Embodiment
In order to make object, technical scheme and the advantage of invention clearer, below in conjunction with embodiment, the specific embodiment of the present invention is further illustrated.Should be appreciated that specific embodiment described herein is only in order to explain the present invention, and be not used in restriction invention.
Implement a kind of organic/inorganic composite material of quick reparation asphalt pavement pit, this matrix material is made up of A, B and C component, and its enforcement composition and mass content scope thereof are as follows.
A component: 82~90 parts of poly methylene poly phenyl poly isocyanates;
10~5 parts of base polyurethane prepolymer for use as;
8~5 parts of propylene glycol carbonates.
B component: 4,450 66~80 parts of type polyether glycols
500 10~7 parts of type polyether glycols;
10~5 parts of dipropylene glycol dibenzoates;
3-chloro-3 '-ethyl-4,4 '2.5~1 parts of-diaminodiphenylmethane;
90 #5~3 parts, petroleum pitch;
1~0.5 part of catalyzer;
5~3 parts of instantly-soluble water glass micro mists;
0.5 part of BYK-A535 defoamer.
C component: 400 parts, silicon carbide;
0~700 part of stone chippings.
Implement the preparation method of the organic/inorganic composite material of a kind of quick reparation asphalt pavement pit described above, the method is made up of A component, B component and C component, and it is as follows that its content and composition are all measured preparation process according to the mass fraction.
A component: get 82~90 parts of poly methylene poly phenyl poly isocyanates and be placed in a band stirring mixer, then add 10~5 parts of base polyurethane prepolymer for use as, 8~5 parts of propylene glycol carbonates, are uniformly mixed and obtain A component under normal temperature, inflated with nitrogen sealing is preserved.
B component: first by 90 #5~3 parts, petroleum pitch joins in 10~5 parts of dipropylene glycol dibenzoates, stand-by after heating for dissolving.
Get 66~80 parts of 4450 type polyether glycols and be placed in a band and be uniformly mixed container, then add successively 10~7 parts of 500 type polyether glycols, 3-chloro-3 '-ethyl-4,4 '2.5~1 parts of-diaminodiphenylmethane, 1~0.5 part of catalyzer, adds 90 after 0.5 part of BYK-A535 defoamer is uniformly mixed again #petroleum pitch dipropylene glycol dibenzoate mixing solutions, is further uniformly mixed, and then 5~3 parts of instantly-soluble water glass micro mists are stirred and are dispersed in system, obtains B component, and sealing is preserved.
C component: 400 parts, silicon carbide, 0~700 part of stone chippings.
Above-mentioned A component and B component are mixed and stir rapidly after add again 300 parts, silicon carbide in C component, after being further uniformly mixed rapidly, be poured in the asphalt pavement pit that cleaned purging is clean, and strike off with scraper plate, then evenly sprinkle again 100 parts, silicon carbide on surface, if hole groove is darker, can in advance 0~700 part of stone chippings be laid on to bottom as aggregate, and then pour into a mould, according to hole groove depth and also graded cast of size, when graded casting, A component and B component are mixed with mass ratio 1:1, after mixing cast, liquid mixture can flowing time≤10min, ambient cure time≤30min, 90min can be open to traffic.
Base polyurethane prepolymer for use as preparation method described in A component following (charging capacity according to the mass fraction).
100 parts of polyether glycol N220 that is 2000 by average molecular mass add in reactor at 120 DEG C, dewater 2 hours under 0.08Mpa vacuum condition, after dehydration, add 37.1 parts of tolylene diisocyanates (TDI-80) to stir in reactor, temperature is controlled in 80 DEG C of reaction 2h, react rear deaeration to bright, obtain the Polyether-Polyol Polyurethane Prepolymer that 137.1 parts-NCO group mass content is 10%, performed polymer is packed to inflated with nitrogen and preserve.
 
Below by specific embodiment, the specific embodiment of the present invention is made and being further illustrated.
Embodiment 1
Implement a kind of preparation method of organic/inorganic composite material of quick reparation asphalt pavement pit, the method is made up of A component, B component and C component, and it is as follows that its content and composition are all measured preparation process according to the mass fraction.
A component: get 82 parts of poly methylene poly phenyl poly isocyanates and be placed in a band stirring mixer, then add 10 parts of base polyurethane prepolymer for use as, 8 parts of propylene glycol carbonates, are uniformly mixed and obtain A component under normal temperature, inflated with nitrogen sealing is preserved.
B component: first by 90 #5 parts, petroleum pitch joins in 10 parts of dipropylene glycol dibenzoates, stand-by after heating for dissolving.
Get 66 parts of 4450 type polyether glycols and be placed in a band and be uniformly mixed container, then add successively 10 parts of 500 type polyether glycols, 3-chloro-3 '-ethyl-4,4 '2.5 parts of-diaminodiphenylmethane, 1 part of PC-150 catalyzer, adds 90 after 0.5 part of BYK-A535 defoamer is uniformly mixed again #petroleum pitch dipropylene glycol dibenzoate mixing solutions, is further uniformly mixed, and then adds wherein rapid stirring to be uniformly dispersed 5 parts of instantly-soluble water glass micro mists, obtains B component, and sealing is preserved.
C component: 400 parts, silicon carbide, 0 part of stone chippings.
Above-mentioned A component and B component are mixed and stir rapidly after add again 300 parts, silicon carbide in C component, after being further uniformly mixed rapidly, be poured in the asphalt pavement pit that cleaned purging is clean, and strike off with scraper plate, then evenly sprinkle again 100 parts, silicon carbide on surface, according to hole groove depth and also graded cast of size, when graded casting, A component and B component are mixed with mass ratio 1:1, after mixing cast, liquid mixture can flowing time≤10min, ambient cure time≤30min, 90min can be open to traffic.
Base polyurethane prepolymer for use as preparation method described in A component following (charging capacity is according to the mass fraction):
100 parts of polyether glycol N220 that is 2000 by average molecular mass add in reactor at 120 DEG C, dewater 2 hours under 0.08Mpa vacuum condition, after dehydration, add 37.1 parts of tolylene diisocyanates (TDI-80) to stir in reactor, temperature is controlled in 80 DEG C of reaction 2h, react rear deaeration to bright, obtain the Polyether-Polyol Polyurethane Prepolymer that 137.1 parts-NCO group mass content is 10%, performed polymer is packed to inflated with nitrogen and preserve.
 
Embodiment 2
Implement a kind of preparation method of organic/inorganic composite material of quick reparation asphalt pavement pit, the method is made up of A component, B component and C component, and it is as follows that its content and composition are all measured preparation process according to the mass fraction.
A component: get 90 parts of poly methylene poly phenyl poly isocyanates and be placed in a band stirring mixer, then add 5 parts of base polyurethane prepolymer for use as, 5 parts of propylene glycol carbonates, are uniformly mixed and obtain A component under normal temperature, inflated with nitrogen sealing is preserved.
B component: first by 90 #3 parts, petroleum pitch joins in 5 parts of dipropylene glycol dibenzoates, stand-by after heating for dissolving.
Get 80 parts of 4450 type polyether glycols and be placed in a band and be uniformly mixed container, then add successively 7 parts of 500 type polyether glycols, 3-chloro-3 '-ethyl-4,4 '1 part of-diaminodiphenylmethane, 0.5 part of organo-bismuth KRBi-A1 catalyzer, adds 90 after 0.5 part of BYK-A535 defoamer is uniformly mixed again #petroleum pitch dipropylene glycol dibenzoate mixing solutions, is further uniformly mixed, and then adds wherein rapid stirring to be uniformly dispersed 3 parts of instantly-soluble water glass micro mists, obtains B component, and sealing is preserved.
C component: 400 parts, silicon carbide, 200 parts of stone chippings.
Above-mentioned A component and B component are mixed and stir rapidly after add again 300 parts, silicon carbide in C component, after being further uniformly mixed rapidly, be poured in the asphalt pavement pit that cleaned purging is clean, and strike off with scraper plate, then evenly sprinkle again 100 parts, silicon carbide on surface, if hole groove is darker, can in advance 200 parts of stone chippings be laid on to bottom as aggregate, and then pour into a mould, according to hole groove depth and also graded cast of size, when graded casting, A component and B component are mixed with mass ratio 1:1, after mixing cast, liquid mixture can flowing time≤10min, ambient cure time≤30min, 90min can be open to traffic.
Base polyurethane prepolymer for use as preparation method described in A component is with specific embodiment 1.
 
Embodiment 3.
Implement a kind of preparation method of organic/inorganic composite material of quick reparation asphalt pavement pit, the method is made up of A component, B component and C component, and it is as follows that its content and composition are all measured preparation process according to the mass fraction.
A component: get 86 parts of poly methylene poly phenyl poly isocyanates and be placed in a band stirring mixer, then add 7 parts of base polyurethane prepolymer for use as, 7 parts of propylene glycol carbonates, are uniformly mixed and obtain A component under normal temperature, inflated with nitrogen sealing is preserved.
B component: first by 90 #3.5 parts, petroleum pitch joins in 8 parts of dipropylene glycol dibenzoates, stand-by after heating for dissolving.
Get 74 parts of 4450 type polyether glycols and be placed in a band and be uniformly mixed container, then add successively 8 parts of 500 type polyether glycols, 3-chloro-3 '-ethyl-4,4 '2 parts of-diaminodiphenylmethane, 1 part of catalyst P C-150, after being uniformly mixed, 0.5 part of BYK-A535 defoamer adds again petroleum pitch dipropylene glycol dibenzoate mixing solutions, further be uniformly mixed, and then 3 parts of instantly-soluble water glass micro mists are stirred and are dispersed in system, obtain B component, sealing is preserved.
C component: 400 parts, silicon carbide, 400 parts of stone chippings.
Above-mentioned A component and B component are mixed and stir rapidly after add again 300 parts, silicon carbide in C component, after being further uniformly mixed rapidly, be poured in the asphalt pavement pit that cleaned purging is clean, and strike off with scraper plate, then evenly sprinkle again 100 parts, silicon carbide on surface, if hole groove is darker, can in advance 400 parts of stone chippings be laid on to bottom as aggregate, and then pour into a mould, according to hole groove depth and also graded cast of size, when graded casting, A component and B component are mixed with mass ratio 1:1, after mixing cast, liquid mixture can flowing time≤10min, ambient cure time≤30min, 90min can be open to traffic.
Base polyurethane prepolymer for use as preparation method specific embodiment 1 described in A component.
 
Embodiment 4
Implement a kind of preparation method of organic/inorganic composite material of quick reparation asphalt pavement pit, the method is made up of A component, B component and C component, and it is as follows that its content and composition are all measured preparation process according to the mass fraction.
A component: get 85 parts of poly methylene poly phenyl poly isocyanates and be placed in a band stirring mixer, then add 10 parts of base polyurethane prepolymer for use as, 5 parts of propylene glycol carbonates, are uniformly mixed and obtain A component under normal temperature, inflated with nitrogen sealing is preserved.
B component: first by 90 #3.5 parts, petroleum pitch joins in 10 parts of dipropylene glycol dibenzoates, stand-by after heating for dissolving.
Get 70 parts of 4450 type polyether glycols and be placed in a band and be uniformly mixed container, then add successively 9 parts of 500 type polyether glycols, 3-chloro-3 '-ethyl-4,4 '2.5 parts of-diaminodiphenylmethane, 0.5 part of PC-150 catalyzer, after being uniformly mixed, 0.5 part of BYK-A535 defoamer adds again petroleum pitch dipropylene glycol dibenzoate mixing solutions, further be uniformly mixed, and then 4 parts of instantly-soluble water glass micro mists are stirred and are dispersed in system, obtain B component, sealing is preserved.
C component: 400 parts of stone chippings, 500 parts, silicon carbide.
Above-mentioned A component and B component are mixed and stir rapidly after add again 300 parts, silicon carbide in C component, after being further uniformly mixed rapidly, be poured in the asphalt pavement pit that cleaned purging is clean, and strike off with scraper plate, then evenly sprinkle again 100 parts, silicon carbide on surface, if hole groove is darker, can in advance 500 parts of stone chippings be laid on to bottom as aggregate, and then pour into a mould, according to hole groove depth and also graded cast of size, when graded casting, A component and B component are mixed with mass ratio 1:1, after mixing cast, liquid mixture can flowing time≤10min, ambient cure time≤30min, 90min can be open to traffic.
Base polyurethane prepolymer for use as preparation method specific embodiment 1 described in A component.
Embodiment 5
Implement a kind of preparation method of organic/inorganic composite material of quick reparation asphalt pavement pit, the method is made up of A component, B component and C component, and it is as follows that its content and composition are all measured preparation process according to the mass fraction.
A component: get 88 parts of poly methylene poly phenyl poly isocyanates and be placed in a band stirring mixer, then add 6 parts of base polyurethane prepolymer for use as, 6 parts of propylene glycol carbonates, are uniformly mixed and obtain A component under normal temperature, inflated with nitrogen sealing is preserved.
B component: first by 90 #3 parts, petroleum pitch joins in 8 parts of dipropylene glycol dibenzoates, stand-by after heating for dissolving.
Get 75 parts of 4450 polyether glycols and be placed in a band and be uniformly mixed container, then add successively 8 parts of 500 polyether glycols, 3-chloro-3 '-ethyl-4,4 '1 part of-diaminodiphenylmethane, 0.5 part of organo-bismuth KRBi-A1 catalyzer, after being uniformly mixed, 0.5 part of BYK-A535 defoamer adds again petroleum pitch dipropylene glycol dibenzoate mixing solutions, further be uniformly mixed, and then 4 parts of instantly-soluble water glass micro mists are stirred and are dispersed in system, obtain B component, sealing is preserved.
C component: 400 parts of stone chippings, 700 parts, silicon carbide.
Above-mentioned A component and B component are mixed and stir rapidly after add again 300 parts, silicon carbide in C component, after being further uniformly mixed rapidly, be poured in the asphalt pavement pit that cleaned purging is clean, and strike off with scraper plate, then evenly sprinkle again 100 parts, silicon carbide on surface, if hole groove is darker, can in advance 700 parts of stone chippings be laid on to bottom as aggregate, and then pour into a mould, according to hole groove depth and also graded cast of size, when graded casting, A component and B component are mixed with mass ratio 1:1, after mixing cast, liquid mixture can flowing time≤10min, ambient cure time≤30min, 90min can be open to traffic.
Base polyurethane prepolymer for use as preparation method specific embodiment 1 described in A component.
 
Embodiment 6
Implement a kind of preparation method of organic/inorganic composite material of quick reparation asphalt pavement pit, the method is made up of A component, B component and C component, and it is as follows that its content and composition are all measured preparation process according to the mass fraction.
A component: get 86 parts of poly methylene poly phenyl poly isocyanates and be placed in a band stirring mixer, then add 9 parts of base polyurethane prepolymer for use as, 5 parts of propylene glycol carbonates, are uniformly mixed and obtain A component under normal temperature, inflated with nitrogen sealing is preserved.
B component: first by 90 #4 parts, petroleum pitch joins in 10 parts of dipropylene glycol dibenzoates, stand-by after heating for dissolving.
Get 70 parts of 4450 polyether glycols and be placed in a band and be uniformly mixed container, then add successively 10 parts of 500 polyether glycols, 3-chloro-3 '-ethyl-4,4 '1.5 parts of-diaminodiphenylmethane, 1 part of organo-bismuth KRBi-A1 catalyzer, after being uniformly mixed, 0.5 part of BYK-A535 defoamer adds again petroleum pitch dipropylene glycol dibenzoate mixing solutions, further be uniformly mixed, and then 3 parts of instantly-soluble water glass micro mists are stirred and are dispersed in system, obtain B component, sealing is preserved.
C component: 400 parts of stone chippings, 100 parts, silicon carbide.
Above-mentioned A component and B component are mixed and stir rapidly after add again 300 parts, silicon carbide in C component, after being further uniformly mixed rapidly, be poured in the asphalt pavement pit that cleaned purging is clean, and strike off with scraper plate, then evenly sprinkle again 100 parts, silicon carbide on surface, can in advance 100 parts of stone chippings be laid on to bottom as aggregate, and then pour into a mould, according to hole groove depth and also graded cast of size, when graded casting, A component and B component are mixed with mass ratio 1:1, after mixing cast, liquid mixture can flowing time≤10min, ambient cure time≤30min, 90min can be open to traffic.
Base polyurethane prepolymer for use as preparation method described in A component following (charging capacity is according to the mass fraction):
100 parts of polyether glycol N220 that is 2000 by average molecular mass add in reactor at 120 DEG C, dewater 2 hours under 0.08Mpa vacuum condition, after dehydration, add 37.1 parts of tolylene diisocyanates (TDI-80) to stir in reactor, temperature is controlled in 80 DEG C of reaction 2h, react rear deaeration to bright, obtain the Polyether-Polyol Polyurethane Prepolymer that 137.1 parts-NCO group mass content is 10%, performed polymer is packed to inflated with nitrogen and preserve.
 
Embodiment 7
Implement a kind of preparation method of organic/inorganic composite material of quick reparation asphalt pavement pit, the method is made up of A component, B component and C component, and it is as follows that its content and composition are all measured preparation process according to the mass fraction.
A component: get 82 parts of poly methylene poly phenyl poly isocyanates and be placed in a band stirring mixer, then add 10 parts of base polyurethane prepolymer for use as, 8 parts of propylene glycol carbonates, are uniformly mixed and obtain A component under normal temperature, inflated with nitrogen sealing is preserved.
B component: first by 90 #3.5 parts, petroleum pitch joins in 9 parts of dipropylene glycol dibenzoates, stand-by after heating for dissolving.
Get 75 parts of 4450 polyether glycols and be placed in a band and be uniformly mixed container, then add successively 7 parts of 500 polyether glycols, 3-chloro-3 '-ethyl-4,4 '1 part of-diaminodiphenylmethane, 1 part of PC-150 catalyzer, after being uniformly mixed, 0.5 part of BYK-A535 defoamer adds again petroleum pitch dipropylene glycol dibenzoate mixing solutions, further be uniformly mixed, and then 3 parts of instantly-soluble water glass micro mists are stirred and are dispersed in system, obtain B component, sealing is preserved.
C component: 400 parts of stone chippings, 300 parts, silicon carbide.
Above-mentioned A component and B component are mixed and stir rapidly after add again 300 parts, silicon carbide in C component, after being further uniformly mixed rapidly, be poured in the asphalt pavement pit that cleaned purging is clean, and strike off with scraper plate, then evenly sprinkle again 100 parts, silicon carbide on surface, if hole groove is darker, can in advance 300 parts of stone chippings be laid on to bottom as aggregate, and then pour into a mould, according to hole groove depth and also graded cast of size, when graded casting, A component and B component are mixed with mass ratio 1:1, after mixing cast, liquid mixture can flowing time≤10min, ambient cure time≤30min, 90min can be open to traffic.
Base polyurethane prepolymer for use as preparation method specific embodiment 1 described in A component.
 
Embodiment 8
Implement a kind of preparation method of organic/inorganic composite material of quick reparation asphalt pavement pit, the method is made up of A component, B component and C component, and it is as follows that its content and composition are all measured preparation process according to the mass fraction.
A component: get 84 parts of poly methylene poly phenyl poly isocyanates and be placed in a band stirring mixer, then add 9 parts of base polyurethane prepolymer for use as, 7 parts of propylene glycol carbonates, are uniformly mixed and obtain A component under normal temperature, inflated with nitrogen sealing is preserved.
B component: first by 90 #3 parts, petroleum pitch joins in 9 parts of dipropylene glycol dibenzoates, stand-by after heating for dissolving.
Get 72 parts of 4450 polyether glycols and be placed in a band and be uniformly mixed container, then add successively 8 parts of 500 polyether glycols, 3-chloro-3 '-ethyl-4,4 '2 parts of-diaminodiphenylmethane, 0.5 part of PC-150 catalyzer, after being uniformly mixed, 0.5 part of BYK-A535 defoamer adds again petroleum pitch dipropylene glycol dibenzoate mixing solutions, further be uniformly mixed, and then 5 parts of instantly-soluble water glass micro mists are stirred and are dispersed in system, obtain B component, sealing is preserved.
C component: 400 parts of stone chippings, 600 parts, silicon carbide.
Above-mentioned A component and B component are mixed and stir rapidly after add again 300 parts, silicon carbide in C component, after being further uniformly mixed rapidly, be poured in the asphalt pavement pit that cleaned purging is clean, and strike off with scraper plate, then evenly sprinkle again 100 parts, silicon carbide on surface, if hole groove is darker, can in advance 600 parts of stone chippings be laid on to bottom as aggregate, and then pour into a mould, according to hole groove depth and also graded cast of size, when graded casting, A component and B component are mixed with mass ratio 1:1, after mixing cast, liquid mixture can flowing time≤10min, ambient cure time≤30min, 90min can be open to traffic.
Base polyurethane prepolymer for use as preparation method specific embodiment 1 described in A component.
 
Embodiment 9
Implement a kind of preparation method of organic/inorganic composite material of quick reparation asphalt pavement pit, the method is made up of A component, B component and C component, and it is as follows that its content and composition are all measured preparation process according to the mass fraction.
A component: get 87 parts of poly methylene poly phenyl poly isocyanates and be placed in a band stirring mixer, then add 7 parts of base polyurethane prepolymer for use as, 6 parts of propylene glycol carbonates, are uniformly mixed and obtain A component under normal temperature, inflated with nitrogen sealing is preserved.
B component: first by 90 #4 parts, petroleum pitch joins in 10 parts of dipropylene glycol dibenzoates, stand-by after heating for dissolving.
Get 71 parts of 4450 polyether glycols and be placed in a band and be uniformly mixed container, then add successively 8 parts of 500 polyether glycols, 3-chloro-3 '-ethyl-4,4 '1 part of-diaminodiphenylmethane, 0.5 part of PC-150 catalyzer, after being uniformly mixed, 0.5 part of BYK-A535 defoamer adds again petroleum pitch dipropylene glycol dibenzoate mixing solutions, further be uniformly mixed, and then 5 parts of instantly-soluble water glass micro mists are stirred and are dispersed in system, obtain B component, sealing is preserved.
C component: 400 parts of stone chippings, 0 part, silicon carbide.
Above-mentioned A component and B component are mixed and stir rapidly after add again 300 parts, silicon carbide in C component, after being further uniformly mixed rapidly, be poured in the asphalt pavement pit that cleaned purging is clean, and strike off with scraper plate, then evenly sprinkle again 100 parts, silicon carbide on surface, according to hole groove depth and also graded cast of size, when graded casting, A component and B component are mixed with mass ratio 1:1, after mixing cast, liquid mixture can flowing time≤10min, ambient cure time≤30min, 90min can be open to traffic.
Base polyurethane prepolymer for use as preparation method specific embodiment 1 described in A component.
 
Embodiment 10
Implement a kind of preparation method of organic/inorganic composite material of quick reparation asphalt pavement pit, the method is made up of A component, B component and C component, and it is as follows that its content and composition are all measured preparation process according to the mass fraction.
A component: get 89 parts of poly methylene poly phenyl poly isocyanates and be placed in a band stirring mixer, then add 6 parts of base polyurethane prepolymer for use as, 5 parts of propylene glycol carbonates, are uniformly mixed and obtain A component under normal temperature, inflated with nitrogen sealing is preserved.
B component: first by 90 #4.5 parts, petroleum pitch joins in 10 parts of dipropylene glycol dibenzoates, stand-by after heating for dissolving.
Get 68 parts of 4450 type polyether glycols and be placed in a band and be uniformly mixed container, then add successively 10 parts of 500 type polyether glycols, 3-chloro-3 '-ethyl-4,4 '2.5 parts of-diaminodiphenylmethane, 0.5 part of organo-bismuth KRBi-A1 catalyzer, after being uniformly mixed, 0.5 part of BYK-A535 defoamer adds again petroleum pitch dipropylene glycol dibenzoate mixing solutions, further be uniformly mixed, and then 4 parts of instantly-soluble water glass micro mists are stirred and are dispersed in system, obtain B component, sealing is preserved.
C component: 400 parts of stone chippings, 300 parts, silicon carbide.
Above-mentioned A component and B component are mixed and stir rapidly after add again 300 parts, silicon carbide in C component, after being further uniformly mixed rapidly, be poured in the asphalt pavement pit that cleaned purging is clean, and strike off with scraper plate, then evenly sprinkle again 100 parts, silicon carbide on surface, if hole groove is darker, can in advance 300 parts of stone chippings be laid on to bottom as aggregate, and then pour into a mould, according to hole groove depth and also graded cast of size, when graded casting, A component and B component are mixed with mass ratio 1:1, after mixing cast, liquid mixture can flowing time≤10min, ambient cure time≤30min, 90min can be open to traffic.
Base polyurethane prepolymer for use as preparation method specific embodiment 1 described in A component.

Claims (9)

1. an organic/inorganic composite material of repairing fast asphalt pavement pit, is characterized in that: described matrix material is made up of A, B and C component, and its composition and mass content thereof are as follows:
A component: 82~90 parts of poly methylene poly phenyl poly isocyanates;
10~5 parts of base polyurethane prepolymer for use as;
8~5 parts of propylene glycol carbonates;
B component: 4,450 66~80 parts of type polyether glycols
500 10~7 parts of type polyether glycols;
10~5 parts of dipropylene glycol dibenzoates;
3-chloro-3 '-ethyl-4,4 '2.5~1 parts of-diaminodiphenylmethane;
90 #5~3 parts, petroleum pitch;
1~0.5 part of catalyzer;
5~3 parts of instantly-soluble water glass micro mists;
0.5 part of BYK-A535 defoamer;
C component: 400 parts, silicon carbide;
0~700 part of stone chippings.
2. for a preparation method for the organic/inorganic composite material of a kind of quick reparation asphalt pavement pit claimed in claim 1, described in it, according to the mass fraction, step is as follows for preparation method:
The preparation of A component
Get 82~90 parts of poly methylene poly phenyl poly isocyanates and be placed in a band stirring mixer, then add 10~5 parts of base polyurethane prepolymer for use as, 8~5 parts of propylene glycol carbonates, are uniformly mixed under normal temperature, obtain A component, and inflated with nitrogen sealing is preserved;
The preparation of B component
By 90 #5~3 parts, petroleum pitch joins in 10~5 parts of dipropylene glycol dibenzoates, stand-by after heating for dissolving;
Get 66~80 parts of 4450 type polyether glycols and be placed in a band and be uniformly mixed container, then add successively 10~7 parts of 500 type polyether glycols, 3-chloro-3 '-ethyl-4,4 '2.5~1 parts of-diaminodiphenylmethane, 0.5 part of 1~0.5 part of catalyzer and BYK-A535 defoamer, after being uniformly mixed, add again petroleum pitch dipropylene glycol dibenzoate mixing solutions, further be uniformly mixed, and then 5~3 parts of instantly-soluble water glass micro mists are added to stir be dispersed in system, obtaining B component, sealing is preserved;
Above-mentioned A component and B component are mixed and stir rapidly after add again 300 parts, silicon carbide in C component, after being further uniformly mixed rapidly, be poured in the asphalt pavement pit that cleaned purging is clean, and strike off with scraper plate, then evenly sprinkle again 100 parts, silicon carbide on surface, if hole groove is darker, can in advance 0~700 part of stone chippings be laid on to bottom as aggregate, and then pour into a mould, according to hole groove depth and also graded cast of size, when graded casting, A component and B component are mixed with mass ratio 1:1.
3. preparation method as claimed in claim 2, described in it, according to the mass fraction, preparation method is as follows for the charging capacity of base polyurethane prepolymer for use as:
100 parts of polyether glycol N220 that is 2000 by average molecular mass add in reactor at 120 DEG C, dewater 2 hours under 0.08Mpa vacuum condition, after dehydration, add 37.1 parts of tolylene diisocyanates to stir in reactor, temperature is controlled in 80 DEG C of reaction 2h, react rear deaeration to bright, obtain the Polyether-Polyol Polyurethane Prepolymer that 137.1 parts-NCO group mass content is 10%, performed polymer is packed to inflated with nitrogen and preserve.
4. preparation method as claimed in claim 2, described in it poly methylene poly phenyl poly isocyanate-NCO group mass content is 30%~32%.
5. preparation method as claimed in claim 2, described in it, the modulus of instantly-soluble water glass micro mist is 2.3~2.5, fineness is 120 orders.
6. preparation method as claimed in claim 2, described in it, the hydroxyl value of 4450 type polyether glycols is 350 ± 20mgKOH/g.
7. preparation method as claimed in claim 2, described in it, the hydroxyl value of 500 type polyether glycols is 335 ± 20mgKOH/g.
8. as right is wanted the preparation method as described in 2, described in it, catalyzer is PC-150 catalyzer, or organo-bismuth KRBi-A1.
9. preparation method as claimed in claim 2, described in it in C component: the particle diameter of stone chippings is 10~40mm; The particle diameter of silicon carbide is 0.5~2mm.
CN201410417601.2A 2014-08-22 2014-08-22 Organic/inorganic composite material of a kind of quick reparation asphalt pavement pit and preparation method thereof Active CN104176988B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410417601.2A CN104176988B (en) 2014-08-22 2014-08-22 Organic/inorganic composite material of a kind of quick reparation asphalt pavement pit and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410417601.2A CN104176988B (en) 2014-08-22 2014-08-22 Organic/inorganic composite material of a kind of quick reparation asphalt pavement pit and preparation method thereof

Publications (2)

Publication Number Publication Date
CN104176988A true CN104176988A (en) 2014-12-03
CN104176988B CN104176988B (en) 2016-04-06

Family

ID=51958374

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410417601.2A Active CN104176988B (en) 2014-08-22 2014-08-22 Organic/inorganic composite material of a kind of quick reparation asphalt pavement pit and preparation method thereof

Country Status (1)

Country Link
CN (1) CN104176988B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104746402A (en) * 2015-01-27 2015-07-01 北京艾施姆科技有限公司 Repair method for damaged pavement around well lid
CN106758647A (en) * 2016-12-08 2017-05-31 贵州省交通规划勘察设计研究院股份有限公司 A kind of method of asphalt pavement pit repairing
CN109503183A (en) * 2018-12-26 2019-03-22 武汉钢铁集团耐火材料有限责任公司 Large face repair material of converter and preparation method thereof
CN111253730A (en) * 2020-03-05 2020-06-09 河南师范大学 Modified material for improving micro-surfacing forming quality and using method thereof
CN111647121A (en) * 2020-06-12 2020-09-11 北京石油化工学院 Preparation method of two-component polyurethane composite material for pipeline repair
CN111892334A (en) * 2019-05-05 2020-11-06 河北德瑞公路工程有限公司 Bi-component modified asphalt cold-patch material and preparation method thereof
CN112309623A (en) * 2020-10-10 2021-02-02 安徽龙庵电缆集团有限公司 Submarine demagnetizing cable and preparation method thereof
CN114457646A (en) * 2021-12-31 2022-05-10 江苏长路智造科技有限公司 HFST high-friction resin surface structure and preparation method thereof
CN114988788A (en) * 2021-12-22 2022-09-02 上海城建城市运营(集团)有限公司 Material for repairing pits of asphalt pavement and preparation method thereof
CN115636921A (en) * 2022-11-18 2023-01-24 山东一诺威新材料有限公司 Rapid repairing material for bridge and tunnel disasters, and preparation method and application of material

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102617070A (en) * 2012-03-23 2012-08-01 重庆市智翔铺道技术工程有限公司 Polyurethane asphalt concrete as well as preparation method and application thereof
CN102762623A (en) * 2009-12-21 2012-10-31 巴斯夫欧洲公司 Composite materials comprising aggregate and an elastomeric composition
CN103555218A (en) * 2013-11-08 2014-02-05 山西长达交通设施有限公司 Pavement crack repairing material and preparation method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102762623A (en) * 2009-12-21 2012-10-31 巴斯夫欧洲公司 Composite materials comprising aggregate and an elastomeric composition
CN102617070A (en) * 2012-03-23 2012-08-01 重庆市智翔铺道技术工程有限公司 Polyurethane asphalt concrete as well as preparation method and application thereof
CN103555218A (en) * 2013-11-08 2014-02-05 山西长达交通设施有限公司 Pavement crack repairing material and preparation method thereof

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104746402A (en) * 2015-01-27 2015-07-01 北京艾施姆科技有限公司 Repair method for damaged pavement around well lid
CN106758647A (en) * 2016-12-08 2017-05-31 贵州省交通规划勘察设计研究院股份有限公司 A kind of method of asphalt pavement pit repairing
CN109503183A (en) * 2018-12-26 2019-03-22 武汉钢铁集团耐火材料有限责任公司 Large face repair material of converter and preparation method thereof
CN111892334A (en) * 2019-05-05 2020-11-06 河北德瑞公路工程有限公司 Bi-component modified asphalt cold-patch material and preparation method thereof
CN111253730A (en) * 2020-03-05 2020-06-09 河南师范大学 Modified material for improving micro-surfacing forming quality and using method thereof
CN111647121A (en) * 2020-06-12 2020-09-11 北京石油化工学院 Preparation method of two-component polyurethane composite material for pipeline repair
CN112309623A (en) * 2020-10-10 2021-02-02 安徽龙庵电缆集团有限公司 Submarine demagnetizing cable and preparation method thereof
CN112309623B (en) * 2020-10-10 2022-03-01 安徽龙庵电缆集团有限公司 Submarine demagnetizing cable and preparation method thereof
CN114988788A (en) * 2021-12-22 2022-09-02 上海城建城市运营(集团)有限公司 Material for repairing pits of asphalt pavement and preparation method thereof
CN114988788B (en) * 2021-12-22 2024-04-26 上海城建城市运营(集团)有限公司 Material for repairing pits of asphalt pavement and preparation method thereof
CN114457646A (en) * 2021-12-31 2022-05-10 江苏长路智造科技有限公司 HFST high-friction resin surface structure and preparation method thereof
CN114457646B (en) * 2021-12-31 2023-10-03 江苏长路智造科技有限公司 HFST high-friction resin surface structure and preparation method thereof
CN115636921A (en) * 2022-11-18 2023-01-24 山东一诺威新材料有限公司 Rapid repairing material for bridge and tunnel disasters, and preparation method and application of material

Also Published As

Publication number Publication date
CN104176988B (en) 2016-04-06

Similar Documents

Publication Publication Date Title
CN104176988B (en) Organic/inorganic composite material of a kind of quick reparation asphalt pavement pit and preparation method thereof
Cong et al. The use of polyurethane for asphalt pavement engineering applications: A state-of-the-art review
Li et al. Recent applications and developments of Polyurethane materials in pavement engineering
CN100577736C (en) Asphalt pavement conditioning curing agent and preparation method thereof
Wang et al. Advanced cold patching materials (CPMs) for asphalt pavement pothole rehabilitation: State of the art
US11072708B2 (en) Asphalt concrete composition having improved waterproof performance by comprising SIS, recycled asphalt aggregate, and fine powder aggregate with improved particle size, and construction method using the same
JP6153640B2 (en) Formation of polyurethane roads
CN103058585B (en) Method for preparing polyurethane rubber granule mixture for pavement self-stress icebreaking
CN104261790B (en) Urethane/silicate composite material of hole, a kind of quick rehabilitating concrete road surface groove and preparation method thereof
KR102119736B1 (en) Modified-Asphalt Concrete Compositions for Pavement of Roads Using Styrene Isoprene Styrene, Styrene Ethylene Butylene Styrene, Recycling Asphalt and Aggregate-powder of Improved Grain Size and Constructing Methods Using Thereof
KR100719855B1 (en) Polyurethane binder composition cured by moisture, cold color asphalt repair materials for road rehabilitation using the same and those manufacture method
KR101323022B1 (en) Method of road repairing by using urethane sealant for repairing broken concrete near expansion joint
CN104987704B (en) A kind of composite for repairing highway crack and preparation method thereof
CN109594471B (en) Paving structure of steel bridge deck and construction method thereof
KR100604655B1 (en) Fast harden type a road repair material
KR100564098B1 (en) Urethane-composite including polyol for pavement of road
CN111056769A (en) Carbon fiber asphalt mixture
CN114656775A (en) Low-freezing-point anti-freezing material for pavement and preparation method thereof
CN115650634A (en) Plant-mixed cold-recycling mixture and road surface construction method
CN114163167B (en) Super-strong high-toughness polyester concrete for rapid structural repair, and preparation method and application thereof
CN114149200B (en) Super-strong high-toughness polyester concrete for rapid structural restoration, and preparation method and application thereof
CN112143245B (en) Water-based cold-mixing cold-paving ultrathin asphalt modifier prepared from wastes
KR102054836B1 (en) Room Temperature Harding Asphalt Concrete Compositions for Packing Using Stylene Isoprene Stylene and Constructing Methods Using Thereof
Sagitova et al. ADVANTAGES OF ASPHALT CONCRETE COATINGS WITH RUBBER CRUMB
Muhammed et al. Characteristics of modified open-graded asphalt mixture with crumb rubber

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201215

Address after: Room 1512, Jincheng Jianguo No.5, Jianguomen North Street, Dongcheng District, Beijing, 100005

Patentee after: Beijing Zhongke Antu Transportation Technology Co., Ltd

Address before: Room 603, Jincheng Jianguo 5, No.5 Jianguomen North Street, Dongcheng District, Beijing

Patentee before: BEIJING AISHIMU TECHNOLOGY Co.,Ltd.