CN104155526A - 一种测量带避雷线的输电线路杆塔接地装置冲击接地阻抗的方法 - Google Patents

一种测量带避雷线的输电线路杆塔接地装置冲击接地阻抗的方法 Download PDF

Info

Publication number
CN104155526A
CN104155526A CN201410377130.7A CN201410377130A CN104155526A CN 104155526 A CN104155526 A CN 104155526A CN 201410377130 A CN201410377130 A CN 201410377130A CN 104155526 A CN104155526 A CN 104155526A
Authority
CN
China
Prior art keywords
impulse
tower
earthing
impedance
grounding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410377130.7A
Other languages
English (en)
Other versions
CN104155526B (zh
Inventor
马御棠
曹晓斌
王磊
马仪
候亚非
周仿荣
申元
黄然
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YUN NAN ELECTRIC TEST & RESEARCH INSTITUTE GROUP Co.,Ltd. ELECTRIC INSTITUTE
Southwest Jiaotong University
Electric Power Research Institute of Yunnan Power Grid Co Ltd
Original Assignee
Southwest Jiaotong University
Yunnan Power Grid Corp Technology Branch
Yunnan Electric Power Experimental Research Institute Group Co Ltd of Electric Power Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Jiaotong University, Yunnan Power Grid Corp Technology Branch, Yunnan Electric Power Experimental Research Institute Group Co Ltd of Electric Power Research Institute filed Critical Southwest Jiaotong University
Priority to CN201410377130.7A priority Critical patent/CN104155526B/zh
Publication of CN104155526A publication Critical patent/CN104155526A/zh
Application granted granted Critical
Publication of CN104155526B publication Critical patent/CN104155526B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Measurement Of Resistance Or Impedance (AREA)

Abstract

一种测量带避雷线的输电线路杆塔接地装置冲击接地阻抗的方法,该方法的输电线路杆塔架设有避雷线或其它类型的架空地线;杆塔的接地装置和杆塔或避雷线、架空地线之间通过引下线相连,引下线与接地装置通过螺栓连接,二者在电气连接上可以拆开。使用该方法可以直接测量输电线路杆塔接地极的冲击接地阻抗,避免土壤结构不均匀和测量电极位置偏差造成的测量误差,布线方式更简单,测量结果更准确。并且通过增大电源输出电压波形或电流波形的幅值,或乘以火花放电系数等方法,还可以得到发生火花放电后的输电线路杆塔接地装置的冲击接地阻抗。

Description

一种测量带避雷线的输电线路杆塔接地装置冲击接地阻抗的方法
技术领域
本发明涉及一种测量带避雷线或其它类型架空地线的输电线路杆塔接地装置冲击接地阻抗方法,该方法适用于输电线路杆塔的防雷设计和防雷改造,属于电力***过电压测试领域。
背景技术
输电线路的雷击跳闸严重影响了我国电网的安全运行。为了提高输电线路的运行可靠性,降低线路杆塔在雷击时产生的反击电压,从而使输电线路的雷击跳闸率维持在正常的水平,因此需要对线路杆塔接地装置的冲击接地阻抗进行测量。目前,根据我国出版的大量高电压技术以及接地相关的教学书籍,以及电力***行业规范中接地的相关规定记载,杆塔接地装置的冲击接地阻抗主要的获得方法是:通过测量杆塔接地装置的工频接地电阻,再乘以冲击系数得到,该方法无法直接直观得到杆塔接地装置的冲击接地阻抗。标准DL/T 266-2012接地装置冲击特性参数测试导则中给出的测量方法是以传统的接地电阻测量中的三极法为基础,测量时需要布置两根测量线,而且通过接地相关的书籍及标准DL/T 266-2012给出的基本知识可知,三极法源于均匀土壤中地表电位分布的规律,因此当土壤结构不均匀或测量电极位置有偏差时,均会给测量结果带来误差。本发明中提出的一种测量输电线路杆塔接地装置冲击接地阻抗的方法,该方法利用接地装置冲击接地阻抗、杆塔和避雷线的波阻抗以及辅助电极冲击接地阻抗组成的电路模型,通过测量三者的电流与电压关系从而得到输电线路杆塔接地装置的冲击接地阻抗,避免土壤结构不均匀和测量电极位置偏差造成的测量误差,布线方式更简单,测量结果更准确。
该方法不仅可以直接测量输电线路杆塔接地装置的冲击接地阻抗,通过增大电源输出电压波形或电流波形的幅值,还可以测量发生火花放电后的输电线路杆塔接地极的冲击接地阻抗;通过改变冲击电源以输出操作过电压波形时,还可以测得操作过电压作用下的输电线路杆塔冲击接地阻抗。
发明内容
本发明的目的在于提供一种测量带避雷线或其它类型架空地线的输电线路杆塔接地装置冲击接地阻抗方法,使用该方法可以直接测量输电线路杆塔接地装置的冲击接地阻抗,通过增大电源输出电压波形或电流波形的幅值,还可以测量发生火花放电后的输电线路杆塔接地极的冲击接地阻抗;冲击电源输出操作过电压波形时,还可以测得操作过电压冲击接地阻抗。
本发明实现上述目的的技术原理是利用输电线路杆塔接地装置对输入的响应情况,采用电路分析法来计算接地阻抗。其原理如附图1与图2所示:图中S为测量用的冲击电源;V为电压波形测量装置;A为电流波形测量装置;R为输电线路杆塔的冲击接地阻抗,其实质为杆塔处接地装置的冲击接地阻抗;Z为输电线路杆塔和避雷线等效阻抗;R2为辅助接地极的等效冲击接地阻抗。
如附图1所示,当在输电线路杆塔接地装置的引下线与避雷线或架空地线接地引下线之间施加测试用冲击电源时,电流通过杆塔接地装置的电阻R,以及杆塔和避雷线或架空地线的等效波阻抗Z;此时根据冲击阻抗的定义,电源输出电压波形的最大值U1和冲击电流波形最大值I1之间满足以下关系:
U1=I1(R+Z)
如附图2所示,当在辅助接地极与杆塔接地引下线及避雷线或架空地线的接地引下线之间施加测试用冲击电源时,设此部分电流波形最大值为I;电流一部分通过杆塔接地装置的冲击接地阻抗R,设此部分电流波形最大值为I2;另一部分通过杆塔和避雷线的等效波阻抗Z,设此部分电流波形最大值为I3;此时施加在R和Z上的电压波形最大值相同,即冲击电源与辅助接地极上的冲击电压波形叠加后的最大值,设为U2;则根据冲击阻抗的定义,有:
U2=I2R
U2=I3Z
又根据并联电路分流定律,可以得到以下关系
I=I2+I3
所以根据上述测得的电流和电压波型最大值,可以得到输电线路的杆塔冲击接地阻抗R。
本发明可以应用于所有具有以下特征的输电线路杆塔:
一种测量带避雷线的输电线路杆塔接地装置冲击接地阻抗的方法,本发明特征在于,该方法的输电线路杆塔架设有避雷线或其它类型的架空地线;杆塔的接地装置和杆塔或避雷线、架空地线之间通过引下线相连,引下线与接地装置通过螺栓连接,二者在电气连接上能够拆开;
本发明方法包括以下步骤:
第一步,拆开所有接地装置引下线与杆塔之间的螺栓电气连接点,在杆塔接地装置任意一条引下线与杆塔之间施加测试用的冲击电源,测得施加的冲击电压波形的最大值U1以及通过避雷线接地引下线的冲击电流波形最大值I1
第二步,在杆塔附近打下辅助接地极,辅助接地极到杆塔的距离应在接地装置对角线长度的2倍以上,辅助接地极通过冲击电源与接地装置引下线以及杆塔相连,测量流过杆塔接地装置引下线的冲击电流波形最大值I2和流过杆塔的冲击电流波形最大值I3
第三步,通过以下表达式得到杆塔接地装置的冲击接地阻抗Z:
Z = U 1 I 2 I 1 ( I 2 + I 3 )
第四步,拆除所有的测量装置,恢复原有的输电线路杆塔接地装置引下线与杆塔之间的电气连接。
本发明第三步测得通过杆塔接地装置的接地引下线的冲击电流波形最大值I2和通过辅助接地极的冲击电流波形最大值I,然后通过以下表达式得到杆塔接地装置的冲击接地阻抗Z:
Z = U 1 I 2 I 1 I
本发明第三步测得通过避雷线接地引下线的冲击电流波形最大值I3和通过辅助接地极的冲击电流波形最大值I,然后通过以下表达式得到杆塔接地装置的冲击接地阻抗R:
Z = U 1 ( I - I 3 ) I 1 I
本发明施加的冲击电源,其输出波形根据实际进行调整,或是标准的雷电流波形,或是标准的操作过电压波形,测得的冲击接地阻抗分别对应雷电过电压冲击接地阻抗和操作过电压冲击接地阻抗。
本发明得到的冲击接地阻抗没有考虑接地极的火花放电效应,要得到考虑接地极的火花放电效应后的冲击接地阻抗,采用增大测试用的冲击电源输出电压或电流的幅值,直至接地装置中的接地极发生火花放电,此时得到的就是考虑接地极的火花放电效应后的冲击接地阻抗;或将上述没有发生火花放电时测得的冲击接地阻抗的值乘以火花放电系数,即得到考虑火花放电效应后的冲击接地阻抗。火花放电系数可以从相关规范以及公开发表的书籍、文章、论文中得到。
本发明中的测量用冲击电源、电压波形测量装置和电流波形测量装置可以是独立的设备,也可以是能实现输入冲击电源,并测量电压和电流波形的两个或多个功能的组合设备。
附图说明
下面结合附图和实施例进一步说明本发明。
图1是第一步的测量原理图;
图2是第二步的测量原理图;
图3是第一步测量接线方式的示意图;
图4是第二步测量接线方式的示意图。
其中1为输电线路杆塔;2为避雷线或其它类型的架空地线;3为导线;4为绝缘子串;5为避雷线接地引下线;6为杆塔接地装置的引下线;7为杆塔接地装置;8为辅助接地极;9为地面;10为测量线;S为测量电源;V为电压测量设备;A为电流测量设备。
具体实施方式
一种测量带避雷线的输电线路杆塔接地装置冲击接地阻抗的方法,本发明特征在于,该方法的输电线路杆塔架设有避雷线或其它类型的架空地线;杆塔的接地装置和杆塔或避雷线、架空地线之间通过引下线相连,引下线与接地装置通过螺栓连接,二者在电气连接上能够拆开;
本发明方法包括以下步骤:
第一步,拆开所有接地装置引下线与杆塔之间的螺栓电气连接点,在杆塔接地装置任意一条引下线与杆塔之间施加测试用的冲击电源,测得施加的冲击电压波形的最大值U1以及通过避雷线接地引下线的冲击电流波形最大值I1
第二步,在杆塔附近打下辅助接地极,辅助接地极到杆塔的距离应在接地装置对角线长度的2倍以上,辅助接地极通过冲击电源与接地装置引下线以及杆塔相连,测量流过杆塔接地装置引下线的冲击电流波形最大值I2和流过杆塔的冲击电流波形最大值I3
第三步,通过以下表达式得到杆塔接地装置的冲击接地阻抗Z:
Z = U 1 I 2 I 1 ( I 2 + I 3 )
第四步,拆除所有的测量装置,恢复原有的输电线路杆塔接地装置引下线与杆塔之间的电气连接。
本发明第三步测得通过杆塔接地装置的接地引下线的冲击电流波形最大值I2和通过辅助接地极的冲击电流波形最大值I,然后通过以下表达式得到杆塔接地装置的冲击接地阻抗Z:
Z = U 1 I 2 I 1 I
本发明第三步测得通过避雷线接地引下线的冲击电流波形最大值I3和通过辅助接地极的冲击电流波形最大值I,然后通过以下表达式得到杆塔接地装置的冲击接地阻抗R:
Z = U 1 ( I - I 3 ) I 1 I
本发明施加的冲击电源,其输出波形根据实际进行调整,或是标准的雷电流波形,或是标准的操作过电压波形,测得的冲击接地阻抗分别对应雷电过电压冲击接地阻抗和操作过电压冲击接地阻抗。
本发明得到的冲击接地阻抗没有考虑接地极的火花放电效应,要得到考虑接地极的火花放电效应后的冲击接地阻抗,采用增大测试用的冲击电源输出电压或电流的幅值,直至接地装置中的接地极发生火花放电,此时得到的就是考虑接地极的火花放电效应后的冲击接地阻抗;或将上述没有发生火花放电时测得的冲击接地阻抗的值乘以火花放电系数,即得到考虑火花放电效应后的冲击接地阻抗。火花放电系数可以从相关规范以及公开发表的书籍、文章、论文中得到。
下面通过实例,结合附图3及图4,对本发明的技术方案进行进一步说明。
第一步,使用扳手拆开所有输电线路杆塔接地装置的引下线6与避雷线接地引下线5之间的电气连接点螺栓,在5与6之间施加测试用的冲击电源,测得图中冲击电压波形的最大值U1以及通过避雷线接地引下线的冲击电流波形的最大值I1
如测量得到U1=30000伏特,I1=2000安培;
第二步,在杆塔附近打下辅助接地极,辅助接地极到杆塔的距离应在杆塔接地装置对角线长度的2倍以上;将第一步中被测量的杆塔接地装置引下线及避雷线的接地引下线相连,在连接点与辅助接地极之间施加测试用的冲击电源,测得流过杆塔接地装置的引下线的冲击电流波形最大值I2和流过避雷线接地引下线的冲击电流波形最大值I3
如测量得到I2=1000安培,I3=500安培;
第三步,通过以下公式计算得到杆塔接地装置的冲击接地阻抗R:
R = U 1 I 2 I 1 ( I 2 + I 3 )
代入算得R=10欧姆。
上述步骤中,第三步,可以将其中一个冲击电流波形测量装置与测量用冲击电源串联,如:测得通过杆塔接地装置的接地引下线的冲击电流波形最大值I2和通过辅助接地极的冲击电流波形最大值I,然后通过以下公式计算得到杆塔的冲击接地阻抗R:
R = U 1 I 2 I 1 I
如测量得到I2=1000安培,I=1500安培;代入算得R=10欧姆。
或者可以测得通过避雷线接地引下线的冲击电流波形最大值I3和通过辅助接地极的冲击电流波形最大值I,然后通过以下公式计算得到杆塔的冲击接地阻抗R:
R = U 1 ( I - I 3 ) I 1 I
如测量得到I3=500安培,I=1500安培;代入算得R=10欧姆。

Claims (5)

1.一种测量带避雷线的输电线路杆塔接地装置冲击接地阻抗的方法,其特征是,该方法的输电线路杆塔架设有避雷线或其它类型的架空地线;杆塔的接地装置和杆塔或避雷线、架空地线之间通过引下线相连,引下线与接地装置通过螺栓连接,二者在电气连接上可以拆开;包括以下步骤: 
第一步,拆开所有接地装置引下线与杆塔之间的螺栓电气连接点,在杆塔接地装置任意一条引下线与杆塔之间施加测试用的冲击电源,测得施加的冲击电压波形的最大值U1以及通过避雷线接地引下线的冲击电流波形最大值I1; 
第二步,在杆塔附近打下辅助接地极,辅助接地极到杆塔的距离应在接地装置对角线长度的2倍以上,辅助接地极通过冲击电源与接地装置引下线以及杆塔相连,测量流过杆塔接地装置引下线的冲击电流波形最大值I2和流过杆塔的冲击电流波形最大值I3; 
第三步,通过以下表达式得到杆塔接地装置的冲击接地阻抗Z: 
第四步,拆除所有的测量装置,恢复原有的输电线路杆塔接地装置引下线与杆塔之间的电气连接。 
2.根据权利要求1所述的一种测量带避雷线的输电线路杆塔接地装置冲击接地阻抗的方法,其特征是,第三步测得通过杆塔接地装置的接地引下线的冲击电流波形最大值I2和通过辅助接地极的冲击电流波形最大值I,然后通过以下表达式得到杆塔接地装置的冲击接地阻抗Z: 
3.根绝权利要求1所述的一种测量带避雷线的输电线路杆塔接地装置冲击接地阻抗的方法,其特征是,第三步测得通过避雷线接地引下线的冲击电流波形最大值I3和通过辅助接地极的冲击电流波形最大值I,然后通过以下表达式得到杆塔接地装置的冲击接地阻抗R: 
4.根据权利要求1或2或3所述的一种测量带避雷线的输电线路杆塔接地装置冲击接地阻抗的方法,其特征是,施加的冲击电源,其输出波形根据实际进行调整,或是标准的雷电流波形,或是标准的操作过电压波形,测得的冲击接地阻抗分别对应雷电过电压冲击接地阻抗和操作过电压冲击接地阻抗。 
5.根据权利要求1或2或3所述的一种测量带避雷线的输电线路杆塔接地装置冲击接地 阻抗的方法,其特征是,得到的冲击接地阻抗没有考虑接地极的火花放电效应,要得到考虑接地极的火花放电效应后的冲击接地阻抗,采用增大测试用的冲击电源输出电压或电流的幅值,直至接地装置中的接地极发生火花放电,此时得到的就是考虑接地极的火花放电效应后的冲击接地阻抗;或将上述没有发生火花放电时测得的冲击接地阻抗的值乘以火花放电系数,即得到考虑火花放电效应后的冲击接地阻抗。 
CN201410377130.7A 2014-08-01 2014-08-01 一种测量带避雷线的输电线路杆塔接地装置冲击接地阻抗的方法 Active CN104155526B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410377130.7A CN104155526B (zh) 2014-08-01 2014-08-01 一种测量带避雷线的输电线路杆塔接地装置冲击接地阻抗的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410377130.7A CN104155526B (zh) 2014-08-01 2014-08-01 一种测量带避雷线的输电线路杆塔接地装置冲击接地阻抗的方法

Publications (2)

Publication Number Publication Date
CN104155526A true CN104155526A (zh) 2014-11-19
CN104155526B CN104155526B (zh) 2017-09-22

Family

ID=51881079

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410377130.7A Active CN104155526B (zh) 2014-08-01 2014-08-01 一种测量带避雷线的输电线路杆塔接地装置冲击接地阻抗的方法

Country Status (1)

Country Link
CN (1) CN104155526B (zh)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104569609A (zh) * 2015-01-04 2015-04-29 云南电网有限责任公司电力科学研究院 一种测量引下线异频电流的杆塔接地阻抗测试方法
CN104569608A (zh) * 2014-12-12 2015-04-29 国家电网公司 一种基于冲击大电流下的冲击接地阻抗现场测量方法
CN105182084A (zh) * 2015-07-02 2015-12-23 国家电网公司 一种利用小雷电流冲击测试得到接地装置冲击阻抗的方法
CN105891604A (zh) * 2016-04-11 2016-08-24 国网安徽省电力公司电力科学研究院 一种测量输电杆塔接地阻抗的回路阻抗法及测试***
CN106054039A (zh) * 2016-07-12 2016-10-26 南方电网科学研究院有限责任公司 直流线路杆塔的瞬态冲击性能检测***
CN106053993A (zh) * 2016-07-12 2016-10-26 南方电网科学研究院有限责任公司 交流线路杆塔的雷电冲击响应检测***
CN106053994A (zh) * 2016-07-12 2016-10-26 南方电网科学研究院有限责任公司 高压直流输电设备的雷电冲击响应检测***
CN106124900A (zh) * 2016-07-12 2016-11-16 南方电网科学研究院有限责任公司 条形导体的雷电冲击响应性能检测***
CN106207510A (zh) * 2016-08-26 2016-12-07 张振堂 一种高压输电线防雷接地装置
CN106226619A (zh) * 2016-07-12 2016-12-14 南方电网科学研究院有限责任公司 换流站设备的瞬态冲击性能检测***
CN106249072A (zh) * 2016-07-12 2016-12-21 南方电网科学研究院有限责任公司 高压交流输电设备的瞬态冲击性能检测***
CN106841814A (zh) * 2017-01-26 2017-06-13 江苏德大自动化设备有限公司 接地***接地电阻在线监测***、在线检测仪以及监测方法
CN107219405A (zh) * 2017-05-26 2017-09-29 云南电网有限责任公司电力科学研究院 一种输电线路杆塔塔腿基础及接地装置接地电阻测试方法
CN107247189A (zh) * 2017-07-26 2017-10-13 云南电网有限责任公司电力科学研究院 一种冲击接地阻抗的测试***及其方法
CN109470930A (zh) * 2018-10-24 2019-03-15 国网四川省电力公司电力科学研究院 一种接地装置接地阻抗频谱特性的测量方法
CN113608031A (zh) * 2021-08-04 2021-11-05 北京英瑞来科技有限公司 一种变电站避雷器冲击阻抗监测方法及装置
CN114152662A (zh) * 2020-09-08 2022-03-08 中国石油天然气集团有限公司 埋地管道与交流接地体的安全间距确定方法、装置及介质

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101650389A (zh) * 2009-08-11 2010-02-17 国网电力科学研究院武汉南瑞有限责任公司 输电线路杆塔冲击接地电阻测量方法及其仪器
CN102435918A (zh) * 2011-09-14 2012-05-02 浙江省电力试验研究院 接地装置雷电冲击特性的大电流户外真型模拟试验方法
KR101250438B1 (ko) * 2008-11-25 2013-04-04 최성일 접지단자함에서 지중매립접지극의 부식상태와 지중매립접지선의 절단 또는 접속상태의 불량유무를 정확히 측정할 수 있는 접지시설 방법
CN103675462A (zh) * 2013-12-17 2014-03-26 厦门红相电力设备股份有限公司 小电流雷电冲击接地阻抗测试方法及其装置
CN103792433A (zh) * 2014-02-21 2014-05-14 国家电网公司 以火花系数修正杆塔接地装置的低幅值冲击电阻测量方法
CN103823101A (zh) * 2014-03-14 2014-05-28 云南电力试验研究院(集团)有限公司电力研究院 一种测量带避雷线的输电线路杆塔冲击分流系数的方法
KR101412748B1 (ko) * 2014-04-29 2014-07-02 (주)화신파워텍 가공 송전 철탑의 접지 저항 측정시스템

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101250438B1 (ko) * 2008-11-25 2013-04-04 최성일 접지단자함에서 지중매립접지극의 부식상태와 지중매립접지선의 절단 또는 접속상태의 불량유무를 정확히 측정할 수 있는 접지시설 방법
CN101650389A (zh) * 2009-08-11 2010-02-17 国网电力科学研究院武汉南瑞有限责任公司 输电线路杆塔冲击接地电阻测量方法及其仪器
CN102435918A (zh) * 2011-09-14 2012-05-02 浙江省电力试验研究院 接地装置雷电冲击特性的大电流户外真型模拟试验方法
CN103675462A (zh) * 2013-12-17 2014-03-26 厦门红相电力设备股份有限公司 小电流雷电冲击接地阻抗测试方法及其装置
CN103792433A (zh) * 2014-02-21 2014-05-14 国家电网公司 以火花系数修正杆塔接地装置的低幅值冲击电阻测量方法
CN103823101A (zh) * 2014-03-14 2014-05-28 云南电力试验研究院(集团)有限公司电力研究院 一种测量带避雷线的输电线路杆塔冲击分流系数的方法
KR101412748B1 (ko) * 2014-04-29 2014-07-02 (주)화신파워텍 가공 송전 철탑의 접지 저항 측정시스템

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
张敏: "输电线路杆塔接地极冲击接地电阻特性分析", 《电瓷避雷器》 *
张波 等: "接地装置雷电冲击特性的大电流试验分析", 《高电压技术》 *
王磊 等: "架空输电线路接地电阻测量研究", 《广东电力》 *

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104569608A (zh) * 2014-12-12 2015-04-29 国家电网公司 一种基于冲击大电流下的冲击接地阻抗现场测量方法
CN104569608B (zh) * 2014-12-12 2019-06-14 国家电网公司 一种基于冲击大电流下的冲击接地阻抗现场测量方法
CN104569609A (zh) * 2015-01-04 2015-04-29 云南电网有限责任公司电力科学研究院 一种测量引下线异频电流的杆塔接地阻抗测试方法
CN105182084A (zh) * 2015-07-02 2015-12-23 国家电网公司 一种利用小雷电流冲击测试得到接地装置冲击阻抗的方法
CN105891604B (zh) * 2016-04-11 2019-05-31 国网安徽省电力公司电力科学研究院 一种测量输电杆塔接地阻抗的回路阻抗法及测试***
CN105891604A (zh) * 2016-04-11 2016-08-24 国网安徽省电力公司电力科学研究院 一种测量输电杆塔接地阻抗的回路阻抗法及测试***
CN106053993B (zh) * 2016-07-12 2019-08-23 南方电网科学研究院有限责任公司 交流线路杆塔的雷电冲击响应检测***
CN106054039A (zh) * 2016-07-12 2016-10-26 南方电网科学研究院有限责任公司 直流线路杆塔的瞬态冲击性能检测***
CN106226619A (zh) * 2016-07-12 2016-12-14 南方电网科学研究院有限责任公司 换流站设备的瞬态冲击性能检测***
CN106249072A (zh) * 2016-07-12 2016-12-21 南方电网科学研究院有限责任公司 高压交流输电设备的瞬态冲击性能检测***
CN106124900A (zh) * 2016-07-12 2016-11-16 南方电网科学研究院有限责任公司 条形导体的雷电冲击响应性能检测***
CN106249072B (zh) * 2016-07-12 2019-12-27 南方电网科学研究院有限责任公司 高压交流输电设备的瞬态冲击性能检测***
CN106053994B (zh) * 2016-07-12 2019-11-08 南方电网科学研究院有限责任公司 高压直流输电设备的雷电冲击响应检测***
CN106053994A (zh) * 2016-07-12 2016-10-26 南方电网科学研究院有限责任公司 高压直流输电设备的雷电冲击响应检测***
CN106053993A (zh) * 2016-07-12 2016-10-26 南方电网科学研究院有限责任公司 交流线路杆塔的雷电冲击响应检测***
CN106054039B (zh) * 2016-07-12 2019-08-23 南方电网科学研究院有限责任公司 直流线路杆塔的瞬态冲击性能检测***
CN106207510A (zh) * 2016-08-26 2016-12-07 张振堂 一种高压输电线防雷接地装置
CN106841814A (zh) * 2017-01-26 2017-06-13 江苏德大自动化设备有限公司 接地***接地电阻在线监测***、在线检测仪以及监测方法
CN107219405A (zh) * 2017-05-26 2017-09-29 云南电网有限责任公司电力科学研究院 一种输电线路杆塔塔腿基础及接地装置接地电阻测试方法
CN107219405B (zh) * 2017-05-26 2019-10-01 云南电网有限责任公司电力科学研究院 一种输电线路杆塔塔腿基础及接地装置接地电阻测试方法
CN107247189A (zh) * 2017-07-26 2017-10-13 云南电网有限责任公司电力科学研究院 一种冲击接地阻抗的测试***及其方法
CN107247189B (zh) * 2017-07-26 2024-02-06 云南电网有限责任公司电力科学研究院 一种冲击接地阻抗的测试***及其方法
CN109470930A (zh) * 2018-10-24 2019-03-15 国网四川省电力公司电力科学研究院 一种接地装置接地阻抗频谱特性的测量方法
CN109470930B (zh) * 2018-10-24 2021-01-22 国网四川省电力公司电力科学研究院 一种接地装置接地阻抗频谱特性的测量方法
CN114152662A (zh) * 2020-09-08 2022-03-08 中国石油天然气集团有限公司 埋地管道与交流接地体的安全间距确定方法、装置及介质
CN113608031A (zh) * 2021-08-04 2021-11-05 北京英瑞来科技有限公司 一种变电站避雷器冲击阻抗监测方法及装置
CN113608031B (zh) * 2021-08-04 2024-02-02 北京英瑞来科技有限公司 一种变电站避雷器冲击阻抗监测方法及装置

Also Published As

Publication number Publication date
CN104155526B (zh) 2017-09-22

Similar Documents

Publication Publication Date Title
CN104155526A (zh) 一种测量带避雷线的输电线路杆塔接地装置冲击接地阻抗的方法
CN103823101B (zh) 一种测量带避雷线的输电线路杆塔冲击分流系数的方法
CN104502819B (zh) 一种避雷器冲击特性试验装置及试验方法
WO2014173317A1 (zh) 一种输电线路雷电电磁暂态动模实验***
CN105652093A (zh) 一种接地装置冲击接地阻抗测试方法
CN105044505A (zh) 一种基于大功率直流电源的接地网直流分流系数测量方法
CN204154824U (zh) 冲击电压与工频振荡合成回路试验平台
CN106053994B (zh) 高压直流输电设备的雷电冲击响应检测***
CN105067889B (zh) 接地网冲击电流导致的二次电缆转移阻抗的测量方法
CN105606924A (zh) 一种接地装置冲击特性测量修正方法
CN111812407B (zh) 一种综合接地阻抗测量方法、***及介质
CN106771930B (zh) 一种用于观测接地棒周围土壤冲击放电特性的装置和方法
CN107167698A (zh) 一种避雷器泄漏电流带电测试装置及方法
CN106053993B (zh) 交流线路杆塔的雷电冲击响应检测***
Fernández et al. Simulation of current distribution in a wind turbine blade using the FDTD method
CN104635087A (zh) 避雷线绝缘架设时输电线路杆塔接地安全性能的检验方法
CN107219423A (zh) 雷电冲击响应测量***
CN203786210U (zh) 一种接地电阻辅助测量装置
CN106249072B (zh) 高压交流输电设备的瞬态冲击性能检测***
CN104833883B (zh) 一种基于10‑35kV短路接地的地网测试方法
Garolera et al. Lightning transient analysis in wind turbine blades
CN202563012U (zh) 大型电站接地网阻抗参数测量装置
CN107704702A (zh) 一种获取egla间隙放电电压承担率的方法
CN107991533A (zh) 基于单相电缆的电压相位定位方法
CN102879649A (zh) 一种接地电阻测量方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 650217 Yunnan city of Kunming Province Economic and Technological Development Zone West Middle Yun cloud electric science and Technology Park

Co-patentee after: ELECTRIC POWER RESEARCH INSTITUTE, YUNNAN POWER GRID Co.,Ltd.

Patentee after: YUN NAN ELECTRIC TEST & RESEARCH INSTITUTE GROUP Co.,Ltd. ELECTRIC INSTITUTE

Co-patentee after: SOUTHWEST JIAOTONG University

Address before: 650217 Yunnan city of Kunming Province Economic and Technological Development Zone West Middle Yun cloud electric science and Technology Park

Co-patentee before: YUNNAN POWER GRID Co. TECHNOLOGY BRANCH

Patentee before: YUN NAN ELECTRIC TEST & RESEARCH INSTITUTE GROUP Co.,Ltd. ELECTRIC INSTITUTE

Co-patentee before: SOUTHWEST JIAOTONG University

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20200217

Address after: 650217 Yunnan city of Kunming Province Economic and Technological Development Zone West Middle Yun cloud electric science and Technology Park

Co-patentee after: ELECTRIC POWER RESEARCH INSTITUTE, YUNNAN POWER GRID Co.,Ltd.

Patentee after: YUN NAN ELECTRIC TEST & RESEARCH INSTITUTE GROUP Co.,Ltd. ELECTRIC INSTITUTE

Address before: 650217 Yunnan city of Kunming Province Economic and Technological Development Zone West Middle Yun cloud electric science and Technology Park

Co-patentee before: ELECTRIC POWER RESEARCH INSTITUTE, YUNNAN POWER GRID Co.,Ltd.

Patentee before: YUN NAN ELECTRIC TEST & RESEARCH INSTITUTE GROUP Co.,Ltd. ELECTRIC INSTITUTE

Co-patentee before: SOUTHWEST JIAOTONG University

TR01 Transfer of patent right