Anti-seepage cofferdam structure and construction process Download PDFInfo
- Publication number
- CN104153380A CN104153380A CN201410408540.3A CN201410408540A CN104153380A CN 104153380 A CN104153380 A CN 104153380A CN 201410408540 A CN201410408540 A CN 201410408540A CN 104153380 A CN104153380 A CN 104153380A
- Authority
- CN
- China
- Prior art keywords
- cofferdam
- antiseepage
- gravel
- seepage
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Revetment (AREA)
Abstract
The invention relates to anti-seepage cofferdam structure and a construction process. The cofferdam structure comprises a vertical anti-seepage body arranged in the middle of the end face of a cofferdam, wherein the bottom of the anti-seepage body extends to be embedded into a river bed covering layer, a main body of the anti-seepage body is formed by filling a multi-layer gel and sand gravel mixture, a vertical anti-seepage insulating layer is arranged on one side of the anti-seepage body and is a layer of geomembrane clamped between two geotextiles, a trapezoid cofferdam body is arranged on the other side of the anti-seepage insulating layer, and a lead wire gabion is arranged on the other side of the anti-seepage body. The construction process comprises using a backhoe excavator to remove large stones in a basic region after a temporary cofferdam is built; then using the backhoe excavator to dig a groove with 1.2m width and 3m depth along the cofferdam axis, and back filling the multi-layer gel and sand gravel mixture in layers to construct the anti-seepage cofferdam structure. The anti-seepage cofferdam structure is simple in structural style, the construction method is easy, and the anti-seepage effect is good. A construction period is shortened, fund is saved, and a simple and effective method is provided technically.
Description
Technical field
The present invention relates to utilize cement sand and gravel compound, geotextile, geomembrane to carry out the structure of seepage prevention of cofferdam and the construction technology of antiseepage on dark covering layer riverbed.
Background technology
In the prior art, stone cofferdam is to fill with local material the cofferdam forming, gather materials on the spot and make full use of excavation rejected material and make cofferdam filler, and simple structure, easy construction, is easy to remove, and construction costs is low, and this cofferdam form is widely adopted.But all there is the problem that transmission coefficient is large in the filling material of main body earth rock cofferdam substantially.The research of therefore, antiseepage problem also just becomes earth rock cofferdam development key problem.Make a general survey of earth rock cofferdam development, history Italy at the beginning of the fifties in last century and France start on gravel foundation, to build hydraulic anti-seepage wall with slurry strengthened wall boring method.Italy has built docking type impervious wall under Ba Shesi diversion cofferdam in nineteen fifty-one~nineteen fifty-two, in 1954~nineteen fifty-five, in AVE MAROA one Austria one, draw brother dam, by containing the dark sandy gravel stratum of large boulder, adopt and built linked concrete cut according to Coase one one dimension Dai Erfa Churn drill pore-creating slurry strengthened wall.
Seepage control for rock-earth cofferdam has the development of advancing by leaps and bounds in recent years, and especially the application of grouting technique and high spray technique not only makes the seepage control project of earth rock cofferdam save the duration, has reduced especially cost.But seepage prevention of cofferdam belongs to a concealed work, the quality of antiseepage quality can only finish to evaluate by the height of water percolating capacity at seepage control project, once and quality go wrong extremely difficult, the delay of duration, loss is economically all that the construction of successive projects causes unthinkable consequence.Therefore just need to adopt a set of scientific and reasonable seepage control for rock-earth cofferdam structure, anti-seepage processing method and fill the quality control theory in process.
Because most earth rock cofferdams need to be constructed under water, material can not Effective Compaction, and particularly throwing Impervious Materials more can not guarantee the quality of the antiseepage in cofferdam under water.And earth rock cofferdam is in order to meet antiseepage requirement, can not make again seepage prevention of cofferdam section too small, and the common cofferdam construction duration is very urgent, and cost also should not be too high.In current domestic and international earth rock cofferdam construction, the normal anti-seepage processing method adopting all exists this above-mentioned variety of problems.Therefore, under the section that can meet easy construction requires, reduce as much as possible cross dimensions and can meet well antiseepage requirement again, become earth rock cofferdam and fill the developing direction with anti-seepage processing method.
Summary of the invention
The object of the invention is, the problem existing for prior art, provides a kind of construction costs simple in structure lower, and the duration can significantly shorten, antiseepage cofferdam structure and construction technology that antiseepage quality can significantly improve.
For achieving the above object, the technical solution used in the present invention is: a kind of antiseepage cofferdam structure is provided, it is characterized in that, the structure in cofferdam comprises and is arranged on the vertical antiseepage body in cofferdam end face middle part, Riverbed is imbedded in the bottom extension of antiseepage body, the main body of antiseepage body is filled and is formed by multilayer cement sand and gravel compound, a side at antiseepage body is provided with vertical antiseepage insulating course, antiseepage insulating course is between two-layer geotextile, to accompany one deck geomembrane, the opposite side of antiseepage insulating course is trapezoidal cofferdam body, at the opposite side of antiseepage body, is provided with galvanized wire stone dragon.
Wherein preferred technical scheme is, the cross section of described vertical antiseepage body is rectangle, and rectangular width is 3 meters, and it is 1.2 meters that the Riverbed degree of depth is imbedded in vertical antiseepage body extension.
Preferred technical scheme also has, and the gradient that described cofferdam is provided with galvanized wire stone dragon one side is 1:0.3, and the gradient of described cofferdam opposite side is 1:1, and the cross section in described cofferdam is trapezoidal, and this trapezoidal upper base length is 6 meters, and the length of going to the bottom is 17.7 meters, and height is 6 meters; The thickness of described galvanized wire stone dragon is 1 meter.
Preferred technical scheme also has, the water permeability geosynthetics that described geotextile is formed by acupuncture or braiding by synthetic fibers, and its finished product is cloth shape, and width is 4-6 rice, and described synthetic fibers are terylene, polypropylene fibre, acrylic fibers, polyamide fibre family macromolecule polymer; Described geomembrane is that plastic sheeting is as antiseepage base material and non-woven fabric compounded forming.
Preferred technical scheme also has, and the thickness that described multilayer cement sand and gravel compound is every layer is less than 50 centimetres.
For achieving the above object, another technical solution used in the present invention is: a kind of antiseepage cofferdam construction technology is provided, it is characterized in that, described construction technology comprises following processing step:
Step 1: first build Temporary Cofferdam;
Step 2: with backacter, the ratchel in base area is removed, utilized vibrations to grind basis compaction simultaneously;
Step 3: before construction is built in cofferdam, must lay in sufficient galvanized wire gabion, boulder, cement, geotextiles and geomembrane, and selected good sand gravel mining area and the cement sand and gravel compound of grating mixed place in advance;
Step 4: excavate the groove of dark 3 meters of wide 1.2m with backacter along cofferdam axis, then back-filling in layers cement sand and gravel compound builds antiseepage cofferdam structure, described antiseepage cofferdam structure, in back-filling in layers cement sand and gravel compound, lay vertical geotextile and geomembrane, the backfill of every layer of cement sand and gravel compound is highly no more than 50cm, and layered rolling;
Step 5: when cement sand and gravel compound is backfilling into riverbed original height, one deck galvanized wire gabion of should first constructing, carry out again the placement in layers of cofferdam and antiseepage body, both cofferdam body filled with galvanized wire gabion and hocketed, while is at the opposite side Cast-in-situ Piles in Sand-filling gravel in cofferdam, until landfill is to the setting height in cofferdam.
Wherein preferred technical scheme is, described galvanized wire gabion construction sequence is, before fill in cofferdam, make in advance protection against erosion galvanized wire gabion, select piece stone or cobble, particle diameter is not less than 15cm, during making, by backacter, is put, require that piece stone faces down greatly, gabion is completely filled out, without compared with macroscopic-void, between cage and cage, adopt No. 8 galvanized wire colligations firm.
Further preferred technical scheme is, the mix layered step of filling of described cement sand and gravel soil requires at construction at dry land, sets up interim little cofferdam during construction, with galvanized wire gabion put and placement in layers, lift height is controlled by 50cm, and surging is not less than 95%; It is even that cement sand and gravel soil compound shifts to an earlier date mix by backacter at the construction field (site), by dump truck, is transported to cofferdam, paved smooth, then ground and carried out grinding compacting by vibrations by bulldozer or land leveller.
Further preferred technical scheme is, described cement sand and gravel is mix layered fill step be also included in before construction prerequisite at the construction field (site) near smooth one 30m * 30m place, and grinding compacting, for latex concrete job mix; Cement sand and gravel compound is that sandstone aggregate is selected directly the sand gravel from river mining, and rejects with screen cloth the oversize stone that particle diameter surpasses 150mm, and cementitious material is selected JP cement No. 53, and volume is by 60~80kg, during mix, by backacter mix 6~8 times; By dump truck, be transported to cofferdam work plane, by bulldozer or land leveller, paved, the empty paving of slicce thickness 45cm, the about 40cm of compacted depth, adopts vibrations to grind and carries out grinding compacting, rolls initial option 2+6 time, and both static pressure 2 times, vibrations rolled 6 times.
Further preferred technical scheme is that the laying step of described geotextile and geomembrane is that the model of geotextile is selected 225g/m
2, elongation at break is greater than 60%, and geomembrane is selected HDPE geomembrane, and hot strength is greater than 17Mpa, and elongation at break is greater than 400%; Lap length is not less than 50cm, and the backfill that closes on geomembrane place is even, good cobble, should choose the broken cobble that forms wedge angle or corner angle simultaneously.
Compared with prior art, the invention has the beneficial effects as follows: adopt antiseepage cofferdam structure of the present invention and construction technology, because construction method is convenient, form of structure is simple, there is no too much red tape.Therefore not only can reach the object of saving the duration, economizing on the use of funds, also meet to a great extent the demand of antiseepage.The filling material of general earth rock cofferdam, for gathering materials on the spot, generally adopts the method for concrete cut, earth core, seepage preventing curtain grouting, brill spray stake etc. on seepage control measure both at home and abroad at present.Concrete cut, seepage preventing curtain grouting, brill spray stake, because working procedure is comparatively complicated, are restricting the progress of duration, and are existing the problem that cost is higher.Earth core earth rock cofferdam is due to the region in the impervious material such as clay source and be not suitable for filling of all earth rock cofferdams.And adopt cement sand and gravel mixed material of the present invention in conjunction with geotextile and geomembrane the way as antiseepage body, not only form of structure is simple, construction method is easy, anti-seepage effect is better.More the reduction of erection time, economize on the use of funds and provide simple effective method from technological layer.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of antiseepage cofferdam structure of the present invention.
Shown in figure: 1-antiseepage body, 2-galvanized wire stone dragon, the trapezoidal cofferdam of 3-body, 4-Riverbed, 5-cement sand and gravel compound, 6-geotextile, 7-geomembrane, 8-geotextile.
The specific embodiment
As shown in Figure 1, the present invention is a kind of antiseepage cofferdam structure, described cofferdam structure comprises and is arranged on the vertical antiseepage body 1 in cofferdam end face middle part, Riverbed 4 is imbedded in the bottom extension of antiseepage body 1, the main body of antiseepage body 1 is filled and is formed by the cement sand and gravel compound 5 of multilayer, a side at antiseepage body 1 is provided with vertical antiseepage insulating course, antiseepage insulating course is to accompany one deck geomembrane 7 between two-layer geotextile 6,8, the opposite side of antiseepage insulating course is trapezoidal cofferdam body 3, at the opposite side of antiseepage body 1, is provided with galvanized wire stone dragon 2.
Preferred embodiment is in the present invention, and the cross section of described vertical antiseepage body 1 is rectangle, and rectangular width is 3 meters, and it is 1.2 meters that Riverbed 4 degree of depth are imbedded in vertical antiseepage body 1 extension.
Preferred embodiment also has in the present invention, and the gradient that described cofferdam is provided with galvanized wire stone dragon 2 one sides is 1:0.3, and the gradient of described cofferdam opposite side is 1:1, and the cross section in described cofferdam is trapezoidal, and this trapezoidal upper base length is 6 meters, and the length of going to the bottom is 17.7 meters, and height is 6 meters; The thickness of described galvanized wire stone dragon 2 is 1 meter.
Preferred embodiment also has in the present invention, the water permeability geosynthetics that described geotextile 6,8 is formed by acupuncture or braiding by synthetic fibers, its finished product is cloth shape, and width is 4-6 rice, and described synthetic fibers are terylene, polypropylene fibre, acrylic fibers, polyamide fibre family macromolecule polymer; Described geomembrane plastic sheeting, as antiseepage base material, forms with non-woven fabric compounded.
Preferred technical scheme also has in the present invention, and the cement sand and gravel compound of described multilayer 5 thickness of every layer are less than 50 centimetres.
Another technical solution used in the present invention is: a kind of antiseepage cofferdam construction technology is provided, and this construction technology comprises following processing step:
Step 1: first build Temporary Cofferdam;
Step 2: with backacter, the ratchel in base area is removed, utilized vibrations to grind basis compaction simultaneously;
Step 3: before construction is built in cofferdam, must lay in sufficient galvanized wire gabion, boulder, cement, geotextiles and geomembrane, and selected good sand gravel mining area and the cement sand and gravel compound of grating mixed place in advance;
Step 4: excavate the groove of dark 3 meters of wide 1.2m with backacter along cofferdam axis, then back-filling in layers cement sand and gravel compound builds the antiseepage cofferdam structure described in power 1, in back-filling in layers cement sand and gravel compound, lay vertical geotextile and geomembrane, the backfill of every layer of cement sand and gravel compound is highly no more than 50cm, and layered rolling;
Step 5: when cement sand and gravel compound is backfilling into riverbed original height, one deck galvanized wire gabion of should first constructing, carry out again the placement in layers of cofferdam and antiseepage body, both cofferdam body filled with galvanized wire gabion and hocketed, while is at the opposite side Cast-in-situ Piles in Sand-filling gravel in cofferdam, until landfill is to the setting height in cofferdam.
Preferred embodiment is in the present invention, described galvanized wire gabion 2 construction sequences are, before fill in cofferdam, make in advance protection against erosion galvanized wire gabion, select piece stone or cobble, particle diameter is not less than 15cm, during making, by backacter, is put, require that piece stone faces down greatly, gabion is completely filled out, without compared with macroscopic-void, between cage and cage, adopt No. 8 galvanized wire colligations firm.
Further preferred embodiment is in the present invention, described cement sand and gravel soil compound 5 placement in layers technological requirements, at construction at dry land, are set up interim little cofferdam during construction, with galvanized wire gabion put and placement in layers, lift height is controlled by 50cm, and surging is not less than 95%; Cement sand and gravel soil compound 5 shifts to an earlier date uniform mixing by backacter at the construction field (site), by dump truck, is transported to behind cofferdam, is paved smooth, then ground and carried out grinding compacting by vibrations by bulldozer or land leveller.
Further preferred embodiment is in the present invention, described cement sand and gravel is mix layered fill step be also included in before construction prerequisite at the construction field (site) near smooth one 30m * 30m place, and grinding compacting, mixes and stirs for latex concrete scene; Cement sand and gravel compound 5 is selected directly the sand gravel from river mining for sandstone aggregate, and rejects with screen cloth the oversize stone that particle diameter surpasses 150mm, and cementitious material is selected JP cement No. 53, and volume, by 60~80kg, while mixing and stirring, is mixed and stirred 6~8 times by backacter; By dump truck, be transported to cofferdam work plane, by bulldozer or land leveller, paved, the empty paving of slicce thickness 45cm, the about 40cm of compacted depth, adopts vibrations to grind and carries out grinding compacting, rolls initial option 2+6 time, and both static pressure 2 times, vibrations rolled 6 times.
Further preferred embodiment is in the present invention, and the laying step of described geotextile and geomembrane is that the model of geotextile is selected 225g/m
2, elongation at break is greater than 60%, and geomembrane is selected HDPE geomembrane, and hot strength is greater than 17Mpa, and elongation at break is greater than 400%; During construction, lap length is not less than 50cm, and guarantees to close on even, the good cobble of backfill at geomembrane place, should choose the broken cobble that forms wedge angle or corner angle simultaneously.
The invention is not restricted to above-mentioned embodiment, those skilled in the art make to any apparent improvement of above-mentioned embodiment or change, can not exceed the protection domain of design of the present invention and claims.
Claims (10)
1. an antiseepage cofferdam structure, it is characterized in that, the structure in cofferdam comprises and is arranged on the vertical antiseepage body in cofferdam end face middle part, Riverbed is imbedded in the bottom extension of antiseepage body, the main body of antiseepage body is filled and is formed by the cement sand and gravel compound of multilayer, in a side of antiseepage body, is provided with vertical antiseepage insulating course, and antiseepage insulating course is between two-layer geotextile, to accompany one deck geomembrane, the opposite side of antiseepage insulating course is trapezoidal cofferdam body, at the opposite side of antiseepage body, is provided with galvanized wire stone dragon.
2. antiseepage cofferdam structure as claimed in claim 1, is characterized in that, the cross section of described vertical antiseepage body is rectangle, and rectangular width is 3 meters, and it is 1.2 meters that the Riverbed degree of depth is imbedded in vertical antiseepage body extension.
3. antiseepage cofferdam structure as claimed in claim 1, is characterized in that, the gradient that described cofferdam is provided with galvanized wire stone dragon one side is 1:0.3, the gradient of described cofferdam opposite side is 1:1, and the cross section in described cofferdam is trapezoidal, and this trapezoidal upper base length is 6 meters, the length of going to the bottom is 17.7 meters, and height is 6 meters; The thickness of described galvanized wire stone dragon is 1 meter.
4. antiseepage cofferdam structure as claimed in claim 1, it is characterized in that, the water permeability geosynthetics that described geotextile is formed by acupuncture or braiding by synthetic fibers, its finished product is cloth shape, width is 4-6 rice, and described synthetic fibers are terylene, polypropylene fibre, acrylic fibers, polyamide fibre family macromolecule polymer; Described geomembrane is that plastic sheeting is as antiseepage base material and non-woven fabric compounded forming.
5. antiseepage cofferdam structure as claimed in claim 1, is characterized in that, the thickness that the cement sand and gravel compound of described multilayer is every layer is less than 50 centimetres.
6. an antiseepage cofferdam construction technology, is characterized in that, described construction technology comprises following processing step:
Step 1: first build Temporary Cofferdam;
Step 2: with backacter, the ratchel in base area is removed, utilized vibrations to grind basis compaction simultaneously;
Step 3: before construction is built in cofferdam, must lay in sufficient galvanized wire gabion, boulder, cement, geotextiles and geomembrane, and selected good sand gravel mining area and the cement sand and gravel compound of grating mixed place in advance;
Step 4: excavate the groove of dark 3 meters of wide 1.2m with backacter along cofferdam axis, then back-filling in layers cement sand and gravel compound builds the antiseepage cofferdam structure described in power 1, in back-filling in layers cement sand and gravel compound, lay vertical geotextile and geomembrane, the backfill of every layer of cement sand and gravel compound is highly no more than 50cm, and layered rolling;
Step 5: when cement sand and gravel compound is backfilling into riverbed original height, one deck galvanized wire gabion of should first constructing, carry out again the placement in layers of cofferdam and antiseepage body, both cofferdam body filled with galvanized wire gabion and hocketed, while is at the opposite side Cast-in-situ Piles in Sand-filling gravel in cofferdam, until landfill is to the setting height in cofferdam.
7. antiseepage cofferdam construction technology as claimed in claim 6, it is characterized in that, described galvanized wire gabion construction sequence is, before fill in cofferdam, make in advance protection against erosion galvanized wire gabion, select piece stone or cobble, particle diameter is not less than 15cm, during making, by backacter, put, require piece stone to face down greatly, gabion is completely filled out, without compared with macroscopic-void, between cage and cage, adopt No. 8 galvanized wire colligations firm.
8. antiseepage cofferdam construction technology as claimed in claim 6, it is characterized in that, the mix layered step of filling of described cement sand and gravel soil requires at construction at dry land, during construction, set up interim little cofferdam, with galvanized wire gabion put and placement in layers, lift height is controlled by 50cm, and surging is not less than 95%; It is even that cement sand and gravel soil compound shifts to an earlier date mix by backacter at the construction field (site), by dump truck, is transported to cofferdam, paved smooth, then ground and carried out grinding compacting by vibrations by bulldozer or land leveller.
9. antiseepage cofferdam construction technology as claimed in claim 8, it is characterized in that, described cement sand and gravel is mix layered fill step be also included in before construction prerequisite at the construction field (site) near smooth one 30m * 30m place, and grinding compacting, for latex concrete job mix; Cement sand and gravel compound is that sandstone aggregate is selected directly the sand gravel from river mining, and rejects with screen cloth the oversize stone that particle diameter surpasses 150mm, and cementitious material is selected JP cement No. 53, and volume is by 60~80kg, during mix, by backacter mix 6~8 times; By dump truck, be transported to cofferdam work plane, by bulldozer or land leveller, paved, the empty paving of slicce thickness 45cm, the about 40cm of compacted depth, adopts vibrations to grind and carries out grinding compacting, rolls initial option 2+6 time, and both static pressure 2 times, vibrations rolled 6 times.
10. antiseepage cofferdam construction technology as claimed in claim 6, is characterized in that, the laying step of described geotextile and geomembrane is that the model of geotextile is selected 225g/m
2, elongation at break is greater than 60%, and geomembrane is selected HDPE geomembrane, and hot strength is greater than 17Mpa, and elongation at break is greater than 400%; Lap length is not less than 50cm, and the backfill that closes on geomembrane place is even, good cobble, should choose the broken cobble that forms wedge angle or corner angle simultaneously.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410408540.3A CN104153380B (en) | 2014-04-11 | 2014-08-19 | A kind of antiseepage cofferdam structure and construction technology |
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410147044.7 | 2014-04-11 | ||
CN201410147044 | 2014-04-11 | ||
CN2014101470447 | 2014-04-11 | ||
CN201410408540.3A CN104153380B (en) | 2014-04-11 | 2014-08-19 | A kind of antiseepage cofferdam structure and construction technology |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104153380A true CN104153380A (en) | 2014-11-19 |
CN104153380B CN104153380B (en) | 2016-08-24 |
Family
ID=51878994
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410408540.3A Active CN104153380B (en) | 2014-04-11 | 2014-08-19 | A kind of antiseepage cofferdam structure and construction technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104153380B (en) |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105544459A (en) * | 2015-12-16 | 2016-05-04 | 大连久鼎祥瑞特种工程技术研究院有限公司 | Tailing dam structure and construction method |
CN105604075A (en) * | 2016-03-04 | 2016-05-25 | 中铁隧道集团二处有限公司 | Easily-restored temporary dock entrance cofferdam construction method and cofferdam structure |
CN106495331A (en) * | 2016-12-09 | 2017-03-15 | 南京工业大学 | A kind of cage offshore wetland construction method for hard revetment river course |
CN107142902A (en) * | 2017-06-24 | 2017-09-08 | 浙江华东工程咨询有限公司 | High head and large flow tunneling boring damming method |
CN107780424A (en) * | 2017-12-07 | 2018-03-09 | 中铁二十局集团第六工程有限公司 | A kind of mud riverbed earth rock cofferdam and its construction method |
CN108035368A (en) * | 2017-12-07 | 2018-05-15 | 中铁二十局集团第六工程有限公司 | A kind of mud riverbed combined cofferdam and its construction method |
CN108086338A (en) * | 2018-02-06 | 2018-05-29 | 东莞坂盈实业有限责任公司 | A kind of foundation pit cofferdam construction technology |
CN108677980A (en) * | 2018-07-12 | 2018-10-19 | 中国电建集团贵阳勘测设计研究院有限公司 | A kind of upstream cofferdam that taking into account communication function increases method and structure |
CN108729460A (en) * | 2017-04-14 | 2018-11-02 | 神翼航空器科技(天津)有限公司 | The method of the soft waterproof of deep basal pit |
CN109295589A (en) * | 2017-07-24 | 2019-02-01 | 无锡市振基土工材料有限公司 | A kind of lightweight geotextiles and preparation method thereof |
CN110004883A (en) * | 2019-02-11 | 2019-07-12 | 中国水电基础局有限公司 | A kind of compound core-wall structure of earth and rockfill dam and construction method |
CN111395267A (en) * | 2020-04-24 | 2020-07-10 | 中水北方勘测设计研究有限责任公司 | Core wall rock-fill dam |
CN111455976A (en) * | 2020-04-14 | 2020-07-28 | 江西省水利科学研究院 | Construction method of self-setting mortar impervious wall by grooving method |
CN111996993A (en) * | 2020-08-13 | 2020-11-27 | 盐城工学院 | Method for forming impervious layer in cofferdam with sandy soil or silt as filler by utilizing straw degradation |
CN112962642A (en) * | 2021-02-22 | 2021-06-15 | 中国十九冶集团有限公司 | Container cofferdam structure and container cofferdam method |
CN113266028A (en) * | 2021-05-17 | 2021-08-17 | 中电建十一局工程有限公司 | Construction method of sea area beach section highway riprap cofferdam seepage prevention system |
CN114809139A (en) * | 2022-05-07 | 2022-07-29 | 中国安能集团第三工程局有限公司 | Method for rapidly repairing seepage of earth-rock cofferdam with deep and thick covering layer |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5454668A (en) * | 1994-05-25 | 1995-10-03 | Baroid Technology, Inc. | Flood barrier and a method for forming a flood barrier |
JP2003020631A (en) * | 2001-07-06 | 2003-01-24 | Shimizu Corp | Impervious structure and construction method for fill dam |
JP2006022631A (en) * | 2004-07-07 | 2006-01-26 | Eizo Aoki | Method for constructing impervious layer of embankment dam |
CN1807764A (en) * | 2005-11-30 | 2006-07-26 | 中水东北勘测设计研究有限责任公司科学研究院 | Casting construction method for asphalt concrete anti-infiltration core wall of earth rockfill dam |
CN102041800A (en) * | 2010-12-08 | 2011-05-04 | 四川路航建设工程有限责任公司 | Method for constructing PVC (polyvinyl chloride) composite geomembrane watertight core of earth-rockfill dam |
CN102660936A (en) * | 2012-05-29 | 2012-09-12 | 中国水利水电第十四工程局有限公司 | Method for realizing seepage prevention of bridge wall by means of polyvinyl chloride film |
CN103410123A (en) * | 2013-08-13 | 2013-11-27 | 中国水电顾问集团成都勘测设计研究院 | Retaining dam for hydraulic and hydro-power engineering |
-
2014
- 2014-08-19 CN CN201410408540.3A patent/CN104153380B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5454668A (en) * | 1994-05-25 | 1995-10-03 | Baroid Technology, Inc. | Flood barrier and a method for forming a flood barrier |
JP2003020631A (en) * | 2001-07-06 | 2003-01-24 | Shimizu Corp | Impervious structure and construction method for fill dam |
JP2006022631A (en) * | 2004-07-07 | 2006-01-26 | Eizo Aoki | Method for constructing impervious layer of embankment dam |
CN1807764A (en) * | 2005-11-30 | 2006-07-26 | 中水东北勘测设计研究有限责任公司科学研究院 | Casting construction method for asphalt concrete anti-infiltration core wall of earth rockfill dam |
CN102041800A (en) * | 2010-12-08 | 2011-05-04 | 四川路航建设工程有限责任公司 | Method for constructing PVC (polyvinyl chloride) composite geomembrane watertight core of earth-rockfill dam |
CN102660936A (en) * | 2012-05-29 | 2012-09-12 | 中国水利水电第十四工程局有限公司 | Method for realizing seepage prevention of bridge wall by means of polyvinyl chloride film |
CN103410123A (en) * | 2013-08-13 | 2013-11-27 | 中国水电顾问集团成都勘测设计研究院 | Retaining dam for hydraulic and hydro-power engineering |
Non-Patent Citations (1)
Title |
---|
刘道文,崔鹏飞,张林: "枕头坝二期围堰防渗墙施工工艺和质量控制", 《人民长江》 * |
Cited By (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105544459A (en) * | 2015-12-16 | 2016-05-04 | 大连久鼎祥瑞特种工程技术研究院有限公司 | Tailing dam structure and construction method |
CN105544459B (en) * | 2015-12-16 | 2018-04-13 | 大连久鼎祥瑞特种工程技术研究院有限公司 | Tailing dam structure and construction method |
CN105604075A (en) * | 2016-03-04 | 2016-05-25 | 中铁隧道集团二处有限公司 | Easily-restored temporary dock entrance cofferdam construction method and cofferdam structure |
CN106495331A (en) * | 2016-12-09 | 2017-03-15 | 南京工业大学 | A kind of cage offshore wetland construction method for hard revetment river course |
CN106495331B (en) * | 2016-12-09 | 2019-08-30 | 南京工业大学 | A kind of cage offshore wetland construction method for hard revetment river |
CN108729460A (en) * | 2017-04-14 | 2018-11-02 | 神翼航空器科技(天津)有限公司 | The method of the soft waterproof of deep basal pit |
CN107142902A (en) * | 2017-06-24 | 2017-09-08 | 浙江华东工程咨询有限公司 | High head and large flow tunneling boring damming method |
CN107142902B (en) * | 2017-06-24 | 2018-12-21 | 浙江华东工程咨询有限公司 | High head and large flow tunneling boring damming method |
CN109295589A (en) * | 2017-07-24 | 2019-02-01 | 无锡市振基土工材料有限公司 | A kind of lightweight geotextiles and preparation method thereof |
CN108035368A (en) * | 2017-12-07 | 2018-05-15 | 中铁二十局集团第六工程有限公司 | A kind of mud riverbed combined cofferdam and its construction method |
CN107780424A (en) * | 2017-12-07 | 2018-03-09 | 中铁二十局集团第六工程有限公司 | A kind of mud riverbed earth rock cofferdam and its construction method |
CN107780424B (en) * | 2017-12-07 | 2019-09-10 | 中铁二十局集团第六工程有限公司 | A kind of mud riverbed earth rock cofferdam and its construction method |
CN108086338A (en) * | 2018-02-06 | 2018-05-29 | 东莞坂盈实业有限责任公司 | A kind of foundation pit cofferdam construction technology |
CN108677980A (en) * | 2018-07-12 | 2018-10-19 | 中国电建集团贵阳勘测设计研究院有限公司 | A kind of upstream cofferdam that taking into account communication function increases method and structure |
CN108677980B (en) * | 2018-07-12 | 2023-10-31 | 中国电建集团贵阳勘测设计研究院有限公司 | Upstream cofferdam heightening method and structure taking traffic function into consideration |
CN110004883A (en) * | 2019-02-11 | 2019-07-12 | 中国水电基础局有限公司 | A kind of compound core-wall structure of earth and rockfill dam and construction method |
CN110004883B (en) * | 2019-02-11 | 2024-03-26 | 中国水电基础局有限公司 | Composite core wall structure of earth-rock dam and construction method |
CN111455976A (en) * | 2020-04-14 | 2020-07-28 | 江西省水利科学研究院 | Construction method of self-setting mortar impervious wall by grooving method |
CN111395267A (en) * | 2020-04-24 | 2020-07-10 | 中水北方勘测设计研究有限责任公司 | Core wall rock-fill dam |
CN111996993A (en) * | 2020-08-13 | 2020-11-27 | 盐城工学院 | Method for forming impervious layer in cofferdam with sandy soil or silt as filler by utilizing straw degradation |
CN112962642A (en) * | 2021-02-22 | 2021-06-15 | 中国十九冶集团有限公司 | Container cofferdam structure and container cofferdam method |
CN113266028A (en) * | 2021-05-17 | 2021-08-17 | 中电建十一局工程有限公司 | Construction method of sea area beach section highway riprap cofferdam seepage prevention system |
CN114809139A (en) * | 2022-05-07 | 2022-07-29 | 中国安能集团第三工程局有限公司 | Method for rapidly repairing seepage of earth-rock cofferdam with deep and thick covering layer |
CN114809139B (en) * | 2022-05-07 | 2023-12-26 | 中国安能集团第三工程局有限公司 | Rapid repairing method for leakage of deep coverage earth-rock cofferdam |
Also Published As
Publication number | Publication date |
---|---|
CN104153380B (en) | 2016-08-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104153380B (en) | A kind of antiseepage cofferdam structure and construction technology | |
CN204059124U (en) | A kind of sand drain strong rammer grouting behind shaft or drift lining foundation reinforcing structure | |
CN106759473B (en) | The constructing structure and its construction method of underground pipe gallery and road | |
CN111851505A (en) | Construction method and structure of pouring type impervious core earth-rock dam | |
CN104131575A (en) | Plugging and drainage method for dam foundation on karst highly developed stratum | |
CN105804007B (en) | A kind of reinforced earth quaywall structure based on the soft base of beach | |
CN105569071B (en) | A kind of slip casting under water of cement-based material or mud jacking block ground mass foundation construction | |
CN108571000A (en) | The construction method of underground water cutting when wearing existing railway under a kind of road of location along the river | |
CN102966072A (en) | Construction method for treating widened and heightened engineering joint surfaces of dikes on soft clay foundation | |
CN110952528A (en) | Construction method of cement-soil underground continuous wall under complex geological conditions | |
CN105386458B (en) | A kind of embedded plasticity cement mixing method groove inside of continuous underground wall construction method | |
CN101008178B (en) | Soft base processing construction process using excavating and stirring method | |
KR101531799B1 (en) | Repair reinforcement method of the waterfront structure | |
CN104594297B (en) | A kind of double face slab rock-fill dams and construction method thereof | |
CN111733842A (en) | Cofferdam construction method and cofferdam structure | |
CN102235007B (en) | Method for supporting deep foundation with upper nail-lower pile combination | |
CN108824412B (en) | Soft foundation treatment method based on gabion wall reinforced soil and dynamic compaction combination | |
CN104328797B (en) | High slope large curvy wall building construction engineering method | |
CN101591906A (en) | The method for processing foundation of intubate, multipass vacuum well-point dewatering dynamic consolidation | |
CN103276717B (en) | The method of composite earthwork synthetic materials reinforcement cushion soft soil foundation | |
CN108277815A (en) | The cofferdam structure and its construction method constructed for water intaking header structure in river | |
CN107881987A (en) | Deep covering layer top panel Rockfill Dam based moisture barrier structure | |
CN111455976A (en) | Construction method of self-setting mortar impervious wall by grooving method | |
CN104695455B (en) | High-flow and high-head antiscour and anti-seepage overflow cofferdam structure and construction method thereof | |
CN213143069U (en) | Pouring type impervious core earth-rock dam structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |