CN104153355B - The constructing device of concrete-pile and construction method thereof - Google Patents

The constructing device of concrete-pile and construction method thereof Download PDF

Info

Publication number
CN104153355B
CN104153355B CN201410358305.XA CN201410358305A CN104153355B CN 104153355 B CN104153355 B CN 104153355B CN 201410358305 A CN201410358305 A CN 201410358305A CN 104153355 B CN104153355 B CN 104153355B
Authority
CN
China
Prior art keywords
casing
concrete
jump bit
conveying pipeline
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410358305.XA
Other languages
Chinese (zh)
Other versions
CN104153355A (en
Inventor
王继忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING PUISSANT GEOTECHNICAL ENGINEERING CO., LTD.
Original Assignee
王继忠
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 王继忠 filed Critical 王继忠
Priority to CN201410358305.XA priority Critical patent/CN104153355B/en
Publication of CN104153355A publication Critical patent/CN104153355A/en
Application granted granted Critical
Publication of CN104153355B publication Critical patent/CN104153355B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

It is an object of the invention to provide the constructing device of a kind of concrete-pile, include casing, conveying pipeline, punching is hammered into shape, it is characterized in that: casing bottom connects jump bit, is provided with conveying pipeline inside casing, conveying pipeline connects with the internal pipeline of jump bit, and the inside of casing is additionally provided with punching hammer;The latter half of jump bit is taper, and the first half is cylinder, is fixed as one with casing;Present invention additionally comprises the construction method of a kind of concrete-pile adopting said apparatus, the steps include: 1) to stake position;2) promote punching hammering and play jump bit drive casing sinking;3) until casing is sunk to projected depth;4) to conveying pipeline delivering concrete;5) one side delivering concrete is while lifting up casing;6) until casing is proposed foundation surface;7) subsequent construction is carried out.

Description

The constructing device of concrete-pile and construction method thereof
Technical field
The present invention relates to field of civil engineering, particularly relate to the construction technology of stake.
Background technology
In the basement process of building, being frequently encountered by such situation, under earth's surface there are the bigger sandy soils of density, crushed stone soil layer, loess formation, gravel boulder bed etc. in certain depth place, and the hardness of these soil layers is uneven, uneven thickness.Pile body pore-forming when this geological conditions is to pile foundation construction causes great difficulty, the mode such as at present conventional vibration sinking tube, static pressure or rotary drilling, is substantially all and is hardly formed stake holes to projected depth.Although rotary drilling rig and manually digging hole can in harder soil layer pore-forming, but it is all the method that original soil is taken out, clear soil outward transport is not only needed to cause cost up and environmental pollution, and owing to not making full use of original soil and there is no retaining wall, very easily cause hole wall collapse and undergauge, particularly when underground water content is higher, stake holes can quickly be intake, it is impossible to carries out lower step construction.
Summary of the invention
The present invention proposes to solve above-mentioned problem, purpose is in that to provide the constructing device of a kind of concrete-pile, and provide a kind of construction method simple, efficient by this constructing device, the disposable operation completing pore-forming, soil compaction, retaining wall, pile body construction, it is achieved the raising of work efficiency and the saving of cost.
To achieve these goals, the constructing device of the concrete-pile of the present invention includes casing, conveying pipeline, punching is hammered into shape, it is characterized in that: casing bottom is fixedly connected with jump bit, the inside of casing be provided with can the conveying pipeline of delivering concrete, conveying pipeline is connected with the internal pipeline of jump bit, and the liftable punching that the inside of casing is additionally provided with through conveying pipeline is hammered into shape;The latter half of jump bit is the diameter taper more than or equal to casing external diameter, the pointed end of taper, the first half is the diameter cylinder less than casing internal diameter, weld with casing bottom or cast and connect or be fixed as one with bolt, the inside of jump bit is provided with a vertical duct and connects several laterals, vertical duct is connected with conveying pipeline, the internal diameter of punching hammer is more than internal diameter less than casing of the external diameter of conveying pipeline and external diameter, the end face of striking impact hammer can be lifted, it is achieved the synchronization of jump bit and casing is sunk in casing.
Preferably, in the constructing device of above-mentioned concrete-pile, it is welded and fixed with strip steel plate at casing and the joint impacting cone.
Preferably, in the constructing device of above-mentioned concrete-pile, the outlet of several laterals within jump bit is located at the taper position of jump bit.
Preferably, in the constructing device of above-mentioned concrete-pile, the inside of casing is filled with steel cable or rubber cushion or coarse-fine aggregate etc., and one or more can alleviate the implant of heavy tamping energy.
Preferably, in the constructing device of above-mentioned concrete-pile, in conveying pipeline during delivering concrete, the pipeline that concrete passes under pressure through within jump bit is discharged outside jump bit.
To achieve these goals, present invention additionally comprises the construction method of a kind of concrete-pile, the method adopts the constructing device of above-mentioned concrete-pile, and its step includes:
1) constructing device of above-mentioned concrete-pile is directed at the stake position in ground;
2) free-falling after lifting punching hammer certain altitude, the end face of striking impact hammer in casing, make the squeezed surrounding soil of jump bit and drive casing to sink;
3) be repeatedly performed above-mentioned steps 2) hammering punch operation, casing is drowned into projected depth;
4) to pressurized delivered concrete in conveying pipeline, concrete fills the pipeline within conveying pipeline and jump bit;
5) while to pressurized delivered concrete in conveying pipeline, lifting up casing, concrete is discharged in the bottom of jump bit, fills stake holes;
6) be performed continuously over above-mentioned steps 5) delivering concrete and lift up casing operation, until casing is proposed foundation surface, in stake holes formed concrete pile body;
7) according to base structure form, subsequent construction is carried out by one of following method:
1. time for pile foundation form, in the center of concrete pile body, downward back-pressure or anti-plug steel reinforcement cage are to projected depth;
2., time for composite foundation form, sandstone or concrete or reinforced concrete soil padding are laid at stake top surface;
3., time for composite foundation form, in the construction of stake jacking row wide diameter portion to increase stake top area, sandstone or concrete or reinforced concrete soil padding are re-layed.
Preferably, in the construction method of above-mentioned concrete-pile, above-mentioned steps 2) in, the weight of punching hammer, and promote the height of punching hammer, it is that the requirement according to soil property and impact energy is determined.
Preferably, in the construction method of above-mentioned concrete-pile, above-mentioned steps 4) in, the concrete of pressurized delivered in conveying pipeline, it is possible to substitute with the compound of one or more mixs in cement or rubble or sand or flyash or coarse-fine aggregate.
The constructing device of above-mentioned concrete-pile and the feature of construction method and advantage thereof are in that:
1. the fast efficiency of speed of fulfiling hole is high, making jump bit by punching hammering, the taper of jump bit bottom directly acts on foundation soil body, produces far to be more than the impact energy of foundation soil body ultimate bearing capacity, make the soil body or rock stratum produce impact failure and form stake holes, drive casing integral sinking simultaneously;2. hole quality is good, while casing plays retaining wall effect, is all squeezed into by the soil body being hit bottom stake holes and on hole wall, arrives in and reinforce compacted effect, and therefore the solidness of the hole wall soil body is higher, it is to avoid hole wall collapse and undergauge;3. seriality is strong, pore-forming, soil compaction, retaining wall, pile whole operations once complete, after the operation completing soil compaction pore-forming, casing or more exchange device need not be proposed, the pressure being made directly pile concrete fills, and the fast efficiency of speed is high;4. applied widely: all applicable under the various geological conditions such as weak soil, hard formation, interlayer, water content height, all applicable in pile foundation construction and complex ground treatment.
Accompanying drawing explanation
Fig. 1 is the elevation cross-sectional view of an embodiment of the constructing device of the concrete-pile of the present invention;
Fig. 2 is the process chart of an embodiment of the construction method of the concrete-pile of the present invention.
Detailed description of the invention
Fig. 1 is the elevation cross-sectional view of an embodiment of the constructing device of the concrete-pile of the present invention, as shown in Figure 1, casing 1 bottom is fixedly connected with jump bit 2, the inside of casing 1 is provided with can the conveying pipeline 3 of delivering concrete, conveying pipeline 3 is connected with the internal pipeline 5 of jump bit 2, and the liftable punching that the inside of casing 1 is additionally provided with through conveying pipeline 3 hammers 4 into shape;The latter half of jump bit 2 is the diameter taper more than or equal to casing 1 external diameter, the pointed end of taper, the first half is the diameter cylinder less than casing internal diameter, it is welded as a whole with casing bottom, and be welded and fixed with strip steel plate at joint, the inside of jump bit is provided with a vertical duct and connects several laterals, vertical duct is connected with conveying pipeline 3, the internal diameter of punching hammer 4 is more than internal diameter less than casing 1 of the external diameter of conveying pipeline 3 and external diameter, the end face of striking impact hammer 2 can be lifted in casing 1, the synchronization realizing jump bit 2 and casing 1 is sunk.
Fig. 2 is the process chart of an embodiment of the construction method of the concrete-pile of the present invention, and it comprises the steps, first, in Fig. 2 shown in a, the constructing device of above-mentioned concrete-pile is directed at the stake position in ground;Then, in Fig. 2 shown in b, casing 1 promotes punching and hammers free-falling after 4 certain altitudes into shape, the end face of striking impact hammer 2, make the squeezed surrounding soil of jump bit 2 and drive casing 1 to sink;Then, in Fig. 2 shown in c, it is repeatedly performed above-mentioned hammering punch operation, casing 1 is drowned into projected depth;Then, in Fig. 2 shown in d, pressurized delivered concrete 6 in conveying pipeline 3, concrete 6 fills the pipeline 5 within conveying pipeline 3 and jump bit 2;Then, in Fig. 2 shown in e, pressurized delivered concrete 6 in conveying pipeline 3, while lifting up casing 1, concrete 6 is discharged in the bottom of jump bit 2, fills stake holes;Then, in Fig. 2 shown in f, it is performed continuously over above-mentioned delivering concrete and lifts up casing 1 and operate, until casing 1 is proposed foundation surface, stake holes forming concrete pile body;Finally, in Fig. 2 shown in g, in the center of concrete pile body, downward anti-plug steel reinforcement cage 7 to projected depth, form armored concrete pile body.

Claims (3)

1. the construction method of a concrete-pile, it is characterized in that: the method adopts the constructing device of corresponding concrete-pile, described constructing device includes casing, conveying pipeline, punching hammer, casing bottom is fixedly connected with jump bit, the inside of casing is provided with can the conveying pipeline of delivering concrete, conveying pipeline is connected with the internal pipeline of jump bit, and the liftable punching that the inside of casing is additionally provided with through conveying pipeline is hammered into shape;The latter half of jump bit is the diameter taper more than or equal to casing external diameter, the wedge angle of taper is downward, the first half is the diameter cylinder less than casing internal diameter, jump bit welds with casing bottom or casts and connects or be fixed as one with bolt, the inside of jump bit is provided with a vertical duct and connects several laterals, vertical duct is connected with conveying pipeline, the internal diameter of punching hammer is more than internal diameter less than casing of the external diameter of conveying pipeline and external diameter, the end face of striking impact hammer can be lifted, it is achieved the synchronization of jump bit and casing is sunk in casing;Joint at casing Yu jump bit is welded and fixed with strip steel plate;The outlet of several laterals within jump bit is located at the taper position of jump bit;The inside of casing is filled with the implant that can alleviate heavy tamping energy, and described implant is one or more in steel cable or rubber cushion or coarse-fine aggregate;
The construction method of described concrete-pile, comprises the steps:
1) constructing device of described concrete-pile is directed at the stake position in ground;
2) free-falling after lifting punching hammer certain altitude, the end face of striking impact hammer in casing, make the squeezed surrounding soil of jump bit and drive casing to sink;
3) be repeatedly performed above-mentioned steps 2) hammering punch operation, casing is drowned into projected depth;
4) to pressurized delivered concrete in conveying pipeline, concrete fills the pipeline within conveying pipeline and jump bit;
5) while to pressurized delivered concrete in conveying pipeline, lifting up casing, concrete is discharged in the bottom of jump bit, fills stake holes;
6) be performed continuously over above-mentioned steps 5) delivering concrete and lift up casing operation, until casing is proposed foundation surface, in stake holes formed concrete pile body;
7) according to base structure form, subsequent construction is carried out by one of following method:
1. time for pile foundation form, in the center of concrete pile body, downward anti-plug steel reinforcement cage is to projected depth;
2., time for composite foundation form, sandstone or concrete or reinforced concrete soil padding are laid at stake top surface;
3., time for composite foundation form, in the construction of stake jacking row wide diameter portion to increase stake top area, sandstone or concrete or reinforced concrete soil padding are re-layed.
2. the construction method of concrete-pile according to claim 1, it is characterised in that above-mentioned steps 2) in, the weight of punching hammer and the height of lifting punching hammer are that the requirement according to soil property and impact energy is determined.
3. the construction method of concrete-pile according to claim 1, it is characterised in that above-mentioned steps 4) in, in conveying pipeline, the compound of one or more mixs in the reinforcement of concrete cement of pressurized delivered or rubble or sand or flyash substitutes.
CN201410358305.XA 2014-07-25 2014-07-25 The constructing device of concrete-pile and construction method thereof Active CN104153355B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410358305.XA CN104153355B (en) 2014-07-25 2014-07-25 The constructing device of concrete-pile and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410358305.XA CN104153355B (en) 2014-07-25 2014-07-25 The constructing device of concrete-pile and construction method thereof

Publications (2)

Publication Number Publication Date
CN104153355A CN104153355A (en) 2014-11-19
CN104153355B true CN104153355B (en) 2016-06-29

Family

ID=51878969

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410358305.XA Active CN104153355B (en) 2014-07-25 2014-07-25 The constructing device of concrete-pile and construction method thereof

Country Status (1)

Country Link
CN (1) CN104153355B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107476295A (en) * 2016-06-08 2017-12-15 宜兴市周铁镇生力钻探机械厂 A kind of Concrete Grouting Pale technique
CN106351585A (en) * 2016-10-27 2017-01-25 东南大学 Hole collapse and shrinkage prevention bidirectional spiral extrusion and expansion drilling tool and construction technology thereof
CN116241173B (en) * 2023-05-09 2023-08-11 中铁第一勘察设计院集团有限公司 Single power source impact rotary compaction drilling construction method and equipment

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2239446Y (en) * 1996-04-10 1996-11-06 王继忠 Construction appts. for tamping super-short shaped pile by use of building garbage
CN100999900A (en) * 2006-01-09 2007-07-18 立基工程有限公司 Bottom impacting type steel pipe concrete pole and construction method thereof
CN101560768A (en) * 2009-05-20 2009-10-21 毕建东 Overall process construction method for hammering pile, special device therefor and application thereof
CN102286970A (en) * 2011-06-24 2011-12-21 毕建东 Whole process construction method of driven cast-in-place piles and special device for same
CN102888839A (en) * 2012-10-16 2013-01-23 深圳市金泰建设工程有限公司 Construction method of static-pressure sleeve rotary digging filling pile
CN204225100U (en) * 2014-07-25 2015-03-25 王继忠 The construction equipment of concrete pile

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06136745A (en) * 1992-04-28 1994-05-17 J D F:Kk Construction method for hollow widened bottom cast-in-place concrete pile

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2239446Y (en) * 1996-04-10 1996-11-06 王继忠 Construction appts. for tamping super-short shaped pile by use of building garbage
CN100999900A (en) * 2006-01-09 2007-07-18 立基工程有限公司 Bottom impacting type steel pipe concrete pole and construction method thereof
CN101560768A (en) * 2009-05-20 2009-10-21 毕建东 Overall process construction method for hammering pile, special device therefor and application thereof
CN102286970A (en) * 2011-06-24 2011-12-21 毕建东 Whole process construction method of driven cast-in-place piles and special device for same
CN102888839A (en) * 2012-10-16 2013-01-23 深圳市金泰建设工程有限公司 Construction method of static-pressure sleeve rotary digging filling pile
CN204225100U (en) * 2014-07-25 2015-03-25 王继忠 The construction equipment of concrete pile

Also Published As

Publication number Publication date
CN104153355A (en) 2014-11-19

Similar Documents

Publication Publication Date Title
CN104074186B (en) The casing device of pore-forming and construction method thereof in a kind of building lot
US8128319B2 (en) Shielded tamper and method of use for making aggregate columns
US9567723B2 (en) Open-end extensible shells and related methods for constructing a support pier
US20080193223A1 (en) Slotted Mandrel for Lateral Displacement Pier and Method of Use
JP5932124B1 (en) Steel pipe pile construction method
CN104314078A (en) Concrete pile construction equipment and construction method thereof
CN104294818B (en) The construction method of concrete-pile
CN104099925A (en) Construction device for concrete pile and construction method thereof
CN203174607U (en) Pipe-inside impacting hammer broken earth vibration crushing and expanding immersed tube pile machine
KR100762991B1 (en) Precast piling method injected with high-strength mortar
CN105714773A (en) Foundation treatment method
CN106522191A (en) Transformer substation foundation treatment method and application thereof
CN110055948A (en) A kind of big Treatment Methods of Karst Foundation of depth and device
CN107100160B (en) A kind of construction technology for lower storage reservoir check dam vibro-replacement stone column
CN104153355B (en) The constructing device of concrete-pile and construction method thereof
CN204225100U (en) The construction equipment of concrete pile
ES2949569T3 (en) Apparatus and method for land improvement
CN206090565U (en) Concrete pile's construction equipment
CN105780766A (en) Drilling backfill end bearing pile foundation and construction method thereof
CN204252120U (en) The construction equipment of concrete pile
CN204225101U (en) The construction equipment of concrete pile
CN105064332A (en) Construction method for bearing base piles of square pile bodies
CN104153356B (en) The constructing device of concrete-pile and construction method thereof
US8562258B2 (en) Shielded tamper and method of use for making aggregate columns
CN205776209U (en) The construction equipment of concrete-pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170905

Address after: 102218, Beijing, Changping District East small town Taiping homes, building 31

Patentee after: BEIJING PUISSANT GEOTECHNICAL ENGINEERING CO., LTD.

Address before: 102218 Beijing city Changping District East Town Taiping home building No. 31 Beijing possente Geotechnical Engineering Co. Ltd.

Patentee before: Wang Jizhong

TR01 Transfer of patent right