CN104135425B CN201410321842.7A CN201410321842A CN104135425B CN 104135425 B CN104135425 B CN 104135425B CN 201410321842 A CN201410321842 A CN 201410321842A CN 104135425 B CN104135425 B CN 104135425B
Authority
CN
China
Prior art keywords
areas
message
service
power plant
generation schedule
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410321842.7A
Other languages
Chinese (zh)
Other versions
CN104135425A (en
Inventor
吴炳祥
戴则梅
丁恰
陈宁
张勇
仇晨光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Jiangsu Electric Power Co Ltd
Nari Technology Co Ltd
Original Assignee
State Grid Jiangsu Electric Power Co Ltd
Nari Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Jiangsu Electric Power Co Ltd, Nari Technology Co Ltd filed Critical State Grid Jiangsu Electric Power Co Ltd
Priority to CN201410321842.7A priority Critical patent/CN104135425B/en
Publication of CN104135425A publication Critical patent/CN104135425A/en
Application granted granted Critical
Publication of CN104135425B publication Critical patent/CN104135425B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of instant factory's net exchange method of the real-time generation schedule based on safe II areas, the service of main website of II areas and the service of power plant of II areas are built first;The service of main website of II areas is issued following multi-period generation schedulecurve to the passage on duty of each target power plant using the stipulations of DL634.5104 2002 based on extension after receiving request message message;After receiving message, planning data is parsed, be locally stored and signal is changed and transmitted to Power Plant DCS System, while power plant's mirror image confirmation message is returned into the service of main website of II areas;The service of main website of II areas carries out the judgement of data interaction mode Correctness Analysis after receiving mirror image confirmation message;Whether whether the acknowledgement state that real-time generation schedule application is returned according to the service of main website of II areas is properly received planned value and participates in the foundation of examination as power plant.The characteristics of real-time generation schedule exchange method of the present invention based on safe II areas has instant, stable, reliable.

Description

A kind of instant factory's net exchange method of real-time generation schedule based on safe II areas
Technical field
The present invention relates to a kind of instant factory's net exchange method of the real-time generation schedule based on safe II areas, belong to power system Factory's network data interaction technique field.
Background technology
The intelligent grid supporting system technology network architecture is generally divided into safe I, II, III area, safe I areas deployment Monitor in real time and the application of early warning class, safe II areas the deployment application of operation plan class and Security Checking class application, safe III areas deployment Management and running class application.
Current control centre needs to be initially formed planning data file cocurrent after safe II areas carry out generation schedule establishment and is sent to Safe I areas or safe III areas issue to power plant again.Traditional net interaction of the generation schedule factory based on safe I areas or safe III areas Mode includes following several:(1) control centre is by each power plant's Plan Curve of safe III areas website orientation, and each power plant is to specified Voluntarily download website;(2) control centre issues each power plant's plan text by safe III areas power scheduling network or special line passage Part, power plant's deployment plan downloads work station;(3) control centre issues Plan Curve by safe I areas EMS system telecontrol channel, Power plant RTU receives Plan Curve.
With intelligent grid supporting system technology real-time generation schedule on-line running and non-AGC units, AGC is not thrown Function unit participates in the demand of closed-loop control, higher to the interactive real-time of the factory of plan in real time net, stability and interactive proposition It is required that.
The content of the invention
In view of the shortcomings of the prior art, it is an object of the present invention to provide a kind of real-time generation schedule based on safe II areas Instant factory's net exchange method, the characteristics of with instant, stable, reliability.
To achieve these goals, the present invention is to realize by the following technical solutions:
The instant factory's net exchange method of real-time generation schedule based on safe II areas of the invention, specifically includes following step Suddenly:
(1) the control centre's Communications service based on safe II areas, the service of main website of abbreviation II areas are built:
Control centre's Communications service be based on the safe II areas of intelligent grid supporting system technology, be responsible for control centre with it is each Real-time generation schedule data communication process task between affiliated power plant;
(2) the power plant's Communications service based on safe II areas, the service of abbreviation II areas plant stand are built:
Power plant's Communications service is based on the safe II areas of intelligent grid supporting system technology, be responsible for power plant and control centre and The generation schedule data communication process task of Power Plant DCS System;
(3) the message interaction specifications of real-time generation schedule application and the service of main website of II areas, real-time generation schedule are defined Request message message to main website of II areas service is issued using transmission plan;
(4) main website of II areas service communicates configuration after receiving request message message according to power plant, using based on extension DL634.5104-2002 stipulations issue following multi-period generation schedulecurve to the passage on duty of each target power plant;With respect to it His stipulations, it is more convenient that the stipulations realize that following multi-period real-time generation schedule curve is issued by extension.
(5) after the plant stand service of II areas receives the real-time generation schedule downward message of main website of II areas service, quota is parsed According to carrying out digital-to-analogue conversion to planning data and become continuously graded current signal and transmit to Power Plant DCS System, while by power plant Mirror image confirmation message returns to the service of main website of II areas;
The service of main website of II areas carries out data interaction mode Correctness Analysis after receiving the mirror image confirmation message that power plant returns Judge, and will confirm that state is sent to real-time generation schedule application with message mode;
Whether real-time generation schedule application correctly connects according to the acknowledgement state that plant stand service in II areas is returned as target power plant Receive real-time generation schedule curve and whether participate in the foundation of examination.
In step (1), the service of main website of II areas is realized including that generation schedule information is exchanged, order is transmitted, the tissue solution of stipulations Analysis, the monitoring preservation of the coding and decoding of passage, communication packet, equipment state monitoring and data maintenance management function.
In step (2), II areas plant stand service realize include generation schedule message receive parsing, mirror image message return confirmation, Stateful Inspection and troubleshooting and signal conversion and transfer function.
In step (3), the attribute of message interaction specifications includes request time, request type, planned time, unit pair As and planned value, support one by one or a plurality of planned value group bag send and message return acknowledgement state.
In step (4), selection issues planned value by amplifying message Class1 37,138, to each planned value distribution one Individual fixing address, from 0 when 0 separately begin 55 points until 23 when, 288 amounts altogether, wherein:
CON<137>: the transmission of target Plan Curve, normalization value C_SE_TD_1 during band CP56Time2a;
CON<138>: the transmission of target Plan Curve, short floating-point number C_SE_TF_1 during band CP56Time2a;
When selection by amplifying message Class1 37 to issue planned value when,
Multiple information object (SQ=0) transmitting message structures are:
C_SE_TD_1 :=CP Data unit identifier, (information object address, NVA), QOS,CP56Time2a}
The transmitting message structure of multiple information objects (SQ=1):
C_SE_TD_1 :=CP Data unit identifier, information object address, (NVA), QOS,CP56Time2a}
When selection by amplifying message Class1 38 to issue planned value when,
The transmitting message structure of multiple information objects (SQ=0):
C_SE_TF_1 :=CP { Data unit identifier, (information object address, IEEE STD 754),QOS,CP56Time2a}
The transmitting message structure of multiple information objects (SQ=1):
C_SE_TF_1 :=CP { Data unit identifier, information object address, (IEEE STD 754),QOS,CP56Time2a}。
In step (5), control centre carries out the side of state analysis judgement after receiving the mirror image confirmation message of power plant's return Method is as follows:
The service of main website of II areas judges whether target power plant correctly connects according to the mirror image confirmation message that plant stand service in II areas is returned Plan Curve is have received, if the planned value in mirror image confirmation message is inconsistent with what is issued, is judged as that power plant does not connect correctly Plan Curve is received, otherwise to be properly received, and will confirm that state returns to real-time generation schedule application.
(1) this method is based on the DL634.5104-2002 of the safe II areas of intelligent grid supporting system technology and extension Stipulations are designed, and realize that real-time generation schedule curve is issued immediately, with real-time and stability very high;
(2) there is this method the data image that real-time generation schedule is issued to verify and auto state affirmation mechanism, meet real When generation schedule factory net interaction automation, it is interactive and plan examination the clear positioning requirements of responsibility;
(3) this method has stronger versatility, in accordance with message structure proposed by the present invention and communication protocol and The various control centre's application software and power plant's receiver for meeting intelligent grid supporting system technology technical specification can expire Plan software or hardware device requirement that factory's net interactive system is built when full.
Brief description of the drawings
Fig. 1 is a kind of instant factory's net interaction data flow chart of real-time generation schedule based on safe II areas of the invention.
Specific embodiment
For technological means, creation characteristic, reached purpose and effect for making present invention realization are easy to understand, with reference to Specific embodiment, is expanded on further the present invention.
Referring to Fig. 1, the invention provides a kind of instant factory's net exchange method of the real-time generation schedule based on safe II areas, its Core is to observe the premise of intelligent grid supporting system technology technical specification and DL634.5104-2002 stipulation structures Under, propose to realize the instant factory's net interaction technique side of real-time generation schedule based on safe II areas and by the network stipulations for extending Case.
This method comprises the following steps:
(1) the control centre's Communications service based on safe II areas is built
Build control centre's Communications service (the abbreviation II area masters based on the safe II areas of intelligent grid supporting system technology The service of standing), it is responsible for the real-time generation schedule data communication process task between control centre and each affiliated power plant, realization includes hair Electric plan information is exchanged, orders transmission, the tissue parsing of stipulations, the coding and decoding of passage, the monitoring preservation of communication packet, equipment The functions such as Stateful Inspection, data maintenance management.
(2) the power plant's Communications service based on safe II areas is built
(abbreviation II areas plant stand takes to build the power plant's Communications service based on the safe II areas of intelligent grid supporting system technology Business), it is responsible for power plant and control centre, the generation schedule data communication process task of Power Plant DCS System, realization includes generation schedule Message reception parsing, mirror image message return to the functions such as confirmation, Stateful Inspection and troubleshooting, signal conversion and transmission.
(3) generation schedule application and main website Communications service message specification are defined
Real-time generation schedule application passes through intelligent grid supporting system technology with the data exchange of main website of II areas service Messaging bus carry out message and send with message subscribing manner realization, it is necessary to pre-defined message interaction specifications.The message disappears Breath specification attributes are supported one by one or a plurality of mainly comprising request time, request type, planned time, machine group objects, planned value etc. Planned value group bag sends and message returns to acknowledgement state.
(4) control centre and power plant's interactive correspondence stipulations
On the premise of in accordance with DL634.5104-2002 stipulation structures, handed over to meet the instant factory's net of real-time generation schedule Mutual actual demand, extends the transmitting order to lower levels of Plan Curve, and makees for transmitting role, flow and the significant process of both sides Clear and definite regulation.Selection issues planned value by amplifying message Class1 37,138, and a fixation is distributed to each planned value Address, from 0 when 0 separately begin 55 points until 23 when, 288 amounts altogether, wherein:
CON<137>: the transmission of target Plan Curve, normalization value C_SE_TD_1 during band CP56Time2a
CON<138>: the transmission of target Plan Curve, short floating-point number C_SE_TF_1 during band CP56Time2a
A) Plan Curve transmission (type identification 137:C_SE_TD_1) band CP56Time2a markers Plan Curve transmission life Order, normalization value
Multiple information object (SQ=0) transmitting message structures:
C_SE_TD_1 :=CP Data unit identifier, (information object address, NVA), QOS,CP56Time2a}
The transmitting message structure of multiple information objects (SQ=1):
C_SE_TD_1 :=CP Data unit identifier, information object address, (NVA), QOS,CP56Time2a}
B) Plan Curve transmission (type identification 138:C_SE_TF_1)
The Plan Curve transmission order of band CP56Time2a markers, short floating-point number
The transmitting message structure of multiple information objects (SQ=0):
C_SE_TF_1 :=CP { Data unit identifier, (information object address, IEEE STD 754),QOS,CP56Time2a}
The transmitting message structure of multiple information objects (SQ=1):
C_SE_TF_1 :=CP { Data unit identifier, information object address, (IEEE STD 754),QOS,CP56Time2a}
The Plan Curve mirror image confirmation message that the service of main website of II areas is returned according to power plant judges whether power plant has correctly received Plan Curve, if the planned value in mirror image confirmation message is inconsistent with what is issued, being judged to power plant does not have positive acknowledgement planned value, Otherwise to be properly received, while will confirm that state returns to real-time generation schedule application, then meter is decided whether by real-time intended application Draw and re-issue, whether include the specific treatment such as power plant's examination.
The method of the present invention has the characteristics that and function:
(1) this method is based on the DL634.5104-2002 of the safe II areas of intelligent grid supporting system technology and extension Stipulations are designed, and realize that real-time generation schedule curve is issued immediately, with real-time and stability very high.
(2) there is this method the data image that real-time generation schedule is issued to verify and auto state affirmation mechanism, meet real When generation schedule factory net interaction automation, it is interactive and plan examination the clear positioning requirements of responsibility.
(3) this method has stronger versatility, in accordance with message structure proposed by the present invention and extension communication protocol And the various control centre's application software and power plant's receiver for meeting intelligent grid supporting system technology technical specification are equal Software or hardware device requirement that the factory of plan in real time net interactive system is built can be met.
Handling process of the invention is:
1) after the completion of real-time generation schedule automatic cycle is calculated, triggering transmission plan issues request message message to II areas master The service of standing.
2) main website of II areas service communicates configuration after receiving real-time generation schedule application request message according to power plant, adopts With based on extension DL634.5104-2002 stipulations by passage on duty from following multi-period generation schedulecurve to each target power plant Issue.
3) II areas plant stand service receives main website of II areas service real-time generation schedule downward message, carries out parsing planning data And be locally stored treatment, signal conversion with transmission concurrently send Power Plant DCS System, while power plant's mirror image confirmation message is returned into II Main website of area is serviced.
4) service of main website of II areas receive carry out after power plant's confirmation message data interaction mode Correctness Analysis judge and with Message mode is sent to real-time generation schedule application.
5) whether real-time generation schedule application is correct as power plant according to power plant's acknowledgement state that the service of main website of II areas is returned Receive planned value and whether participate in the foundation of examination.
General principle of the invention and principal character and advantages of the present invention has been shown and described above.The technology of the industry Personnel it should be appreciated that the present invention is not limited to the above embodiments, simply explanation described in above-described embodiment and specification this The principle of invention, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appending claims and its Equivalent thereof.

Claims (5)

1. the instant factory's net exchange method of a kind of real-time generation schedule based on safe II areas, it is characterised in that specifically include following Several steps:
(1) the control centre's Communications service based on safe II areas, the service of main website of abbreviation II areas are built:
Control centre's Communications service be based on the safe II areas of intelligent grid supporting system technology, be responsible for control centre with it is each Real-time generation schedule data communication process task between affiliated power plant;
(2) the power plant's Communications service based on safe II areas, the service of abbreviation II areas plant stand are built:
Power plant's Communications service is based on the safe II areas of intelligent grid supporting system technology, be responsible for power plant and control centre and The generation schedule data communication process task of Power Plant DCS System;
(3) the message interaction specifications of real-time generation schedule application and the service of main website of II areas, the real-time generation schedule are defined Request message message to main website of II areas service is issued using transmission plan;
(4) main website of II areas service communicates configuration after receiving request message message according to power plant, using based on extension DL634.5104-2002 stipulations issue following multi-period generation schedulecurve to the passage on duty of each target power plant;
(5) after the II areas plant stand service receives the real-time generation schedule downward message of main website of II areas service, quota is parsed According to, digital-to-analogue conversion is carried out to planning data and is become continuously graded current signal and is transmitted to the Power Plant DCS System, while by Power plant's mirror image confirmation message returns to the service of main website of II areas;
The service of main website of the II areas carries out data interaction mode Correctness Analysis after receiving the mirror image confirmation message that power plant returns Judge, and will confirm that state is sent to real-time generation schedule application with message mode;
Whether the real-time generation schedule application correctly connects according to the acknowledgement state that plant stand service in II areas is returned as target power plant Receive real-time generation schedule curve and whether participate in the foundation of examination;
In step (4), selection issues planned value by amplifying message Class1 37,138, and one is distributed admittedly to each planned value Determine address, from 0 when 0 separately begin 55 points until 23 when, 288 amounts altogether, wherein:
CON<137>: the transmission of target Plan Curve, normalization value C_SE_TD_1 during band CP56Time2a;
CON<138>: the transmission of target Plan Curve, short floating-point number C_SE_TF_1 during band CP56Time2a;
When selection by amplifying message Class1 37 to issue planned value when,
Multiple information object (SQ=0) transmitting message structures are:
C_SE_TD_1 :=CP Data unit identifier, (information object address, NVA), QOS, CP56Time2a}
The transmitting message structure of multiple information objects (SQ=1):
C_SE_TD_1 :=CP Data unit identifier, information object address, (NVA), QOS, CP56Time2a}
When selection by amplifying message Class1 38 to issue planned value when,
The transmitting message structure of multiple information objects (SQ=0):
C_SE_TF_1 :=CP { Data unit identifier, (information object address, IEEE STD 754),QOS,CP56Time2a}
The transmitting message structure of multiple information objects (SQ=1):
C_SE_TF_1 :=CP { Data unit identifier, information object address, (IEEE STD 754),QOS,CP56Time2a}。
2. the instant factory's net exchange method of the real-time generation schedule based on safe II areas according to claim 1, its feature exists In,
In step (1), the service of main website of the II areas is realized including that generation schedule information is exchanged, order is transmitted, the tissue solution of stipulations Analysis, the monitoring preservation of the coding and decoding of passage, communication packet, equipment state monitoring and data maintenance management function.
3. the instant factory's net exchange method of the real-time generation schedule based on safe II areas according to claim 2, its feature exists In,
In step (2), the II areas plant stand service realize include generation schedule message receive parsing, mirror image message return confirmation, Stateful Inspection and troubleshooting and signal conversion and transfer function.
4. the instant factory's net exchange method of the real-time generation schedule based on safe II areas according to claim 3, its feature exists In,
In step (3), the attribute of the message interaction specifications includes request time, request type, planned time, unit pair As and planned value, support one by one or a plurality of planned value group bag send and message return acknowledgement state.
5. the instant factory's net exchange method of the real-time generation schedule based on safe II areas according to claim 1, its feature exists In,
In step (5), the control centre carries out the side of state analysis judgement after receiving the mirror image confirmation message of power plant's return Method is as follows:
The service of main website of the II areas judges whether target power plant correctly connects according to the mirror image confirmation message that plant stand service in II areas is returned Plan Curve is have received, if the planned value in mirror image confirmation message is inconsistent with what is issued, is judged as that power plant does not connect correctly Plan Curve is received, otherwise to be properly received, and will confirm that state returns to the real-time generation schedule application.
CN201410321842.7A 2014-07-07 2014-07-07 A kind of instant factory's net exchange method of real-time generation schedule based on safe II areas Active CN104135425B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410321842.7A CN104135425B (en) 2014-07-07 2014-07-07 A kind of instant factory's net exchange method of real-time generation schedule based on safe II areas

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410321842.7A CN104135425B (en) 2014-07-07 2014-07-07 A kind of instant factory's net exchange method of real-time generation schedule based on safe II areas

Publications (2)

Publication Number Publication Date
CN104135425A CN104135425A (en) 2014-11-05
CN104135425B true CN104135425B (en) 2017-07-11

Family

ID=51807954

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410321842.7A Active CN104135425B (en) 2014-07-07 2014-07-07 A kind of instant factory's net exchange method of real-time generation schedule based on safe II areas

Country Status (1)

Country Link
CN (1) CN104135425B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3996870B2 (en) * 2003-05-13 2007-10-24 日本電信電話株式会社 Wireless data communication start method and wireless data communication apparatus
CN101938518A (en) * 2010-09-03 2011-01-05 上海大学 Data link layer protocol of low voltage power line spread-frequency communication
CN102156815A (en) * 2011-04-07 2011-08-17 国电南瑞科技股份有限公司 Method for optimizing power generation plan in mode of tracing scheduling of annual electric quantity progress
CN102496968A (en) * 2011-12-20 2012-06-13 国电南瑞科技股份有限公司 Generation plan optimizing method in intermittent energy and conventional energy coordinated dispatching mode
CN102510073A (en) * 2011-10-15 2012-06-20 江苏省电力公司南京供电公司 Data exchanging system of large power consumption interaction system/ distribution automation master station system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3996870B2 (en) * 2003-05-13 2007-10-24 日本電信電話株式会社 Wireless data communication start method and wireless data communication apparatus
CN101938518A (en) * 2010-09-03 2011-01-05 上海大学 Data link layer protocol of low voltage power line spread-frequency communication
CN102156815A (en) * 2011-04-07 2011-08-17 国电南瑞科技股份有限公司 Method for optimizing power generation plan in mode of tracing scheduling of annual electric quantity progress
CN102510073A (en) * 2011-10-15 2012-06-20 江苏省电力公司南京供电公司 Data exchanging system of large power consumption interaction system/ distribution automation master station system
CN102496968A (en) * 2011-12-20 2012-06-13 国电南瑞科技股份有限公司 Generation plan optimizing method in intermittent energy and conventional energy coordinated dispatching mode

Also Published As

Publication number Publication date
CN104135425A (en) 2014-11-05

Similar Documents

Publication Publication Date Title
CN108400908B (en) Automatic checking and accepting method for monitoring information of transformer substation
CN107612998B (en) A kind of substation&#39;s telemechanical forwarding remote data nucleus correcting system and method
CN102595472B (en) Method and device for monitoring quality of service
CN101976883B (en) Self-adapting integrative five-prevention system based on Ethernet communication
CN106850271B (en) Power distribution master station and terminal communication network fault studying and judging method
CN108255124A (en) The methods, devices and systems transmitted to PLC into line program and parameter
CN102594604A (en) Operation and maintenance management system and method
CN203193387U (en) Information automatic publishing device based on power distribution network automatic control system
CN111800309B (en) Communication state monitoring and management system for power communication
CN102724164A (en) Multi-communication protocol transmission apparatus of electric power control system and method thereof
CN105449855A (en) Real time data run-through method for intelligent power grid deployment automatic system
CN107835529A (en) Space-based backbone network dynamic access system, node, administrative center and method
CN104317868B (en) A kind of regulation and control integral method based on single preposition more SCADA applications
CN103957266B (en) A kind of equipment centralized Control method of communication system
CN102316417B (en) A kind of Wi-Fi radio sensing network order distribution method
CN105376800B (en) A kind of group-net communication method, system and the common control equipment of micro-base station
CN107147522B (en) A kind of method and device of determining networking topological structure
CN104135425B (en) A kind of instant factory&#39;s net exchange method of real-time generation schedule based on safe II areas
CN210042232U (en) Multi-mode electric power emergency communication system
CN105337257B (en) It is a kind of that the adaptive method of station domain protection definite value is realized based on central server
CN208257863U (en) Weft-knitting machine real-time monitoring system
CN204759716U (en) Remote terminal warning system
CN106487888A (en) A kind of dispatching communication based on case file is automatically to point methods
CN104853323B (en) A kind of distributed multilink synchronous communication processing method towards power emergency rescue
CN113543185B (en) Automatic-opening-assistance-based 5G high-density base station rapid operation method and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant