CN104131637B - A kind of the frame curtain wall of unordered installation can close chamber grid system and installation method thereof - Google Patents
A kind of the frame curtain wall of unordered installation can close chamber grid system and installation method thereof Download PDFInfo
- Publication number
- CN104131637B CN104131637B CN201410343321.1A CN201410343321A CN104131637B CN 104131637 B CN104131637 B CN 104131637B CN 201410343321 A CN201410343321 A CN 201410343321A CN 104131637 B CN104131637 B CN 104131637B
- Authority
- CN
- China
- Prior art keywords
- crossbeam
- fixed plate
- connector
- opening
- hook lock
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Curtains And Furnishings For Windows Or Doors (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
The present invention relates to building curtain wall technical field, it is specifically related to a kind of the frame curtain wall of unordered installation to close chamber grid system and installation method thereof, comprising: column and crossbeam, two ends of described crossbeam are equipped with opening, it is fixed with connector on the lateral wall of described column, described connector top is stretched in this opening and connects with the inwall of cross rail top, and its both sides connect with the both sides of crossbeam inwall, the bottom of described connector connects with the top of pintle hook lock code part, the lower surface of described pintle hook lock code part connects with the inwall bottom crossbeam, one sidewall of described crossbeam is provided with first and keeps away an opening, the inwall of the opposite side of described crossbeam is provided with pintle hook lock code locating slot, the bottom of described pintle hook lock code part is accessed in this pintle hook lock code locating slot.The present invention solves the difficult problem that construction need to install in order and can not independently change, and it is easy to adjust, installation is simple, has extraordinary dismounting and change ability, and reliability is big, construction and installation are convenient.
Description
Technical field
The present invention relates to building curtain wall technical field, be specifically related to a kind of the frame curtain wall of unordered installation to close chamber grid system and installation method thereof。
Background technology
Along with the development of society, curtain wall has been widely used in various architectural, and curtain wall needs to be installed on curtain skeleton.Traditional chamber frame curtain wall system of closing can only be after one column of installation when construction, the whole installation of crossbeam before installing two columns before another column, just can install another adjacent root post, otherwise will result in the crossbeam between column cannot install.This succession that has that must carry out curtain skeleton is installed, extremely disadvantageous adjustment in on-the-spot construction and work progress to Os Draconis, during construction, column need to be carried out with crossbeam simultaneously, need multi-configuration workmen and concentrate construction, the scope of operation is little, be inconvenient to construct, also the progress of construction is had a strong impact on, horizontal Os Draconis cannot realize single maintenance especially change, crossbeam is damaged once in installation or the process of use, then the most normally cannot be individually replaced crossbeam on the premise of not affecting adjacent upright posts and crossbeam and adjacent curtain wall panel。
Summary of the invention
For overcoming drawbacks described above, the purpose of the present invention is i.e. to provide a kind of the frame curtain wall of unordered installation can close chamber grid system and installation method thereof.
It is an object of the invention to be achieved through the following technical solutions:
nullThe present invention is a kind of the frame curtain wall of unordered installation can to close chamber grid system,Including: column and crossbeam,Two ends of described crossbeam are equipped with opening,It is fixed with connector on the lateral wall of described column,Described connector includes: crossbeam fixed plate、Connector fixed plate,Described connector fixed plate fixes with column,Described crossbeam fixed plate is fixed on the upper end of connector fixed plate,And the upper surface of this crossbeam fixed plate stretches in this opening and connects with the inwall of cross rail top,The both sides of this crossbeam fixed plate connect with the both sides of crossbeam inwall,The bottom of described connector fixed plate connects with the top of pintle hook lock code part,The bottom of described pintle hook lock code part is provided with crossbeam latch,The lower surface of described crossbeam latch connects with the inwall bottom crossbeam,One sidewall of described crossbeam is provided with first and keeps away an opening,And this first keeps away an opening and is arranged on the edge of this opening,Described first keeps away an opening matches with described crossbeam latch,The inwall of the opposite side of described crossbeam is provided with pintle hook lock code locating slot,Described crossbeam latch accesses in this pintle hook lock code locating slot.
Further, described first upside keeping away an opening is provided with second and keeps away an opening.
Further, the bottom of described connector fixed plate is provided with tenon, and the top of described pintle hook lock code part is provided with tongue-and-groove, and described tenon cooperates with tongue-and-groove.
Further, described connector is fixed on the lateral wall of described column by bolts and nuts.
Further, the sidewall of described column and the side of crossbeam connect with the inner surface of curtain wall panel.
A kind of frame curtain wall of the present invention closes the installation method of chamber grid system, including:
Column carries out installing to be fixed, and the connector fixed plate in connector is fixed on the lateral surface of column;
On crossbeam second is kept away the side that an opening is directed at the crossbeam fixed plate of described connector, promotes crossbeam to make crossbeam fixed plate completely into the inside of crossbeam;After crossbeam fixed plate is completely into the inside of crossbeam, crossbeam is fallen from top to bottom, until the inwall of cross rail top is fallen in crossbeam fixed plate;
After the top of pintle hook lock code part side and bottom are respectively aligned to bottom connector fixed plate and first keeps away an opening, pintle hook lock code part is advanced from the sidewall of crossbeam the inside of crossbeam, until in the pintle hook lock code locating slot of the inside of accessing crossbeam, the bottom of pintle hook lock code part side.
Further, described connector fixed plate in connector being fixed on the lateral surface of column includes:
The side of column gets out installing hole, and on this installing hole, by screw bolt and nut, the connector fixed plate in connector is fixed on the lateral surface of column.
The present invention solves the difficult problem that construction need to install in order and can not independently change, and it is easy to adjust, installation is simple, has extraordinary dismounting and change ability, and reliability is big, construction and installation are convenient.
Accompanying drawing explanation
For ease of explanation, the present invention is described in detail by following preferred embodiment and accompanying drawing.
Figure
1
Overall structure exploded view for grid system of the present invention;
Figure
2
Partial structurtes schematic diagram for the middle cross beam of the present invention;
Figure
3
The structure principle chart matched with pintle hook lock code part for connector in the present invention;
Figure
4
For the operation principle schematic diagram of step one in the installation method of the present invention;
Figure
5
For the operation principle schematic diagram of step 2 in the installation method of the present invention;
Figure
6
For the operation principle schematic diagram of step 3 in the installation method of the present invention.
Detailed description of the invention
In order to make the purpose of the present invention, technical scheme and advantage clearer, below in conjunction with drawings and Examples, the present invention is described in more detail.Should be appreciated that specific embodiment described herein, only in order to explain the present invention, is not intended to limit the present invention.
nullRefer to Fig. 1 to Fig. 3,The present invention is a kind of the frame curtain wall of unordered installation can to close chamber grid system,Including: column 1 and crossbeam 2,Two ends of described crossbeam 2 are equipped with opening,It is fixed with connector 3 on the lateral wall of described column 1,Described connector 3 includes: crossbeam fixed plate 31、Connector fixed plate 32,Described connector fixed plate 32 fixes with column 1,Described crossbeam fixed plate 31 is fixed on the upper end of connector fixed plate 32,And the upper surface of this crossbeam fixed plate 31 stretches in this opening and connects with the inwall at crossbeam 2 top,The both sides of this crossbeam fixed plate 31 connect with the both sides of crossbeam 2 inwall,It can prevent crossbeam 2 from deforming under stress and affect the realization of use function,The bottom of described connector fixed plate 32 connects with the top of pintle hook lock code part 4,The bottom of described pintle hook lock code part 4 is provided with crossbeam latch 41,The lower surface of described crossbeam latch 41 connects with the inwall bottom crossbeam 2,One sidewall of described crossbeam 2 is provided with first and keeps away an opening 21,And this first keeps away an opening 21 and is arranged on the edge of this opening,Described first keeps away an opening 21 matches with described crossbeam latch 41,First keeps away an opening 21 positions the de-groove possibility being possible to prevent pintle hook lock code part 4 under stress effect to pintle hook lock code part 4,The inwall of the opposite side of described crossbeam 2 is provided with pintle hook lock code locating slot 23,Described crossbeam latch 41 accesses in this pintle hook lock code locating slot 23.
Further, described first upside keeping away an opening 21 is provided with second and keeps away an opening 22, this second keeps away size of an opening 22 size not less than the cross section of connector 3 so that crossbeam second can be kept away an opening 22 by this and makes connector 3 enter the inside of crossbeam when mounted.
Further, the bottom of described connector fixed plate 32 is provided with tenon, and the top of described pintle hook lock code part 4 is provided with tongue-and-groove, and described tenon cooperates with tongue-and-groove.It is mutually twisted mode modular design by tenon and tongue-and-groove between connector 3 and pintle hook lock code part 4, crossbeam 2 can be met and prevent when holding and being affected by gravity crossbeam 2 forward downward from overturning.
Further, described connector 3 is fixed on the lateral wall of described column 1 by bolt 5 and nut 6.
Further, sidewall and the side of crossbeam 2 of described column 1 connects with the inner surface of curtain wall panel.
Refer to Fig. 3 to Fig. 6, a kind of frame curtain wall of the present invention closes the installation method of chamber grid system, including:
Step one, column 1 carry out installing to be fixed, and the connector fixed plate 32 in connector 3 is fixed on the lateral surface of column 1;
Step 2, second on crossbeam 2 is kept away the side that an opening 22 is directed at the crossbeam fixed plate 31 of described connector 3, promote crossbeam 2 to make crossbeam fixed plate 31 completely into the inside of crossbeam 2;After crossbeam fixed plate 31 is completely into the inside of crossbeam 2, crossbeam 2 is fallen from top to bottom, until the inwall at crossbeam 2 top is fallen in crossbeam fixed plate 31;
Step 3, after the top of pintle hook lock code part 4 side and bottom are respectively aligned to bottom connector fixed plate 32 and first keeps away an opening 21, pintle hook lock code part 4 is advanced from the sidewall of crossbeam 2 inside of crossbeam 2, until in the pintle hook lock code locating slot 23 of the inside of the bottom access crossbeam 2 of pintle hook lock code part 4 side.And curtain wall panel can push down pintle hook lock code part 4 so it does not outwards skid off when installing, so connector 3 coordinates the space of the opening by crossbeam 2 to be stuffed entirely with completely with pintle hook lock code part 4, make crossbeam 2 cannot move and arrive and be completely fixed, make crossbeam 2 under panel stress will not before and after, above-below direction move or overturn, fully meet the force request of curtain wall panel.
When needing to be replaced because of crossbeam damage when constructing, have only to first extract pintle hook lock code part out, again crossbeam is moved apart connector, the crossbeam to this is impaired can be realized be individually replaced, its Renewal process is not related to other crossbeams, need not in order all crossbeams be carried out installation again, change and be quite convenient to installation.
Further, described connector fixed plate 32 in connector 3 being fixed on the lateral surface of column 1 includes:
The side of column 1 gets out installing hole, and on this installing hole, by screw bolt and nut, the connector fixed plate 32 in connector 3 is fixed on the lateral surface of column 1.
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all any amendment, equivalent and improvement etc. made within the spirit and principles in the present invention, should be included within the scope of the present invention.
Claims (7)
1. the frame curtain wall of unordered installation can close a chamber grid system, including: column and crossbeam, described
Two ends of crossbeam are equipped with opening, it is characterised in that be fixed with connector on the lateral wall of described column,
Described connector includes: crossbeam fixed plate, connector fixed plate, and described connector fixed plate and column are solid mutually
Fixed, described crossbeam fixed plate is fixed on the upper end of connector fixed plate, and the upper surface of this crossbeam fixed plate is stretched
Enter in this opening and connect with the inwall of cross rail top, the both sides of this crossbeam fixed plate and the two of crossbeam inwall
Side connects, and the bottom of described connector fixed plate connects with the top of pintle hook lock code part, the end of described pintle hook lock code part
Portion is provided with crossbeam latch, and the lower surface of described crossbeam latch connects with the inwall bottom crossbeam, described horizontal stroke
One sidewall of beam is provided with first and keeps away an opening, and this first is kept away an opening and be arranged on the edge of this opening,
Described first keeps away an opening matches with described crossbeam latch, and the inwall of the opposite side of described crossbeam is provided with
Pintle hook lock code locating slot, described crossbeam latch accesses in this pintle hook lock code locating slot.
The most according to claim 1 the frame curtain wall of unordered installation can close chamber grid system, its feature
Being, described first upside keeping away an opening is provided with second and keeps away an opening.
The most according to claim 2 the frame curtain wall of unordered installation can close chamber grid system, its feature
Being, the bottom of described connector fixed plate is provided with tenon, and the top of described pintle hook lock code part is provided with tongue-and-groove, institute
State tenon to cooperate with tongue-and-groove.
The most according to claim 3 the frame curtain wall of unordered installation can close chamber grid system, its feature
Being, described connector is fixed on the lateral wall of described column by bolts and nuts.
The most according to claim 4 the frame curtain wall of unordered installation can close chamber grid system, its feature
Being, the sidewall of described column and the side of crossbeam connect with the inner surface of curtain wall panel.
6. one kind apply in claim 1 to 5 described in any one the frame curtain wall of unordered installation can close chamber
The frame curtain wall of grid system closes the installation method of chamber grid system, it is characterised in that including:
Column carries out installing to be fixed, and the connector fixed plate in connector is fixed on the lateral surface of column
On;
First upside keeping away an opening is provided with second and keeps away an opening, second on crossbeam is kept away an opening and is directed at institute
State the side of the crossbeam fixed plate of connector, promote crossbeam to make crossbeam fixed plate completely into the inside of crossbeam;
After crossbeam fixed plate is completely into the inside of crossbeam, crossbeam is fallen from top to bottom, until cross rail top
Inwall is fallen in crossbeam fixed plate;
It is respectively aligned to bottom connector fixed plate keep away an opening with first in top and the bottom of pintle hook lock code part side
After, pintle hook lock code part is advanced the inside of crossbeam, until the bottom of pintle hook lock code part side is accessed from the sidewall of crossbeam
In the pintle hook lock code locating slot of the inside of crossbeam.
Frame curtain wall the most according to claim 6 closes the installation method of chamber grid system, and its feature exists
In, described connector fixed plate in connector being fixed on the lateral surface of column includes:
The side of column gets out installing hole, and on this installing hole, by screw bolt and nut by connector
In connector fixed plate be fixed on the lateral surface of column.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410343321.1A CN104131637B (en) | 2014-07-18 | 2014-07-18 | A kind of the frame curtain wall of unordered installation can close chamber grid system and installation method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410343321.1A CN104131637B (en) | 2014-07-18 | 2014-07-18 | A kind of the frame curtain wall of unordered installation can close chamber grid system and installation method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104131637A CN104131637A (en) | 2014-11-05 |
CN104131637B true CN104131637B (en) | 2016-10-12 |
Family
ID=51804475
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410343321.1A Expired - Fee Related CN104131637B (en) | 2014-07-18 | 2014-07-18 | A kind of the frame curtain wall of unordered installation can close chamber grid system and installation method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104131637B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105484453B (en) * | 2015-12-28 | 2018-04-13 | 武汉沿程科技有限公司 | The Assembled stairs platform of gradient adjustable |
CN107366376A (en) * | 2017-08-02 | 2017-11-21 | 无锡恒尚装饰工程有限公司 | A kind of steel construction curtain wall |
CN108222334B (en) * | 2018-01-17 | 2019-09-17 | 江苏中南建设装饰有限公司 | A kind of frame curtain wall and its on-site assembly construction method |
CN114016750A (en) * | 2021-11-25 | 2022-02-08 | 武汉一冶建筑安装工程有限责任公司 | Method for mounting upright post and cross beam in glass curtain wall engineering |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10110799A1 (en) * | 2001-03-06 | 2002-09-12 | Raico Bautechnik Gmbh | Locked connection between two construction component units, at right angles to each other, has locking profiles at each to be clamped in place by wedges pulled together by a screw bolt |
DE10125973A1 (en) * | 2001-05-29 | 2002-12-12 | Hartmann & Co W | Facing profile construction has connector with longitudinal member for fastening on cross member section, and transverse member for fastening on upright section, both sections being catch-free |
CN201531077U (en) * | 2009-08-26 | 2010-07-21 | 珠海兴业幕墙工程有限公司 | Highly efficient anti-torque connecting system used in framed curtain wall |
DE202012101289U1 (en) * | 2012-04-11 | 2013-07-12 | SCHÜCO International KG | T-joint and mullion-transom construction |
EP2725159A1 (en) * | 2012-08-03 | 2014-04-30 | Alcoa Aluminium Deutschland, Inc. | Holding device, method for producing a holding device, and use of a holding device on a curtain wall |
CN204152037U (en) * | 2014-07-18 | 2015-02-11 | 深圳市瑞华建设股份有限公司 | A kind ofly the frame curtain wall of unordered installation can close chamber grid system |
-
2014
- 2014-07-18 CN CN201410343321.1A patent/CN104131637B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN104131637A (en) | 2014-11-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204152037U (en) | A kind ofly the frame curtain wall of unordered installation can close chamber grid system | |
CN104131637B (en) | A kind of the frame curtain wall of unordered installation can close chamber grid system and installation method thereof | |
CN204096827U (en) | Stacked steelframe elevator hoistways | |
CN203603452U (en) | Folded plate small space formwork assembly | |
CN205296799U (en) | Construction of elevator well and protection platform | |
CN206801298U (en) | A kind of window arrangement of exterior inward opening | |
CN203640064U (en) | Crossbeam and stand column connecting structure | |
CN203640266U (en) | Building template system | |
CN205531418U (en) | Elevartor shaft plane protection frame | |
CN206448406U (en) | A kind of connection component of curtain wall cross beam and column | |
CN208457513U (en) | The split type Second bearing wall hanging rack component of photovoltaic DC-to-AC converter | |
CN203951422U (en) | The solar energy mounting bracket that angle is adjustable | |
CN102889049A (en) | Mouse-stopping device for warehouse door | |
CN207455499U (en) | A kind of harden structure that is in the light of achievable Fast Installation | |
CN207079941U (en) | A kind of Prefabricated slope roof surface board support system | |
CN205242988U (en) | Cantilever type steel with inclined support at bottom | |
CN206554431U (en) | Escalator security isolation column | |
CN207242641U (en) | A kind of Combined detachable shelf | |
CN206569400U (en) | A kind of archives transfer car(buggy) | |
CN205933004U (en) | Device for connecting construction elevator adheres to and tower crane | |
CN208699301U (en) | A kind of easy device preventing member impacts | |
CN204057606U (en) | The supporting construction of elevator landing sill | |
CN204662996U (en) | Auxiliary fixed support device built by a kind of pull-type post | |
CN207739663U (en) | A kind of cities and towns ancient building building strengthening device | |
CN203961772U (en) | A kind of shelter hanging ladder composite member |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161012 Termination date: 20170718 |