CN104124672A CN201410362059.5A CN201410362059A CN104124672A CN 104124672 A CN104124672 A CN 104124672A CN 201410362059 A CN201410362059 A CN 201410362059A CN 104124672 A CN104124672 A CN 104124672A
Authority
CN
China
Prior art keywords
time
fault section
reclosing
voltage
interval
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410362059.5A
Other languages
Chinese (zh)
Other versions
CN104124672B (en
Inventor
林祺蓉
王俏俏
刘红霞
王景川
董晨晖
王晓军
林琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd
Zhuhai Xujizhi Power System Automation Co Ltd
Original Assignee
State Grid Corp of China SGCC
Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd
Zhuhai Xujizhi Power System Automation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd, Zhuhai Xujizhi Power System Automation Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410362059.5A priority Critical patent/CN104124672B/en
Publication of CN104124672A publication Critical patent/CN104124672A/en
Application granted granted Critical
Publication of CN104124672B publication Critical patent/CN104124672B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

Disclosed is a power restoration method for a voltage type fault section front end. Time from reclosing to tripping is calculated according to transformer substation protection trip time, first reclosing time, and transformer substation re-tripping time; calculation is performed according to the time and time limit set parameters of a voltage type switch device on lines so as to determine a specific section of a fault section; when a fault is located in a first section, a master station system shuts switching-on of a transformer substation line outlet switch; when the fault is located in a non-first section, the master station system sends out a switching-on instruction in a remote control mode. According to the power restoration method for the voltage type fault section front end, under the condition that the transformer substation line outlet switch lacks secondary reclosing, the fault section is automatically judged by using a distribution automation system; under the condition that secondary reclosing of a transformer substation protection device is not transformed, the problem of power restoration of the voltage type feeder automation fault section can be solved, meanwhile, modification of a transformer substation reclosing device can be avoided, expenses for changing settings or replacing devices are reduced, and an influence on operation of the transformer substation protection device is avoided.

Description

The method restoring electricity for voltage-type fault section front end
Technical field
the present invention relates to a kind of distribution network failure treatment technology, specifically a kind of method restoring electricity for voltage-type fault section front end.
Background technology
The feeder automation of existing normal voltage time type is taking voltage as failure criterion, transformer station's tripping operation in the time breaking down, after transformer station's reclosing, terminal is passed through time-delay closing step by step, be incorporated into fault section after transformer station again trip, identification fault section; Transformer station again close a floodgate after terminal time-delay closing step by step again, the locking of fault section front end terminal completes fault section isolation, realizes restoring electricity of fault section front end.
Under this operational mode, transformer station needs twice reclosing, realizes restoring electricity of fault section isolation and front end, and reclosing is realized the isolation of fault section for the first time, and reclosing is realized fault section front end and restored electricity for the second time.But operation power code has specified some on-the-spot service conditions and has not allowed to overlap for the second time, as cable line does not allow to overlap.Therefore, can not realize reclosing function for the second time, cause the step that fault section front end restores electricity not realize, thereby can not realize voltage-type feeder automation function.Therefore, need to solve transformer station's problem of reclosing for the second time.
Summary of the invention
The shortcoming existing in order to overcome above-mentioned prior art; the invention provides a kind of method restoring electricity for voltage-type fault section front end; it,, in the case of the secondary reclosing of not transforming transforming plant protecting and arranging, both can solve the voltage-type feeder automation fault section problem that restores electricity.
In order to address the above problem, the present invention by the following technical solutions: a kind of method restoring electricity for voltage-type fault section front end, it is characterized in that, comprise the following steps:
The method restoring electricity for voltage-type fault section front end, is characterized in that being to comprise:
A, transforming plant primary reclosing attribute is set, voltage-type operational mode attribute is set, transformer station is set and occurs switch spring energy storage time t1;
B, adopt power distribution automation main station system troubleshooting function, according to topology information, transforming plant protecting trip time, reclosure time, transformer station trip time again for the first time, the first interval accident of calculating is judged time limit T;
C, judge time limit T according to the first interval accident, calculate with the time limit parameters of voltage-type switchgear on circuit, judge the concrete section of fault section;
D, when the fault section calculating is positioned at first when interval, main station system locking transformer station outlet switch closes a floodgate;
E, when the fault section calculating is positioned at non-first when interval, reclosing command is sent in main station system remote control.
Further; the computational methods that the first interval accident in described step b is judged the time limit as: in the time that power distribution network has an accident; the time that outlet switch reclosing action for the first time, switch are closed a floodgate is designated as t2; being again incorporated into fault point; the transforming plant protecting action outlet switch trip time is designated as t3, and the first interval accident is judged time limit T=t3-t2.
Further, described step c comprises: according to the x time limit between Second Region in the definite outlet of the x time limit of first block switch collecting, be designated as tq1, if T<tq1*5/7, be judged to be the first interval accident, if T>=tq1*5/7, is judged to be non-the first interval accident.
The invention has the beneficial effects as follows: do not have at transformer station's outlet switch under the condition of secondary reclosing; adopt distribution automation system automatic decision fault section; recover the power supply of fault section front end; realize voltage-type feeder automation function; in the case of not transforming the secondary reclosing that transforming plant protecting arranges, both can solve the voltage-type feeder automation fault section problem that restores electricity.It can also avoid revising transformer station's reclosing device, and minimizing change setting or the more expense of changing device, avoid affecting the operation of transforming plant protecting device.
Brief description of the drawings
below in conjunction with drawings and Examples, the present invention is described further:
Fig. 1 is voltage-type transmission line structure schematic diagram;
Fig. 2 is flow chart of the present invention.
Embodiment
below in conjunction with accompanying drawing, the present invention is described in further details:
In Fig. 1, FCB is transformer station 10 kV outgoing line switch, and PVS is voltage-type block switch, and A and F are the first intervals, and B-E is non-the first interval.In conjunction with the flow chart of Fig. 2, method of the present invention is explained again below:
The Integral Thought of the method for the invention is: adopt power distribution automation main station system troubleshooting function, according to topology information, transforming plant protecting trip time, reclosure time, transformer station trip time again for the first time, calculate the time that overlaps to tripping operation.Then according to this time, calculate with the time limit parameters of voltage-type switchgear on circuit, judge the concrete section of fault section.
In the time that the fault section calculating is arranged in the first interval (as the A interval of Fig. 1), main station system locking transformer station outlet switch closes a floodgate.
When the fault section calculating is arranged in (as the B interval of Fig. 1) between Second Region or later when interval, reclosing command is sent in main station system remote control.Issuing of reclosing command, according to the spring energy-storage Time Calculation of transformer station's outlet switch, requires to be greater than the spring energy-storage time.
After transformer station's outlet switch closes a floodgate, the fault section front end of realizing voltage-type feeder automation restores electricity, thereby realizes voltage-type feeder automation function.
Concrete steps of the present invention are as follows:
Step 1, in electrical power distribution automatization system configuration transformer station, reclosing is a coincidence system.
Step 2, be voltage-type in the feeder automation operational mode of power distribution automation main station system configuration outlet.
Step 3, at the spring energy-storage time t1 of power distribution automation main station system configuration transformer station outlet switch.
Step 4, in the time that power distribution network 10KV fault occurs, outlet switch (FCB1 in Fig. 1) tripping operation, afterwards, system overlaps for the first time, the time that outlet switch FCB1 reclosing action for the first time, switch are closed a floodgate is designated as t2.In the time overlapping to fault place, outlet switch FCB1 can trip again, and the current trip time of transforming plant protecting action outlet switch FCB1 is designated as to t3.
The x time limit of first block switch that step 5, basis collect is determined the x time limit between Second Region in outlet, is designated as tq1.
Step 6, determine that the first interval accident judges time limit T=t3-t2.
If step 7 T<tq1*5/7, is judged to be the first interval accident, locking transformer station closes a floodgate, and transformer station 10 kV outgoing line circuit breaker lock, can not close a floodgate, and accident treatment completes.
If step 8 T>=tq1*5/7, is judged to be non-the first interval accident, waiting for that after the t1 time, electrical power distribution automatization system is sent out reclosing command, the outlet switch FCB1 of transformer station that closes, accident treatment completes.
The above is the preferred embodiment of the present invention, for those skilled in the art, under the premise without departing from the principles of the invention, can also make some improvements and modifications, and these improvements and modifications are also regarded as protection scope of the present invention.

Claims (3)

1. the method restoring electricity for voltage-type fault section front end, is characterized in that being to comprise:
A, transforming plant primary reclosing attribute is set, voltage-type operational mode attribute is set, transformer station is set and occurs switch spring energy storage time t1;
B, adopt power distribution automation main station system troubleshooting function, according to topology information, transforming plant protecting trip time, reclosure time, transformer station trip time again for the first time, the first interval accident of calculating is judged time limit T;
C, judge time limit T according to the first interval accident, calculate with the time limit parameters of voltage-type switchgear on circuit, judge the concrete section of fault section;
D, when the fault section calculating is positioned at first when interval, main station system locking transformer station outlet switch closes a floodgate;
E, when the fault section calculating is positioned at non-first when interval, reclosing command is sent in main station system remote control.
2. the method restoring electricity for voltage-type fault section front end according to claim 1; it is characterized in that; the computational methods that the first interval accident in described step b is judged the time limit as: in the time that power distribution network has an accident; the time that outlet switch reclosing action for the first time, switch are closed a floodgate is designated as t2; being again incorporated into fault point; the transforming plant protecting action outlet switch trip time is designated as t3, and the first interval accident is judged time limit T=t3-t2.
3. the method restoring electricity for voltage-type fault section front end according to claim 1, it is characterized in that, described step c comprises: according to the x time limit between Second Region in the definite outlet of the x time limit of first block switch collecting, be designated as tq1, if T<tq1*5/7, be judged to be the first interval accident, if T>=tq1*5/7 is judged to be non-the first interval accident.
CN201410362059.5A 2014-07-28 2014-07-28 For the method that voltage-type fault section front end restores electricity Active CN104124672B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410362059.5A CN104124672B (en) 2014-07-28 2014-07-28 For the method that voltage-type fault section front end restores electricity

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410362059.5A CN104124672B (en) 2014-07-28 2014-07-28 For the method that voltage-type fault section front end restores electricity

Publications (2)

Publication Number Publication Date
CN104124672A true CN104124672A (en) 2014-10-29
CN104124672B CN104124672B (en) 2017-03-29

Family

ID=51769990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410362059.5A Active CN104124672B (en) 2014-07-28 2014-07-28 For the method that voltage-type fault section front end restores electricity

Country Status (1)

Country Link
CN (1) CN104124672B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105137294A (en) * 2015-09-25 2015-12-09 国网山东省电力公司济南供电公司 Voltage type power distribution system single-phase grounding fault elimination method
CN107453317A (en) * 2017-09-21 2017-12-08 国网山东省电力公司 A kind of three times reclosing method of distribution line
CN108548990A (en) * 2018-04-04 2018-09-18 国电南瑞科技股份有限公司 Telegram in reply Proposals method based on electric network fault behavioural analysis
CN110224882A (en) * 2019-04-25 2019-09-10 国网江苏省电力有限公司电力科学研究院 A kind of energy-accumulating power station remote control time delay measuring method and device
CN112003232A (en) * 2020-08-17 2020-11-27 国网安徽省电力有限公司黄山供电公司 Transformer substation tripping coincidence determination method based on network topology
CN113690835A (en) * 2021-07-14 2021-11-23 广西电网有限责任公司电力科学研究院 Detection method for short-circuit fault section of in-situ overlapping type feeder automation line
CN113690834A (en) * 2021-07-14 2021-11-23 广西电网有限责任公司电力科学研究院 Overlapping type feeder automation line short circuit fault interval detection system on spot

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102005819A (en) * 2010-11-12 2011-04-06 南京因泰莱配电自动化设备有限公司 Fault isolation method of electric distribution network
CN102916409A (en) * 2012-11-13 2013-02-06 山东电力集团公司济南供电公司 Voltage-time type feeder automation running method based on parameter adjustment
CN103746353A (en) * 2013-12-31 2014-04-23 宏秀电气有限公司 Self-healing control system of intelligent distribution network and working method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102005819A (en) * 2010-11-12 2011-04-06 南京因泰莱配电自动化设备有限公司 Fault isolation method of electric distribution network
CN102916409A (en) * 2012-11-13 2013-02-06 山东电力集团公司济南供电公司 Voltage-time type feeder automation running method based on parameter adjustment
CN103746353A (en) * 2013-12-31 2014-04-23 宏秀电气有限公司 Self-healing control system of intelligent distribution network and working method thereof

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105137294A (en) * 2015-09-25 2015-12-09 国网山东省电力公司济南供电公司 Voltage type power distribution system single-phase grounding fault elimination method
CN105137294B (en) * 2015-09-25 2018-08-31 国网山东省电力公司济南供电公司 A kind of voltage-type distribution system single phase earthing troubleshooting methodology
CN107453317A (en) * 2017-09-21 2017-12-08 国网山东省电力公司 A kind of three times reclosing method of distribution line
CN108548990A (en) * 2018-04-04 2018-09-18 国电南瑞科技股份有限公司 Telegram in reply Proposals method based on electric network fault behavioural analysis
CN110224882A (en) * 2019-04-25 2019-09-10 国网江苏省电力有限公司电力科学研究院 A kind of energy-accumulating power station remote control time delay measuring method and device
CN110224882B (en) * 2019-04-25 2021-01-22 国网江苏省电力有限公司电力科学研究院 Energy storage power station remote control time delay test method and device
CN112003232A (en) * 2020-08-17 2020-11-27 国网安徽省电力有限公司黄山供电公司 Transformer substation tripping coincidence determination method based on network topology
CN112003232B (en) * 2020-08-17 2022-07-01 国网安徽省电力有限公司黄山供电公司 Transformer substation tripping coincidence determination method based on network topology
CN113690835A (en) * 2021-07-14 2021-11-23 广西电网有限责任公司电力科学研究院 Detection method for short-circuit fault section of in-situ overlapping type feeder automation line
CN113690834A (en) * 2021-07-14 2021-11-23 广西电网有限责任公司电力科学研究院 Overlapping type feeder automation line short circuit fault interval detection system on spot

Also Published As

Publication number Publication date
CN104124672B (en) 2017-03-29

Similar Documents

Publication Publication Date Title
CN104124672A (en) Power restoration method for voltage type fault section front end
CN103022994B (en) Method for achieving fault isolation and recovery of power distribution network with permeability distribution type power supply
CN102075005B (en) Processing method for 110KV zone automatic standby power switching action on basis of EMS (Engine Management System) system
CN112165090A (en) Cooperative self-healing system and method
CN103022992A (en) Feeder ground positioning method based on dispersion zero sequence voltage detection
CN106300285A (en) It is independent of the self adaptation type feeder automation fault handling method on the spot of network topology
CN106169740A (en) 110kV single-trunk segmental wiring incoming relay-protection locking prepared auto restart relay protecting method
CN105527541B (en) A method of judgement distribution line failure tripping
CN102611082B (en) Self-adaptive feeder neighborhood interactive fault-tolerant relay protection method for power distribution network
CN104113141A (en) Intelligent lengthways interconnected feeder line automatic control method
CN103378583A (en) Feeder automation technical scheme based on intelligent rapid vacuum circuit breaker
CN104518564A (en) Backup automatic switching apparatus with area automatic switching function, and backup automatic switching method
CN204928105U (en) Power distribution terminal device with trip protections function of preventing bypassing immediate leadership
CN103825363B (en) A kind of wind-light storage low pressure micro-capacitance sensor group protection coordination controller
CN102386614A (en) Method for sharing standby protecting device by power equipment in intelligent transformer substation
CN204156517U (en) A kind of intelligent substation low-voltage bus bar protection system
CN102623994B (en) Substation area control method and system of microgrid operation mode
CN108321774A (en) A kind of distribution automation controls on the spot and central controlled combined optimization method
CN103227460A (en) Intelligent power distribution monitoring system and intelligent power distribution monitoring method
CN202550668U (en) Distributed power distribution network management terminal
CN103384062B (en) Isolation control system of grid power distribution fault detection
CN116207702B (en) Multi-factor minimum set power distribution network fault research and judgment-based power restoration method and device
CN201877814U (en) Controller for circuit breaker
CN107800118A (en) The optical fiber autonomous negotiating formula guard method of switching station&#39;s comprehensive intelligent terminal
JP2007037354A (en) Independent operation preventing device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Lin Qirong

Inventor after: Liu Bo

Inventor after: Fan Yongyan

Inventor after: Wang Qiaoqiao

Inventor after: Guan Ti

Inventor after: Yin Aihui

Inventor after: Liu Hongxia

Inventor after: Ding Lecheng

Inventor after: Lin Lin

Inventor after: Li Huicong

Inventor after: Zhang Qiang

Inventor before: Lin Qirong

Inventor before: Wang Qiaoqiao

Inventor before: Liu Hongxia

Inventor before: Wang Jingchuan

Inventor before: Dong Chenhui

Inventor before: Wang Xiaojun

Inventor before: Lin Lin

COR Change of bibliographic data
GR01 Patent grant
GR01 Patent grant