CN104123434A - 一种顶管隧道穿越高速公路的地面沉降实时主动控制方法 - Google Patents

一种顶管隧道穿越高速公路的地面沉降实时主动控制方法 Download PDF

Info

Publication number
CN104123434A
CN104123434A CN201410264505.9A CN201410264505A CN104123434A CN 104123434 A CN104123434 A CN 104123434A CN 201410264505 A CN201410264505 A CN 201410264505A CN 104123434 A CN104123434 A CN 104123434A
Authority
CN
China
Prior art keywords
real
subsidence
highway
active control
pipe tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410264505.9A
Other languages
English (en)
Inventor
陈飞
卞荣
刘燕平
王志勇
陈攀
张益群
章李刚
丁小蔚
周文俊
叶冠林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Zhejiang Electric Power Co Ltd, Economic and Technological Research Institute of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410264505.9A priority Critical patent/CN104123434A/zh
Publication of CN104123434A publication Critical patent/CN104123434A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Alarm Systems (AREA)

Abstract

本发明提供了一种顶管隧道施工穿越高速公路时,对高速公路路面沉降进行控制的实时主动控制方法。目前仅对路面的沉降进行被动式监测,没有对地面沉降进行主动控制,从而无法解决沉降问题。本发明的特征在于,设定高速公路路面的沉降控制值,根据沉降控制值计算一次报警值及二次报警值;在顶管隧道顶进过程中,实时采集高速公路路面的沉降量;根据顶管隧道顶进时高速公路的实测沉降量与沉降控制值大小关系,用控制软件实时调整注浆位置和注浆量,抬升地层,达到主动控制高速公路路面沉降的目的。本发明可靠度高,经济实用,适用于顶管隧道施工穿越高速公路时,控制高速公路的路面沉降。

Description

一种顶管隧道穿越高速公路的地面沉降实时主动控制方法
 
技术领域
本发明涉及隧道施工对基础设施影响的实时主动控制方法,具体地说是一种顶管隧道穿越高速公路的地面沉降实时主动式控制方法。
背景技术
随着我国城市基础设施建设的飞速发展,隧道已经成为城市基础设施不可缺少的一部分。由于城市空间有限,隧道线路将不可避免地穿越各种构筑物,包括城市基础设施,如高速公路等。施工过程中如果缺乏必要的控制手段,一旦从高速公路下方穿越时出现异常地面沉降,将危及高速公路上的行驶车辆,造成严重交通事故,带来巨大的社会影响。因此,针对隧道施工穿越高速公路引起其沉降的问题,需要一套专门的监控***。
目前,国内与高速公路路基沉降监控相关的***在以下专利文献中有记载:
1)刘观仕、孔令伟、郭爱国,一种软土路基沉降监测方法及装置,CN200710052501.4,2010-9-1。
2)唐才荣、艾重阳,一种路基沉降监测***[P],CN201210477714.2,2013-2-27。
3)欧建平、周斌,一种路基沉降监测设备,CN201120198678.7,2012-1-11。
4)陆小龙、杨文威、何真珍,一种顶管隧道的扰动施工监测方法,CN201310365796.6。
以上文献仅对路面的沉降进行被动式监测,没有对地面沉降进行主动控制,从而无法有效解决沉降问题。
发明内容
本发明所要解决的技术问题是克服上述现有技术存在的缺陷,提供一种顶管隧道穿越高速公路的地面沉降实时主动控制方法,其可靠性高,经济实用,适用于顶管隧道施工穿越高速公路时,有效控制高速公路路面沉降。
为此,本发明采用如下的技术方案:一种顶管隧道穿越高速公路的地面沉降实时主动控制方法,其步骤如下:
1)在从高速公路下方穿过的顶管管节处布设注浆管;
2)在顶管隧道穿越施工段的高速公路路面上布置多个沉降测点,沉降测点测得的沉降量传输给沉降检测仪器;
3)设定高速公路路面的沉降控制值,根据沉降控制值计算一次报警值及二次报警值;
4)在顶管隧道顶进过程中,实时采集高速公路路面的沉降量;
5)根据顶管隧道顶进时高速公路的实测沉降量与沉降控制值大小关系,用控制软件实时调整注浆位置和注浆量,抬升地层,达到主动控制高速公路路面沉降的目的,所述的控制软件采用PID算法。
本发明提出一种顶管隧道穿越高速公路的地面沉降实时主动控制方法,事先设定路面沉降控制值并在管节内预留注浆孔,控制软件根据高速公路路面沉降情况,实时调整注入地层的注浆量,对路面沉降进行主动控制。
进一步,所述控制软件的具体算法是以实测沉降量与原始地层标高的差值为目标函数,采用PID算法控制不同区域的注浆控制设备,注浆控制设备与注浆管连接,实时调整注浆位置与注浆量,抬起已沉降地层,直到实测沉降量小于沉降控制值。
进一步,所述的控制软件安装在电脑内,电脑与沉降监测仪器及注浆控制设备连接;电脑从沉降监测仪器上获得高速公路路面的实测沉降量,经过PID算法后发出指令给注浆控制设备。
进一步,所述的一次报警值及二次报警值分别为沉降控制值的50%和80%,当实测沉降量达到一次报警值时,需加密监测频率,调整注浆位置和注浆量;当实测沉降量达到二次报警值时,立即停工,改用固化型化学浆液紧急修补路面。
进一步,所述的沉降控制值根据相关部门的规范条例设定。
进一步,位于同一处的注浆管布置于顶管管片上部90度范围内,沿轴线方向每隔1米布置一处注浆管。
与现有技术相比,本发明具有如下的有益效果:
1.在对高速公路进行路面沉降监测的同时,可以通过调节管节周围注浆管的注浆量,对异常的路面沉降进行实时主动控制。
2.本发明的适用对象是顶管隧道施工单位,适用时间是顶管隧道施工进行时,较常规路面沉降监测***扩大了适用范围,可靠度高,经济实用。
附图说明
通过阅读参照以下附图对非限制性实施例所作的详细描述,本发明的其它特征、目的和优点将会变得更明显。
图1为本发明的组成图。
图2为本发明控制软件的工作流程图。
图3为本发明沉降监测仪器布置俯视图。
图4为本发明沉降监测仪器布置剖面图。
具体实施方式
下面结合具体实施例对本发明进行详细说明。以下实施例将有助于本领域的技术人员进一步理解本发明,但不以任何形式限制本发明。应当指出的是,对本领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干变形和改进。这些都属于本发明的保护范围。
本实施例提供一种顶管隧道穿越高速公路的地面沉降实时主动控制方法,具体步骤如下:
(1)根据高速公路相关的规范条例,设定路面的沉降控制值,根据沉降控制值计算一次报警值及二次报警值。
(2)在隧道所穿越的高速公路路面布置多个沉降测点,沉降测点测得的沉降量传输给沉降检测仪器;并将沉降监测仪器和注浆控制设备与电脑主机相连,电脑主机内安装配套的控制软件。电脑从沉降监测仪器上获得高速公路路面的实测沉降量,经过PID算法后发出指令给注浆控制设备。
(3)从高速公路路面下方穿过的顶管管节***布置好注浆管,注浆管在顶管管片制造时预留,布置于管片上部90度范围内,沿轴线方向每隔1米布置一处,注浆管与注浆控制设备相连。
(4)控制软件的算法如下:实测沉降量与原始地层标高的差值为目标函数,采用PID算法控制注浆控制设备,调节不同区域注浆量,直到地层沉降量小于允许值。
(5)开始施工,顶管在高速公路下方进行顶进时,控制软件根据以下方法进行控制:
①沉降稳定,不大于沉降控制值时,保持现有施工方法继续施工;
②沉降超过沉降控制值50%,但不超过80%,进行一次报警,报告相关单位,提醒加密监测频率、调整注浆位置和注浆量;
③一次报警并采取措施后沉降仍继续增加,超过沉降控制值80%,进行二次报警,提醒立即停工,改用固化型化学浆液紧急修补路面等措施;
④最初沉降即超过沉降控制值80%,立即进行报警,提醒立即停工,采用固化型化学浆液紧急修补路面等措施。

Claims (6)

1.一种顶管隧道穿越高速公路的地面沉降实时主动控制方法,其步骤如下:
1)在从高速公路下方穿过的顶管管节处布设注浆管;
2)在顶管隧道穿越施工段的高速公路路面上布置多个沉降测点,沉降测点测得的沉降量传输给沉降检测仪器;
3)设定高速公路路面的沉降控制值,根据沉降控制值计算一次报警值及二次报警值;
4)在顶管隧道顶进过程中,实时采集高速公路路面的沉降量;
5)根据顶管隧道顶进时高速公路的实测沉降量与沉降控制值大小关系,用控制软件实时调整注浆位置和注浆量,抬升地层,达到主动控制高速公路路面沉降的目的,所述的控制软件采用PID算法。
2.根据权利要求1所述的顶管隧道穿越高速公路的地面沉降实时主动控制方法,其特征在于,所述控制软件的具体算法是以实测沉降量与原始地层标高的差值为目标函数,采用PID算法控制不同区域的注浆控制设备,注浆控制设备与注浆管连接,实时调整注浆位置与注浆量,抬起已沉降地层,直到实测沉降量小于沉降控制值。
3.根据权利要求2所述的顶管隧道穿越高速公路的地面沉降实时主动控制方法,其特征在于,所述的控制软件安装在电脑内,电脑与沉降监测仪器及注浆控制设备连接;电脑从沉降监测仪器上获得高速公路路面的实测沉降量,经过PID算法后发出指令给注浆控制设备。
4.根据权利要求1或2所述的顶管隧道穿越高速公路的地面沉降实时主动控制方法,其特征在于,所述的一次报警值及二次报警值分别为沉降控制值的50%和80%,当实测沉降量达到一次报警值时,需加密监测频率,调整注浆位置和注浆量;当实测沉降量达到二次报警值时,立即停工,改用固化型化学浆液紧急修补路面。
5.根据权利要求1或2所述的顶管隧道穿越高速公路的地面沉降实时主动控制方法,其特征在于,所述的沉降控制值根据相关部门的规范条例设定。
6.根据权利要求1或2所述的顶管隧道穿越高速公路的地面沉降实时主动控制方法,其特征在于,位于同一处的注浆管布置于顶管管片上部90度范围内,沿轴线方向每隔1米布置一处注浆管。
CN201410264505.9A 2014-06-13 2014-06-13 一种顶管隧道穿越高速公路的地面沉降实时主动控制方法 Pending CN104123434A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410264505.9A CN104123434A (zh) 2014-06-13 2014-06-13 一种顶管隧道穿越高速公路的地面沉降实时主动控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410264505.9A CN104123434A (zh) 2014-06-13 2014-06-13 一种顶管隧道穿越高速公路的地面沉降实时主动控制方法

Publications (1)

Publication Number Publication Date
CN104123434A true CN104123434A (zh) 2014-10-29

Family

ID=51768844

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410264505.9A Pending CN104123434A (zh) 2014-06-13 2014-06-13 一种顶管隧道穿越高速公路的地面沉降实时主动控制方法

Country Status (1)

Country Link
CN (1) CN104123434A (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107228652A (zh) * 2017-06-15 2017-10-03 杭州品联科技有限公司 具有沉陷报警***的光伏接地网
CN109139019A (zh) * 2018-09-04 2019-01-04 中铁十二局集团有限公司 潜埋暗挖隧道下穿地铁既有线路的监测方法及监测装置
CN109750658A (zh) * 2018-12-28 2019-05-14 中国铁道科学研究院集团有限公司铁道建筑研究所 注浆控制方法和注浆***
CN111706337A (zh) * 2020-05-19 2020-09-25 北京城建中南土木工程集团有限公司 一种盾构穿高铁施工方法
CN113216283A (zh) * 2021-05-18 2021-08-06 中铁北京工程局集团有限公司 高速公路路基沉降注浆监控***及方法
CN113957775A (zh) * 2021-11-04 2022-01-21 河海大学 修复桥头跳车病害的智能装置

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102606163A (zh) * 2012-03-20 2012-07-25 天津城建隧道股份有限公司 一种盾构法隧道施工地面沉降控制方法
CN103397845A (zh) * 2013-07-24 2013-11-20 国家电网公司 一种通过浆液置换控制顶管穿越建筑物引起的沉降的方法
CN103471648A (zh) * 2013-08-21 2013-12-25 国家电网公司 一种顶管隧道的扰动施工监测方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102606163A (zh) * 2012-03-20 2012-07-25 天津城建隧道股份有限公司 一种盾构法隧道施工地面沉降控制方法
CN103397845A (zh) * 2013-07-24 2013-11-20 国家电网公司 一种通过浆液置换控制顶管穿越建筑物引起的沉降的方法
CN103471648A (zh) * 2013-08-21 2013-12-25 国家电网公司 一种顶管隧道的扰动施工监测方法

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
YANG H.ET AL.: "Electro-hydraulic proportional control of turust system for shield tunneling machine", 《AUTOMATION IN CONTRUCTION》 *
刘宣宇等: "盾构机自动控制技术现状与展望", 《机械工程学报》 *
杨平等: "密集建筑群下大断面隧道施工反馈分析及安全性控制研究", 《岩石力学与工程学报》 *
黄腾等: "地铁盾构隧道下穿公路隧道安全监控的研究", 《中国科技论文在线》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107228652A (zh) * 2017-06-15 2017-10-03 杭州品联科技有限公司 具有沉陷报警***的光伏接地网
CN107228652B (zh) * 2017-06-15 2020-01-07 杭州品联科技有限公司 具有沉陷报警***的光伏接地网
CN109139019A (zh) * 2018-09-04 2019-01-04 中铁十二局集团有限公司 潜埋暗挖隧道下穿地铁既有线路的监测方法及监测装置
CN109750658A (zh) * 2018-12-28 2019-05-14 中国铁道科学研究院集团有限公司铁道建筑研究所 注浆控制方法和注浆***
CN111706337A (zh) * 2020-05-19 2020-09-25 北京城建中南土木工程集团有限公司 一种盾构穿高铁施工方法
CN113216283A (zh) * 2021-05-18 2021-08-06 中铁北京工程局集团有限公司 高速公路路基沉降注浆监控***及方法
CN113957775A (zh) * 2021-11-04 2022-01-21 河海大学 修复桥头跳车病害的智能装置

Similar Documents

Publication Publication Date Title
CN104123434A (zh) 一种顶管隧道穿越高速公路的地面沉降实时主动控制方法
CN103556579A (zh) 一种综合注浆保压加管幕支护的箱涵顶推工法
CN103046638A (zh) 一种顶管施工方法
CN110656640B (zh) 一种高速公路工后沉降自动监测***及方法
CN112983441A (zh) 一种超近距离侧穿既有运营地铁线路施工工法
CN104932392A (zh) 碾压监控方法及装置
CN104746399A (zh) 防治桥头跳车施工方法
CN113236260A (zh) 一种全方位盾构下穿既有地铁车站施工监测方法
CN206258105U (zh) 一种路基沉降监测点装置
CN205088982U (zh) 一种建筑物整体移位车载托换***
CN113338983B (zh) 适用于高水位岩石地质的大管径泥水平衡顶管施工方法
CN104912122B (zh) 基坑工程监测数据报警级别的判定方法
CN104655099A (zh) 一种安全沉降观测方法
CN108981657A (zh) 泥炭土软土路基沉降的监测及分析方法
CN105862560A (zh) 对环境无污染的对路面的桥头台背处进行修复的方法
CN104032631B (zh) 一种存在冻胀问题的铁路无砟轨道维护处理方法
CN203132536U (zh) 铁路营业线桥涵施工支墩沉降自动化监测装置
Rahman et al. Settlement of bridge approaches on soft soil area in Batu Pahat, Johor
Raithel et al. Construction of the New High-Speed Railway Line Ulm–Wendlingen in Karstifed Rock
CN112538798A (zh) 高速公路低湿水田软基区路基直填施工工艺
CN104480966B (zh) 螺栓钢盖板护井施工工法及所用螺栓钢盖板装置
CN204418216U (zh) 螺栓钢盖板护井施工工法所用螺栓钢盖板装置
CN114964144B (zh) 一种地下管群灾害监测预警结构与控制方法
CN110374017A (zh) 一种水泥桥面黑色化改造方法
CN106764055A (zh) 顶管三点一线施工工法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Power Networks Co

Applicant after: State Grid Zhejiang Electric Power Company

Applicant after: Zhejiang Huayun Electric Power Engineering Design Consulting Co., Ltd.

Applicant after: State Grid Zhejiang Electric Power Company Economic Technical Institute

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant before: State Power Networks Co

Applicant before: State Grid Zhejiang Electric Power Company

Applicant before: Zhejiang Zhedian Economic Technology Research Institute

Applicant before: State Grid Zhejiang Electric Power Company Economic Technical Institute

COR Change of bibliographic data
RJ01 Rejection of invention patent application after publication

Application publication date: 20141029

RJ01 Rejection of invention patent application after publication