CN104123425B - Crude oil pipeline preheats operation thermal procession emulation mode - Google Patents

Crude oil pipeline preheats operation thermal procession emulation mode Download PDF

Info

Publication number
CN104123425B
CN104123425B CN201410386614.8A CN201410386614A CN104123425B CN 104123425 B CN104123425 B CN 104123425B CN 201410386614 A CN201410386614 A CN 201410386614A CN 104123425 B CN104123425 B CN 104123425B
Authority
CN
China
Prior art keywords
pipeline
soil
pipe
parameter
crude oil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410386614.8A
Other languages
Chinese (zh)
Other versions
CN104123425A (en
Inventor
宇波
张健
王欣然
章涛
张欣雨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Petroleum Beijing
Original Assignee
China University of Petroleum Beijing
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Petroleum Beijing filed Critical China University of Petroleum Beijing
Priority to CN201410386614.8A priority Critical patent/CN104123425B/en
Publication of CN104123425A publication Critical patent/CN104123425A/en
Application granted granted Critical
Publication of CN104123425B publication Critical patent/CN104123425B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pipeline Systems (AREA)

Abstract

The invention discloses a kind of crude oil pipeline to preheat operation thermal procession emulation mode, including:Preheating method selection and safety evaluatio are configured;Input pipe parameter, medium and soil physical factors between each station;Import and calculate grid;Calculating parameter initializes and utilizes Finite Volume Method for Air and calculate heat exchange amount between Soil Temperature Field, computer tube stream and soil finite difference calculus, thermodynamic features collimation method solves pipe flow medium relevant parameter;Obtain temperature, the pressure of the latter node of pipeline section;Determine each node operational factor along pipeline;Preheating safety evaluatio simultaneously exports to result.

Description

Crude oil pipeline preheats operation thermal procession emulation mode
Technical field
The present invention relates to the long-range conveying technology field of oil, more particularly to a kind of preheating operation thermal procession of crude oil pipeline to imitate True method.
Background technology
Important component of the pipeline transportation as modern transportation system, have cost of transportation is low, security reliability it is high with And the unique advantages such as environmental pollution is small, transported particularly suitable for the long range of the inflammable and explosive dangerous goods such as crude oil, product oil and natural gas It is defeated.
In recent years, as the economic steady-state growth of world's emerging economy and developed economies economic recovery, the world are mainly big State increasingly improves to the demand of the energy, therefore the pace of construction of oil-gas pipeline is also accelerated.By the end of the year 2008, world's crude oil pipeline Main line total length is more than 40 × 104km.China has also welcome the pipe-line construction climax of a new round, it is contemplated that to " 12 " end Phase, China's pipeline total kilometrage will break through 15 × 104km.At that time, long-distance transmission pipeline will undertake the Crude Oil Transportation in China 70% Task.
With China's plumbing installations " base on our country, developing overseas " implementation, Western crude pipeline, the Sudan 1/2/4 A series of large-scale pipeline engineerings both at home and abroad such as area's crude oil pipeline, the area's crude oil pipeline of the Sudan 3/7 and China-Russia Crude Oil Pipeline are constructed and put into operation. With the construction of national strategy energy source pathway, will also there are large quantities of crude oil pipeline engineerings to build up and operation of putting into production.These crude oil In pipeline engineering, have be greatly heated transportation crude oil pipeline.The safe and stable operation of these hot oil pipelines, for Ensure that national energy security is significant.
As the critical stage that production run is transferred to by construction, the operation process of hot oil pipeline is for detection pipeline Design and construction quality are significant.Different from the crude oil pipeline of isothermal conveying, hot oil pipeline is during operation, pipeline And its surrounding soil temperature field is in transient state all the time, and this is one and is related to media flow in pipe and couples and manage with heat transfer Double coupled problems that interior media for heat exchange couples with managing outer thermal conduction of soil, this stage any accident or scheduled shut-down are all by the solidifying pipe of increase Risk.
Therefore, for make pipe safety, be smoothly transferred to normal operating phase, it is necessary to hot oil pipeline preheating the operation stage Involved thermal procession is clearly described.On the other hand, it is still a blank for above-mentioned pipeline simulation software.
The content of the invention
It is an object of the invention to provide a kind of crude oil pipeline to preheat operation thermal procession emulation mode, to solve above-mentioned ask Topic.
In order to achieve the above object, the technical proposal of the invention is realized in this way:
A kind of crude oil pipeline preheats operation thermal procession emulation mode, comprises the following steps:
Preheating method selection and safety evaluatio are configured;
Input pipe parameter, medium and soil physical factors between each station;
Import and calculate grid;
Calculating parameter initializes and utilizes Finite Volume Method for Air to calculate Soil Temperature Field, computer tube stream and soil with finite difference calculus Heat exchange amount, thermodynamic features collimation method between earth solve pipe flow medium relevant parameter;Obtain temperature, the pressure of the latter node of pipeline section;
Determine each node operational factor along pipeline;
Preheating safety evaluatio simultaneously exports to result.
It is preferred that also comprise the following steps:
Stopping transportation initializes;
Areas of dielectric mesh generation in pipe;
Judge that boundary position whether there is free convection;
If so, equivalent heat conductivity is then calculated, and to medium temperature in pipe and soil moisture couple solution;It is if it is not, then straight Connect to medium temperature in pipe and soil moisture couple solution;
Shutdown time is judged, and exports the result of calculation of stopping transportation.
It is preferred that also comprise the following steps:
Restart safety evaluation initialization;
Mesh generation is carried out to medium mobile grid in pipe and carries out water force;
Mesh generation is carried out to pipeline and its surrounding soil fixed mesh and carries out thermodynamic computing;
Determine parameter interpolation between grid;
Each node operational factor is determined, is judged restarting the time, and exports the result of calculation restarted.
Compared with prior art, this have the advantage that:
A kind of crude oil pipeline preheating operation thermal procession emulation mode provided by the invention, above-mentioned analogy method is applied to big The processing of data is measured, is simulated suitable for the thermal procession simulation process of the long distance oil pipeline of complicated landform.Buried deep fat pipe During preheating is gone into operation, pipeline and surrounding soil temperature field are in transient state all the time in road, and during which any accident or plan stops It is defeated all to increase solidifying manage-style danger.To be transferred to normal production run with making pipe safety, it is necessary to heating power to being related in warm Process is accurately described.
Brief description of the drawings
Fig. 1 is that the basic procedure for the crude oil pipeline preheating operation thermal procession emulation mode that the embodiment of the present invention one provides shows It is intended to;
Fig. 2 .1 are normal conveying condition calculating flow chart in the warm that the embodiment of the present invention one is related to;
Fig. 2 .2 are stopping transportation condition calculating flow chart in the warm that the embodiment of the present invention one is related to;
Fig. 2 .3 are that the warm that the embodiment of the present invention one is related to restarts safety evaluation calculation flow chart;
Fig. 2 .4 are the calculating type selection interface that the embodiment of the present invention one is related to;
Fig. 2 .5 are that the basic parameter that the embodiment of the present invention one is related to sets interface;
Fig. 2 .6 are the pipe flow medium parameter setting interface that the embodiment of the present invention one is related to;
Fig. 2 .7 are parameter setting interface between the station that the embodiment of the present invention one is related to;
Fig. 2 .8 are that the medium temperature along the line that the embodiment of the present invention one is related to is distributed display interface;
Fig. 2 .9 are the pipeline section Soil Temperature Field display interface that the embodiment of the present invention one is related to;
Fig. 2 .10 are oil temperature distribution along pipeline at the end of the forward direction that the embodiment of the present invention one is related to preheats;
Oil temperature distribution along pipeline at the end of the reverse preheating that Fig. 2 .11 are related to for the embodiment of the present invention one;
Fig. 2 .12 are the pipeline Soil Temperature Field that the embodiment of the present invention one is related to.
Embodiment
The present invention is described in further detail below by specific examples of the implementation and with reference to accompanying drawing.
Embodiment one
Referring to Fig. 1, the embodiment of the present invention one provides a kind of crude oil pipeline preheating operation thermal procession emulation mode, including Following steps:
Step S100, preheating method selection and safety evaluatio are configured;
Step S200, pipe parameter, medium and soil physical factors between each station of input;
Step S300, import and calculate grid;
Step S400, calculating parameter initializes and utilizes Finite Volume Method for Air to calculate Soil Temperature Field, meter with finite difference calculus Calculate the heat exchange amount between pipe stream and soil, thermodynamic features collimation method solves pipe flow medium relevant parameter;Obtain the latter node of pipeline section Temperature, pressure;The methods of utilizing Finite Volume Method for Air and finite difference calculus, can solve to obtain pipe flow medium relevant parameter.
Step S500, each node operational factor along pipeline is determined;
Step S600, preheat safety evaluatio and result is exported.
It is preferred that also comprise the following steps:
Stopping transportation initializes;
Areas of dielectric mesh generation in pipe;
Judge that boundary position whether there is free convection;
If so, equivalent heat conductivity is then calculated, and to medium temperature in pipe and soil moisture couple solution;It is if it is not, then straight Connect to medium temperature in pipe and soil moisture couple solution;
Shutdown time is judged, and exports the result of calculation of stopping transportation.
It is preferred that also comprise the following steps:
Restart safety evaluation initialization;
Mesh generation is carried out to medium mobile grid in pipe and carries out water force;
Mesh generation is carried out to pipeline and its surrounding soil fixed mesh and carries out thermodynamic computing;
Determine parameter interpolation between grid;
Each node operational factor is determined, is judged restarting the time, and exports the result of calculation restarted.
Above-mentioned emulation mode incorporation engineering actual demand, Rational Simplification is carried out to pipeline preheating operation process, established The physical model of medium and pipeline soil heat exchange in pipe is described, using unstructured quadrilateral mesh and polar grid pair Soil and wall section have carried out discrete, and discrete governing equation has been obtained using Finite Volume Method for Air.Develop friendly interface Crude oil pipeline preheats operation thermodynamic computing software, and the real data pair during the engineering operation of application A Jiademu crude oil pipelines The accuracy and applicability of institute's making software are verified.
Preheating operation thermal procession emulation mode to crude oil pipeline provided in an embodiment of the present invention below, (i.e. related software is opened Hair) specific features do and illustrate:
Crude oil pipeline preheating operation thermal procession emulation mode is opening defeated process or in-service to newly-built buried heated pipeline The handoff procedure that crude oil of low-coagulation pipeline changes defeated crude oil with high solidifying point carries out heating power emulation and stopped flow injection analysis analysis.This is developed soft Part can act also as the ratio choosing and analysis that aid decision instrument is used for different preheating schemes.Software will be upper using Fortran77 language State flowing and the solution procedure sequencing of the double coupled problems of heat transfer, and the friendship developed with Microsoft Visual Basic6.0 Mutual interface integrates, easy to use using the style at Windows user interface.The data of input can preserve, it is convenient and swift and It is easily modified;As a result graphically export, simple and clear and abundant information.
The basic function of place of matchmakers's exploitation software first, and with the actual ginseng of Niger A Jiademu crude oil pipeline engineerings Number, the function and its application method of each module of software are introduced, during finally being gone into operation using A Jiademu crude oil pipelines engineering Real data is verified to the accuracy of institute's making software with applicability.
3.1 software basic functions:
On the basis of to a plurality of buried heated pipeline operation process carries out literature survey both at home and abroad, buried heat of combining closely Oil-piping opens the practical problem faced during defeated operation, considers what is be likely to occur during buried heated pipeline preheating is gone into operation Various operating modes, are developed《Crude oil pipeline preheats operation thermodynamic computing software》.Software mainly has following function:
(1) in-pipe inspection robot Work condition analogue
According to existing tender budget, the positive preheating of the newly-built buried heated pipeline of software solidification, forward and reverse preheating are (initial Soil Temperature Field is nature) and in-service low solidifying oil-piping change and defeated high coagulate oily handoff procedure (initial soil temperature field is Low solidifying oil-piping operation Steady-State Thermal Field) three kinds of different thermodynamic computing patterns., can be right for three kinds of thermodynamic computing patterns Pipeline completely (allows heat stations, pumping plant not to combine cloth station), and crude oil temperature is distributed, frictional resistance and pipeline Soil Temperature Field carry out one Bodyization calculates.Scheduled shut-down or accident stopping transportation for the in-pipe inspection robot stage, can be to the temperature drop of pipeline all fronts crude oil, pipeline week Enclose the soil moisture to be calculated with the change of shutdown time, and restart safety evaluatio with what this carried out pipeline, can to Surely pipeline under mode (constant flow is restarted, constant pressure is restarted and restarts according to pump characteristic curve) is restarted along linear flow rate The related process parameters such as recovery situation, crude oil temperature, pressure change and the change of pipeline Soil Temperature Field are predicted.
(2) result of calculation exports
User can carry out the output of data file to software result of calculation according to being actually needed.The output text of software support Part has:Medium temperature distribution along any time pipeline, along pipeline in the pipe of optional position medium mean temperature with the time change Change, the soil monitoring point temperature of optional position changes with time along pipeline, arbitrary section is at any time along pipeline Underground temperature field, and pipeline is under any operating mode after stopping transportation, restart process piping along line pressure, flow and temperature at any time Between change.
(3) result of calculation graphic software platform
To show result of calculation, form is more directly perceived, and software can be to pipeline normal operation, all fronts of preheating finish time Medium temperature distribution, frictional resistance are patterned display.In addition, to grasp soil thermal storage rule and aiding in carrying out safety evaluatio, Software is reproduced to the partial function of the softwares of Tecplot 9.0, can be shown along any time pipeline at arbitrary section Underground temperature field.
3.2 software design and development:
To realize above-mentioned software function, normal conveying operating mode, stopping transportation operating mode according to Fig. 2 .1 to Fig. 2 .3 and open again The calculation flow chart of dynamic safety evaluation, is developed modular《Crude oil pipeline preheats operation thermodynamic computing software》, mainly include Installation interface, main interface, basic parameter input, Work condition analogue and result of calculation output and five modules of graphic software platform.
(1) installation interface
Double-click " crude oil pipeline preheats operation thermodynamic computing software installation procedure .exe " files, selects software installation position, Installed according to prompting.
(2) main interface
After the completion of software installation, by double-clicking " the crude oil pipeline preheating operation thermodynamic computing software .exe " under installation directory Executable file, you can logged in.After input meets the username and password of mandate, you can into software main interface.Software Main interface on share 5 title bars, correspond to the difference in functionality of software respectively, i.e., " file (F) ", " calculating parameter set (E) ", " numerical simulation (V) ", " display pattern option (T) " and " helping (H) ".In software running process, the operation of each submodule is held After the completion of row, software main interface can be all returned to, then other operations are performed by the menu setecting in main interface.
(3) basic parameter input
" calculating parameter sets (E) " in main interface is clicked, drop-down menu occurs, selection " calculates type and sets (L) ", i.e., The calculating type selection interface shown in Fig. 2 .4 can be jumped to, according to technique needs, selection " forward direction preheating ", " forward and reverse preheating " (reverse preheating is considered as to the special case of forward and reverse preheating, its positive preheating time is zero) or " in-service low solidifying oil-piping changes defeated Gao Ning Oil ".If need to carry out pipeline restarts safety evaluation, " carry out safety evaluatio " check box is chosen, and combines actual condition, is selected Select " constant flow is restarted ", " constant pressure is restarted " or " considering that pump characteristic curve is restarted ", click OK.Now, calculate Type selection interface will be hidden, while return to software main interface.
" calculating parameter sets (E) " in main interface is clicked, drop-down menu, selection " basic parameter sets (B) ", bullet occurs Go out the interface as shown in Fig. 2 .5, as requested input station number.Wherein, pumping plant number, heat stations number and heated pump station number are required to individually defeated Enter, and think that the terminal under single mode of movement is not belonging to the station of any type.Software is by according to calculating type selecting As a result, selectively show or hide " reverse pumping ", " stopping transportation " label and text box.Software will provide the suggestion of material calculation Value, the value can be also adjusted according to actual condition.After above- mentioned information inputs, click OK, complete basic parameter and set Put, interface will jump back to software main interface.
Newly-built buried heated pipeline open defeated process or in-service low solidifying oil-piping changes the defeated high handoff procedure for coagulating oil and will all related to And the sequentially-fed problem to two media (pumped (conveying) medium, pre- thermal medium) in pipe, it is therefore desirable to the thing of each medium Property is inputted respectively." calculating parameter sets (E) " in main interface is clicked, drop-down menu occurs, selects " pipe flow medium parameter Set (O) ", eject the interface as shown in Fig. 2 .6.For the convenience of the user, the physical property of the conventional oil product in part is solidificated in software by software In, " selecting existing medium " is clicked during calling, and is selected from Media Lists;Not carrying out the oil product of parameter solidification can pass through " oil quality characteristic fitting ", oil product specific heat, consistency coefficient and rheological behavior index are fitted according to experimental data, and are cured to In software, directly it can be chosen when reusing from " selecting existing medium ".After selection, click on " application " and " true It is fixed " exit interface parameter setting.Complete basic parameter to set, interface will jump back to software main interface.
, can be to each by clicking in main interface " parameter setting (D) between standing " in " calculating parameter sets (E) " drop-down menu Soils physical parameters, ambient parameter and pipe parameter between individual station are configured (as shown in Fig. 2 .7).Software will be according to " basic Number between the pumping plant number, heat stations number and the heated pump station number Auto-matching that are inputted in parameter setting " are outbound.Carrying out parameter input When, between a certain station in " list between standing " need to be chosen first, the type of inception point between the station is then selected, sequentially inputs soil thing Property parameter, ambient parameter and pipe parameter.Change defeated high solidifying oil if pipeline is in-service low solidifying oil-piping, and need to consider bitumen layer and " considering bitumen layer and wax deposition layer " check box during wax deposition layer, is chosen, inputs relevant parameter.In addition, each physical quantity should be scaled to it is soft Listed unit in part interface text.After the completion of being inputted between single station, " application " button should be clicked on, then between station in list Select to be inputted between other stations, after input finishes between all stations, click on " it is determined that " parameter setting interface between station is exited, return to Software main interface.
(4) Work condition analogue
Calculate needed for parameters input finish and confirm it is errorless after, click on " numerical simulation (V) " drop-down menu in " starting to calculate (C) ", software calculates the Fortran programs of kernel by calling, to Soil Temperature Field along the line, medium temperature and frictional resistance Calculated.After calculating terminates, by display zero-computing time, end time and program runtime.
(5) result of calculation output and graphic software platform
After calculating terminates, software will can be situated between in the medium temperature distribution along some predetermined time pipelines, specified location pipe Matter temperature changes with time, specified location pipeline soil monitoring point temperature changes with time and some specified cross-sections Soil Temperature Field automatically saves can be as needed using Origin softwares or the softwares of Tecplot 9.0 to it for DAT files, user It is patterned display and subsequent treatment.In addition, this software also the partial functions of the softwares of Tecplot 9.0 reproduce with Solidification.
" oil temperature change curve (T) along the line " clicked in " numerical simulation (V) " drop-down menu can be opened shown in Fig. 2 .8 The display interface of medium temperature distribution along the line.Can be chosen according to the content of required display " just defeated at the end of along oil temperature distribution ", " oil temperature distribution along at the end of reverse pumping ", " oil temperature distribution along at the end of stopping transportation " or " oil temperature distribution along at the end of restarting " One or more of check box, medium temperature along corresponding can be drawn out by clicking " display ".Clicking on " removing " can remove The rendered all figures of Drawing zone, click on " exiting " can exit along medium temperature distribution display interface.
Fig. 2 .9 show pipeline section Soil Temperature Field display interface, by clicking in " numerical simulation (V) " drop-down menu " Soil Temperature Field (A) " interface can be entered.First according to the content of required display, left side " grid ", " isothermal are chosen One or more of line " or " shimming " check box, click the pipeline soil moisture of " display " exportable specified location Distribution, the rendered all figures of Drawing zone can be removed by clicking on " removing ", and clicking on " exiting " can exit conduit section soil temperature Spend field display interface.
Above-mentioned software is done below and verified:
The real data during Niger A Jiademu crude oil pipelines engineering is gone into operation is chosen herein to institute's making software Accuracy is verified with applicability.
Xia Mian Dui A Jiademu crude oil pipeline operation overviews, which are done, to be introduced:
Niger A Jiademu crude oil pipelines design throughput is 100 × 104t/a, design pressure 10MPa, total track length About 462.5km, caliber 323.9mm, the selection of pipe API 5L X52 HFW steel pipes, using buried-pipe laying, the outer anti-corrosion of pipeline is adopted With high temperature modification 3PE (3 strata ethene), highest out-station temperature is no more than 70 DEG C.
The pipeline of table 3.1 and ambient parameter
Soil thermal conductivity along the pipeline of table 3.2
The crude oil basic physical properties parameter of table 3.3
The in-pipe inspection robot scheme of table 3.4
Pipeline using a pump on earth, heated transportation technique.If Goumeri initial stations, Tianjin Dare terminal and 5 intermediate heating stations (2#, 4# band pigging function), 6 manual block valve for pipeline, 7 cathodic protection stations (all being built jointly with yard).Initial station be located at Ah The central processing station (CPF) in Judd's nurse oil field, terminal are located at Tianjin Dare refinery southern side.
Total institute is planned to CNPC《The Niger's one phase in-pipe inspection robot solution process calculated description》, CZL co-design bodies《Buddhist nun Er A Judd's nurse crude oil pipeline engineering Preliminary designs》And after the technological parameter being related in document is collected, arranged, it can obtain Soil thermal conductivity along to the pipeline as shown in table 3.1 to table 3.4 and ambient parameter, pipeline, crude oil basic physical properties parameter and In-pipe inspection robot scheme, and as calculating parameter, the first round is forward and reverse during being gone into operation to Niger's A Jiademu crude oil pipelines Preheating carries out numerical simulation calculation, and result of calculation and measurement data are contrasted, so as to test the software worked out Card.
The contrast of 3.3 result of calculations and measurement data
Using establishment《Crude oil pipeline preheats operation thermodynamic computing software》, Niger A Jiademu described herein above is former Real data during oil-piping engineering is gone into operation is calculating parameter, can obtain positive preheating and reversely preheating finish time pipe Oil temperature distribution along road.Wherein, each station enter the station locate oil temperature calculated value and measured value to such as shown in table 3.5.It can see Go out, the maximum deviation of calculated value and measured value is 3.5 DEG C, and average deviation is 1.52 DEG C, considers the inclined of parameters measurement Difference and requirement of engineering precision, it is believed that the calculating deviation of software is in the range of engineering permission.
The inlet temperature calculated value of table 3.5 contrasts with measured value
Forward direction preheating and the oil temperature reversely preheated along finish time pipeline are distributed as shown in Fig. 2 .10 and Fig. 2 .11, from figure In as can be seen that due to when newly-built buried heated pipeline is gone into operation pipeline soil be nature ground temperature, the outbound temperature drop afterwards of deep fat is fast Rate is larger, and oil head is often just to be down to ground temperature before entering the station;With the gradual accumulation of heat of the soil of oil stream upstream, place of being entered the station between each station Oil temperature starts to gradually rise.After reverse warm starts, the cold oil of second half section will be by deep fat head opposite direction between former stand Promote, but because its temperature difference between soil is smaller, temperature drop amplitude is also smaller.If cold oil is pushed to front half section between former station, It is possible to absorb heat from soil, will be unable to play a part of preheating soil.Therefore, should be by imitative during Practical Project is gone into operation It is true to calculate to draw rational positive preheating time and reverse preheating time.
Fig. 2 .12 give the underground temperature field of positive preheating and reversely preheating finish time pipeline starting point and end point, right Than (b) and (d) as can be seen that during positive preheating, because preheating time is shorter, crude oil inlet temperature access expansion ground temperature, pipe Road end point oil stream is less to the heat of surrounding soil transmission, and soil thermal storage amount is also smaller, pre-heat effect unobvious;Reversely preheating When, because pipeline end point is now changed into exit, crude oil temperature is higher, and oil stream is more to surrounding soil liberated heat, soil Amount of stored heat is larger, and pre-heat effect is obvious.Although contrast (a) and (c) as can be seen that reversely preheating when pipeline start position be changed into Exit, inlet temperature constantly reduce, but because reverse preheating time is shorter, the oil stream temperature for reaching pipeline starting point is still notable Higher than the soil moisture, oil stream still transmits heat to surrounding soil so that soil thermal storage amount increases.If reverse preheating time compared with Long, the cold oil of second half section is pushed to front half section between former station between original station, it is likely that is absorbed heat from soil, causes pipeline accumulation of heat on the contrary Amount reduces.
In summary:Above-mentioned technical proposal pair《Crude oil pipeline preheats operation thermodynamic computing software》Major function, part Development process and application method are described, and choose the reality during Niger A Jiademu crude oil pipelines engineering is gone into operation Data are verified to the accuracy of institute's making software with applicability.As a result show, software calculated value and field measurement value Maximum deviation is 3.5 DEG C, and average deviation is 1.52 DEG C, after the deviation and requirement of engineering precision that consider each term coefficient measurement, Think the calculating deviation of software in the range of engineering permission.Meanwhile found during the analysis to verifying example, technique ginseng Several selections will significantly affect pre-heat effect.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (1)

1. a kind of crude oil pipeline preheats operation thermal procession emulation mode, it is characterised in that comprises the following steps:
Preheating method selection and safety evaluatio are configured;
Input pipe parameter, medium and soil physical factors between each station;
Import and calculate grid;
Calculating parameter initialize and utilize Finite Volume Method for Air and finite difference calculus calculate Soil Temperature Field, computer tube stream and soil it Between heat exchange amount, thermodynamic features collimation method solve pipe flow medium relevant parameter;Obtain temperature, the pressure of the latter node of pipeline section;
Determine each node operational factor along pipeline;
Preheating safety evaluatio simultaneously exports to result;
Also comprise the following steps:
Stopping transportation initializes;
Areas of dielectric mesh generation in pipe;
Judge that boundary position whether there is free convection;
If so, equivalent heat conductivity is then calculated, and to medium temperature in pipe and soil moisture couple solution;It is if it is not, then directly right Medium temperature and soil moisture couple solution in pipe;
Shutdown time is judged, and exports the result of calculation of stopping transportation;
Also comprise the following steps:
Restart safety evaluation initialization;
Mesh generation is carried out to medium mobile grid in pipe and carries out water force;
Mesh generation is carried out to pipeline and its surrounding soil fixed mesh and carries out thermodynamic computing;
Determine parameter interpolation between grid;
Each node operational factor is determined, is judged restarting the time, and exports the result of calculation restarted.
CN201410386614.8A 2014-08-07 2014-08-07 Crude oil pipeline preheats operation thermal procession emulation mode Active CN104123425B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410386614.8A CN104123425B (en) 2014-08-07 2014-08-07 Crude oil pipeline preheats operation thermal procession emulation mode

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410386614.8A CN104123425B (en) 2014-08-07 2014-08-07 Crude oil pipeline preheats operation thermal procession emulation mode

Publications (2)

Publication Number Publication Date
CN104123425A CN104123425A (en) 2014-10-29
CN104123425B true CN104123425B (en) 2017-12-08

Family

ID=51768836

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410386614.8A Active CN104123425B (en) 2014-08-07 2014-08-07 Crude oil pipeline preheats operation thermal procession emulation mode

Country Status (1)

Country Link
CN (1) CN104123425B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105042627A (en) * 2015-07-24 2015-11-11 中国石油化工股份有限公司 Closed-loop regulation method and system for gas consumption of heating furnace of transfer station
CN105956340B (en) * 2016-06-20 2019-08-30 广东电网有限责任公司电力科学研究院 A kind of the geometrical model construction method and system of power transformer

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103136701A (en) * 2011-11-25 2013-06-05 中国石油天然气股份有限公司 Method for quantitatively evaluating pipe condensation probability of crude oil pipeline

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ITMI20041480A1 (en) * 2004-07-22 2004-10-22 Eni Spa PROCEDURE TO REDUCE THE RESTART PRESSURE OF SELECTED CURRENTS BETWEEN WAXY CRUDES, EMULSIONS OF CRUDE WATER AND HYDROCARBON HYDRATES DISPERSIONS AND METHOD FOR MEASURING THE PROFILE OF THE INTERNAL DIAMETER OF A PIPE AND THE INSTANT VISCOSITY
CN201866534U (en) * 2010-10-19 2011-06-15 中国石油天然气勘探开发公司 Pipeline conveying stop and restart test device
FR2976670B1 (en) * 2011-06-17 2013-06-28 IFP Energies Nouvelles METHOD FOR RESTARTING PARAFFINIC CRUDE FLOWS.

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103136701A (en) * 2011-11-25 2013-06-05 中国石油天然气股份有限公司 Method for quantitatively evaluating pipe condensation probability of crude oil pipeline

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
冷热原油交替输送停输再启动研究;宇波等;《油气储运》;20091130;第28卷(第11期);第4-16页 *
埋地原油管道降温特性的大型环道试验研究;王龙;《中国优秀硕士学位论文全文数据库 工程科技Ⅰ辑》;20110415;第B019-309页 *
输油管道非稳态热力、水力过程研究及应用;路长友;《中国优秀硕士学位论文全文数据库 工程科技I辑》;20100415;第B019-360页 *

Also Published As

Publication number Publication date
CN104123425A (en) 2014-10-29

Similar Documents

Publication Publication Date Title
Fan et al. A transient composition tracking method for natural gas pipe networks
CN107886182B (en) Optimal design method and device for oil field gathering and transportation system
CN104808634B (en) A kind of thermal power plant's Visualized management system based on virtual reality
CN103380424B (en) For at the system and method using artificial neural network to simulate pipeline hydraulics in reservoir simulation
CN103136701B (en) Pipe condensation probability of crude oil pipeline method for quantitatively evaluating
CN101427006B (en) Process for extracting liquid hydrocarbon from underground reservoir
Mechleri et al. CO2 capture and storage (CCS) cost reduction via infrastructure right-sizing
CN104123425B (en) Crude oil pipeline preheats operation thermal procession emulation mode
He et al. A framework of smart pipeline system and its application on multiproduct pipeline leakage handling
Hermansson et al. An automated approach to building and simulating dynamic district heating networks
Enemark-Rasmussen et al. A simulation based engineering method to support HAZOP studies
Zhao et al. Optimization of energy saving gathering and transportation mode in a block of Tahe oilfield
CN110174237A (en) The experiment porch of fluid state in a kind of measurement oil pipe
Xie et al. Wax deposition law and OLGA-Based prediction method for multiphase flow in submarine pipelines
Rüger et al. Online leakage attribution to exclusion areas prototype application
Diaz-Bejarano et al. Enhancing the flexibility of pipeline infrastructure to cope with heavy oils: Incremental thermal retrofit
Zhu et al. Simulation analysis of thermal influential factors on crude oil temperature when double pipelines are laid in one ditch
Wei et al. Research and application on the gathering and transportation radius chart of multi-phase pipelines in high water cut stage
CN104850708A (en) Non-steady state characteristic analysis method for fiberglass pipeline transportation system temperature field
CN109871568B (en) Heat exhausting and ventilating design method for comprehensive pipe rack considering wall heat transfer
CN104102852A (en) Computing method of preheating commissioning thermodynamic process of crude oil pipeline
García-Gutiérrez et al. Development of a numerical hydraulic model of the Los Azufres steam pipeline network
CN104199804A (en) Flow failure mode judgment method of underground heat oil pipe in high-water-content soil
CN102305057B (en) Layered steam injection simulation test system and working method thereof
Zhou et al. Research on the initial state and safety of pipeline shutdown in crude oil forward and reverse transportation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant