CN104120656A - Method for automatically controlling bridge high pier construction perpendicularity - Google Patents

Method for automatically controlling bridge high pier construction perpendicularity Download PDF

Info

Publication number
CN104120656A
CN104120656A CN201410368592.2A CN201410368592A CN104120656A CN 104120656 A CN104120656 A CN 104120656A CN 201410368592 A CN201410368592 A CN 201410368592A CN 104120656 A CN104120656 A CN 104120656A
Authority
CN
China
Prior art keywords
template
pier
laser
concrete
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410368592.2A
Other languages
Chinese (zh)
Other versions
CN104120656B (en
Inventor
张久林
崔昌洪
田世宽
韦健江
尹波
张强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Original Assignee
Fourth Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Engineering Co Ltd of CCCC First Highway Engineering Co Ltd filed Critical Fourth Engineering Co Ltd of CCCC First Highway Engineering Co Ltd
Priority to CN201410368592.2A priority Critical patent/CN104120656B/en
Publication of CN104120656A publication Critical patent/CN104120656A/en
Application granted granted Critical
Publication of CN104120656B publication Critical patent/CN104120656B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a method for automatically controlling bridge high pier construction perpendicularity. A plumb aligner control device is used, after concrete is poured to one section of a pier body, the deviation situation of a formed concrete pier body is detected, a laser plumb aligner is installed, a vertical line is provided when a next formwork is corrected, the formwork is accurately corrected, operation control is conducted in this way in a reciprocating mode until a pier column is constructed. By means of the method for bridge high pier perpendicularity construction, based on the principle that upward laser rays of the laser plumb aligner are parallel to the pier body, the deviation situation of the formwork can be clearly and visually observed through a top end formwork laser target; due to protective measures, instruments do not need to be erected multiple times in a whole high pier construction project, operating errors of the instruments are reduced, observation can be achieved at any time every day, labor intensity of measurement personnel and the number of staff are reduced, and meanwhile construction progress and pier body perpendicularity quality are guaranteed.

Description

Bridge High-pier construction verticality autocontrol method
Technical field
Wataru of the present invention and a kind of method for bridge construction, especially a kind of Bridge High-pier construction verticality autocontrol method .
Background technology
Traditional Bridge High-pier construction method mainly contains turns over mould, creeping formwork, sliding formwork, Support Method and up-to-date roller die construction etc., along with speedway and high-speed railway gradually to mountain area, the continuous propelling of remote mountains area, particularly the regional execution conditions such as Tibet, Guizhou, Sichuan, Guangxi, Yunnan, Chongqing are more and more arduous, geological conditions becomes increasingly complex, and land economic development passage must be got through in these areas, bring many-sided impact, the impact that wherein one of importance causes high pier construction exactly so just to complex area bridge construction.The control of high pier verticality is loaded down with trivial details work of the high pier of survey crew control always, and the control of traditional high pier verticality generally adopts messenger wire cone method, total powerstation observation method, traditional plumb aligner method.
Ceiling hammer method: hang the plumb bob of heavy 15~25kg on working platform with iron wire corresponding to pier shaft central point or four jiaos of predetermined points, iron wire is on little larry, with climbing, with unwrapping wire.By the deviation of observation plumb bob and central point or predetermined point, measure pier shaft off-centring and torsion degree.As strong wind weather, plumb bob ball can be placed in to water or oil waves to reduce, although messenger wire cone method simple, intuitive, current high pier is more than 60 meters mostly, have more than 100 meters, because line cone is exposed to former Yezhong, our high pier construction region is generally in mountain valley or river valley, and the higher wind-force of pier shaft is larger, larger on the impact of line cone, precision cannot ensure continuous construction, and therefore this method is only suitable for low pier or householder method control.
Total powerstation observation: utilize total powerstation, drawing corresponding punctuate according to set control point, ground and template measures, calculate skew and the torsion at pier shaft center according to corresponding points drift condition in template, also be because mountain area Gao Dun is more and more higher, bring heavy measurement task to survey crew, when high pier template Installation and Debugging, need survey crew to set up prism repeated measures, sometimes during because of template deformation or other reason adjustment template, need several hours or tens hours, need measurement to put repeatedly upper and lower pier shaft of mirror personnel, and it is larger to measure observation difficulty evening, therefore this method is only suitable for daytime or detects other method precision.
Tradition plumb aligner observation method: at the added frame of keeping a foothold of cushion cap, plumb aligner is installed, open downward Emission Lasers bundle button, downward firing button is closed in alignment position afterwards accurate leveling plumb aligner, open upwards Emission Lasers bundle button, regulate objective focal length, make laser beam on target, form the luminous point of diameter 1 mm, first standing in top layer turns on mould platform, from template angle, draw invar tape along the extended line of template inward flange, a line of laser target central cross line is overlapped with the 50cm graduation mark of invar tape, hold up flat laser target, laser target plane and template are pushed up in same level, measure distance the record of laser spots apart from 50cm graduation mark with another invar tape.Measure successively the deviate of 4 points of pier shaft, establishing criteria judges that whether 4 angle point plan-positions of template are qualified, if there is a some deviate to be above standard, needs to readjust template, reexamines.
Along with improvement and the optimization of high pier construction technology; high pier construction progress is more and more faster; traditional high pier construction progress completed 0.6-1.0 meters every day in the past, used now sliding formwork or roller die can complete 3 every day---the construction speed of 6 meters, and need uninterrupted construction 24 hours every days.
Owner requires construction speed more and more faster now, substantially each work plane is that multiple high piers are simultaneously in construction, surveying work amount is corresponding just larger, enough survey crews must be equipped with and construction needs could be met, and while adjusting template, all by day, survey crew will be observed several high pier control simultaneously, and this brings extensive work amount and data processing difficulty to survey crew, sometimes when data are adjusted in explanation, easily cause a deviation, conventional approach cannot meet present construction method and construction speed.
Summary of the invention
The object of this invention is to provide a kind of Bridge High-pier construction verticality autocontrol method ,for accelerating Bridge High-pier construction speed, improve pier shaft verticality quality, and be project creation profit margin.
The technical scheme that Bian of the present invention gets:
Use plumb aligner control device, after pier shaft one saves concreting and completes, detect concrete pier shaft off normal situation after moulding, laser plummet is installed, and in the time that next mould template is corrected, providing the directrix of hanging down accurately to correct template, operation control and so forth, until this pier stud has been constructed.
Concrete construction method step is as follows:
(1) while, processing high pier rack template in template producer, reserve and install verticality control device: at the cutting of corresponding plumb aligner laser target installation site, template diagonal angle or welding laser plummet laser target hole, when two-layer template or multilayer template, to, according to vertical principle reserving hole simultaneously, after installing laser target, template top layer appear on the scene;
(2), laser plummet transformation processing wireless remote controller;
(3), pre-buried when cushion cap concreting: building before concrete according to template laser target to the pre-buried plumb aligner base of concrete pier shaft relative position, and base pre-buried power pipe to cushion cap;
(4), use first: generally plumb aligner cannot be installed when concreting first, first adopt the first joint of conventional method control pier body formwork verticality;
(5), pier shaft control: template is installed plumb aligner after promoting first, rear installation protector, debugging wireless remote-control system, detect pier shaft concrete off normal situation, projection plumb aligner laser vertical line arrives and receives laser target, plane positioning standard baseline when control template promotes, according to laser in the direct interpretation template of laser target off normal situation off normal value, be adjusted to and carry out concrete behind tram and build, in casting process, observe off normal change simultaneously, repeat template and rise, build concrete working procedure until to design elevation.
Advantage of the present invention:
Use the inventive method to carry out the construction of Bridge High-pier verticality, by upwards laser rays principle parallel with pier shaft of laser plummet, can clear and intuitive observation template off normal situation at top template laser target.Because there are safeguard procedures, in whole high pier construction engineering, without repeatedly setting up instrument, reduce instrumentation error, can observe 24 hours every days, reduce survey crew labour intensity and personnel amount, ensured construction speed and pier shaft verticality quality simultaneously.
Brief description of the drawings
Fig. 1 the present invention forms structure floor map under structure.
Fig. 2 the present invention forms structure floor map in structure.
Fig. 3 the present invention forms structure elevational schematic view in structure.
Shown in figure: 1. plumb aligner mounting base, 2. Cast-in-place concrete pier shaft, 3. plumb aligner laser vertical line, 4. high pier rack template, 5. plumb aligner laser target installation site, 6. receives laser target.
Detailed description of the invention
Concrete construction method step is as follows:
(1) laser plummet transformation processing wireless remote controller: buying after laser plummet, buying wireless remote control module and AC power converter, open laser plummet power pack, link to outside instrument with the electric iron source of welding current, be switched to AC power converter by wireless remote control dash receiver control end, wireless remote controlled receiver uses 12-volt dc power supply, 3 volts of the direct currents using by DC decompression to plumb aligner.
(2) template processing unit (plant): cut or weld laser target in plumb aligner laser target installation site 5 according to template drawing in the time of the high pier rack template 4 of processing passage is installed, install and receive laser target 6 in top layer template position.
(3) it is front pre-buried that cushion cap is built concrete: in the time of cushion cap assembling reinforcement and pre-buried pier shaft reinforcing bar, synchronous pre-buried plumb aligner base screw, according to the accurate embedding plumb aligner mounting base 1 in template laser target position, plumb aligner protector, according to the pre-buried fixing reinforcing bar of protective cover, buries the supply of electric power pipeline of position base to cushion cap.
(4) pier construction control: after the concreting of pier shaft first segment completes, laser plummet is installed on base screw, connect AC power, accurately leveling instrument, inspection related device and laser spots, in laser target imaging situation, are brought into use this device after all are errorless, and projection plumb aligner laser vertical line 3 is to receiving laser target 6, can be in the time that construction needs at any time wireless remote control open laser and check pier shaft off normal data, complete the construction of Cast-in-place concrete pier shaft 2 always.

Claims (2)

1. a Bridge High-pier construction verticality control method, it is characterized in that: use plumb aligner control device, after pier shaft one saves concreting and completes, concrete pier shaft off normal situation after detection moulding, laser plummet is installed, and in the time that next mould template is corrected, providing the directrix of hanging down accurately to correct template, operation control and so forth, until this pier stud has been constructed.
2. Bridge High-pier construction verticality control method according to claim 1, is characterized in that concrete construction method step is as follows:
2.1, while processing high pier rack template (4) in template producer, reserve and install verticality control device: at corresponding plumb aligner laser target installation site, template diagonal angle (5) cutting or welding laser plummet laser target hole, when two-layer template or multilayer template, to, according to vertical principle reserving hole simultaneously, install and receive the rear appearance of laser target (6) at template top layer;
2.2, laser plummet transformation processing wireless remote controller;
2.3, pre-buried when cushion cap concreting: building before concrete according to template laser target to the pre-buried plumb aligner mounting base of concrete pier shaft relative position (1), and base pre-buried power pipe to cushion cap;
2.4, use first: generally plumb aligner cannot be installed when concreting first, first adopt the first joint of conventional method control pier body formwork verticality;
2.5, pier shaft control: template is installed plumb aligner after promoting first, rear installation protector, debugging wireless remote-control system, detect pier shaft concrete off normal situation, projection plumb aligner laser vertical line (3) is to receiving laser target (6), plane positioning standard baseline while controlling template lifting, according to laser in the direct interpretation template of laser target off normal situation off normal value, be adjusted to and carry out concrete behind tram and build, in casting process, observe off normal change simultaneously, repeat template and rise, build concrete working procedure until to design elevation.
CN201410368592.2A 2014-07-30 2014-07-30 Method for automatically controlling bridge high pier construction perpendicularity Expired - Fee Related CN104120656B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410368592.2A CN104120656B (en) 2014-07-30 2014-07-30 Method for automatically controlling bridge high pier construction perpendicularity

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410368592.2A CN104120656B (en) 2014-07-30 2014-07-30 Method for automatically controlling bridge high pier construction perpendicularity

Publications (2)

Publication Number Publication Date
CN104120656A true CN104120656A (en) 2014-10-29
CN104120656B CN104120656B (en) 2017-01-18

Family

ID=51766273

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410368592.2A Expired - Fee Related CN104120656B (en) 2014-07-30 2014-07-30 Method for automatically controlling bridge high pier construction perpendicularity

Country Status (1)

Country Link
CN (1) CN104120656B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106192769A (en) * 2016-09-06 2016-12-07 中铁二十四局集团南昌铁路工程有限公司 High pier slding form operation verticality control device and using method thereof
CN106639500A (en) * 2016-12-22 2017-05-10 广西建工集团第建筑工程有限责任公司 One-time slip-form construction method for square variable-section multi-layer platform chimney under high air pressure
CN107328379A (en) * 2017-08-18 2017-11-07 中国二十二冶集团有限公司 Piping lane wall section size detecting method
CN107504962A (en) * 2017-06-29 2017-12-22 中交航局第四工程有限公司 A kind of method using laser plummet apparatus control bridge deck-molding pier stud perpendicularity
CN108221706A (en) * 2018-03-23 2018-06-29 中国五冶集团有限公司 A kind of twin legged thin wall pier overmolded method template and application method
CN108917730A (en) * 2018-05-17 2018-11-30 中国十九冶集团有限公司 Synovial membrane elevation real-time monitoring device and device installation method
CN109373934A (en) * 2018-11-28 2019-02-22 中国建筑第四工程局有限公司 Super-high pier verticality measuring method
CN109610320A (en) * 2018-11-13 2019-04-12 柳州煜乾机械装备股份公司 A kind of band crane slip form construction device and construction method
CN112227213A (en) * 2020-10-16 2021-01-15 中国矿业大学 Prefabricated assembling guiding and positioning method for assembled bent cap and upright post and guide frame
CN114032782A (en) * 2021-12-02 2022-02-11 中铁一局集团有限公司 Pier column reinforcement construction work platform and method
CN115540823A (en) * 2022-11-28 2022-12-30 中国水利水电第七工程局有限公司 Variable-section ultrahigh pier verticality measuring and controlling method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11323843A (en) * 1998-05-15 1999-11-26 Ohbayashi Corp Construction method for steel pipe and concrete composite construction bridge pier
CN101481944A (en) * 2009-01-06 2009-07-15 四川公路桥梁建设集团有限公司 Method for installing reinforcing steel bars in high pier and tower rollover construction and movable support thereof
CN102409617A (en) * 2011-09-21 2012-04-11 天津二十冶建设有限公司 Method for constructing high pier
CN103147403A (en) * 2013-03-29 2013-06-12 中交一公局第四工程有限公司 Roller die construction method for bridge high pier
CN103306206A (en) * 2013-06-13 2013-09-18 浙江金筑交通建设有限公司 Reinforcing steel formwork supporting rack for thin-walled hollow high pier and construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11323843A (en) * 1998-05-15 1999-11-26 Ohbayashi Corp Construction method for steel pipe and concrete composite construction bridge pier
CN101481944A (en) * 2009-01-06 2009-07-15 四川公路桥梁建设集团有限公司 Method for installing reinforcing steel bars in high pier and tower rollover construction and movable support thereof
CN102409617A (en) * 2011-09-21 2012-04-11 天津二十冶建设有限公司 Method for constructing high pier
CN103147403A (en) * 2013-03-29 2013-06-12 中交一公局第四工程有限公司 Roller die construction method for bridge high pier
CN103306206A (en) * 2013-06-13 2013-09-18 浙江金筑交通建设有限公司 Reinforcing steel formwork supporting rack for thin-walled hollow high pier and construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈健: "公路桥梁高墩施工阶段稳定性分析与施工控制技术", 《工程科技Ⅱ辑》 *

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106192769B (en) * 2016-09-06 2018-04-20 中铁二十四局集团南昌铁路工程有限公司 High pier slding form operation verticality control device and its application method
CN106192769A (en) * 2016-09-06 2016-12-07 中铁二十四局集团南昌铁路工程有限公司 High pier slding form operation verticality control device and using method thereof
CN106639500A (en) * 2016-12-22 2017-05-10 广西建工集团第建筑工程有限责任公司 One-time slip-form construction method for square variable-section multi-layer platform chimney under high air pressure
CN106639500B (en) * 2016-12-22 2019-01-11 广西建工集团第一建筑工程有限责任公司 Slding form operation method of square variable-section multilayer platform chimney under high wind pressure
CN107504962A (en) * 2017-06-29 2017-12-22 中交航局第四工程有限公司 A kind of method using laser plummet apparatus control bridge deck-molding pier stud perpendicularity
CN107328379A (en) * 2017-08-18 2017-11-07 中国二十二冶集团有限公司 Piping lane wall section size detecting method
CN108221706B (en) * 2018-03-23 2023-04-14 中国五冶集团有限公司 Double-limb thin-wall pier turnover formwork and using method
CN108221706A (en) * 2018-03-23 2018-06-29 中国五冶集团有限公司 A kind of twin legged thin wall pier overmolded method template and application method
CN108917730A (en) * 2018-05-17 2018-11-30 中国十九冶集团有限公司 Synovial membrane elevation real-time monitoring device and device installation method
CN109610320A (en) * 2018-11-13 2019-04-12 柳州煜乾机械装备股份公司 A kind of band crane slip form construction device and construction method
CN109373934A (en) * 2018-11-28 2019-02-22 中国建筑第四工程局有限公司 Super-high pier verticality measuring method
CN112227213A (en) * 2020-10-16 2021-01-15 中国矿业大学 Prefabricated assembling guiding and positioning method for assembled bent cap and upright post and guide frame
CN114032782A (en) * 2021-12-02 2022-02-11 中铁一局集团有限公司 Pier column reinforcement construction work platform and method
CN115540823A (en) * 2022-11-28 2022-12-30 中国水利水电第七工程局有限公司 Variable-section ultrahigh pier verticality measuring and controlling method
CN115540823B (en) * 2022-11-28 2023-03-10 中国水利水电第七工程局有限公司 Method for measuring and controlling vertical degree of variable-section ultrahigh pier

Also Published As

Publication number Publication date
CN104120656B (en) 2017-01-18

Similar Documents

Publication Publication Date Title
CN104120656A (en) Method for automatically controlling bridge high pier construction perpendicularity
CN102828470B (en) Method for locating main girder cable sleeve of cable-stayed bridge
CN104328799B (en) A kind of sheltered reverse excavation subway station steel pipe column accurate positioning method
CN102251478B (en) Control method for synchronous construction survey of pylons and beams of cable-stayed bridge
CN106123776B (en) A kind of push pipe intelligence jacking measuring system and measurement method
CN106638318B (en) The localization method and cable guide pipe installation method of cable-stayed bridge beam-ends anchor point
CN102778226B (en) Calibration method for waist line of underground long-distance tunnel
CN109443327A (en) A kind of distribution method of SURVEYING CONTROL NETWORK
CN110646159A (en) Construction method for high-precision control and measurement of cast-in-place bare concrete wind tunnel
CN106192769A (en) High pier slding form operation verticality control device and using method thereof
CN204059200U (en) Bridge High-pier construction verticality automatic control structure
CN105973141A (en) Device and method of measuring shield tunnel segment dislocation
CN105865416A (en) Leveling rod suspended leveling method for settlement monitoring
CN102966041A (en) Spatial stay-cable positioning method of multispan continuous S-shaped landscape bridge
CN104674860B (en) Wire holing through survey method in seabed tunnel
CN204881624U (en) Super high -rise building core section of thick bamboo template location survey controlling means
CN204286435U (en) Verticality ACTIVE CONTROL warning device
CN107238377B (en) A kind of measurement method suitable for large underground hole speedy lofting bolthole position
CN206562667U (en) A kind of quick pedestal anchor bolt structure in place
CN115387221A (en) High pier line type control method for high altitude area
CN106017444A (en) Independent monitoring method for construction verticality of super-high building
CN109341675A (en) A kind of development machine three dimension location case, system and localization method
CN102966254A (en) Measuring tower used for construction of stub matching method and arrangement thereof
CN110241735B (en) Positioning and adjusting device and method for main tower cable guide pipe of cable-stayed bridge
CN104006798B (en) Pier stud verticality measuring instrument

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170118

Termination date: 20210730

CF01 Termination of patent right due to non-payment of annual fee