CN104113083A - New energy access and energy storage coordination control method under high permeability - Google Patents

New energy access and energy storage coordination control method under high permeability Download PDF

Info

Publication number
CN104113083A
CN104113083A CN201410345052.2A CN201410345052A CN104113083A CN 104113083 A CN104113083 A CN 104113083A CN 201410345052 A CN201410345052 A CN 201410345052A CN 104113083 A CN104113083 A CN 104113083A
Authority
CN
China
Prior art keywords
energy
scada
station
new energy
phase
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410345052.2A
Other languages
Chinese (zh)
Other versions
CN104113083B (en
Inventor
谢三军
陈燕东
胡海梅
衷莉兰
黄志强
熊志凌
王芬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410345052.2A priority Critical patent/CN104113083B/en
Publication of CN104113083A publication Critical patent/CN104113083A/en
Application granted granted Critical
Publication of CN104113083B publication Critical patent/CN104113083B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin

Landscapes

  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

Disclosed is a new energy access and energy storage coordination control method under high permeability. According to the method, a supervisory control and data acquisition (SCADA) system is used as a control center, and performs mutual communication with an electric vehicle charging station and a telecontrol station of a new energy power supply point, starting and stopping orders of a new energy power generating system are given by the SCADA system, and new energy access and energy storage coordination control can be achieved. A smallest system for implementing the method comprises an electric vehicle charging system in the electric vehicle charging station, a new energy power supply system and the SCADA system. According to the new energy access and energy storage coordination control method under the high permeability, as for grid connection of a random intermittent new energy power supply system, real-time balance of new energy output and adjustable loads can be achieved and the influence of the new energy grid connection on a public power grid can be greatly reduced on one hand; according to the random intermittent new energy grid-connection power supply scheme, isolated power can be provided for each area of a city in an emergency condition; ideally, power of electric vehicles of the city can be provided by new energy in terms of most of consumed energy, consumption of fossil energy can be reduced, and urban air pollution can be reduced.

Description

New forms of energy access and energy reserve control method for coordinating under a kind of high permeability
Technical field
The present invention relates to new forms of energy access and energy reserve control method for coordinating under a kind of high permeability, belong to new-energy grid-connected technical field.
Background technology
The world today, the non-renewable energy resources such as coal, oil signal for help repeatedly, and global warming issue is day by day serious, and energy problem becomes the bottleneck of restriction international community economic development day by day, exploitation Renewable Energy Resources, and utilize and become problem demanding prompt solution on a large scale.
One of core bottleneck problem of the grid-connected power supply of regenerative resource is, existing most of regenerative resource power supply adopts maximal power tracing control as wind power generation and ground photovoltaic power supply, and it is exerted oneself and all has random intervals characteristic.Large-scale photovoltaic or the grid-connected power supply of wind-force will cause exert oneself non-scheduling or be difficult for scheduling of electric network source.This will make power supply exert oneself not match with loading, cause the unstable or even more serious mains breakdown consequence of mains frequency under extreme case.
Summary of the invention
The object of the invention is, make network load and power supply mismatch problem according to the grid-connected form of existing regenerative resource, new forms of energy access and energy reserve control method for coordinating under a kind of high permeability are proposed, new forms of energy are exerted oneself and deferrable load Real-time Balancing, significantly reduce the impact that new-energy grid-connected brings utility network, and under the state of emergency (affecting under mains supply situation as war and ice damage), can be city isolated supply of electric power is provided.
Technical scheme of the present invention is that this method is taking SCADA system as control centre, with the mutual communication in telemechanical station of electric automobile charging station and new energy point; The open and close order of grid-connected power generation system is provided by SCADA system, realizes the coordination control with energy reserve to new forms of energy access.
The inventive method is implemented required minimum system and is comprised an electric automobile in electric automobile charging station and change charging system, new energy system (as wind power generation or photovoltaic generation) and SCADA (coordinate control centre) system.Described new energy system comprises the single-phase or three-phase mixed power supply system of photovoltaic, wind-force new forms of energy.Change in charging system at described electric automobile, comprise the single-phase and three-phase energy storage device charging system that super capacitor or storage battery form.
Described electric automobile charging station changes charging system and at least includes one and change to fill and control computer platform, several single-phase or three-phase super capacitor or storage battery and change charging system; Described changing filled the several single-phase or three-phase super capacitors of master control computer platform control or storage battery changes charging system absorbed power value or Absorption Current value in real time.
Change to fill at electric automobile charging station and control platform while judging that energy storage device needs energy storage,, to SCADA system, SCADA system is included this energy storage device in energy reserve coordination system to send energy storage signal (as needed the signal of energy storage and treating the capacity of needs storage); Control platform while judge that energy storage device energy storage completes changing to fill, send and stop filling signal to SCADA system, this energy storage device is separated energy reserve coordination system by SCADA system.
Opening when grid-connected power generation system, described three-phase grid-connected power generation system, by online ammeter, is sent to SCADA system by various communication modes by power or current instruction value, then is aggregated into region domestic demand by SCADA system and receives total new forms of energy power; Then performance number need being stored is dispensed to each in energy reserve coordination system and changes and fill station.Change and fill the energy value that station need to store and determine that each changes the apportioning cost of filling station according to each.Described in the control of Zai Youhuanchong district computer control platform, three-phase super capacitor or storage battery change charging system and receive new energy resources system to exert oneself completely.Simultaneously according to the scale that fills amount of capacity and energy storage device number and how much determine to open new forms of energy that changes that in real time can storage capacity in electrical network.
The inventive method specifically coordinates to control step:
(1) change charging system to super capacitor or storage battery and change storage battery to be charged or super capacitor;
(2) super capacitor or storage battery change charging system after replacing storage battery to be charged or super capacitor, change to fill and control platform and send and need energy storage information (as needed the signal of energy storage and treating the capacity of needs storage) to SCADA, after SCADA system reception information, included in energy reserve coordinated control system;
(3) SCADA system is sent performance number by the new forms of energy of being known by online ammeter and various communication modes and is gathered, and the performance number then need being stored is dispensed to each in energy reserve coordination system and changes and fill station; Change and fill the energy value that station need to store and determine that each changes the apportioning cost of filling station according to each; Meanwhile, SCADA also by according to energy storage device number and the real-time storable grid-connected power generation system of filling amount of capacity and determine whether to open or close some of changing;
SCADA system call meets the following conditions:
(1) p jreferring to that j changes fills the stores power value of distributing at station.P is that in SCADA system, new forms of energy send performance number and gather value.C jbe that individual the changing of j filled the performance number that station need to be stored. change and fill station and need stored energy for all under this SCADA system.
(2) σ is that the power being obtained by engineering experience limits with the ratio of total absorptive capacity.
(4) filling station and control platform while judge that energy storage device energy storage completes changing, request being stopped filling order and inform SCADA system, SCADA is accepting after this information, is departed from energy coordination deposit system, stops its charging.
(5) if judge, network load is extremely heavy, and SCADA controls minimizing charging station and changes active power that charging system absorbs, and controlling the active power and the grid-connected power generation system power output difference that absorb is fixed value.Providing constant to heavy load electrical network exerts oneself.Alleviate burden under electrical network heavy load.
(6) at new forms of energy undercapacity during with sufficient super capacitor or storage battery, when selected one section of electric-net valley, SCADA stops new energy separately, fills station control system and fixes and controlled power at electrical network valley intussusception, to be full of energy storage device by changing.
In the time opening grid-connected power generation system, described single-phase grid-connected power generation system is sent to SCADA system by the ammeter of surfing the Net by its current instruction value or power command value.Be sent in real time electric automobile charging station by SCADA system again and change charging system control platform.Then changing charging system according to three-phase energy coordination deposit control mode You Huanchong district's computer control mutually single-phase super capacitor of platform control correspondence or storage battery receives new energy resources system to exert oneself completely.
In the situation that network load extremely weighs, change charging system control platform and can reduce charging station and change charging system and absorb energy, controlling the energy that absorbs and the grid-connected power generation system difference of exerting oneself is fixed value.Providing constant to heavy load electrical network exerts oneself.Alleviate burden under electrical network heavy load.
When new forms of energy undercapacity is bypassed the immediate leadership electric capacity or storage battery with abundance, while selecting one section of electric-net valley separately, stop new energy, fill station control system at the controlled power of electrical network valley intussusception, to be full of energy storage device by changing.
Electric automobile charging station in the present invention at least includes one and changes and fill master control computer platform, several single-phase or three-phase super capacitor or storage battery and change charging system.
Electric automobile charging station master control computer platform in the present invention can change the communication of charging system controller with multiple super capacitors or storage battery, controls each super capacitor or storage battery and changes the size of charging system from electrical network Absorption Current or active power.
Super capacitor in the present invention or storage battery change charging system and comprise and single-phasely change charging system and three-phase changes two types of charging systems.Two types form by electronic power convertor and controller.Described electronic power convertor comprises power electronics main circuit, sensor circuit and drive circuit.Described controller adopts charging realtime power control or charging current control mode control super capacitor or charge in batteries.
Described single-phase and three-phase change charging system difference and are that three-phase changes charging system and absorbs electrical network three-phase current, and the single-phase charging system that changes absorbs electrical network monophase current.
Described new energy system comprises the single-phase or three-phase mixed power supply system of the new forms of energy such as photovoltaic wind-force.
Described three-phase or single-phase photovoltaic system are made up of photovoltaic array, combining inverter and online ammeter.Described combining inverter is by power electronics main circuit, transducer, and controller and drive circuit form.
Described three-phase or single-phase wind generator system are made up of wind-driven generator, AC-DC module, combining inverter and online ammeter.Described combining inverter is by power electronics main circuit, transducer, and controller and drive circuit form.
Described power system communication control system is coordinated communication control task as SCADA system completes.
The invention has the beneficial effects as follows: the present invention proposes a kind of scheme of electrical network receiving new forms of energy.Random intervals new energy system is grid-connected by the inventive method, will make new forms of energy exert oneself and deferrable load Real-time Balancing on the one hand, significantly reduces the impact that new-energy grid-connected brings utility network; On the other hand, this random intervals new-energy grid-connected power supply plan can be city regional isolated supply of electric power is provided under the state of emergency (affecting under mains supply situation as war and ice damage); Finally, in the ideal situation, city electric car power consumption by new energy, has reduced the consumption of fossil energy by major part, has alleviated urban air pollution, reduces the spending of new power plant construction for vehicle charging.
The present invention is applicable to new forms of energy access and coordinates to control with energy reserve.
Brief description of the drawings
Fig. 1 is new-energy grid-connected schematic diagram of the present invention;
In figure, the 1st, three-phase photovoltaic generating system; The 2nd, single-phase photovoltaic generating system; The 3rd, wind generator system; The 4th, large-sized photovoltaic power station; The 5th, large-scale wind power field; The 6th, the grid-connected power generation system of other types; The 7th, change and fill control computer platform; The 8th, change and fill station control system; The 9th, SCADA system; The 10th, three-phase super capacitor or storage battery change charging system; The 11st, single-phase super capacitor or storage battery change charging system.
Embodiment
Below in conjunction with accompanying drawing, the present invention is further illustrated.
As shown in Figure 1, in eight frames, represent that electric automobile charging station changes charging system.Described electric automobile charging station at least include one change fill control computer platform 7, several single-phase super capacitors or storage battery change charging system 11 or three-phase super capacitor or storage battery and change charging system 10, the communication control unit RTU being connected with system.Described communication control unit RTU completes SCADA system and electric automobile changes communication and the control of filling between control computer platform.
Described new energy system is the single-phase or three-phase mixed power supply systems of the new forms of energy such as photovoltaic wind-force.Wherein comprise the grid-connected power generation system 6 of wind generator system 3, three-phase photovoltaic generating system 1 and single-phase photovoltaic generating system 2, large-sized photovoltaic power station 4, large-scale wind power field 5 and other types.
Described three-phase photovoltaic generating system 1 or single-phase photovoltaic system 2 are made up of photovoltaic array, combining inverter and online ammeter.
Described wind generator system 3 is made up of single-phase or three-phase wind-driven generator, AC-DC module, combining inverter and online ammeter.
SCADA control system 9 is the control centre of whole energy reserve coherent system, and SCADA system is controlled each device by each telemechanical station RTU.
Described electric automobile changes to fill to control as changing to fill controls computer platform 7.
Described new forms of energy access with energy reserve control method for coordinating is: taking SCADA system as control centre, with the wherein mutual communication in telemechanical station of electric automobile charging station and new energy point; The open and close order of grid-connected power generation system is provided by SCADA system.
Change to fill at electric automobile charging station and control computer platform 7 while judging that energy storage device needs energy storage,, to SCADA system 9, SCADA system 9 is included this energy storage device in energy reserve coordination system to send energy storage signal (as needed the signal of energy storage and treating the capacity of needs storage); Control computer platform 7 while judging that energy storage device energy storage completes changing to fill, send and stop filling signal to SCADA system, SCADA system 9 is changed charging station by this electric automobile and is separated energy reserve and coordinate system.
Opening when grid-connected power generation system, described three-phase grid-connected power generation system, by online ammeter, is sent to SCADA system 9 with various communication modes by power or current instruction value, then is aggregated into region domestic demand by SCADA system and receives total new forms of energy power; SCADA system is changed this power division to fill to electric automobile charging station in compass of competency and is controlled computer platform 7, change and fill the energy value that station need to store and determine that each changes the apportioning cost of filling station according to each, three-phase super capacitor or storage battery change charging system 10 and receive new energy resources system to exert oneself completely described in the control of Zai Youhuanchong district computer control platform.Simultaneously SCADA system is according to the in real time storable scale that fills amount of capacity and energy storage device number and how much determine to open new forms of energy that changes in electrical network.SCADA system call is taking following condition as main:
(1) p jreferring to that j changes fills the stores power value of distributing at station.P is that in SCADA system, new forms of energy send performance number and gather value.C jbe that individual the changing of j filled the performance number that station need to be stored. change and fill station and need stored energy for all under this SCADA system.
(2) σ is that the power being obtained by engineering experience limits with the ratio of total absorptive capacity.
In the time opening grid-connected power generation system, single-phase grid-connected power generation system 2 is sent to SCADA system by online ammeter by its current instruction value or power command value.Be sent in real time electric automobile charging station by SCADA system again and change charging system control platform.Then the mutually single-phase super capacitor of You Huanchong district computer control platform control correspondence or storage battery change charging system 11 and receive single-phase new energy resources system to exert oneself completely.
In the situation that network load extremely weighs, change to fill and control computer platform 7 and can reduce charging station and change charging system and absorb energy, controlling the energy that absorbs and the grid-connected power generation system difference of exerting oneself is fixed value.Providing constant to heavy load electrical network exerts oneself.Alleviate burden under electrical network heavy load.
When new forms of energy undercapacity is bypassed the immediate leadership electric capacity or storage battery with abundance, while selecting one section of electric-net valley separately, stop new energy, fill station control system 8 at the controlled power of electrical network valley intussusception, to be full of energy storage device by changing.

Claims (6)

1. new forms of energy access and an energy reserve control method for coordinating under high permeability, is characterized in that, described method is taking SCADA system as control centre, with the mutual communication in telemechanical station of electric automobile charging station and new energy point; The open and close order of grid-connected power generation system is provided by SCADA system, realizes the coordination control with energy reserve to new forms of energy access;
Described method is implemented the electric automobile that required minimum system comprises in electric automobile charging station and is changed charging system, new energy system and SCADA system;
The coordination control step of described method is:
(1) change charging system to super capacitor or storage battery and change storage battery to be charged or super capacitor;
(2) super capacitor or storage battery change charging system and are changing after storage battery to be charged or super capacitor, change to fill and control platform and send and need energy storage information to SCADA, after SCADA system reception information, are included in energy reserve coordinated control system;
(3) SCADA system is sent performance number by the new forms of energy of being known by online ammeter and various communication modes and is gathered, and the performance number then need being stored is dispensed to each in energy reserve coordination system and changes and fill station; Change and fill the energy value that station need to store and determine that each changes the apportioning cost of filling station according to each; Meanwhile, SCADA also by according to energy storage device number and the real-time storable grid-connected power generation system of filling amount of capacity and determine whether to open or close some of changing;
(4) filling station and control platform while judge that energy storage device energy storage completes changing, request being stopped filling order and inform SCADA system, SCADA is accepting after this information, is departed from energy coordination deposit system, stops its charging;
(5) if judge, network load is extremely heavy, and SCADA controls minimizing charging station and changes active power that charging system absorbs, and controlling the active power and the grid-connected power generation system power output difference that absorb is fixed value; Providing constant to heavy load electrical network exerts oneself; Alleviate burden under electrical network heavy load;
(6) at new forms of energy undercapacity during with sufficient super capacitor or storage battery, when selected one section of electric-net valley, SCADA stops new energy separately, fills station control system and fixes and controlled power at electrical network valley intussusception, to be full of energy storage device by changing.
2. new forms of energy access and energy reserve control method for coordinating under a kind of high permeability according to claim 1, is characterized in that, described SCADA system call meets the following conditions:
(1) p jreferring to that j changes fills the stores power value of distributing at station; P is that in SCADA system, new forms of energy send performance number and gather value; C jbe that individual the changing of j filled the performance number that station need to be stored; change and fill station and need stored energy for all under this SCADA system;
(2) σ is that the power being obtained by engineering experience limits with the ratio of total absorptive capacity.
3. new forms of energy access and energy reserve control method for coordinating under a kind of high permeability according to claim 1, is characterized in that the single-phase or three-phase mixed power supply system that described new energy system comprises photovoltaic, wind-force new forms of energy.
4. new forms of energy access and energy reserve control method for coordinating under a kind of high permeability according to claim 1, is characterized in that, described electric automobile changes in charging system, comprises the single-phase and three-phase energy storage device charging system that super capacitor or storage battery form.
5. new forms of energy access and energy reserve control method for coordinating under a kind of high permeability according to claim 1, it is characterized in that, described electric automobile charging station changes charging system and at least includes one and change to fill and control computer platform, several single-phase or three-phase super capacitor or storage battery and change charging system; Described changing filled the several single-phase or three-phase super capacitors of master control computer platform control or storage battery changes charging system absorbed power value or Absorption Current value in real time.
6. new forms of energy access and energy reserve control method for coordinating under a kind of high permeability according to claim 1, it is characterized in that, described electric automobile charging station master control computer platform can change the communication of charging system controller with multiple super capacitors or storage battery, controls each super capacitor or storage battery and changes the size of charging system from electrical network Absorption Current or active power.
CN201410345052.2A 2014-07-18 2014-07-18 Under a kind of high permeability, new forms of energy access and energy reserve control method for coordinating Active CN104113083B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410345052.2A CN104113083B (en) 2014-07-18 2014-07-18 Under a kind of high permeability, new forms of energy access and energy reserve control method for coordinating

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410345052.2A CN104113083B (en) 2014-07-18 2014-07-18 Under a kind of high permeability, new forms of energy access and energy reserve control method for coordinating

Publications (2)

Publication Number Publication Date
CN104113083A true CN104113083A (en) 2014-10-22
CN104113083B CN104113083B (en) 2016-07-06

Family

ID=51709769

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410345052.2A Active CN104113083B (en) 2014-07-18 2014-07-18 Under a kind of high permeability, new forms of energy access and energy reserve control method for coordinating

Country Status (1)

Country Link
CN (1) CN104113083B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105244911A (en) * 2015-10-23 2016-01-13 华北电力大学 High permeability new energy power grid connection system and stability control method
CN106410799A (en) * 2016-11-27 2017-02-15 东北电力大学 Addressing method for electromobile charging station suitable for photovoltaic high-permeability power distribution network

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102723742A (en) * 2012-06-12 2012-10-10 上海市电力公司 Distributed energy power generation access control system
CN103337890A (en) * 2013-06-27 2013-10-02 华北电力大学 Orderly charging system and method for electric taxi charging station
KR20140040405A (en) * 2012-09-26 2014-04-03 한국전력공사 Load control apparatus and method
US8744790B2 (en) * 2008-11-06 2014-06-03 Southwire Company Real-time power line rating

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8744790B2 (en) * 2008-11-06 2014-06-03 Southwire Company Real-time power line rating
CN102723742A (en) * 2012-06-12 2012-10-10 上海市电力公司 Distributed energy power generation access control system
KR20140040405A (en) * 2012-09-26 2014-04-03 한국전력공사 Load control apparatus and method
CN103337890A (en) * 2013-06-27 2013-10-02 华北电力大学 Orderly charging system and method for electric taxi charging station

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘高维: "充放储一体化电站接入电网的能量流动控制策略", 《电力与能源》, vol. 34, no. 2, 30 April 2013 (2013-04-30) *
龚长武: "微网高渗透率下电动汽车入网技术的研究", 《中国优秀硕士学位论文全文数据库》, 15 March 2013 (2013-03-15), pages 27 - 34 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105244911A (en) * 2015-10-23 2016-01-13 华北电力大学 High permeability new energy power grid connection system and stability control method
CN106410799A (en) * 2016-11-27 2017-02-15 东北电力大学 Addressing method for electromobile charging station suitable for photovoltaic high-permeability power distribution network
CN106410799B (en) * 2016-11-27 2019-04-16 东北电力大学 Site selecting method for electric automobile charging station in photovoltaic high permeability power distribution network

Also Published As

Publication number Publication date
CN104113083B (en) 2016-07-06

Similar Documents

Publication Publication Date Title
Li et al. Energy management and operational control methods for grid battery energy storage systems
CN104518563B (en) The control method of charging system for electric automobile based on new energy application
Amrouche et al. Overview of energy storage in renewable energy systems
Ferreira et al. Characterisation of electrical energy storage technologies
CN102931653B (en) Comprehensive coordination control method of wind-solar direct current micro-grid
CN103117552B (en) Hybrid energy storage system based on ordered energy control
CN205104913U (en) Flexible energy storage charging system
CN106450528B (en) Energy-storage system and its Power balance control method and control device
CN102290841A (en) Peak clipping and valley filling electric vehicle swapping station for distribution network
CN102832662A (en) Electromobile charging, discharging and storage integrated system
CN104362658A (en) Energy type and power type hybrid energy storage coordination control method
CN204681125U (en) A kind of charging system for electric automobile based on solar energy
CN106541845A (en) A kind of wireless electric automobile charging system actual and control method
CN109217290A (en) Meter and the microgrid energy optimum management method of electric car charge and discharge
CN103683272A (en) Independent direct-current micro-grid system and energy balance control method thereof
CN205039612U (en) Scene stores up charging station system based on public dc bus of distributing type
CN105226689A (en) Consider polymorphic type energy-storage system energy management method and the system of operation and maintenance
CN105552969A (en) Power prediction-based distributed output power smoothing method and system for photovoltaic generation
CN102347620A (en) Micro grid control method
CN104022527A (en) DC micro grid system
CN103208826A (en) Container movable type photovoltaic energy storage charging station
CN105305489B (en) A kind of demanding side of the electrical power net resource response frequency response capability assessment method
CN103107579A (en) Control method for battery energy storage system combining energy type and power type
CN110474321A (en) Combined cleaning energy electricity generation system and its operation method
CN209730824U (en) A kind of energy storage monitoring device of the zinc-iron flow battery applied to photovoltaic power generation field

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180828

Address after: 330096 No. 88, min Qiang Road, private science and Technology Park, Nanchang, Jiangxi

Co-patentee after: State Grid Corporation of China

Patentee after: Power Science Research Institute of Jiangxi Electric Power Co., Ltd.

Address before: 100761 West Chang'an Avenue, Xicheng District, Xicheng District, Beijing

Co-patentee before: State's net Jiangxi Province Electric power Science Academe

Patentee before: State Grid Corporation of China

TR01 Transfer of patent right