CN104105151A - Base station processing method and device, and base station - Google Patents

Base station processing method and device, and base station Download PDF

Info

Publication number
CN104105151A
CN104105151A CN201310112343.2A CN201310112343A CN104105151A CN 104105151 A CN104105151 A CN 104105151A CN 201310112343 A CN201310112343 A CN 201310112343A CN 104105151 A CN104105151 A CN 104105151A
Authority
CN
China
Prior art keywords
chip
processing unit
baseband board
base station
state
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310112343.2A
Other languages
Chinese (zh)
Other versions
CN104105151B (en
Inventor
刘亚林
张伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Priority to CN201310112343.2A priority Critical patent/CN104105151B/en
Priority to PCT/CN2014/074545 priority patent/WO2014161474A1/en
Publication of CN104105151A publication Critical patent/CN104105151A/en
Application granted granted Critical
Publication of CN104105151B publication Critical patent/CN104105151B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/16Performing reselection for specific purposes
    • H04W36/22Performing reselection for specific purposes for handling the traffic
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses a base station processing method and device, and a base station; the method comprises the following steps: summing business load condition of the base station; calculating the number of baseband boards and chips needed by the base station according to the business load condition of the base station; switching users of the base station between the baseband boards according to the activated baseband boards number and needed baseband boards number of the base station, and closing the baseband board with zero loading user; switching the users of the base station between the chips according to the activated chips number and the needed chips number of the base station, and closing the chip with zero loading user. The method, device and the base station can automatically adjust and close the baseband boards and the chips according to the business loading condition of the base station, thus controlling on/off of devices in a more macroscopic angle and fine granularity, thereby reducing base station power consumption, and realizing system energy saving.

Description

Base station processing method, device and base station
Technical field
The present invention relates to wireless communication field, particularly a kind of base station processing method, device and base station.
Background technology
Along with developing rapidly of mobile communication, the quality of people to mobile communication and the type of service providing thereof require also more and more higher, therefore, the capacity of communication base station gets most of the attention, in order to improve the capacity of base station, can increase on the one hand the quantity of baseband board, can improve on the other hand the disposal ability of one single chip in baseband board, but, in different time sections, the traffic carrying capacity of base station differs greatly, when the traffic carrying capacity of base station is lower, if increase the mode of baseband board, a large amount of power wastages will be produced, if and employing improves the mode of one single chip disposal ability, one single chip can produce larger power consumption, cause a large amount of power wastages.
In the prior art, in order to reduce base station power consumption, the number of users of every baseband board of master control veneer statistics, if when on certain baseband board, the actual number of users using is less, the user on this baseband board is switched on other baseband boards, this baseband board current state is set to power-off or resting state.
Realizing in process of the present invention, inventor finds that prior art at least exists following problem:
Prior art is only by arranging the current state of baseband board so that the less baseband board of actual user's number quits work, and it is thicker that it adjusts granularity, and synthesis energy saving effect is poor.
Summary of the invention
In order to solve the problem of prior art, the embodiment of the present invention provides a kind of base station processing method, device and base station.Described technical scheme is as follows:
On the one hand, the embodiment of the present invention provides a kind of base station processing method, and described method comprises:
The business load situation of accounting base-station;
According to the business load situation of described base station, calculate the required baseband board number in described base station and required chip number;
According to current baseband board number and the described required baseband board number in state of activation in described base station, the user of described base station is switched between baseband board, turn-off the baseband board that carrying number of users is zero;
According to current chip number and the described required chip number in state of activation in described base station, the user of described base station is switched between chip, turn-off the chip that carrying number of users is zero.
The first possibility implementation taking said method as the embodiment of the present invention, in the second possibility implementation on the basis of the first possibility implementation, according to current baseband board number and the described required baseband board number in state of activation in described base station, the user of described base station is switched between baseband board, turn-off the baseband board that carrying number of users is zero, comprising:
When in the time that the baseband board number of state of activation is greater than described required baseband board number, according to described required baseband board number, the user of the second baseband board carrying in the baseband board by described base station in state of activation switches to the first baseband board, the number of described the first baseband board is identical with described required baseband board number, and described the second baseband board is the baseband board beyond the first baseband board described in the described baseband board in state of activation;
In the time detecting that the number of users carrying on any second baseband board is zero, turn-off the second baseband board that carrying number of users is zero.
In the third possibility implementation on the basis of the second possibility implementation, when in the time that the baseband board number of state of activation is greater than described required baseband board number, according to described required baseband board number, the user of the second baseband board carrying in the baseband board by described base station in state of activation switches to the first baseband board, comprising:
According to the number of users of the described baseband board access in state of activation, the described baseband board in state of activation is sorted;
According to the ranking results of baseband board, from the described baseband board in state of activation, obtain the first baseband board, the user of the second baseband board carrying in the baseband board by described base station in state of activation switches to the first baseband board, the number of described the first baseband board is identical with described required baseband board number, and the number of users that each described the first baseband board carries is greater than the number of users that each described the second baseband board carries.
In the 4th kind of possibility implementation on the basis of above-mentioned possibility implementation, according to current chip number and the described required chip number in state of activation in described base station, the user of described base station is switched between chip, after turn-offing the chip that carrying number of users is zero, described method comprises:
When there is new user access described base station, when the user of carrying when described the first baseband board does not reach the first default value, described new user is accessed to described the first baseband board;
When the user of carrying when described the first baseband board reaches the first default value, start the baseband board in off state, described new user is accessed to the baseband board of startup.
In the 5th kind of possibility implementation on the basis of the first possibility implementation, according to current chip number and the described required chip number in state of activation in described base station, the user of described base station is switched between chip, turn-offs the chip that carrying number of users is zero, comprising:
When in the time that the chip number of state of activation is greater than described required chip number, according to described required chip number, the user of the second chip bearing in state of activation in described the first baseband board is switched to the first chip, the number of described the first chip is identical with described required chip number, and described the second chip is the chip beyond the first chip described in the described chip in state of activation;
In the time detecting that the number of users carrying on any second chip is zero, turn-off the second chip that carrying number of users is zero.
In the 6th kind of possibility implementation on the basis of the 5th kind of possibility implementation, when the described chip number in state of activation is greater than required chip number, according to described chip number and described required chip number in state of activation, the user that the second chip is carried switches to the first chip, comprising:
According to the number of users of the described chip access in state of activation, the described chip in state of activation is sorted;
According to the ranking results of chip, from the described chip in state of activation, obtain the first chip, the number of described the first chip is identical with described required chip number, and the number of users that each described the first chip carries is greater than the number of users that each described the second chip carries, and the user that the second chip is carried switches to the first chip.
The 5th or six kinds may implementations basis on the 7th kind may implementation in, in the time detecting that the number of users carrying on any second chip is zero, after turn-offing the second chip that carrying number of users is zero, described method comprises:
When described the first baseband board has new user access, when the user of carrying when described the first chip does not reach the second default value, described new user is accessed to described the first chip;
When the user of carrying when described the first chip reaches the second default value, start the chip in off state, described new user is accessed to the chip of startup.
In the 8th kind of possibility implementation on the basis of the first possibility implementation, according to the business load situation of described base station, calculate the required baseband board number in described base station and required chip number, comprising:
Calculate according to the business load situation of described base station and baseband board bearing capacity, by the baseband board number calculating and the first default multiplication, obtain described required baseband board number.
Calculate according to the business load situation of described base station and chip bearing ability, by the chip number calculating and the second default multiplication, obtain described required chip number.
In the 9th kind of possibility implementation on the basis of the first possibility implementation, according to current chip number and the described required chip number in state of activation in described base station, the user of described base station is switched between chip, after turn-offing the chip that carrying number of users is zero, described method also comprises:
According to current processing unit number and the described required processing unit number in state of activation in described base station, the user of described base station is switched between processing unit, turn-off the processing unit that carrying number of users is zero.
In the tenth kind of possibility implementation on the basis of the first possibility implementation, according to current processing unit number and the described required processing unit number in state of activation in described base station, the user of described base station is switched between processing unit, turn-off the processing unit that carrying number of users is zero, comprising:
The business load situation that statistics is carried in the chip of state of activation;
According to the business load situation of carrying in the chip of state of activation, calculate required processing unit number;
In the time that in the described chip in state of activation, processing unit number is greater than described required processing unit number, described user of carrying in the second processing unit of state of activation is switched to the first processing unit, the number of described the first processing unit is identical with the number of described required processing unit, and described the second processing unit is the processing unit beyond the first processing unit described in the processing unit in the described chip in state of activation;
In the time detecting that number of users that any second processing unit carries is zero, turn-off the second processing unit that carrying number of users is zero.
In the 11 kind of possibility implementation on the basis of the tenth kind of possibility implementation, in the time that in the described chip in state of activation, processing unit number is greater than described required processing unit number, described user of carrying in the second processing unit of state of activation is switched to the first processing unit, comprising:
According to the number of users of the described processing unit access in state of activation, the described processing unit in state of activation is sorted;
According to the ranking results of processing unit, from the described processing unit in state of activation, obtain the first processing unit, described user of carrying in the second processing unit of state of activation is switched to the first processing unit, the number of described the first processing unit is identical with described required processing unit number, and the number of users that each described the first processing unit carries is greater than the number of users that each described the second processing unit carries.
In the 12 kind of possibility implementation on the basis of the tenth kind of possibility implementation, according to the business load situation of carrying in the chip of state of activation, calculate required processing unit number, comprising:
Calculate according to described business load situation of carrying in the chip of state of activation and processing unit bearing capacity, by the processing unit number calculating and the 3rd default multiplication, obtain described required processing unit number.
In the 13 kind of possibility implementation on the basis of the 9th kind of possibility implementation, according to current processing unit number and the described required processing unit number in state of activation in described base station, the user of described base station is switched between processing unit, after turn-offing the processing unit that carrying number of users is zero, described method also comprises:
When described the first chip has new user access, when the user of carrying when described the first processing unit does not reach the 3rd default value, described new user is accessed to described the first processing unit;
When the user of carrying when described the first processing unit reaches the 3rd default value, start the processing unit in off state, described new user is accessed to the processing unit of startup.
In the 14 kind of possibility implementation on the basis of the first possibility implementation, before the business load situation of accounting base-station, described method also comprises:
In base station, the baseband board of preset number, chip and processing unit are set to state of activation;
In base station, all the other baseband boards, chip and processing unit are set to power save mode.
In the 15 kind of possibility implementation on the basis of the 14 kind of possibility implementation, before in base station, the baseband board of preset number, chip and processing unit are set to state of activation, described method also comprises:
According to the traffic carrying capacity Changing Pattern of the described base station of historical statistics in described base station, determine baseband board, chip and the processing unit of described preset number; Or,
The user density of serving according to the described base station of historical statistics in described base station, determines baseband board, chip and the processing unit of described preset number.
In the 16 kind of possibility implementation on the basis of the 14 kind of possibility implementation, before in base station, the baseband board of preset number, chip and processing unit are set to state of activation, described method also comprises:
Number of users described in real-time statistics in base station;
Determine baseband board, chip and the processing unit of described preset number according to described number of users.
In the 17 kind of possibility implementation on the basis of the 14 kind of possibility implementation, after in base station, the baseband board of preset number, chip and processing unit are set to state of activation, described method also comprises:
In the time having new user to access, according to load balancing principle, described new user is linked on the processing unit in state of activation.
On the other hand, the embodiment of the present invention provides a kind of base station processing unit, and described device comprises:
Business load situation statistical module, for the business load situation of accounting base-station;
The first computing module, for according to the business load situation of described base station, calculates the required baseband board number in described base station and required chip number;
Baseband board processing module for according to current baseband board number and the described required baseband board number in state of activation in described base station, is switched the user of described base station between baseband board, turn-offs the baseband board that carrying number of users is zero;
Chip processing module for according to current chip number and the described required chip number in state of activation in described base station, is switched the user of described base station between chip, turn-offs the chip that carrying number of users is zero.
The first possibility implementation taking said method as the embodiment of the present invention, in the second possibility implementation on the basis of the first possibility implementation, described baseband board processing module, comprising:
Baseband board switch unit, be used for when in the time that the baseband board number of state of activation is greater than described required baseband board number, according to described required baseband board number, the user of the second baseband board carrying in the baseband board by described base station in state of activation switches to the first baseband board, the number of described the first baseband board is identical with described required baseband board number, and described the second baseband board is the baseband board beyond the first baseband board described in the described baseband board in state of activation;
Baseband board turn-offs unit, in the time detecting that the number of users carrying on any second baseband board is zero, turn-offs the second baseband board that carrying number of users is zero.
In the third possibility implementation on the basis of the second possibility implementation, described baseband board switch unit is for sorting to the described baseband board in state of activation according to the number of users of the described baseband board access in state of activation; According to the ranking results of baseband board, from the described baseband board in state of activation, obtain the first baseband board, the user of the second baseband board carrying in the baseband board by described base station in state of activation switches to the first baseband board, the number of described the first baseband board is identical with described required baseband board number, and the number of users that each described the first baseband board carries is greater than the number of users that each described the second baseband board carries.
In the 4th kind of possibility implementation on the basis of above-mentioned possibility implementation, described device also comprises:
The first access module, for there is new user access when described base station, when the user of carrying when described the first baseband board does not reach the first default value, accesses described the first baseband board by described new user;
Baseband board starts module, while reaching the first default value, starts the baseband board in off state for the user of carrying when described the first baseband board, described new user is accessed to the baseband board of startup.
In the 5th kind of possibility implementation on the basis of the first possibility implementation, described chip processing module comprises:
Chip switch unit, be used for when in the time that the chip number of state of activation is greater than described required chip number, according to described required chip number, the user of the second chip bearing in state of activation in described the first baseband board is switched to the first chip, the number of described the first chip is identical with described required chip number, and described the second chip is the chip beyond the first chip described in the described chip in state of activation;
Chip turn-offs unit, in the time detecting that the number of users carrying on any second chip is zero, turn-offs the second chip that carrying number of users is zero.
In the 6th kind of possibility implementation on the basis of the 5th kind of possibility implementation, described chip switch unit is for sorting to the described chip in state of activation according to the number of users of the described chip access in state of activation; According to the ranking results of chip, from the described chip in state of activation, obtain the first chip, the number of described the first chip is identical with described required chip number, and the number of users that each described the first chip carries is greater than the number of users that each described the second chip carries, and the user that the second chip is carried switches to the first chip.
The 5th or six kinds may implementations basis on the 7th kind may implementation in, described device also comprises:
The second access module, for there is new user access when described the first baseband board, when the user of carrying when described the first chip does not reach the second default value, accesses described the first chip by described new user;
Chip enable module, while reaching the second default value, starts the chip in off state for the user of carrying when described the first chip, described new user is accessed to the chip of startup.
In the 8th kind of possibility implementation on the basis of the first possibility implementation, described the first computing module is for calculating according to the business load situation of described base station and baseband board bearing capacity, by the baseband board number calculating and the first default multiplication, obtain described required baseband board number;
Described the first computing module, also for calculating according to the business load situation of described base station and chip bearing ability, by the chip number calculating and the second default multiplication, obtains described required chip number.
In the 9th kind of possibility implementation on the basis of the first possibility implementation, described device also comprises:
Cell processing module for according to current processing unit number and the described required processing unit number in state of activation in described base station, is switched the user of described base station between processing unit, turn-offs the processing unit that carrying number of users is zero.
In the tenth kind of possibility implementation on the basis of the first possibility implementation, described business load situation statistical module is also for adding up the business load situation of carrying in the chip of state of activation;
Described the first computing module also, for according to the business load situation of carrying in the chip of state of activation, calculates required processing unit number;
Described processing unit processes module comprises:
Cell processing unit, for in the time that the described chip processing unit number in state of activation is greater than described required processing unit number, described user of carrying in the second processing unit of state of activation is switched to the first processing unit, the number of described the first processing unit is identical with the number of described required processing unit, and described the second processing unit is the processing unit beyond the first processing unit described in the processing unit in the described chip in state of activation;
Shutoff unit, unit, in the time detecting that number of users that any second processing unit carries is zero, turn-offs the second processing unit that carrying number of users is zero.
In the 11 kind of possibility implementation on the basis of the tenth kind of possibility implementation, described cell processing unit is for sorting to the described processing unit in state of activation according to the number of users of the described processing unit access in state of activation;
Described cell processing unit is also for according to the ranking results of processing unit, from the described processing unit in state of activation, obtain the first processing unit, described user of carrying in the second processing unit of state of activation is switched to the first processing unit, the number of described the first processing unit is identical with described required processing unit number, and the number of users that each described the first processing unit carries is greater than the number of users that each described the second processing unit carries.
In the 12 kind of possibility implementation on the basis of the tenth kind of possibility implementation, described the first computing module is for calculating according to described business load situation of carrying in the chip of state of activation and processing unit bearing capacity, by the processing unit number calculating and the 3rd default multiplication, obtain described required processing unit number.
In the 13 kind of possibility implementation on the basis of the 9th kind of possibility implementation, described device also comprises:
The 3rd access module, for there is new user access when described the first chip, when the user of carrying when described the first processing unit does not reach the 3rd default value, accesses described the first processing unit by described new user;
Processing unit starts module, while reaching the 3rd default value, starts the processing unit in off state for the user of carrying when described the first processing unit, described new user is accessed to the processing unit of startup.
In the 14 kind of possibility implementation on the basis of the first possibility implementation, described device also comprises:
State of activation arranges module, is set to state of activation for baseband board, chip and the processing unit of base station preset number;
Power save mode arranges module, is set to power save mode for all the other baseband boards of base station, chip and processing unit.
In the 14 kind of possibility implementation on the basis of the first possibility implementation, described device also comprises:
Number determination module, for according to the traffic carrying capacity Changing Pattern of the described base station of described base station historical statistics, determines baseband board, chip and the processing unit of described preset number; Or,
Described number determination module, the also user density for serving according to the described base station of described base station historical statistics, determines baseband board, chip and the processing unit of described preset number.
The 14 kind may implementation basis on the 16 kind may implementation in, described business load situation statistical module, also for the number of users of base station described in real-time statistics;
Described number determination module is for determining baseband board, chip and the processing unit of described preset number according to described number of users.
In the 17 kind of possibility implementation on the basis of the 14 kind of possibility implementation, described device also comprises:
The 4th access module, in the time having new user to access, according to load balancing principle, is linked into described new user on the processing unit in state of activation.
Another aspect, the embodiment of the present invention also provides a kind of base station, comprising: processor, described processor is configured to for carrying out following operation: the business load situation of accounting base-station; According to the business load situation of described base station, calculate the required baseband board number in described base station and required chip number; According to current baseband board number and the described required baseband board number in state of activation in described base station, the user of described base station is switched between baseband board, turn-off the baseband board that carrying number of users is zero; According to current chip number and the described required chip number in state of activation in described base station, the user of described base station is switched between chip, turn-off the chip that carrying number of users is zero.
Base station processing method, device and base station that the embodiment of the present invention provides, by the business load situation of accounting base-station; According to the business load situation of described base station, calculate the required baseband board number in described base station and required chip number; According to current baseband board number and the described required baseband board number in state of activation in described base station, the user of described base station is switched between baseband board, turn-off the baseband board that carrying number of users is zero; According to current chip number and the described required chip number in state of activation in described base station, the user of described base station is switched between chip, turn-off the chip that carrying number of users is zero.The technical scheme that adopts the embodiment of the present invention to provide, baseband board shutoff, chip in base station are turn-offed and carried out combined optimization, using baseband board as preferential shutoff device, using the shutoff of chip as minimum turn-off granularity, according to the business load situation of base station, adjust adaptively the shutoff of baseband board, the shutoff of chip, from the switch of more macroscopical angle, thinner granularity control device, reduce the energy consumption of base station, realize the energy-conservation of system.
Brief description of the drawings
In order to be illustrated more clearly in the technical scheme in the embodiment of the present invention, below the accompanying drawing of required use during embodiment is described is briefly described, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, do not paying under the prerequisite of creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 is a kind of base station basic composition schematic diagram that the embodiment of the present invention provides;
Fig. 2 is a kind of base band basic composition schematic diagram that the embodiment of the present invention provides;
Fig. 3 is the flow chart of a kind of base station processing method of providing of the embodiment of the present invention;
Fig. 4 is the flow chart of a kind of base station processing method of providing of the embodiment of the present invention;
Fig. 5 a is the structural representation of a kind of base station processing unit of providing of the embodiment of the present invention;
Fig. 5 b is that the base station processing unit of the application embodiment of the present invention turn-offs the effect schematic diagram reaching;
Fig. 6 is the schematic diagram that is related between base station power and base band power down ratio;
Fig. 7 is the schematic diagram that is related between down ratio that is related to of base station energy-saving gain and base band power consumption.
Embodiment
For making the object, technical solutions and advantages of the present invention clearer, below in conjunction with accompanying drawing, embodiment of the present invention is described further in detail.
Base station mainly comprises base band, radio frequency, power amplifier, antenna, heat radiation and six parts of power supply, as shown in Figure 1.Baseband portion mainly completes the signal works for the treatment of such as modulating/demodulating, coding/decoding, mapping/demapping; The amplification of the main settling signal of power amplifier; The radio frequency of narrow sense refers to RF small signals, and the radio frequency of broad sense refers to whole piece radio frequency link, comprises power amplifier.In dissimilar base station, the accounting of each device on base station power consumption is all not identical.For example, in macro base station, power amplifier occupies main energy consumption, and in micro-base station and femto base station, base band is occupied main energy consumption; In little base station, power amplifier and base band are all occupied larger energy consumption.In addition, the variation of traffic carrying capacity is also different on the impact of dissimilar base station, and the power consumption of macro base station and little base station enlarges markedly along with the rising of traffic carrying capacity, and the power consumption of micro-base station and femto base station changes along with the rising of traffic carrying capacity not quite.
As shown in Figure 2, base band mainly comprises seven parts: sampling and filtration module, forward error correction coding module, Fourier transform and OFDM(Orthogonal Frequency Division Multiplexing, OFDM) processing module, frequency domain processing module (mapping/demapping and balance module), digital pre-distortion processing module, processor, to the serial link of backbone network.The report of European Union's green communications research project shows, base band power with and accounting in base station power in different base station type, alter a great deal; When full load, single antenna corresponding base band power in different base station type is as shown in table 1; Wherein, within 2010,2012, represent respectively the data corresponding to base station of new production in 2010,2012.
Table 1
On hardware is realized, each base station comprises multiple baseband boards, and every baseband board comprises multiple chips, and each chip comprises multiple modules (or being referred to as processing unit); Wherein, the module in baseband board, chip and chip is referred to as device.Therefore, baseband board turn-offs and chip shutoff relatively, and module shuts down is the thinner power save mode of granularity.In addition, turn-off for the device that can realize power remove, refer to power remove; For the device that only can realize clock shutoff, refer to that clock turn-offs.
The power-saving technology of turn-offing based on baseband board: be applied to the base station that comprises master control veneer and base band veneer, the number of users of every base band veneer of master control veneer statistics, if the actual number of users using is less on certain base band veneer, the user on this veneer is switched to other above veneer, it is dormancy or off-position that this veneer is set.In distributed base station, can realize the integration of business and scheduling between multiple baseband boards in BBU, make as far as possible carrier wave and baseband board enter or be in off state, reduce the energy consumption of BBU.Energy-conservation gain: the power consumption (energy consumption of that piece plank of turning off, although other plank traffic carrying capacity increases, power changes little, because the power consumption of BBP changes very little with traffic carrying capacity) of an about BBP plate; In macro base station, approximately 30w.
The power-saving technology of turn-offing based on chip: be applied in the base station of the baseband board that comprises multiple parallel processing chips.First estimate total demand of processing quantity by master control borad, obtain the chip-count of current needs, then judging whether current in running order number of chips exceedes estimates the number of chips obtaining, if the chip-count in reality exceedes required chip-count, by the unnecessary process chip power-off on baseband board or enter resting state.Method of adjustment is that the user on chip less total number of users is migrated on other chips, and ensures that the load in other process chip is no more than predefined thresholding, after adjustment, closes idle chip.Energy-conservation gain is approximately the power consumption of a chip, 10w left and right.
Fig. 3 is the flow chart of a kind of base station processing method of providing of the embodiment of the present invention.Referring to Fig. 3, described method comprises:
301, the business load situation of accounting base-station;
Wherein, the business load situation of base station refers to the number of carrier wave, the number of number of users or the size of traffic carrying capacity.In the time of the business load situation of accounting base-station, can, by the statistics of at least one in carrier number, number of users and traffic carrying capacity, determine the business load situation that this base station is current.
302,, according to the business load situation of described base station, calculate the required baseband board number in described base station and required chip number;
For baseband board and chip, its load capacity is fixed, that is to say that its carrier number that can carry, number of users and traffic carrying capacity all fix, therefore, when knowing after the business load situation of base station, can be according to business load situation and baseband board and chip ability, know the base station current required baseband board number of normal operation and required chip number.
303, according to current baseband board number and the described required baseband board number in state of activation in described base station, the user of described base station is switched between baseband board, turn-off the baseband board that carrying number of users is zero;
When moving in base station, the access of its user and business etc. may be not unbalanced, even and balanced, due to the end of some business, and cause the user on each baseband board to disperse, if when therefore the current baseband board number in state of activation is greater than required baseband board number, illustrate that the current baseband board in state of activation does not reach maximum load capability, waste baseband board resource, waste the power consumption of base band, therefore, the user of base station need to be switched, reduce the baseband board number in state of activation, in the process of switching, turn-off in real time carrying number of users and reduce to zero baseband board, to save the power consumption of base station.
304, according to current chip number and the described required chip number in state of activation in described base station, the user of described base station is switched between chip, turn-off the chip that carrying number of users is zero.
For the baseband board of base station, each baseband board comprises multiple chips, general, the chip of the baseband board in state of activation is all in state of activation, if and be greater than required chip number in the chip number of state of activation, illustrate that the current chip in state of activation does not reach maximum load capability, waste the resource of chip, also wasted the power consumption of base band, the user of base station need to be switched between chip, reduce the chip number in state of activation, in the process of switching, turn-off in real time carrying number of users and reduce to zero chip, to save the power consumption of base station.
Alternatively, on basis embodiment illustrated in fig. 3, this step 303 " according to current baseband board number and the described required baseband board number in state of activation in described base station; the user of described base station is switched between baseband board; turn-off the baseband board that carrying number of users is zero ", comprises step 3031 and 3032:
3031, when in the time that the baseband board number of state of activation is greater than described required baseband board number, according to described required baseband board number, the user of the second baseband board carrying in the baseband board by described base station in state of activation switches to the first baseband board, the number of described the first baseband board is identical with described required baseband board number, and described the second baseband board is the baseband board beyond the first baseband board described in the described baseband board in state of activation.
Preferably, by the user of the second baseband board carrying in the baseband board in state of activation is switched to the first baseband board, reduce the number of the baseband board in state of activation.Wherein, the first baseband board can be the random baseband board identical with described required baseband board number of selecting, can also be the baseband board identical with required baseband board number of selecting according to preset rules, as sorted from big to small according to access customer number, baseband board larger number of users is chosen as to the first baseband board, or, sort from big to small according to activating carrier number, be chosen as the first baseband board by activating the larger baseband board of carrier number, or, sort from big to small according to access service amount, baseband board larger access service amount is chosen as to the first baseband board.
3032,, in the time detecting that the number of users carrying on any second baseband board is zero, turn-off the second baseband board that carrying number of users is zero.
This detection can be carried out with switching simultaneously, is zero baseband board once detect that the number of users carrying on baseband board is zero, turn-offing this number of users, and carries out without waiting until that all users are switched after all completing again.
Further alternatively, on basis embodiment illustrated in fig. 3, this step 3031 " when in the time that the baseband board number of state of activation is greater than described required baseband board number; according to described required baseband board number; the user of the second baseband board carrying in the baseband board by described base station in state of activation switches to the first baseband board ", comprises step 3031a and 3031b:
3031a, the number of users accessing according to the described baseband board in state of activation sort to the described baseband board in state of activation;
3031b, according to the ranking results of baseband board, from the described baseband board in state of activation, obtain the first baseband board, the user of the second baseband board carrying in the baseband board by described base station in state of activation switches to the first baseband board, the number of described the first baseband board is identical with described required baseband board number, and the number of users that each described the first baseband board carries is greater than the number of users that each described the second baseband board carries.
In embodiments of the present invention, only, to select the first baseband board as example describes according to access customer number, in other embodiments, can also only sort according to carrier number or traffic carrying capacity, or wantonly two in number of users, carrier number and traffic carrying capacity are considered, to select the first baseband board.
Further alternatively, on basis embodiment illustrated in fig. 3, afterwards, described method comprises step (1) and (2) to this step 304 " according to current chip number and the described required chip number in state of activation in described base station; the user of described base station is switched between chip; turn-off the chip that carrying number of users is zero ":
(1), when there is new user access described base station, when the user of carrying when described the first baseband board does not reach the first default value, described new user is accessed to described the first baseband board;
Because base station is always in normal operation state, therefore, can constantly there is new user's access base station, therefore, need to judge whether to need to activate the baseband board in off state according to the bearing capacity of current the first baseband board in state of activation, the number of users that every the first baseband board is carried judges, when the number of users that has any first baseband board to carry does not reach the first default value, this new user is accessed to this and does not reach the baseband board of the first default value, when the number of users that has multiple the first baseband boards to carry does not reach the first default value, according to the principle of load balancing or at random this new user is accessed to the first baseband board.
(2) when the user of carrying when described the first baseband board reaches the first default value, start the baseband board in off state, described new user is accessed to the baseband board of startup.
When the number of users carrying when each the first baseband board all reaches the first default value, any in the baseband board in off state activated, new user is accessed to the baseband board of activation, to ensure the normal access of business.
Alternatively, on basis embodiment illustrated in fig. 3, this step 304 " according to current chip number and the described required chip number in state of activation in described base station; the user of described base station is switched between chip; turn-off the chip that carrying number of users is zero ", comprises step 3041 and 3042:
3041, when in the time that the chip number of state of activation is greater than described required chip number, according to described required chip number, the user of the second chip bearing in state of activation in described the first baseband board is switched to the first chip, the number of described the first chip is identical with described required chip number, and described the second chip is the chip beyond the first chip described in the described chip in state of activation;
Preferably, by the user of upper the second chip bearing in the chip in state of activation is switched to the first chip, reduce the number of the chip in state of activation.Wherein, the first chip can be the random chip identical with required chip number of selecting, can also be the chip identical with required chip number of selecting according to preset rules, as sorted from big to small according to baseband board access customer number, be the first chip by chip selection larger number of users, or, sort from big to small according to activating carrier number, be the first chip by activating the larger chip selection of carrier number, or, sorting from big to small according to access service amount, is the first chip by chip selection larger access service amount.
3042,, in the time detecting that the number of users carrying on any second chip is zero, turn-off the second chip that carrying number of users is zero.
This detection can be carried out with switching simultaneously, is zero chip once detect that the number of users carrying on chip is zero, turn-offing this number of users, and carries out without waiting until that all users are switched after all completing again.
Alternatively, on basis embodiment illustrated in fig. 3, above-mentioned steps 3041 " when the described chip number in state of activation is greater than required chip number; according to described chip number and described required chip number in state of activation; the user that the second chip is carried switches to the first chip ", comprising:
3041a, the number of users accessing according to the described chip in state of activation sort to the described chip in state of activation;
3041b, according to the ranking results of chip, from the described chip in state of activation, obtain the first chip, the number of described the first chip is identical with described required chip number, and the number of users that each described the first chip carries is greater than the number of users that each described the second chip carries, and the user that the second chip is carried switches to the first chip.
In embodiments of the present invention, only, to select the first chip as example describes according to access customer number, in other embodiments, can also only sort according to carrier number or traffic carrying capacity, or wantonly two in number of users, carrier number and traffic carrying capacity are considered, to select the first chip.
Alternatively, on basis embodiment illustrated in fig. 3, above-mentioned steps 3042 " in the time detecting that the number of users carrying on any second chip is zero, is turn-offed the second chip that carrying number of users is zero ", and afterwards, described method comprises step (3) and (4):
(3), when described the first baseband board has new user access, when the user of carrying when described the first chip does not reach the second default value, described new user is accessed to described the first chip;
Because base station is always in normal operation state, therefore, can constantly there is new user's access base station, therefore, need to judge whether to need to activate the chip in off state according to the bearing capacity of current the first chip in state of activation, the number of users that every the first chip is carried judges, when the number of users that has any first chip to carry does not reach the second default value, this new user is accessed to this and does not reach the first chip of the second default value, when the number of users that has multiple the first chips to carry does not reach the second default value, according to the principle of load balancing or at random this new user is accessed to the first chip.
(4) when the user of carrying when described the first chip reaches the second default value, start the chip in off state, described new user is accessed to the chip of startup.
When the number of users carrying when each the first chip all reaches the second default value, any in the chip in off state activated, new user is accessed to the chip of activation, to ensure the normal access of business.
It should be noted that, this can be to carry out after the bearing capacity of baseband board is judged to the judgement of the first chip, when having selected new user by after the baseband board of access, according to the first chip in state of activation and the second default value on baseband board, know the chip in off state that whether needs to activate on this baseband board.
Alternatively, on basis embodiment illustrated in fig. 3, this step 302 " according to the business load situation of described base station, is calculated the required baseband board number in described base station and required chip number ", comprising:
Calculate according to the business load situation of described base station and baseband board bearing capacity, by the baseband board number calculating and the first default multiplication, obtain described required baseband board number.
Calculate according to the business load situation of described base station and chip bearing ability, by the chip number calculating and the second default multiplication, obtain described required chip number.
The business of reply fast burst, avoids affecting the impression of new access user, in the time calculating required baseband board number and chip number, need to leave certain redundancy.For example, the numbers of users that each baseband board is supported are at most C_max, in the time that actual user's number exceedes C_max*80%, think that required baseband board number is 2 so, for the calculating of chip number also with the calculating of baseband board in like manner.
The numerical value that it is pointed out that this first default coefficient can suitably be adjusted according to baseband board opening speed and number of users etc.The numerical value of this second default coefficient can suitably be adjusted according to baseband board opening speed and number of users etc.
Alternatively, on basis embodiment illustrated in fig. 3, afterwards, described method also comprises step 305 to this step 304 " according to current chip number and the described required chip number in state of activation in described base station; the user of described base station is switched between chip; turn-off the chip that carrying number of users is zero ":
305, according to current processing unit number and the described required processing unit number in state of activation in described base station, the user of described base station is switched between processing unit, turn-off the processing unit that carrying number of users is zero.
For the chip of baseband board, on each chip, comprise multiple processing units, each processing unit can or carry different user etc. for the treatment of different business.General, the processing unit of the chip in state of activation is all in state of activation, if and be greater than required processing unit number in the processing unit number of state of activation, illustrate that the current processing unit in state of activation does not reach maximum load capability, waste the resource of processing unit, also wasted the power consumption of base station, the user of base station need to be switched between processing unit, reduce the processing unit number in state of activation, in the process of switching, turn-off in real time carrying number of users and reduce to zero processing unit, to save the power consumption of base station.
The technical scheme that adopts the embodiment of the present invention to provide, baseband board shutoff, chip in base station are turn-offed and carried out combined optimization, using baseband board as preferential shutoff device, using the shutoff of processing unit as minimum turn-off granularity, according to the business load situation of base station, adjust adaptively shutoff, the shutoff of chip and the shutoff of processing unit of baseband board, from the switch of more macroscopical angle, thinner granularity control device, reduce the energy consumption of base station, realize the energy-conservation of system.
Alternatively, on basis based on embodiment illustrated in fig. 3, this step 305 " according to current processing unit number and the described required processing unit number in state of activation in described base station; the user of described base station is switched between processing unit; turn-off the processing unit that carrying number of users is zero ", comprising:
3051, the business load situation that statistics is carried in the chip of state of activation;
Wherein, the business load situation of chip refers to the number of carrier wave, the number of number of users or the size of traffic carrying capacity.In the time of the business load situation of statistics chip, can, by the statistics of at least one in carrier number, number of users and traffic carrying capacity, determine the business load situation that this chip is current.
3052, according to the business load situation of carrying in the chip of state of activation, calculate required processing unit number;
For processing unit, its load capacity is fixed, that is to say that its carrier number that can carry, number of users and traffic carrying capacity all fix, therefore, when knowing after the business load situation of chip, can be according to business load situation and processing unit ability, know current required processing unit number.
3053, in the time that in the described chip in state of activation, processing unit number is greater than described required processing unit number, described user of carrying in the second processing unit of state of activation is switched to the first processing unit, the number of described the first processing unit is identical with the number of described required processing unit, and described the second processing unit is the processing unit beyond the first processing unit described in the processing unit in the described chip in state of activation;
Preferably, by the user of the second processing unit carrying in the processing unit in state of activation is switched to the first processing unit, reduce the number of the processing unit in state of activation.Wherein, the first processing unit can be the random baseband board identical with described required processing unit number of selecting, can also be the processing unit identical with required processing unit number of selecting according to preset rules, as sorted from big to small according to access customer number, processing unit larger number of users is chosen as to the first processing unit, or, sort from big to small according to activating carrier number, be chosen as the first processing unit by activating the larger processing unit of carrier number, or, sort from big to small according to access service amount, processing unit larger access service amount is chosen as to the first processing unit.
3054,, in the time detecting that number of users that any second processing unit carries is zero, turn-off the second processing unit that carrying number of users is zero.
This detection can be carried out with switching simultaneously, is zero processing unit once detect that the number of users carrying on processing unit is zero, turn-offing this number of users, and carries out without waiting until that all users are switched after all completing again.
Alternatively, on basis based on embodiment illustrated in fig. 3, this step 3053 " in the time that processing unit number is greater than described required processing unit number in the described chip in state of activation; described user of carrying in the second processing unit of state of activation is switched to the first processing unit ", comprising: according to the number of users of the described processing unit access in state of activation, the described processing unit in state of activation is sorted; According to the ranking results of processing unit, from the described processing unit in state of activation, obtain the first processing unit, described user of carrying in the second processing unit of state of activation is switched to the first processing unit, the number of described the first processing unit is identical with described required processing unit number, and the number of users that each described the first processing unit carries is greater than the number of users that each described the second processing unit carries.
In embodiments of the present invention, only to select the first processing unit to describe as example according to access customer number, in other embodiments, can also only sort according to carrier number or traffic carrying capacity, or wantonly two in number of users, carrier number and traffic carrying capacity are considered, to select the first processing unit.
Alternatively, on the basis based on embodiment illustrated in fig. 3, this step 3052 " according to the business load situation of carrying in the chip of state of activation, is calculated required processing unit number ", comprising:
Calculate according to described business load situation of carrying in the chip of state of activation and processing unit bearing capacity, by the processing unit number calculating and the 3rd default multiplication, obtain described required processing unit number.
The business of reply fast burst, avoids affecting the impression of new access user, in the time calculating required processing unit number, need to leave certain redundancy.For example, the numbers of users that each processing unit is supported are at most C_max, in the time that actual user's number exceedes C_max*80%, think that required processing unit number is 2 so, for the calculating of processing unit number also with the calculating of baseband board in like manner.
The numerical value that it is pointed out that the 3rd default coefficient can suitably be adjusted according to processing unit opening speed and number of users etc.
Alternatively, on basis embodiment illustrated in fig. 3, afterwards, described method also comprises step (5) and (6) to this step 305 " according to current processing unit number and the described required processing unit number in state of activation in described base station; the user of described base station is switched between processing unit; turn-off the processing unit that carrying number of users is zero ":
(5), when described the first chip has new user access, when the user of carrying when described the first processing unit does not reach the 3rd default value, described new user is accessed to described the first processing unit;
Because base station is always in normal operation state, therefore, can constantly there is new user's access base station, therefore, in the time that chip has new user to access, need to judge whether to need to activate the processing unit in off state according to the bearing capacity of current the first processing unit in state of activation, the number of users that every the first processing unit is carried judges, when the number of users that has any first processing unit to carry does not reach the 3rd default value, this new user is accessed to this and does not reach the first processing unit of the 3rd default value, when the number of users that has multiple the first processing units to carry does not reach the 3rd default value, according to the principle of load balancing or at random this new user is accessed to the first processing unit.
(6) when the user of carrying when described the first processing unit reaches the 3rd default value, start the processing unit in off state, described new user is accessed to the processing unit of startup.
When the number of users carrying when each the first processing unit all reaches the 3rd default value, any in the processing unit in off state activated, new user is accessed to the processing unit of activation, to ensure the normal access of business.
It should be noted that, this can be to carry out after the bearing capacity of baseband board and chip is judged to the judgement of the first processing unit, when having selected new user by the baseband board of access and having selected after the chip of access, according to the first processing unit in state of activation on chip and the 3rd default value, know the processing unit in off state that whether needs to activate this chip.
Alternatively, on basis embodiment illustrated in fig. 3, before, described method also comprises this step 301 " the business load situation of accounting base-station ": in base station, the baseband board of preset number, chip and processing unit are set to state of activation; In base station, all the other baseband boards, chip and processing unit are set to power save mode.
In order farthest to reach energy-saving effect, can be at base station initial operating stage, only start baseband board, chip and the processing unit of preset number, and remaining baseband board, chip and processing unit are set to power save mode.
Further alternatively, on basis embodiment illustrated in fig. 3, before in base station, the baseband board of preset number, chip and processing unit are set to state of activation, described method also comprises following arbitrary step:
(A), according to the traffic carrying capacity Changing Pattern of the described base station of historical statistics in described base station, determine baseband board, chip and the processing unit of described preset number; Or,
(B) user density of serving according to the described base station of historical statistics in described base station, determines baseband board, chip and the processing unit of described preset number.
Due to the difference of the number of users of the different and different scene in present position, base station and different time period, can adopt above-mentioned (A) or mode (B) to determine the method to set up of baseband board, chip and processing unit, while distinguishing scene, can divide according to different user density such as rural area, suburb, urban districts.Distinguishing the time period can, according to the Changing Pattern of traffic carrying capacity, divide according to busy, idle etc.The quantity of required device can be determined according to historical statistics or self study, every kind of scene may need the device count difference using in the different time periods, open the device of preset number in different time period, and by the user assignment of access at these on device in state of activation.
Alternatively, on basis embodiment illustrated in fig. 3, before in base station, the baseband board of preset number, chip and processing unit are set to state of activation, described method also comprises: the number of users described in real-time statistics in base station; Determine baseband board, chip and the processing unit of described preset number according to described number of users.This preset number can also be determined by the real-time statistics in the running of base station.
Alternatively, on basis embodiment illustrated in fig. 3, after in base station, the baseband board of preset number, chip and processing unit are set to state of activation, described method also comprises: in the time having new user to access, according to load balancing principle, described new user is linked on the processing unit in state of activation.
Fig. 4 is the flow chart of a kind of base station processing method of providing of the embodiment of the present invention.Referring to Fig. 4, the method comprises:
400, in base station, the baseband board of preset number, chip and processing unit are set to state of activation, and in base station, all the other baseband boards, chip and processing unit are set to power save mode;
This step 400 is optional step, and preset number in this step can be given tacit consent to or be determined according to scene, time etc. by base station.
401, the business load situation of accounting base-station;
402,, according to the business load situation of described base station, calculate the required baseband board number in described base station and required chip number;
403,, when in the time that the baseband board number of state of activation is greater than described required baseband board number, according to the number of users of the described baseband board access in state of activation, the described baseband board in state of activation is sorted;
404, according to the ranking results of baseband board, from the described baseband board in state of activation, obtain the first baseband board, the user of the second baseband board carrying in the baseband board by described base station in state of activation switches to the first baseband board, the number of described the first baseband board is identical with described required baseband board number, and the number of users that each described the first baseband board carries is greater than the number of users that each described the second baseband board carries;
405,, in the time detecting that the number of users carrying on any second baseband board is zero, turn-off the second baseband board that carrying number of users is zero;
406,, when the described chip number in state of activation is greater than required chip number, according to the number of users of the described chip access in state of activation, the described chip in state of activation is sorted;
407, according to the ranking results of chip, from the described chip in state of activation, obtain the first chip, the number of described the first chip is identical with described required chip number, and the number of users that each described the first chip carries is greater than the number of users that each described the second chip carries, and the user that the second chip is carried switches to the first chip;
408,, in the time detecting that the number of users carrying on any second chip is zero, turn-off the second chip that carrying number of users is zero;
It should be noted that, step 401~408 are a preferred embodiment provided by the invention, first carry out the shutoff of baseband board, and baseband board turn-offs the energy-conservation gain maximum of bringing, and next carries out chip shutoff, and the minimum particle size taking chip as turn-offing, can realize energy-conservation.
409, the business load situation that statistics is carried in the chip of state of activation;
This step is optional step, in the time carrying out the business switching of chip bearing, also can obtain this business load situation.
410, according to the business load situation of carrying in the chip of state of activation, calculate required processing unit number;
411, according to the number of users of the described processing unit access in state of activation, the described processing unit in state of activation is sorted;
412, according to the ranking results of processing unit, from the described processing unit in state of activation, obtain the first processing unit, described user of carrying in the second processing unit of state of activation is switched to the first processing unit, the number of described the first processing unit is identical with described required processing unit number, and the number of users that each described the first processing unit carries is greater than the number of users that each described the second processing unit carries;
It should be noted that, step 401~412 are a preferred embodiment provided by the invention, first carry out the shutoff of baseband board, it is maximum that baseband board turn-offs the energy-conservation gain bringing, next carries out chip shutoff, again carry out the shutoff of processing unit, the minimum particle size taking the processing unit on chip as turn-offing, can realize energy-conservation to greatest extent.
And in other embodiment provided by the invention, the shutoff of the shutoff of baseband board and processing unit can also be combined, first carry out the shutoff of baseband board, next carries out the shutoff of processing unit.The shutoff of the shutoff of chip and processing unit can also be combined, first carry out the shutoff of chip, next carries out the shutoff of processing unit.Turn-off a baseband board, the absolute energy consumption of saving is suitable with the energy consumption of a baseband board, although because remaining baseband board traffic carrying capacity has increased a lot, the increment of this baseband board energy consumption is very little, because the dynamic energy consumption of baseband board is very little.As a same reason, turn-off a chip, module, also can save respectively the energy consumption of a chip, module.
413,, when there is new user access described base station, when the user of carrying when described the first baseband board does not reach the first default value, described new user is accessed to described the first baseband board;
Further, when the user of carrying when described the first baseband board reaches the first default value, start the baseband board in off state, described new user is accessed to the baseband board of startup.
414,, when described the first baseband board has new user access, when the user of carrying when described the first chip does not reach the second default value, described new user is accessed to described the first chip;
Further, when the user of carrying when described the first chip reaches the second default value, start the chip in off state, described new user is accessed to the chip of startup.
415,, when described the first chip has new user access, when the user of carrying when described the first processing unit does not reach the 3rd default value, described new user is accessed to described the first processing unit.
Further, when the user of carrying when described the first processing unit reaches the 3rd default value, start the processing unit in off state, described new user is accessed to the processing unit of startup.
By first the user of newly access being accessed to the base band device in state of activation, and progressively open each base band device according to business load situation, can reach to the full extent energy-conservation effect.
The technical scheme that adopts the embodiment of the present invention to provide, baseband board shutoff, chip in base station are turn-offed and carried out combined optimization, using baseband board as preferential shutoff device, using the shutoff of chip as minimum turn-off granularity, according to the business load situation of base station, adjust adaptively the shutoff of baseband board, the shutoff of chip, from the switch of more macroscopical angle, thinner granularity control device, reduce the energy consumption of base station, realize the energy-conservation of system.Further, adjust adaptively the switch of base band device according to the variation of traffic carrying capacity, reduce the power consumption of base station in LTE system.
Fig. 5 a is the structural representation of a kind of base station processing unit of providing of the embodiment of the present invention.Referring to Fig. 5 a, described device comprises:
Business load situation statistical module 501, for the business load situation of accounting base-station;
The first computing module 502, for according to the business load situation of described base station, calculates the required baseband board number in described base station and required chip number;
Baseband board processing module 503 for according to current baseband board number and the described required baseband board number in state of activation in described base station, is switched the user of described base station between baseband board, turn-offs the baseband board that carrying number of users is zero;
Chip processing module 504 for according to current chip number and the described required chip number in state of activation in described base station, is switched the user of described base station between chip, turn-offs the chip that carrying number of users is zero.
Alternatively, described baseband board processing module 503, comprising:
Baseband board switch unit, be used for when in the time that the baseband board number of state of activation is greater than described required baseband board number, according to described required baseband board number, the user of the second baseband board carrying in the baseband board by described base station in state of activation switches to the first baseband board, the number of described the first baseband board is identical with described required baseband board number, and described the second baseband board is the baseband board beyond the first baseband board described in the described baseband board in state of activation;
Baseband board turn-offs unit, in the time detecting that the number of users carrying on any second baseband board is zero, turn-offs the second baseband board that carrying number of users is zero.
Alternatively, described baseband board switch unit is for sorting to the described baseband board in state of activation according to the number of users of the described baseband board access in state of activation; According to the ranking results of baseband board, from the described baseband board in state of activation, obtain the first baseband board, the user of the second baseband board carrying in the baseband board by described base station in state of activation switches to the first baseband board, the number of described the first baseband board is identical with described required baseband board number, and the number of users that each described the first baseband board carries is greater than the number of users that each described the second baseband board carries.
Alternatively, described device also comprises:
The first access module, for there is new user access when described base station, when the user of carrying when described the first baseband board does not reach the first default value, accesses described the first baseband board by described new user;
Baseband board starts module, while reaching the first default value, starts the baseband board in off state for the user of carrying when described the first baseband board, described new user is accessed to the baseband board of startup.
Alternatively, described chip processing module comprises:
Chip switch unit, be used for when in the time that the chip number of state of activation is greater than described required chip number, according to described required chip number, the user of the second chip bearing in state of activation in described the first baseband board is switched to the first chip, the number of described the first chip is identical with described required chip number, and described the second chip is the chip beyond the first chip described in the described chip in state of activation;
Chip turn-offs unit, in the time detecting that the number of users carrying on any second chip is zero, turn-offs the second chip that carrying number of users is zero.
Alternatively, described chip switch unit is for sorting to the described chip in state of activation according to the number of users of the described chip access in state of activation; According to the ranking results of chip, from the described chip in state of activation, obtain the first chip, the number of described the first chip is identical with described required chip number, and the number of users that each described the first chip carries is greater than the number of users that each described the second chip carries, and the user that the second chip is carried switches to the first chip.
Alternatively, described device also comprises:
The second access module, for there is new user access when described the first baseband board, when the user of carrying when described the first chip does not reach the second default value, accesses described the first chip by described new user;
Chip enable module, while reaching the second default value, starts the chip in off state for the user of carrying when described the first chip, described new user is accessed to the chip of startup.
Alternatively, described the first computing module, for calculating according to the business load situation of described base station and baseband board bearing capacity, by the baseband board number calculating and the first default multiplication, obtains described required baseband board number;
Described the first computing module, also for calculating according to the business load situation of described base station and chip bearing ability, by the chip number calculating and the second default multiplication, obtains described required chip number.
Alternatively, described device also comprises:
Cell processing module for according to current processing unit number and the described required processing unit number in state of activation in described base station, is switched the user of described base station between processing unit, turn-offs the processing unit that carrying number of users is zero.
Alternatively, described business load situation statistical module is also for adding up the business load situation of carrying in the chip of state of activation;
Described the first computing module also, for according to the business load situation of carrying in the chip of state of activation, calculates required processing unit number;
Described processing unit processes module comprises:
Cell processing unit, for in the time that the described chip processing unit number in state of activation is greater than described required processing unit number, described user of carrying in the second processing unit of state of activation is switched to the first processing unit, the number of described the first processing unit is identical with the number of described required processing unit, and described the second processing unit is the processing unit beyond the first processing unit described in the processing unit in the described chip in state of activation;
Shutoff unit, unit, in the time detecting that number of users that any second processing unit carries is zero, turn-offs the second processing unit that carrying number of users is zero.
Alternatively, described cell processing unit is for sorting to the described processing unit in state of activation according to the number of users of the described processing unit access in state of activation;
Described cell processing unit is also for according to the ranking results of processing unit, from the described processing unit in state of activation, obtain the first processing unit, described user of carrying in the second processing unit of state of activation is switched to the first processing unit, the number of described the first processing unit is identical with described required processing unit number, and the number of users that each described the first processing unit carries is greater than the number of users that each described the second processing unit carries.
Alternatively, described the first computing module is for calculating according to described business load situation of carrying in the chip of state of activation and processing unit bearing capacity, by the processing unit number calculating and the 3rd default multiplication, obtain described required processing unit number.
Alternatively, described device also comprises:
The 3rd access module, for there is new user access when described the first chip, when the user of carrying when described the first processing unit does not reach the 3rd default value, accesses described the first processing unit by described new user;
Processing unit starts module, while reaching the 3rd default value, starts the processing unit in off state for the user of carrying when described the first processing unit, described new user is accessed to the processing unit of startup.
Alternatively, described device also comprises:
State of activation arranges module, is set to state of activation for baseband board, chip and the processing unit of base station preset number;
Power save mode arranges module, is set to power save mode for all the other baseband boards of base station, chip and processing unit.
Alternatively, described device also comprises:
Number determination module, for according to the traffic carrying capacity Changing Pattern of the described base station of described base station historical statistics, determines baseband board, chip and the processing unit of described preset number; Or,
Described number determination module, the also user density for serving according to the described base station of described base station historical statistics, determines baseband board, chip and the processing unit of described preset number.
Alternatively, described business load situation statistical module, also for the number of users of base station described in real-time statistics;
Described number determination module is for determining baseband board, chip and the processing unit of described preset number according to described number of users.
Alternatively, described device also comprises:
The 4th access module, in the time having new user to access, according to load balancing principle, is linked into described new user on the processing unit in state of activation.
It should be noted that: the device of the triggering intelligent network service that above-described embodiment provides is in the time of triggering intelligent network service, only be illustrated with the division of above-mentioned each functional module, in practical application, can above-mentioned functions be distributed and completed by different functional modules as required, be divided into different functional modules by the internal structure of equipment, to complete all or part of function described above.In addition, the device of the triggering intelligent network service that above-described embodiment provides and the embodiment of the method for triggering intelligent network service belong to same design, and its specific implementation process refers to embodiment of the method, repeats no more here.
Illustrate, in the situation that traffic carrying capacity is lower, only using chip to turn-off may occur: six baseband boards on base station are all in activating active state, and on every baseband board, only has 25% chip in activating active state; And use this programme there will be: three baseband boards turn-off, three baseband boards are in activating active state, on every baseband board, there is 50% chip in activating active state, can make the more energy consumption of base station saving.
Fig. 5 b is that the base station processing unit of the application embodiment of the present invention turn-offs the effect schematic diagram reaching.By the processing of above-mentioned business load situation statistical module, baseband board processing module, chip processing module and cell processing module, can allow processing unit on baseband board as much as possible, chip, chip in off state, make the more energy consumption of base station saving.
Another aspect, the embodiment of the present invention also provides a kind of base station, comprising: processor, described processor is configured to for carrying out following operation: the business load situation of accounting base-station; According to the business load situation of described base station, calculate the required baseband board number in described base station and required chip number; According to current baseband board number and the described required baseband board number in state of activation in described base station, the user of described base station is switched between baseband board, turn-off the baseband board that carrying number of users is zero; According to current chip number and the described required chip number in state of activation in described base station, the user of described base station is switched between chip, turn-off the chip that carrying number of users is zero.
Alternatively, according to current baseband board number and the described required baseband board number in state of activation in described base station, the user of described base station is switched between baseband board, turn-offs the baseband board that carrying number of users is zero, comprising:
When in the time that the baseband board number of state of activation is greater than described required baseband board number, according to described required baseband board number, the user of the second baseband board carrying in the baseband board by described base station in state of activation switches to the first baseband board, the number of described the first baseband board is identical with described required baseband board number, and described the second baseband board is the baseband board beyond the first baseband board described in the described baseband board in state of activation;
In the time detecting that the number of users carrying on any second baseband board is zero, turn-off the second baseband board that carrying number of users is zero.
Alternatively, when in the time that the baseband board number of state of activation is greater than described required baseband board number, according to described required baseband board number, the user of the second baseband board carrying in the baseband board by described base station in state of activation switches to the first baseband board, comprising:
According to the number of users of the described baseband board access in state of activation, the described baseband board in state of activation is sorted;
According to the ranking results of baseband board, from the described baseband board in state of activation, obtain the first baseband board, the user of the second baseband board carrying in the baseband board by described base station in state of activation switches to the first baseband board, the number of described the first baseband board is identical with described required baseband board number, and the number of users that each described the first baseband board carries is greater than the number of users that each described the second baseband board carries.
Alternatively, according to current chip number and the described required chip number in state of activation in described base station, the user of described base station is switched between chip, after turn-offing the chip that carrying number of users is zero, described method comprises:
When there is new user access described base station, when the user of carrying when described the first baseband board does not reach the first default value, described new user is accessed to described the first baseband board;
When the user of carrying when described the first baseband board reaches the first default value, start the baseband board in off state, described new user is accessed to the baseband board of startup.
Alternatively, according to current chip number and the described required chip number in state of activation in described base station, the user of described base station is switched between chip, turn-offs the chip that carrying number of users is zero, comprising:
When in the time that the chip number of state of activation is greater than described required chip number, according to described required chip number, the user of the second chip bearing in state of activation in described the first baseband board is switched to the first chip, the number of described the first chip is identical with described required chip number, and described the second chip is the chip beyond the first chip described in the described chip in state of activation;
In the time detecting that the number of users carrying on any second chip is zero, turn-off the second chip that carrying number of users is zero.
Alternatively, when the described chip number in state of activation is greater than required chip number, according to described chip number and described required chip number in state of activation, the user that the second chip is carried switches to the first chip, comprising:
According to the number of users of the described chip access in state of activation, the described chip in state of activation is sorted;
According to the ranking results of chip, from the described chip in state of activation, obtain the first chip, the number of described the first chip is identical with described required chip number, and the number of users that each described the first chip carries is greater than the number of users that each described the second chip carries, and the user that the second chip is carried switches to the first chip.
Alternatively, in the time detecting that the number of users carrying on any second chip is zero, after turn-offing the second chip that carrying number of users is zero, described method comprises:
When described the first baseband board has new user access, when the user of carrying when described the first chip does not reach the second default value, described new user is accessed to described the first chip;
When the user of carrying when described the first chip reaches the second default value, start the chip in off state, described new user is accessed to the chip of startup.
Alternatively, according to the business load situation of described base station, calculate the required baseband board number in described base station and required chip number, comprising:
Calculate according to the business load situation of described base station and baseband board bearing capacity, by the baseband board number calculating and the first default multiplication, obtain described required baseband board number.
Calculate according to the business load situation of described base station and chip bearing ability, by the chip number calculating and the second default multiplication, obtain described required chip number.
Alternatively, according to current chip number and the described required chip number in state of activation in described base station, the user of described base station is switched between chip, after turn-offing the chip that carrying number of users is zero, described method also comprises:
According to current processing unit number and the described required processing unit number in state of activation in described base station, the user of described base station is switched between processing unit, turn-off the processing unit that carrying number of users is zero.
Alternatively, according to current processing unit number and the described required processing unit number in state of activation in described base station, the user of described base station is switched between processing unit, turn-offs the processing unit that carrying number of users is zero, comprising:
The business load situation that statistics is carried in the chip of state of activation;
According to the business load situation of carrying in the chip of state of activation, calculate required processing unit number;
In the time that in the described chip in state of activation, processing unit number is greater than described required processing unit number, described user of carrying in the second processing unit of state of activation is switched to the first processing unit, the number of described the first processing unit is identical with the number of described required processing unit, and described the second processing unit is the processing unit beyond the first processing unit described in the processing unit in the described chip in state of activation;
In the time detecting that number of users that any second processing unit carries is zero, turn-off the second processing unit that carrying number of users is zero.
Alternatively, in the time that processing unit number is greater than described required processing unit number in the described chip in state of activation, described user of carrying in the second processing unit of state of activation is switched to the first processing unit, comprising:
According to the number of users of the described processing unit access in state of activation, the described processing unit in state of activation is sorted;
According to the ranking results of processing unit, from the described processing unit in state of activation, obtain the first processing unit, described user of carrying in the second processing unit of state of activation is switched to the first processing unit, the number of described the first processing unit is identical with described required processing unit number, and the number of users that each described the first processing unit carries is greater than the number of users that each described the second processing unit carries.
Alternatively, according to the business load situation of carrying in the chip of state of activation, calculate required processing unit number, comprising:
Calculate according to described business load situation of carrying in the chip of state of activation and processing unit bearing capacity, by the processing unit number calculating and the 3rd default multiplication, obtain described required processing unit number.
Alternatively, according to current processing unit number and the described required processing unit number in state of activation in described base station, the user of described base station is switched between processing unit, and after turn-offing the processing unit that carrying number of users is zero, described method also comprises:
When described the first chip has new user access, when the user of carrying when described the first processing unit does not reach the 3rd default value, described new user is accessed to described the first processing unit;
When the user of carrying when described the first processing unit reaches the 3rd default value, start the processing unit in off state, described new user is accessed to the processing unit of startup.
Alternatively, before the business load situation of accounting base-station, described method also comprises:
In base station, the baseband board of preset number, chip and processing unit are set to state of activation;
In base station, all the other baseband boards, chip and processing unit are set to power save mode.
Alternatively, before in base station, the baseband board of preset number, chip and processing unit are set to state of activation, described method also comprises:
According to the traffic carrying capacity Changing Pattern of the described base station of historical statistics in described base station, determine baseband board, chip and the processing unit of described preset number; Or,
The user density of serving according to the described base station of historical statistics in described base station, determines baseband board, chip and the processing unit of described preset number.
Alternatively, before in base station, the baseband board of preset number, chip and processing unit are set to state of activation, described method also comprises:
Number of users described in real-time statistics in base station;
Determine baseband board, chip and the processing unit of described preset number according to described number of users.
Alternatively, after in base station, the baseband board of preset number, chip and processing unit are set to state of activation, described method also comprises:
In the time having new user to access, according to load balancing principle, described new user is linked on the processing unit in state of activation.
The technical program can be in the base station of the cellular systems such as global system for mobile communications (GSM:Global System of Mobile communication), universal mobile telecommunications system (UMTS:Universal Mobile Telecommunications System), long evolving system (LTE:Long Term Evolution) and evolution LTE system (LTE-Advanced), also can be for having in the hardware device of multistage turn-off function.
The size of absolute power consumption and the power of baseband board, chip and module of the scheme saving that the present invention proposes are closely related, and these power datas are because of the difference difference of device fabrication manufacturer, so this programme is applied on the equipment of different vendor, the absolute energy consumption of reduction is different.Because these data are more responsive, we do not discuss its specifically size herein.Meanwhile, base station power is also different because of manufacturer, and the relatively energy-conservation gain that this programme produces is also different on the equipment of different vendor.
One of ordinary skill in the art will appreciate that all or part of step that realizes above-described embodiment can complete by hardware, also can carry out the hardware that instruction is relevant by program completes, described program can be stored in a kind of computer-readable recording medium, the above-mentioned storage medium of mentioning can be read-only memory, disk or CD etc.
The foregoing is only preferred embodiment of the present invention, in order to limit the present invention, within the spirit and principles in the present invention not all, any amendment of doing, be equal to replacement, improvement etc., within all should being included in protection scope of the present invention.
The technique effect that the present invention produces for convenience of description, please refer to following formula and data:
The distributed base station (BTS:Base Transceiver Station) of extensive use is at present mainly by BBU(Base Band Unit, baseband processing unit) and RRU(Radio Remote Unit, Remote Radio Unit) composition, the wherein Base-Band Processing part in BBU corresponding diagram 1, RRU comprises radio frequency, power amplifier and the antenna in Fig. 1, and its power consumption calculation formula is as follows:
P BTS = Σ i = 1 M P BBU i + Σ j = 1 N P RRU j + P overhead = Σ i = 1 M P BBU i + Σ j = 1 N P static RRU j + Σ k = 1 AN j P out k RRU j α ( P out k RRU j ) η DCDC RRU j + P overhead · · · ( 1 )
Wherein, M, N represent respectively the number of BBU, the number of RRU; p overheadrepresent respectively power, a j RRU of i BBU power, base station remainder power or be called overhead; AN jrepresent j the antenna number on RRU; represent respectively the static power of j RRU, the DC power supply conversion efficiency of a j RRU, the power output of the j upper k root of a RRU antenna; represent that j the corresponding power amplifier of the upper k root of RRU antenna in power output is time efficiency; If there are 1 BBU and 3 RRU in certain base station, on each RRU, all there are 2 antennas, that is: M=1, N=3, AN j=2, j=1,2,3.Under certain traffic carrying capacity, the power consumption data of each device is as follows:
the power of BBU is 100 watts;
P overhead=50watt: the power of base station remainder is 50 watts;
the static power of each RRU is 80 watts;
the DC power supply conversion efficiency of each RRU is 90%;
the power output of the upper every antenna of each RRU is 15 watts;
the efficiency that the power amplifier that the upper every antenna of each RRU is corresponding is 15 watt-hours in power output is 30%;
So according to formula (1), can obtain the power of this base station in the time of current business amount and be:
P BTS = P BBU 1 + Σ j = 1 3 P static RRU j + Σ k = 1 2 P out k RRU j α ( P out k RRU j ) η DCDC RRU j + P overhead = 100 + Σ j = 1 3 80 + Σ k = 1 2 15 0.3 0.9 + 50 = 750 watt · · · ( 2 )
Suppose that after the base station processing scheme that provides of the application embodiment of the present invention,, under equal traffic carrying capacity, the power down ratio of BBU is that the power of the so whole base station of x will be reduced to:
P BTS New = Σ i = 1 M ( P BBU i ( 1 - x ) ) + Σ j = 1 N P static RRU j + Σ k = 1 AN j P out k RRU j α ( P out k RRU j ) η DCDC RRU j + P overhead · · · ( 3 )
Tentation data substitution formula (3) in wushu (2), can obtain
P BTS New = 100 ( 1 - x ) + Σ j = 1 3 80 + Σ k = 1 2 15 0.3 0.9 + 50 · · · ( 4 )
= 100 ( 1 - x ) + 1000 3 + 50 + 800 3
According to formula (4), we can draw the variation relation of base station power with base band power, as shown in Figure 6.As can be seen from Figure 6, base station power reduces along with the reduction of the power of eating dishes without rice or wine, base band power and overhead, and wherein, when base band power declines 50% time, base station power is by declining 50W;
The formula of the energy-conservation gain of calculation base station as the formula (5)
EnergySavingGain = P BTS - P BTS New P BTS · · · ( 5 )
Formula (2) and formula (4) substitution formula (5) are obtained,
EnergySavingGain = 1 - [ 100 ( 1 - x ) + 1000 3 + 50 + 800 3 ] / 750 · · · ( 6 )
According to formula (6), we can draw the relation between energy-conservation gain and the down ratio of base band power of base station, as shown in Figure 7.As can be seen from Figure 7, the energy-conservation gain of base station raises along with the increase of the power down ratio of eating dishes without rice or wine, and wherein, when base band power declines 50% time, the energy-conservation gain of base station is 6.67%.
It is worth mentioning that, energy efficiency and spectrum efficiency are two important indicators that following green communications system is paid close attention to, and wherein, energy efficiency refers to the throughput of system under unit energy, and system peak transfer rate under the spectrum efficiency unit of referring to frequency spectrum.With regard to the Base-Band Processing scheme proposing with regard to the embodiment of the present invention, device closes has no progeny, and the energy that base station consumes has reduced, and the throughput of base station does not change with the frequency spectrum taking, and therefore, has improved energy efficiency, and spectrum efficiency is not affected.

Claims (35)

1. a base station processing method, is characterized in that, described method comprises:
The business load situation of accounting base-station;
According to the business load situation of described base station, calculate the required baseband board number in described base station and required chip number;
According to current baseband board number and the described required baseband board number in state of activation in described base station, the user of described base station is switched between baseband board, turn-off the baseband board that carrying number of users is zero;
According to current chip number and the described required chip number in state of activation in described base station, the user of described base station is switched between chip, turn-off the chip that carrying number of users is zero.
2. method according to claim 1, it is characterized in that, according to current baseband board number and the described required baseband board number in state of activation in described base station, the user of described base station is switched between baseband board, turn-off the baseband board that carrying number of users is zero, comprising:
When in the time that the baseband board number of state of activation is greater than described required baseband board number, according to described required baseband board number, the user of the second baseband board carrying in the baseband board by described base station in state of activation switches to the first baseband board, the number of described the first baseband board is identical with described required baseband board number, and described the second baseband board is the baseband board beyond the first baseband board described in the described baseband board in state of activation;
In the time detecting that the number of users carrying on any second baseband board is zero, turn-off the second baseband board that carrying number of users is zero.
3. method according to claim 2, it is characterized in that, when in the time that the baseband board number of state of activation is greater than described required baseband board number, according to described required baseband board number, the user of the second baseband board carrying in the baseband board by described base station in state of activation switches to the first baseband board, comprising:
According to the number of users of the described baseband board access in state of activation, the described baseband board in state of activation is sorted;
According to the ranking results of baseband board, from the described baseband board in state of activation, obtain the first baseband board, the user of the second baseband board carrying in the baseband board by described base station in state of activation switches to the first baseband board, the number of described the first baseband board is identical with described required baseband board number, and the number of users that each described the first baseband board carries is greater than the number of users that each described the second baseband board carries.
4. according to the method described in claim 1-3 any one, it is characterized in that, according to current chip number and the described required chip number in state of activation in described base station, the user of described base station is switched between chip, after turn-offing the chip that carrying number of users is zero, described method comprises:
When there is new user access described base station, when the user of carrying when described the first baseband board does not reach the first default value, described new user is accessed to described the first baseband board;
When the user of carrying when described the first baseband board reaches the first default value, start the baseband board in off state, described new user is accessed to the baseband board of startup.
5. method according to claim 1, it is characterized in that, according to current chip number and the described required chip number in state of activation in described base station, the user of described base station is switched between chip, turn-off the chip that carrying number of users is zero, comprising:
When in the time that the chip number of state of activation is greater than described required chip number, according to described required chip number, the user of the second chip bearing in state of activation in described the first baseband board is switched to the first chip, the number of described the first chip is identical with described required chip number, and described the second chip is the chip beyond the first chip described in the described chip in state of activation;
In the time detecting that the number of users carrying on any second chip is zero, turn-off the second chip that carrying number of users is zero.
6. method according to claim 5, it is characterized in that, when the described chip number in state of activation is greater than required chip number, according to described chip number and described required chip number in state of activation, the user that the second chip is carried switches to the first chip, comprising:
According to the number of users of the described chip access in state of activation, the described chip in state of activation is sorted;
According to the ranking results of chip, from the described chip in state of activation, obtain the first chip, the number of described the first chip is identical with described required chip number, and the number of users that each described the first chip carries is greater than the number of users that each described the second chip carries, and the user that the second chip is carried switches to the first chip.
7. according to the method described in claim 5 or 6, it is characterized in that, in the time detecting that the number of users carrying on any second chip is zero, after turn-offing the second chip that carrying number of users is zero, described method comprises:
When described the first baseband board has new user access, when the user of carrying when described the first chip does not reach the second default value, described new user is accessed to described the first chip;
When the user of carrying when described the first chip reaches the second default value, start the chip in off state, described new user is accessed to the chip of startup.
8. method according to claim 1, is characterized in that, according to the business load situation of described base station, calculates the required baseband board number in described base station and required chip number, comprising:
Calculate according to the business load situation of described base station and baseband board bearing capacity, by the baseband board number calculating and the first default multiplication, obtain described required baseband board number.
Calculate according to the business load situation of described base station and chip bearing ability, by the chip number calculating and the second default multiplication, obtain described required chip number.
9. method according to claim 1, it is characterized in that, according to current chip number and the described required chip number in state of activation in described base station, the user of described base station is switched between chip, after turn-offing the chip that carrying number of users is zero, described method also comprises:
According to current processing unit number and the described required processing unit number in state of activation in described base station, the user of described base station is switched between processing unit, turn-off the processing unit that carrying number of users is zero.
10. method according to claim 9, it is characterized in that, according to current processing unit number and the described required processing unit number in state of activation in described base station, the user of described base station is switched between processing unit, turn-off the processing unit that carrying number of users is zero, comprising:
The business load situation that statistics is carried in the chip of state of activation;
According to the business load situation of carrying in the chip of state of activation, calculate required processing unit number;
In the time that in the described chip in state of activation, processing unit number is greater than described required processing unit number, described user of carrying in the second processing unit of state of activation is switched to the first processing unit, the number of described the first processing unit is identical with the number of described required processing unit, and described the second processing unit is the processing unit beyond the first processing unit described in the processing unit in the described chip in state of activation;
In the time detecting that number of users that any second processing unit carries is zero, turn-off the second processing unit that carrying number of users is zero.
11. methods according to claim 10, it is characterized in that, in the time that in the described chip in state of activation, processing unit number is greater than described required processing unit number, described user of carrying in the second processing unit of state of activation is switched to the first processing unit, comprising:
According to the number of users of the described processing unit access in state of activation, the described processing unit in state of activation is sorted;
According to the ranking results of processing unit, from the described processing unit in state of activation, obtain the first processing unit, described user of carrying in the second processing unit of state of activation is switched to the first processing unit, the number of described the first processing unit is identical with described required processing unit number, and the number of users that each described the first processing unit carries is greater than the number of users that each described the second processing unit carries.
12. methods according to claim 10, is characterized in that, according to the business load situation of carrying in the chip of state of activation, calculate required processing unit number, comprising:
Calculate according to described business load situation of carrying in the chip of state of activation and processing unit bearing capacity, by the processing unit number calculating and the 3rd default multiplication, obtain described required processing unit number.
13. methods according to claim 9, it is characterized in that, according to current processing unit number and the described required processing unit number in state of activation in described base station, the user of described base station is switched between processing unit, after turn-offing the processing unit that carrying number of users is zero, described method also comprises:
When described the first chip has new user access, when the user of carrying when described the first processing unit does not reach the 3rd default value, described new user is accessed to described the first processing unit;
When the user of carrying when described the first processing unit reaches the 3rd default value, start the processing unit in off state, described new user is accessed to the processing unit of startup.
14. methods according to claim 1, is characterized in that, before the business load situation of accounting base-station, described method also comprises:
In base station, the baseband board of preset number, chip and processing unit are set to state of activation;
In base station, all the other baseband boards, chip and processing unit are set to power save mode.
15. methods according to claim 14, is characterized in that, before in base station, the baseband board of preset number, chip and processing unit are set to state of activation, described method also comprises:
According to the traffic carrying capacity Changing Pattern of the described base station of historical statistics in described base station, determine baseband board, chip and the processing unit of described preset number; Or,
The user density of serving according to the described base station of historical statistics in described base station, determines baseband board, chip and the processing unit of described preset number.
16. methods according to claim 14, is characterized in that, before in base station, the baseband board of preset number, chip and processing unit are set to state of activation, described method also comprises:
Number of users described in real-time statistics in base station;
Determine baseband board, chip and the processing unit of described preset number according to described number of users.
17. methods according to claim 14, is characterized in that, after in base station, the baseband board of preset number, chip and processing unit are set to state of activation, described method also comprises:
In the time having new user to access, according to load balancing principle, described new user is linked on the processing unit in state of activation.
18. 1 kinds of base station processing unit, is characterized in that, described device comprises:
Business load situation statistical module, for the business load situation of accounting base-station;
The first computing module, for according to the business load situation of described base station, calculates the required baseband board number in described base station and required chip number;
Baseband board processing module for according to current baseband board number and the described required baseband board number in state of activation in described base station, is switched the user of described base station between baseband board, turn-offs the baseband board that carrying number of users is zero;
Chip processing module for according to current chip number and the described required chip number in state of activation in described base station, is switched the user of described base station between chip, turn-offs the chip that carrying number of users is zero.
19. devices according to claim 18, is characterized in that, described baseband board processing module, comprising:
Baseband board switch unit, be used for when in the time that the baseband board number of state of activation is greater than described required baseband board number, according to described required baseband board number, the user of the second baseband board carrying in the baseband board by described base station in state of activation switches to the first baseband board, the number of described the first baseband board is identical with described required baseband board number, and described the second baseband board is the baseband board beyond the first baseband board described in the described baseband board in state of activation;
Baseband board turn-offs unit, in the time detecting that the number of users carrying on any second baseband board is zero, turn-offs the second baseband board that carrying number of users is zero.
20. devices according to claim 19, is characterized in that, described baseband board switch unit is for sorting to the described baseband board in state of activation according to the number of users of the described baseband board access in state of activation; According to the ranking results of baseband board, from the described baseband board in state of activation, obtain the first baseband board, the user of the second baseband board carrying in the baseband board by described base station in state of activation switches to the first baseband board, the number of described the first baseband board is identical with described required baseband board number, and the number of users that each described the first baseband board carries is greater than the number of users that each described the second baseband board carries.
21. according to the device described in claim 18-20 any one, it is characterized in that, described device also comprises:
The first access module, for there is new user access when described base station, when the user of carrying when described the first baseband board does not reach the first default value, accesses described the first baseband board by described new user;
Baseband board starts module, while reaching the first default value, starts the baseband board in off state for the user of carrying when described the first baseband board, described new user is accessed to the baseband board of startup.
22. devices according to claim 18, is characterized in that, described chip processing module comprises:
Chip switch unit, be used for when in the time that the chip number of state of activation is greater than described required chip number, according to described required chip number, the user of the second chip bearing in state of activation in described the first baseband board is switched to the first chip, the number of described the first chip is identical with described required chip number, and described the second chip is the chip beyond the first chip described in the described chip in state of activation;
Chip turn-offs unit, in the time detecting that the number of users carrying on any second chip is zero, turn-offs the second chip that carrying number of users is zero.
23. devices according to claim 22, is characterized in that, described chip switch unit is for sorting to the described chip in state of activation according to the number of users of the described chip access in state of activation; According to the ranking results of chip, from the described chip in state of activation, obtain the first chip, the number of described the first chip is identical with described required chip number, and the number of users that each described the first chip carries is greater than the number of users that each described the second chip carries, and the user that the second chip is carried switches to the first chip.
24. according to the device described in claim 22 or 23, it is characterized in that, described device also comprises:
The second access module, for there is new user access when described the first baseband board, when the user of carrying when described the first chip does not reach the second default value, accesses described the first chip by described new user;
Chip enable module, while reaching the second default value, starts the chip in off state for the user of carrying when described the first chip, described new user is accessed to the chip of startup.
25. devices according to claim 18, it is characterized in that, described the first computing module, for calculating according to the business load situation of described base station and baseband board bearing capacity, by the baseband board number calculating and the first default multiplication, obtains described required baseband board number;
Described the first computing module, also for calculating according to the business load situation of described base station and chip bearing ability, by the chip number calculating and the second default multiplication, obtains described required chip number.
26. devices according to claim 18, is characterized in that, described device also comprises:
Cell processing module for according to current processing unit number and the described required processing unit number in state of activation in described base station, is switched the user of described base station between processing unit, turn-offs the processing unit that carrying number of users is zero.
27. devices according to claim 26, is characterized in that,
Described business load situation statistical module is also for adding up the business load situation of carrying in the chip of state of activation;
Described the first computing module also, for according to the business load situation of carrying in the chip of state of activation, calculates required processing unit number;
Described processing unit processes module comprises:
Cell processing unit, for in the time that the described chip processing unit number in state of activation is greater than described required processing unit number, described user of carrying in the second processing unit of state of activation is switched to the first processing unit, the number of described the first processing unit is identical with the number of described required processing unit, and described the second processing unit is the processing unit beyond the first processing unit described in the processing unit in the described chip in state of activation;
Shutoff unit, unit, in the time detecting that number of users that any second processing unit carries is zero, turn-offs the second processing unit that carrying number of users is zero.
28. devices according to claim 27, is characterized in that, described cell processing unit is for sorting to the described processing unit in state of activation according to the number of users of the described processing unit access in state of activation;
Described cell processing unit is also for according to the ranking results of processing unit, from the described processing unit in state of activation, obtain the first processing unit, described user of carrying in the second processing unit of state of activation is switched to the first processing unit, the number of described the first processing unit is identical with described required processing unit number, and the number of users that each described the first processing unit carries is greater than the number of users that each described the second processing unit carries.
29. devices according to claim 27, it is characterized in that, described the first computing module is for calculating according to described business load situation of carrying in the chip of state of activation and processing unit bearing capacity, by the processing unit number calculating and the 3rd default multiplication, obtain described required processing unit number.
30. devices according to claim 26, is characterized in that, described device also comprises:
The 3rd access module, for there is new user access when described the first chip, when the user of carrying when described the first processing unit does not reach the 3rd default value, accesses described the first processing unit by described new user;
Processing unit starts module, while reaching the 3rd default value, starts the processing unit in off state for the user of carrying when described the first processing unit, described new user is accessed to the processing unit of startup.
31. devices according to claim 18, is characterized in that, described device also comprises:
State of activation arranges module, is set to state of activation for baseband board, chip and the processing unit of base station preset number;
Power save mode arranges module, is set to power save mode for all the other baseband boards of base station, chip and processing unit.
32. devices according to claim 31, is characterized in that, described device also comprises:
Number determination module, for according to the traffic carrying capacity Changing Pattern of the described base station of described base station historical statistics, determines baseband board, chip and the processing unit of described preset number; Or,
Described number determination module, the also user density for serving according to the described base station of described base station historical statistics, determines baseband board, chip and the processing unit of described preset number.
33. devices according to claim 32, is characterized in that,
Described business load situation statistical module, also for the number of users of base station described in real-time statistics;
Described number determination module is for determining baseband board, chip and the processing unit of described preset number according to described number of users.
34. devices according to claim 31, is characterized in that, described device also comprises:
The 4th access module, in the time having new user to access, according to load balancing principle, is linked into described new user on the processing unit in state of activation.
35. 1 kinds of base stations, is characterized in that, comprising: processor, and described processor is configured to for carrying out following operation: the business load situation of accounting base-station; According to the business load situation of described base station, calculate the required baseband board number in described base station and required chip number; According to current baseband board number and the described required baseband board number in state of activation in described base station, the user of described base station is switched between baseband board, turn-off the baseband board that carrying number of users is zero; According to current chip number and the described required chip number in state of activation in described base station, the user of described base station is switched between chip, turn-off the chip that carrying number of users is zero.
CN201310112343.2A 2013-04-01 2013-04-01 Base station handles method, apparatus and base station Active CN104105151B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201310112343.2A CN104105151B (en) 2013-04-01 2013-04-01 Base station handles method, apparatus and base station
PCT/CN2014/074545 WO2014161474A1 (en) 2013-04-01 2014-04-01 Base station processing method and device, and base station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310112343.2A CN104105151B (en) 2013-04-01 2013-04-01 Base station handles method, apparatus and base station

Publications (2)

Publication Number Publication Date
CN104105151A true CN104105151A (en) 2014-10-15
CN104105151B CN104105151B (en) 2017-11-17

Family

ID=51657603

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310112343.2A Active CN104105151B (en) 2013-04-01 2013-04-01 Base station handles method, apparatus and base station

Country Status (2)

Country Link
CN (1) CN104105151B (en)
WO (1) WO2014161474A1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016074516A1 (en) * 2014-11-13 2016-05-19 中兴通讯股份有限公司 Method and device for saving energy for service board
CN107105452A (en) * 2016-02-19 2017-08-29 大唐移动通信设备有限公司 A kind of method and device of the load balancing based on PUCCH
CN111132284A (en) * 2019-12-05 2020-05-08 珠海格力电器股份有限公司 Dynamic capacity allocation method for base station and base station
CN111132174A (en) * 2019-12-06 2020-05-08 珠海格力电器股份有限公司 Resource setting method and device for base station
CN111163506A (en) * 2019-12-23 2020-05-15 京信通信技术(广州)有限公司 Energy saving method and device, computer equipment and storage medium
CN112118617A (en) * 2020-09-02 2020-12-22 中国联合网络通信集团有限公司 Base station energy saving method, device and storage medium
WO2024113084A1 (en) * 2022-11-28 2024-06-06 华为技术有限公司 Energy-saving method and related device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101232659A (en) * 2008-02-20 2008-07-30 中兴通讯股份有限公司 Method for reducing single board power consumption
CN101730314A (en) * 2008-11-03 2010-06-09 大唐移动通信设备有限公司 Power consumption lowering method and system of base station base band plate
CN102546999A (en) * 2012-01-20 2012-07-04 华为技术有限公司 Method, control device and system for reducing device power consumption based on business model
CN102918909A (en) * 2011-05-31 2013-02-06 华为技术有限公司 Processing method and device based on base band pool

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101232659A (en) * 2008-02-20 2008-07-30 中兴通讯股份有限公司 Method for reducing single board power consumption
CN101730314A (en) * 2008-11-03 2010-06-09 大唐移动通信设备有限公司 Power consumption lowering method and system of base station base band plate
CN102918909A (en) * 2011-05-31 2013-02-06 华为技术有限公司 Processing method and device based on base band pool
CN102546999A (en) * 2012-01-20 2012-07-04 华为技术有限公司 Method, control device and system for reducing device power consumption based on business model

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016074516A1 (en) * 2014-11-13 2016-05-19 中兴通讯股份有限公司 Method and device for saving energy for service board
CN107105452A (en) * 2016-02-19 2017-08-29 大唐移动通信设备有限公司 A kind of method and device of the load balancing based on PUCCH
CN111132284A (en) * 2019-12-05 2020-05-08 珠海格力电器股份有限公司 Dynamic capacity allocation method for base station and base station
CN111132174A (en) * 2019-12-06 2020-05-08 珠海格力电器股份有限公司 Resource setting method and device for base station
CN111163506A (en) * 2019-12-23 2020-05-15 京信通信技术(广州)有限公司 Energy saving method and device, computer equipment and storage medium
CN111163506B (en) * 2019-12-23 2021-05-28 京信通信技术(广州)有限公司 Energy saving method and device, computer equipment and storage medium
CN112118617A (en) * 2020-09-02 2020-12-22 中国联合网络通信集团有限公司 Base station energy saving method, device and storage medium
CN112118617B (en) * 2020-09-02 2022-09-16 中国联合网络通信集团有限公司 Base station energy saving method, device and storage medium
WO2024113084A1 (en) * 2022-11-28 2024-06-06 华为技术有限公司 Energy-saving method and related device

Also Published As

Publication number Publication date
CN104105151B (en) 2017-11-17
WO2014161474A1 (en) 2014-10-09

Similar Documents

Publication Publication Date Title
CN104105151A (en) Base station processing method and device, and base station
KR101309611B1 (en) Apparatus and method for controlling a node of a wireless communication system
US20130288686A1 (en) Techniques to manage energy savings for interoperable radio access technology networks
CN104080151B (en) A kind of network selecting method, device and base station
CN110677873A (en) Service data transmission method and device
CN103200655A (en) Method and device for energy conservation of remote radio frequency system
KR102173446B1 (en) Method of management of a wireless interface of a device and corresponding wireless device
CN110062450A (en) Method, apparatus, equipment and the readable storage medium storing program for executing of the base station 5G energy saving
CN101627561A (en) Mobile platform tracking in wireless networks
EP2779725B1 (en) Carrier control method and corresponding base station device
CN102170685A (en) Energy-saving method of wireless communication system
WO2021139323A1 (en) Base station control method, operations support system (oss), and distributed base station system (dbs)
CN106060911A (en) Radio unit (RU) hibernation and wakeup methods and node B
CN104811965B (en) A kind of method and device of terminal optimized Internet resources
CN106332203A (en) Green energy-saving algorithm for use in LTE (long-term evolution) hierarchical cell architecture
CN102740426A (en) Base station energy-saving method, device and system
CN105430705B (en) A kind of method for switching network, device and communication terminal
CN102685858B (en) Radio frequency unit power consumption control method and station system
Jorguseski et al. Energy saving in wireless access networks
CN102300295B (en) Method for realizing energy conservation of base station
CN102421122B (en) Service processing method and equipment
CN206251119U (en) A kind of router
CN103686760B (en) Access point plan model and method of a kind of distributed base station based on efficiency criterion
CN102348213B (en) Evaluation method and device based on wireless network resource utilization
CN103167577A (en) Method for closing small residential area and site device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant