CN104092295A - Power grid dispatching comprehensive monitoring MIS platform - Google Patents
Power grid dispatching comprehensive monitoring MIS platform Download PDFInfo
- Publication number
- CN104092295A CN104092295A CN201410266658.7A CN201410266658A CN104092295A CN 104092295 A CN104092295 A CN 104092295A CN 201410266658 A CN201410266658 A CN 201410266658A CN 104092295 A CN104092295 A CN 104092295A
- Authority
- CN
- China
- Prior art keywords
- switch
- dispatching
- mis
- exchanger
- platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/40—Display of information, e.g. of data or controls
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a power grid dispatching comprehensive monitoring MIS platform which comprises a running section and a dispatching section. The dispatching section comprises a first exchanger, an MIS database and a dispatching operation end. The running section comprises a second exchanger, operation and monitoring devices, an SCADA system host, a background control end and a foreground monitoring end. The first exchanger is connected with the second exchanger through the internet, the number of the operation and monitoring devices is a lot, and the operation and monitoring devices are connected with the second exchanger. The SCADA system host, the background control end and the foreground monitoring end are connected with the second exchanger, and the MIS database and the dispatching operation end are connected with the first exchanger. According to the power grid dispatching comprehensive monitoring MIS platform, the integration degree of a power generation MIS platform can be improved, and accordingly a rational and simplified hardware integration system is provided for achieving power grid dispatching comprehensive monitoring.
Description
Technical field
The present invention relates to a kind of dispatching of power netwoks overall monitor MIS platform, belong to power distribution network dispatching automation and safe operation technical field.
Background technology
Along with the continuous expansion of electrical network scale, the work of regional power grid scheduling is day by day heavy.The microcomputer of Dispatching from initial manual formulation to operation order is auxiliary to be generated, and is the great change of dispatcher being intended to ticket mode.Along with the maturation application of computer networking technology in electrical production, scheduling operation instruction ticket realized from intending ticket, examine ticket, be dealt in advance execution etc. all passes through electrical production MIS(Management Information System, being management information system) platform realizes electronics circulation, realized the management of Dispatching procedure.But the degree of integration of existing electrical production MIS platform still needs further to be improved, to realize Computer-aided Intelligent monitoring; Thereby in the anti-error technological means of Dispatching, there is a lifting, make to dispatch misoperation all the time in controllable state.
Summary of the invention
The deficiency that the present invention exists for prior art just, provides a kind of dispatching of power netwoks overall monitor MIS platform, can improve the integrated degree of electrical production MIS platform, thus the hardware integration system that provides rationally, simplifies for the realization of dispatching of power netwoks overall monitor.
For addressing the above problem, the technical solution used in the present invention is as follows:
A kind of dispatching of power netwoks overall monitor MIS platform, comprising:
Operation department and traffic department, described traffic department comprises the first switch, MIS database, schedule job end, described operation department comprises the second switch, operation and watch-dog, SCADA system host, backstage manipulation end, foreground monitoring client;
Described the first switch and described the second switch pass through Internet connection, described operation is multiple with watch-dog and is connected described the second switch, and described SCADA system host, described backstage manipulation end and described foreground monitoring client are all connected described the second switch; Described MIS database is connected described the first switch with described schedule job end.
Above-mentioned the first switch, MIS database, schedule job end, the second switch, operation and watch-dog, SCADA system host, backstage manipulation end, foreground monitoring client all refer to hardware device, wherein MIS database and SCADA system host should be understood to main frame or the server for depositing information and data, schedule job end, backstage manipulation end and foreground monitoring client should be understood to the display device that can observe and operate and the equipment of ordering, and the concrete equipment of ordering can be button, switch, computor-keyboard etc.
As the improvement of technique scheme, described traffic department also comprises communication switcher and the first telephone set, described operation department also comprises the second telephone set, described the first telephone set connects described communication switcher, described communication switcher connects described the first switch, and described communication switcher is connected by communication network with described the second telephone set.
As the improvement of technique scheme, between described the first switch and internet, be provided with the first firewall box, between described the second switch and internet, be provided with the second firewall box.Described the first firewall box and the second firewall box all refer to have the finished product network equipment of firewall functionality, as the commercially available product such as the USG2210 of Huawei, SINFOR NGAF-1120.
Compared with prior art, implementation result of the present invention is as follows in the present invention:
A kind of dispatching of power netwoks overall monitor MIS platform of the present invention, form the integrated system taking operation of power networks real-time information collection feedback, operation dispatching instruction as main purpose in operation department, traffic department form taking operation of power networks record preserve, scheduling issues an order as the integrated system of main purpose; And in operation department, the operating side structure that foreground monitoring client and backstage manipulation end combine is set, thereby is conducive to improve the anti-error level of scheduling operation; Take into full account the flexibility that dispatching telephone is ordered, dispatcher telephone system is integrated in dispatching of power netwoks overall monitor MIS platform by being arranged at the communication switcher 11 of traffic department, make both non-interference of network system and communication system, there is again relevant relevance.
Brief description of the drawings
Fig. 1 is a kind of dispatching of power netwoks overall monitor MIS platform structure schematic diagram of the present invention.
Embodiment
Content of the present invention is described below in conjunction with specific embodiments.
As shown in Figure 1, be a kind of dispatching of power netwoks overall monitor MIS platform structure schematic diagram of the present invention.A kind of dispatching of power netwoks overall monitor MIS platform of the present invention, comprise: operation department and traffic department, described traffic department comprises the first switch 6, MIS database 7, schedule job end 13, and described operation department comprises the second switch 2, operation and watch-dog 1, SCADA system host 8, backstage manipulation end 3, foreground monitoring client 9; Described the first switch 6 and described the second switch 2 pass through Internet connection, described operation and watch-dog 1 is for multiple and be connected described the second switch 2, and described SCADA system host 8, described backstage manipulation end 3 and described foreground monitoring client 9 are all connected described the second switch 2; Described MIS database 7 is connected described the first switch 6 with described schedule job end 13.
Foreground monitoring client 9 sends after instruction, backstage manipulation end 3 is carried out operation according to instruction manipulation operation and the watch-dog 1 of foreground monitoring client 9, and operation simultaneously and watch-dog 1 are sent out deaf by operation of power networks information to foreground monitoring client 9, backstage manipulation end 3 and schedule job end 13 in time; By foreground monitoring client 9 being set in operation department, backstage manipulation end 3 is set again, make can implement well monitoring principle in scheduling operation process, the safety and reliability that improves the operation of operation department, meanwhile, traffic department can understand job scheduling and the state of operation department in real time.SCADA system host 8 is main reception and dispatching centres of operation of power networks real time information, and MIS database is the preservation center of operation of power networks record.
With improvement, described traffic department also comprises communication switcher 11 and the first telephone set 12, described operation department also comprises the second telephone set 10, described the first telephone set 12 connects described communication switcher 11, described communication switcher 11 connects described the first switch 6, and described communication switcher 11 is connected by communication network with described the second telephone set 10.Further with improvement, between described the first switch 6 and internet, be provided with the first firewall box 5, between described the second switch 2 and internet, be provided with the second firewall box 4.
Use dispatching telephone to order to have network instruction and be difficult to alternative flexibility, therefore in a kind of dispatching of power netwoks overall monitor MIS platform of the present invention, carry out integrated to telephone plant, and make the phone connection between operation department and traffic department be connected parallel with network, thereby improve the reliability of information interchange, avoid the shared interconnection network of phone and computer and the phase mutual interference or the operating personnel that produce make mistakes in the time of schedule job simultaneously; In addition, by communication switcher 11 is set in traffic department, and by communication switcher 11, the first telephone set 12 is integrated in dispatching of power netwoks overall monitor MIS platform, thereby can records dispatching telephone, preserve, the operation such as monitoring.The secret and safe that the first firewall box 5 and the second firewall box 4 are conducive to realize network data transmission is set.
The logical operation that a kind of dispatching of power netwoks overall monitor MIS platform of the present invention uses in operation process or the realization of determination methods can adopt existing conventional computer treatment facility on the one hand, also can adopt on the other hand the single-chip microcomputer that does not relate to programming with special function circuit structure.
Above content is detailed description made for the present invention in conjunction with specific embodiments, can not assert that the concrete enforcement of the present invention only limits to these explanations.For those skilled in the art, without departing from the inventive concept of the premise, can also make some simple deduction or replace, all should be considered as belonging to the scope of protection of the invention.
Claims (3)
1. a dispatching of power netwoks overall monitor MIS platform, is characterized in that, comprising:
Operation department and traffic department, described traffic department comprises the first switch (6), MIS database (7), schedule job end (13), and described operation department comprises the second switch (2), operation and watch-dog (1), SCADA system host (8), backstage manipulation end (3), foreground monitoring client (9);
Described the first switch (6) and described the second switch (2) pass through Internet connection, described operation and watch-dog (1) are for multiple and be connected described the second switch (2), and described SCADA system host (8), described backstage manipulation end (3) and described foreground monitoring client (9) are all connected described the second switch (2); Described MIS database (7) is connected described the first switch (6) with described schedule job end (13).
2. a kind of dispatching of power netwoks overall monitor MIS platform as claimed in claim 1, it is characterized in that, described traffic department also comprises communication switcher (11) and the first telephone set (12), described operation department also comprises the second telephone set (10), described the first telephone set (12) connects described communication switcher (11), described communication switcher (11) connects described the first switch (6), and described communication switcher (11) is connected by communication network with described the second telephone set (10).
3. a kind of dispatching of power netwoks overall monitor MIS platform as claimed in claim 1, it is characterized in that, between described the first switch (6) and internet, be provided with the first firewall box (5), between described the second switch (2) and internet, be provided with the second firewall box (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410266658.7A CN104092295A (en) | 2014-06-16 | 2014-06-16 | Power grid dispatching comprehensive monitoring MIS platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410266658.7A CN104092295A (en) | 2014-06-16 | 2014-06-16 | Power grid dispatching comprehensive monitoring MIS platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104092295A true CN104092295A (en) | 2014-10-08 |
Family
ID=51639986
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410266658.7A Pending CN104092295A (en) | 2014-06-16 | 2014-06-16 | Power grid dispatching comprehensive monitoring MIS platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104092295A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109103859A (en) * | 2018-10-24 | 2018-12-28 | 云南电网有限责任公司电力科学研究院 | A kind of distribution differential protection measure and control device for supporting 4G to communicate |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202166879U (en) * | 2011-03-18 | 2012-03-14 | 沈阳易讯科技股份有限公司 | Power intelligent dispatch management system |
CN202817897U (en) * | 2012-07-05 | 2013-03-20 | 山西省电力公司长治供电分公司 | Power grid system for integrating grid distribution, scheduling and centralized control in one |
-
2014
- 2014-06-16 CN CN201410266658.7A patent/CN104092295A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202166879U (en) * | 2011-03-18 | 2012-03-14 | 沈阳易讯科技股份有限公司 | Power intelligent dispatch management system |
CN202817897U (en) * | 2012-07-05 | 2013-03-20 | 山西省电力公司长治供电分公司 | Power grid system for integrating grid distribution, scheduling and centralized control in one |
Non-Patent Citations (2)
Title |
---|
王文林 等: "新型调度操作票***防误技术研究与应用", 《电网技术》, vol. 30, 30 December 2006 (2006-12-30) * |
陈武: "SCADA***与MIS***的新型连接方式", 《云南电力技术》, vol. 34, no. 1, 28 February 2006 (2006-02-28) * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109103859A (en) * | 2018-10-24 | 2018-12-28 | 云南电网有限责任公司电力科学研究院 | A kind of distribution differential protection measure and control device for supporting 4G to communicate |
CN109103859B (en) * | 2018-10-24 | 2020-02-07 | 云南电网有限责任公司电力科学研究院 | Distribution network differential protection measurement and control device supporting 4G communication |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106774192B (en) | Heat treatment intelligence system and its control method based on MES | |
CN203070033U (en) | PLC remote monitoring system based on Web | |
CN104076770A (en) | Method and system for monitoring production line | |
CN106532935B (en) | For carrying out the method and its system of secondary system of intelligent substation fault diagnosis | |
CN106026405A (en) | Relay protection on-line monitoring and analyzing system based on EMS system | |
CN103488150B (en) | Ironmaking production information online management system and management method | |
CN106160219A (en) | The monitoring method of remote forced monitoring system for transformer station switching operation | |
CN105262227A (en) | Fool-proof lockout system | |
CN103312031A (en) | Electric power device data acquisition system and acquisition method | |
CN201742443U (en) | Computer network for testing electric transmission and transformation equipment states | |
CN202550669U (en) | Data acquisition system for power equipment | |
CN105022369A (en) | Intelligent monitoring system of sewage treatment plant | |
CN204392301U (en) | A kind of remote maintenance system | |
CN104320478A (en) | Transformer substation real-time information browsing system based on digital remote centralized management scheme | |
CN107545519A (en) | A kind of power grid enterprises' fortune inspection management-control method | |
CN201830020U (en) | Remote video monitoring system of intelligent transformer substation based on electric power data network | |
CN202003203U (en) | Multistage ring-net-controlled framework for sewage-processing plant | |
CN103368262B (en) | Programmed control method and system based on intelligent telecontrol | |
CN203588043U (en) | Remote wireless monitoring system for equipment of coal preparation plant | |
CN102904756A (en) | Power information communication scheduling-operation-inspection integrated processing method | |
CN105488573A (en) | Substation inspection management method based on online and offline modes | |
CN104092295A (en) | Power grid dispatching comprehensive monitoring MIS platform | |
CN106850816A (en) | A kind of remote network control system based on VLAN | |
CN102591295A (en) | Cement mill real-time monitoring statistics query integration system | |
CN203241782U (en) | System for collecting hospital clean operating room information and monitoring air-conditioner |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20141008 |