CN104092201A - 远距离特高压交流输电线路故障判别方法 - Google Patents

远距离特高压交流输电线路故障判别方法 Download PDF

Info

Publication number
CN104092201A
CN104092201A CN201410361574.1A CN201410361574A CN104092201A CN 104092201 A CN104092201 A CN 104092201A CN 201410361574 A CN201410361574 A CN 201410361574A CN 104092201 A CN104092201 A CN 104092201A
Authority
CN
China
Prior art keywords
tau
omega
beta
alpha
voltage alternating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410361574.1A
Other languages
English (en)
Other versions
CN104092201B (zh
Inventor
曾惠敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Maintenance Branch of State Grid Fujian Electric Power Co Ltd
Putian Power Supply Co of State Grid Fujian Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Maintenance Branch of State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Fujian Electric Power Co Ltd, Maintenance Branch of State Grid Fujian Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410361574.1A priority Critical patent/CN104092201B/zh
Publication of CN104092201A publication Critical patent/CN104092201A/zh
Application granted granted Critical
Publication of CN104092201B publication Critical patent/CN104092201B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Protection Circuit Devices (AREA)

Abstract

一种远距离特高压交流输电线路故障判别方法。首先采集特高压交流输电线路两端保护安装处各个采样时刻的电压、电流行波分量,计及线路损耗的影响,利用各采样时刻行波电气量通过预测算法计算特高压交流输电线路一端的电流行波分量,然后利用特高压交流输电线路沿线分布电容电流作为制动电流,利用计算得到的特高压交流输电线路一端的电流行波分量与采样得到的该端电流行波分量的矢量和作为差动电流,分相构成特高压交流输电线路主保护。本发明方法无需通过插值运算求取各采样时刻的电流行波分量,减少了电流行波保护运算量,提高了电流行波差动保护动作速度,适用于不同运行环境和线路参数的特高压交流输电线路继电保护。

Description

远距离特高压交流输电线路故障判别方法
技术领域
本发明涉及电力***继电保护技术领域,具体地说是涉及一种远距离特高压交流输电线路故障判别方法。
背景技术
由于不受***运行方式和电网结构影响且具有天然的选相功能,电流差动保护一直是各种电压等级输电线路的主保护。在220kV及以下电压等级输电线路中,由于输电线路沿线分布电容电流很小,分布电容对电流差动保护动作性能影响很小。然而,特高压交流输电线路的电压、电流传输具有明显的波过程,沿线分布电容电流很大,利用两端基频稳态电流分量的矢量和的幅值作为动作量的传统电流差动保护面临着电流差动保护启动电流大,而为了防止保护误动,提高启动设定值又会导致保护灵敏度不足,制约着传统电流差动保护在特高压交流输电线路上的应用。
基于分布参数模型输电线路电流差动保护算法考虑了分布电容的影响,动作性能不受分布电容电流的影响,但需要设计大量复杂的双曲函数运算,双曲函数在微机代码中不易实现,实用困难。行波差动保护在保护算法数学模型中考虑了分布电容的影响,行波差动保护原理上不受输电线路分布电容的影响,具有很高的动作性能。申请号200910034669.1发明专利“适用于串联电容补偿线路的行波差动保护方法”解决了分布电容对差动保护动作性能的影响,但对于行波传播延时为非整数倍采样间隔的情况,需要通过插值运算得到各个时间点上的电气量,对保护装置采样频率的要求非常高,因此对保护装置硬件要求很高,且每个采样时间都要进行插值运算,保护算法本身所需运算量大,无法满足保护速动性的要求。苏斌、董新洲和孙元章发表的《特高压带并联电抗器线路的行波差动保护》以及苏斌、董新洲和孙元章发表的《基于小波变换的行波差动保护》和申请号200410079501.X发明专利“行波保护中电压过零附近故障的检测方法”对于行波传播延时为非整数倍采样间隔的情况也需要通过插值运算得到各个时间点上的电气量,同样存在着运算量大的问题;需要进行小波变换,所需数据窗大,保护检测到故障发生所需时间长。
目前,许多学者已提出的输电线路行波差动保护方法对行波传播延时为非整数倍采样间隔的情况都需要进行插值运算求其各个时间点上的电气量,保护算法本身运算量大,对保护装置采样硬件要求高。其中部分输电线路行波差动保护方法甚至需要进行小波变换,所需数据窗大,延长了保护检测到故障发生的时间,无法满足继电保护对速动性的要求。
发明内容
本发明的目的在于克服已有技术存在的不足,提供一种远距离特高压交流输电线路故障判别方法。本发明方法无需通过插值运算求取各采样时刻的电流行波分量,减少了电流行波保护运算量,提高了电流行波差动保护动作速度。本发明方法利用特高压交流输电线路沿线分布电容电流作为制动电流,无需进行电流门槛值整定,可随着特高压交流输电线路距离、对地分布电容参数变化而变化,适用于各种运行环境和线路参数的特高压交流输电线路继电保护。
本发明采用如下技术方案:
远距离特高压交流输电线路故障判别方法,包括如下依序步骤:
(1)利用位于特高压交流输电线路两端的m变电站保护安装处和n变电站保护安装处的各采样时刻的行波电气量计算t采样时刻的m变电站保护安装处的0、α、β模电流行波分量i′m0(t)、i′(t)、i′(t):
i m 0 ′ ( t ) = u m 0 ( t ) ( 1 - cos ( ω τ 0 ) ) - u m 0 ( t - T 4 ) sin ( ω τ 0 ) ( Z c 0 + R 0 4 ) ( 1 + cos ( ω τ 0 ) ) - i m 0 ( t - T 4 ) sin ( ω τ 0 ) 1 + cos ( ω τ 0 ) - i n 0 ( t ) - i n 0 ( t - T 4 ) sin ( ω τ 0 ) 1 + cos ( ω τ 0 ) + u n 0 ( t ) ( 1 - cos ( ω τ 0 ) ) - u n 0 ( t - T 4 ) sin ( ω τ 0 ) ( Z c 0 + R 0 4 ) ( 1 + cos ( ω τ 0 ) )
i mα ′ ( t ) = u mα ( t ) ( 1 - cos ( ω τ α ) ) - u mα ( t - T 4 ) sin ( ω τ α ) ( Z cα + R α 4 ) ( 1 + cos ( ω τ α ) ) - i mα ( t - T 4 ) sin ( ω τ α ) 1 + cos ( ω τ α ) - i nα ( t ) - i nα ( t - T 4 ) sin ( ω τ α ) 1 + cos ( ω τ α ) + u nα ( t ) ( 1 - cos ( ω τ α ) ) - u nα ( t - T 4 ) sin ( ω τ α ) ( Z cα + R α 4 ) ( 1 + cos ( ω τ α ) )
i mβ ′ ( t ) = u mβ ( t ) ( 1 - cos ( ω τ β ) ) - u mβ ( t - T 4 ) sin ( ω τ β ) ( Z cβ + R β 4 ) ( 1 + cos ( ω τ β ) ) - i mβ ( t - T 4 ) sin ( ω τ β ) 1 + cos ( ω τ β ) - i nβ ( t ) - i nβ ( t - T 4 ) sin ( ω τ β ) 1 + cos ( ω τ β ) + u nβ ( t ) ( 1 - cos ( ω τ β ) ) - u nβ ( t - T 4 ) sin ( ω τ β ) ( Z cβ + R β 4 ) ( 1 + cos ( ω τ β ) )
其中,t为采样时间;l为连接m变电站和n变电站的特高压交流输电线路长度;T为基频分量的周期时间;Zc0、Z、Z分别为特高压交流输电线路0、α、β模行波分量的特性阻抗;νc0、ν、ν分别为特高压交流输电线路0、α、β模行波分量的传播速度;ω为电力***角频率;R0、Rα、Rβ分别为特高压交流输电线路0、α、β模行波分量的电阻;um0(t)、u(t)、u(t)分别为m变电站保护安装处的t采样时刻的0、α、β模的电压行波分量;un0(t)、u(t)、u(t)分别为n变电站保护安装处的t采样时刻的0、α、β模的电压行波分量;in0(t)、i(t)、i(t)分别为n变电站保护安装处的t采样时刻的0、α、β模的电流行波分量; 分别为m变电站保护安装处的采样时刻的0、α、β模的电压行波分量;分别为n变电站保护安装处的采样时刻的0、α、β模的电压行波分量;分别为m变电站保护安装处的采样时刻的0、α、β模的电流行波分量; 分别为n变电站保护安装处的采样时刻的0、α、β模的电流行波分量;
(7)将i′m0(t)、i′(t)、i′(t)进行相模反变换得到t采样时刻的m变电站保护安装处的三相电流行波分量i′mA(t)、i′mB(t)、i′mC(t);对i′mA(t)、i′mB(t)、i′mC(t)采用傅里叶算法计算m变电站保护安装处的t采样时刻的三相基频电流分量
(8)对t采样时刻的m变电站保护安装处的三相实测的电流行波分量imA(t)、imB(t)、imC(t)采用傅里叶算法计算m变电站保护安装处的t采样时刻的三相实测的基频电流分量
(9)对t采样时刻的n变电站保护安装处的三相实测的电流行波分量inA(t)、inB(t)、inC(t)采用傅里叶算法计算n变电站保护安装处的t采样时刻的三相实测的基频电流分量
(10)判断t采样时刻的是否成立,若成立,则判断A相特高压交流输电线路发生故障,跳开A相特高压交流输电线路两端的断路器;
(11)判断t采样时刻的是否成立,若成立,则判断B相特高压交流输电线路发生故障,跳开B相特高压交流输电线路两端的断路器;
(7)判断t采样时刻的是否成立,若成立,则判断C相特高压交流输电线路发生故障,跳开C相特高压交流输电线路两端的断路器。
本发明与现有技术相比较,具有以下积极成果:
当行波分量在特高压交流输电线路上的传输时间不是采样间隔时间的整数倍时,本发明方法无需通过插值运算求取各采样时刻的电流行波分量,减少了电流行波保护运算量,提高了电流行波差动保护动作速度。本发明方法利用特高压交流输电线路沿线分布电容电流作为制动电流,无需整定电流门槛值,可随着特高压交流输电线路长度、对地分布电容参数变化而变化,适用于不同运行环境和线路参数的特高压交流输电线路继电保护。本发明方法无需涉及复杂的双曲函数运算,计算量小,运算速度快,保护动作速度快,适用于实现特高压交流输电线路主保护功能。
附图说明
图1为应用本发明方法的特高压交流输电***示意图。
具体实施方式
下面根据说明书附图对本发明的技术方案做进一步详细表述。
图1为应用本发明方法的特高压交流输电***示意图。本实施例首先采集特高压交流输电线路在m变电站保护安装处的各个采样时刻的三相电压行波分量和三相电流行波分量;采集特高压交流输电线路在n变电站保护安装处的各个采样时刻的三相电压行波分量和三相电流行波分量。
采用相模变换将m、n变电站保护安装处的各个采样时刻的三相电压行波分量、三相电流行波分量转换成0、α、β模电压行波分量和0、α、β模电流行波分量。
利用位于特高压交流输电线路两端的m变电站保护安装处和n变电站保护安装处的各采样时刻的行波电气量计算t采样时刻的m变电站保护安装处的0、α、β模电流行波分量i′m0(t)、i′(t)、i′(t):
i m 0 ′ ( t ) = u m 0 ( t ) ( 1 - cos ( ω τ 0 ) ) - u m 0 ( t - T 4 ) sin ( ω τ 0 ) ( Z c 0 + R 0 4 ) ( 1 + cos ( ω τ 0 ) ) - i m 0 ( t - T 4 ) sin ( ω τ 0 ) 1 + cos ( ω τ 0 ) - i n 0 ( t ) - i n 0 ( t - T 4 ) sin ( ω τ 0 ) 1 + cos ( ω τ 0 ) + u n 0 ( t ) ( 1 - cos ( ω τ 0 ) ) - u n 0 ( t - T 4 ) sin ( ω τ 0 ) ( Z c 0 + R 0 4 ) ( 1 + cos ( ω τ 0 ) )
i mα ′ ( t ) = u mα ( t ) ( 1 - cos ( ω τ α ) ) - u mα ( t - T 4 ) sin ( ω τ α ) ( Z cα + R α 4 ) ( 1 + cos ( ω τ α ) ) - i mα ( t - T 4 ) sin ( ω τ α ) 1 + cos ( ω τ α ) - i nα ( t ) - i nα ( t - T 4 ) sin ( ω τ α ) 1 + cos ( ω τ α ) + u nα ( t ) ( 1 - cos ( ω τ α ) ) - u nα ( t - T 4 ) sin ( ω τ α ) ( Z cα + R α 4 ) ( 1 + cos ( ω τ α ) )
i mβ ′ ( t ) = u mβ ( t ) ( 1 - cos ( ω τ β ) ) - u mβ ( t - T 4 ) sin ( ω τ β ) ( Z cβ + R β 4 ) ( 1 + cos ( ω τ β ) ) - i mβ ( t - T 4 ) sin ( ω τ β ) 1 + cos ( ω τ β ) - i nβ ( t ) - i nβ ( t - T 4 ) sin ( ω τ β ) 1 + cos ( ω τ β ) + u nβ ( t ) ( 1 - cos ( ω τ β ) ) - u nβ ( t - T 4 ) sin ( ω τ β ) ( Z cβ + R β 4 ) ( 1 + cos ( ω τ β ) )
其中,t为采样时间;l为连接m变电站和n变电站的特高压交流输电线路长度;T为基频分量的周期时间;Zc0、Z、Z分别为特高压交流输电线路0、α、β模行波分量的特性阻抗;νc0、ν、ν分别为特高压交流输电线路0、α、β模行波分量的传播速度;ω为电力***角频率;R0、Rα、Rβ分别为特高压交流输电线路0、α、β模行波分量的电阻;um0(t)、u(t)、u(t)分别为m变电站保护安装处的t采样时刻的0、α、β模的电压行波分量;im0(t)、i(t)、i(t)分别为m变电站保护安装处的t采样时刻的0、α、β模的电流行波分量;un0(t)、u(t)、u(t)分别为n变电站保护安装处的t采样时刻的0、α、β模的电压行波分量;in0(t)、i(t)、i(t)分别为n变电站保护安装处的t采样时刻的0、α、β模的电流行波分量;分别为m变电站保护安装处的采样时刻的0、α、β模的电压行波分量;分别为n变电站保护安装处的采样时刻的0、α、β模的电压行波分量; 分别为m变电站保护安装处的采样时刻的0、α、β模的电流行波分量;分别为n变电站保护安装处的采样时刻的0、α、β模的电流行波分量。
将i′m0(t)、i′(t)、i′(t)进行相模反变换得到t采样时刻的m变电站保护安装处的三相电流行波分量i′mA(t)、i′mB(t)、i′mC(t)。
对i′mA(t)、i′mB(t)、i′mC(t)采用傅里叶算法计算m变电站保护安装处的t采样时刻的三相基频电流分量
对t采样时刻的m变电站保护安装处的三相实测的电流行波分量imA(t)、imB(t)、imC(t)采用傅里叶算法计算m变电站保护安装处的t采样时刻的三相实测的基频电流分量
对t采样时刻的n变电站保护安装处的三相实测的电流行波分量inA(t)、inB(t)、inC(t)采用傅里叶算法计算n变电站保护安装处的t采样时刻的三相实测的基频电流分量
判断t采样时刻的是否成立,若成立,则判断A相特高压交流输电线路发生故障,跳开A相特高压交流输电线路两端的断路器;
判断t采样时刻的是否成立,若成立,则判断B相特高压交流输电线路发生故障,跳开B相特高压交流输电线路两端的断路器;
判断t采样时刻的是否成立,若成立,则判断C相特高压交流输电线路发生故障,跳开C相特高压交流输电线路两端的断路器。
当行波分量在特高压交流输电线路上的传输时间不是采样间隔时间的整数倍时,本发明方法无需通过插值运算求取各采样时刻的电流行波分量,减少了电流行波保护运算量,提高了电流行波差动保护动作速度。本发明方法利用特高压交流输电线路沿线分布电容电流作为制动电流,无需整定电流门槛值,可随着特高压交流输电线路长度、对地分布电容参数变化而变化,适用于不同运行环境和线路参数的特高压交流输电线路继电保护。本发明方法无需涉及复杂的双曲函数运算,计算量小,运算速度快,适用于实现特高压交流输电线路主保护功能。
以上所述仅为本发明的较佳具体实施例,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,可轻易想到的变化或替换,都应涵盖在本发明的保护范围之内。

Claims (1)

1.远距离特高压交流输电线路故障判别方法,其特征在于,包括如下依序步骤:
(1)利用位于特高压交流输电线路两端的m变电站保护安装处和n变电站保护安装处的各采样时刻的行波电气量计算t采样时刻的m变电站保护安装处的0、α、β模电流行波分量i′m0(t)、i′(t)、i′(t):
i m 0 ′ ( t ) = u m 0 ( t ) ( 1 - cos ( ω τ 0 ) ) - u m 0 ( t - T 4 ) sin ( ω τ 0 ) ( Z c 0 + R 0 4 ) ( 1 + cos ( ω τ 0 ) ) - i m 0 ( t - T 4 ) sin ( ω τ 0 ) 1 + cos ( ω τ 0 ) - i n 0 ( t ) - i n 0 ( t - T 4 ) sin ( ω τ 0 ) 1 + cos ( ω τ 0 ) + u n 0 ( t ) ( 1 - cos ( ω τ 0 ) ) - u n 0 ( t - T 4 ) sin ( ω τ 0 ) ( Z c 0 + R 0 4 ) ( 1 + cos ( ω τ 0 ) )
i mα ′ ( t ) = u mα ( t ) ( 1 - cos ( ω τ α ) ) - u mα ( t - T 4 ) sin ( ω τ α ) ( Z cα + R α 4 ) ( 1 + cos ( ω τ α ) ) - i mα ( t - T 4 ) sin ( ω τ α ) 1 + cos ( ω τ α ) - i nα ( t ) - i nα ( t - T 4 ) sin ( ω τ α ) 1 + cos ( ω τ α ) + u nα ( t ) ( 1 - cos ( ω τ α ) ) - u nα ( t - T 4 ) sin ( ω τ α ) ( Z cα + R α 4 ) ( 1 + cos ( ω τ α ) )
i mβ ′ ( t ) = u mβ ( t ) ( 1 - cos ( ω τ β ) ) - u mβ ( t - T 4 ) sin ( ω τ β ) ( Z cβ + R β 4 ) ( 1 + cos ( ω τ β ) ) - i mβ ( t - T 4 ) sin ( ω τ β ) 1 + cos ( ω τ β ) - i nβ ( t ) - i nβ ( t - T 4 ) sin ( ω τ β ) 1 + cos ( ω τ β ) + u nβ ( t ) ( 1 - cos ( ω τ β ) ) - u nβ ( t - T 4 ) sin ( ω τ β ) ( Z cβ + R β 4 ) ( 1 + cos ( ω τ β ) )
其中,t为采样时间;l为连接m变电站和n变电站的特高压交流输电线路长度;T为基频分量的周期时间;Zc0、Z、Z分别为特高压交流输电线路0、α、β模行波分量的特性阻抗;νc0、ν、ν分别为特高压交流输电线路0、α、β模行波分量的传播速度;ω为电力***角频率;R0、Rα、Rβ分别为特高压交流输电线路0、α、β模行波分量的电阻;um0(t)、u(t)、u(t)分别为m变电站保护安装处的t采样时刻的0、α、β模的电压行波分量;un0(t)、u(t)、u(t)分别为n变电站保护安装处的t采样时刻的0、α、β模的电压行波分量;in0(t)、i(t)、i(t)分别为n变电站保护安装处的t采样时刻的0、α、β模的电流行波分量;分别为m变电站保护安装处的采样时刻的0、α、β模的电压行波分量; 分别为n变电站保护安装处的采样时刻的0、α、β模的电压行波分量;分别为m变电站保护安装处的采样时刻的0、α、β模的电流行波分量;分别为n变电站保护安装处的采样时刻的0、α、β模的电流行波分量;
(2)将i′m0(t)、i′(t)、i′(t)进行相模反变换得到t采样时刻的m变电站保护安装处的三相电流行波分量i′mA(t)、i′mB(t)、i′mC(t);对i′mA(t)、i′mB(t)、i′mC(t)采用傅里叶算法计算m变电站保护安装处的t采样时刻的三相基频电流分量
(3)对t采样时刻的m变电站保护安装处的三相实测的电流行波分量imA(t)、imB(t)、imC(t)采用傅里叶算法计算m变电站保护安装处的t采样时刻的三相实测的基频电流分量
(4)对t采样时刻的n变电站保护安装处的三相实测的电流行波分量inA(t)、inB(t)、inC(t)采用傅里叶算法计算n变电站保护安装处的t采样时刻的三相实测的基频电流分量
(5)判断t采样时刻的是否成立,若成立,则判断A相特高压交流输电线路发生故障,跳开A相特高压交流输电线路两端的断路器;
(6)判断t采样时刻的是否成立,若成立,则判断B相特高压交流输电线路发生故障,跳开B相特高压交流输电线路两端的断路器;
(7)判断t采样时刻的是否成立,若成立,则判断C相特高压交流输电线路发生故障,跳开C相特高压交流输电线路两端的断路器。
CN201410361574.1A 2014-07-25 2014-07-25 远距离特高压交流输电线路故障判别方法 Active CN104092201B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410361574.1A CN104092201B (zh) 2014-07-25 2014-07-25 远距离特高压交流输电线路故障判别方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410361574.1A CN104092201B (zh) 2014-07-25 2014-07-25 远距离特高压交流输电线路故障判别方法

Publications (2)

Publication Number Publication Date
CN104092201A true CN104092201A (zh) 2014-10-08
CN104092201B CN104092201B (zh) 2017-02-15

Family

ID=51639893

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410361574.1A Active CN104092201B (zh) 2014-07-25 2014-07-25 远距离特高压交流输电线路故障判别方法

Country Status (1)

Country Link
CN (1) CN104092201B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104360232A (zh) * 2014-11-14 2015-02-18 国家电网公司 基于故障位置因子相位特性线路相间故障判别方法
CN105071355A (zh) * 2015-05-19 2015-11-18 国家电网公司 一种长距离特高压直流输电线路的差动保护方法
WO2016173312A1 (zh) * 2015-04-29 2016-11-03 南京南瑞继保电气有限公司 一种基于电压量的断路器非全相判别方法及装置
CN108872768A (zh) * 2018-06-11 2018-11-23 国网湖北省电力有限公司宜昌供电公司 一种复压闭锁中负序元件精准测试方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102694374A (zh) * 2012-06-11 2012-09-26 福建省电力有限公司检修分公司 一种基于电流行波预测的输电线路差动保护方法
CN103248025A (zh) * 2013-05-10 2013-08-14 国家电网公司 一种有损耗输电线路电流行波差动保护方法
CN103296649A (zh) * 2013-05-19 2013-09-11 国家电网公司 抗电流互感器饱和影响的有损耗输电线路电流行波差动保护方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102694374A (zh) * 2012-06-11 2012-09-26 福建省电力有限公司检修分公司 一种基于电流行波预测的输电线路差动保护方法
CN103248025A (zh) * 2013-05-10 2013-08-14 国家电网公司 一种有损耗输电线路电流行波差动保护方法
CN103296649A (zh) * 2013-05-19 2013-09-11 国家电网公司 抗电流互感器饱和影响的有损耗输电线路电流行波差动保护方法

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104360232A (zh) * 2014-11-14 2015-02-18 国家电网公司 基于故障位置因子相位特性线路相间故障判别方法
WO2016173312A1 (zh) * 2015-04-29 2016-11-03 南京南瑞继保电气有限公司 一种基于电压量的断路器非全相判别方法及装置
US10267859B2 (en) 2015-04-29 2019-04-23 Nr Electric Co., Ltd Method and apparatus for identifying open phase of circuit breaker on basis of voltage
CN105071355A (zh) * 2015-05-19 2015-11-18 国家电网公司 一种长距离特高压直流输电线路的差动保护方法
CN105071355B (zh) * 2015-05-19 2018-01-09 国家电网公司 一种长距离特高压直流输电线路的差动保护方法
CN108872768A (zh) * 2018-06-11 2018-11-23 国网湖北省电力有限公司宜昌供电公司 一种复压闭锁中负序元件精准测试方法
CN108872768B (zh) * 2018-06-11 2020-09-22 国网湖北省电力有限公司宜昌供电公司 一种复压闭锁中负序元件精准测试方法

Also Published As

Publication number Publication date
CN104092201B (zh) 2017-02-15

Similar Documents

Publication Publication Date Title
CN102694374B (zh) 一种基于电流行波预测的输电线路差动保护方法
Sahoo et al. An enhanced fault detection and location estimation method for TCSC compensated line connecting wind farm
CN102721902B (zh) 基于电压行波预测的输电线路故障检测方法
CN102129014B (zh) 一种利用分布参数模型实现线路相间故障单端测距方法
CN103219711B (zh) 一种同杆并架双回线路接地故障距离保护方法
CN103762568B (zh) 输电线路负序电流分相差动保护方法
CN104092201A (zh) 远距离特高压交流输电线路故障判别方法
CN102129011B (zh) 一种抗分布电容电流和故障电阻的线路相间故障单端测距方法
CN102967779B (zh) 一种输电线路分布参数的辨识方法
CN103983847B (zh) 一种同步相量测量中基于rls的自适应频率跟踪测量方法
CN103248025B (zh) 一种有损耗输电线路电流行波差动保护方法
CN103207312B (zh) 基于动态数据窗的电压电流相量测量方法
CN105552865A (zh) 一种基于单侧电流的半波长线路自由波能量保护方法
CN103248026B (zh) 抗分布电容电流和过渡电阻的线路单相接地故障继电保护方法
CN104655981A (zh) 一种利用交叉顺序差分变换的行波极性比较式方向保护方法
Liu et al. A novel pilot directional protection scheme for HVDC transmission line based on specific frequency current
Nasab et al. A hybrid scheme for fault locating for transmission lines with TCSC
CN102608498B (zh) 新能源输电线路故障选相方法
CN103762566B (zh) 利用双曲正切函数幅值特性实现线路相间故障继电保护方法
Ukil et al. Power systems frequency estimation using amplitude tracking square wave for low-end protective relays
CN103296655B (zh) 抗电流互感器饱和影响的无损耗线路电流行波差动保护方法
Sahoo et al. An enhanced travelling wave-based fault detection and location estimation technique for series compensated transmission network
CN104124673A (zh) 一种确定振荡中心位置的方法
CN103248021B (zh) 一种有损耗输电线路电压行波保护方法
CN103296649B (zh) 抗电流互感器饱和影响的有损耗输电线路电流行波差动保护方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: STATE GRID FUJIAN ELECTRIC POWER CO., LTD. MAINTEN

Free format text: FORMER OWNER: STATE GRID FUJIAN ELECTRIC POWER CO., LTD. MAINTENANCE BRANCH COMPANY OF STATE GRID FUJIAN ELECTRIC POWER COMPANY

Effective date: 20140924

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zeng Huimin

Inventor after: Lin Fuhong

Inventor before: Zeng Huimin

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: CENG HUIMIN TO: CENG HUIMIN LIN FUHONG

TA01 Transfer of patent application right

Effective date of registration: 20140924

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: STATE GRID FUJIAN ELECTRIC POWER Co.,Ltd.

Applicant after: STATE GRID FUJIAN MAINTENANCE Co.

Applicant after: STATE GRID PUTIAN ELECTRIC POWER SUPPLY Co.

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant before: State Grid Corporation of China

Applicant before: STATE GRID FUJIAN ELECTRIC POWER Co.,Ltd.

Applicant before: STATE GRID FUJIAN MAINTENANCE Co.

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Co-patentee after: STATE GRID FUJIAN ELECTRIC POWER Co.,Ltd.

Patentee after: STATE GRID CORPORATION OF CHINA

Co-patentee after: STATE GRID FUJIAN MAINTENANCE Co.

Co-patentee after: STATE GRID PUTIAN ELECTRIC POWER SUPPLY Co.

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Co-patentee before: STATE GRID FUJIAN ELECTRIC POWER Co.,Ltd.

Patentee before: State Grid Corporation of China

Co-patentee before: STATE GRID FUJIAN MAINTENANCE Co.

Co-patentee before: STATE GRID PUTIAN ELECTRIC POWER SUPPLY Co.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 351100 Putian province Fujian city Chengxiang District Nanyuan Xia Lin Street Road No. 999

Co-patentee after: STATE GRID CORPORATION OF CHINA

Patentee after: STATE GRID PUTIAN ELECTRIC POWER SUPPLY Co.

Co-patentee after: STATE GRID FUJIAN ELECTRIC POWER Co.,Ltd.

Co-patentee after: STATE GRID FUJIAN MAINTENANCE Co.

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Co-patentee before: STATE GRID FUJIAN ELECTRIC POWER Co.,Ltd.

Patentee before: STATE GRID CORPORATION OF CHINA

Co-patentee before: STATE GRID FUJIAN MAINTENANCE Co.

Co-patentee before: STATE GRID PUTIAN ELECTRIC POWER SUPPLY Co.