CN104090243B - Voltage stabilizer testing tool - Google Patents

Voltage stabilizer testing tool Download PDF

Info

Publication number
CN104090243B
CN104090243B CN201410313333.XA CN201410313333A CN104090243B CN 104090243 B CN104090243 B CN 104090243B CN 201410313333 A CN201410313333 A CN 201410313333A CN 104090243 B CN104090243 B CN 104090243B
Authority
CN
China
Prior art keywords
manostat
still
load
fixtures
tested
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410313333.XA
Other languages
Chinese (zh)
Other versions
CN104090243A (en
Inventor
方玉胡
施清清
伍唯唯
解伟
张成成
崔斌
陈逵
蒋建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Gree Hefei Electric Appliances Co Ltd
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Gree Hefei Electric Appliances Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai, Gree Hefei Electric Appliances Co Ltd filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201410313333.XA priority Critical patent/CN104090243B/en
Publication of CN104090243A publication Critical patent/CN104090243A/en
Application granted granted Critical
Publication of CN104090243B publication Critical patent/CN104090243B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Of Individual Semiconductor Devices (AREA)

Abstract

The invention provides a voltage stabilizer testing tool which comprises a voltage change-over switch, a load change-over switch and an IC clamp. The voltage change-over switch is connected between a plurality of power sources and the IC clamp and used for switching among the multiple power sources in the testing process; the load change-over switch is connected between multiple loads and the IC clamp and used for switching among the multiple loads in the testing process; the IC clamp is used for containing a voltage stabilizer to be tested. By means of the voltage stabilizer testing tool, when testing is carried out, the voltage stabilizer to be tested only needs to be contained in the IC clamp, testing can be completed by operating the voltage change-over switch and the load change-over switch, the complex connection, disassembling and assembling working procedures in the testing process are avoided, the testing process is simplified, and the testing efficiency is greatly improved.

Description

Manostat test fixture
Technical field
The present invention relates to test fixture technical field, more particularly to a kind of manostat test fixture.
Background technology
Generally, the method that the test of the maximum input voltage and maximum load of manostat is generally adopted is first will Dead load is welded on the outfan of manostat, and the input of manostat is connected to power supply with wire then.Test first steady Service behaviour of the depressor in the case of low-voltage, little load, after being completed by Power convert be high voltage.Test completes height Load is replaced by into high capacity after voltage, re-test low-load after high capacity has been tested, all of Renewal process is all needed in the middle of this Dismount, removed after the completion of once testing again, complex steps, efficiency are low.
The content of the invention
In view of the present situation of prior art, it is an object of the invention to provide a kind of manostat test fixture, simplifies voltage stabilizing The process of device test, improves testing efficiency.
For achieving the above object, the present invention is adopted the following technical scheme that:
A kind of manostat test fixture, including voltage change-over switch, load transfer switch and IC fixtures;
The voltage change-over switch is connected between multiple power supplys and the IC fixtures, for multiple power supplys in test process Between switching;
The load transfer switch is connected between multiple loads and the IC fixtures, for multiple loads in test process Between switching;The IC fixtures are used to place manostat to be tested.
Wherein in one embodiment, the quantity of the power supply is two, respectively the first power supply and second source;It is described Voltage of the voltage of the first power supply higher than the second source.
Wherein in one embodiment, the quantity of the load is two, and the respectively first load and second is loaded, described Power of the power of the first load more than the described second load.
Wherein in one embodiment, the voltage change-over switch is double-point double-throw switch, including two moving plates and four Still;Two moving plates are respectively the first moving plate and the second moving plate, and four stills are respectively the first still, the second still, the 3rd quiet Piece and the 4th still;First still, first moving plate and the 3rd still form a single-pole double-throw switch (SPDT), described Second still, second moving plate and the 4th still form a single-pole double-throw switch (SPDT);
First moving plate is connected to the input of the manostat to be tested, and second moving plate is connected to described to be measured The earth terminal of examination manostat;First still is connected to the positive pole of first power supply, and second still is connected to described The negative pole of the first power supply;3rd still is connected to the positive pole of the second source, and the 4th still is connected to described The negative pole of two power supplys.
Wherein in one embodiment, the voltage change-over switch is DPDT toggle switch.
Wherein in one embodiment, load transfer switch is single-pole double-throw switch (SPDT), including a moving plate and two Still, two stills are respectively the 5th still and the 6th still;
The moving plate is connected to the outfan of the manostat to be tested, and the 5th still is connected to first load First end, the 6th still is connected to the first end of second load, second end and described the of first load Two load the second ends connection after as the manostat test fixture outfan.
Wherein in one embodiment, the load transfer switch is single-pole double throw toggle switch.
Wherein in one embodiment, it is provided with the IC fixtures corresponding with the input of the manostat to be tested The first contact second contact corresponding with the outfan of the manostat to be tested and connect with the manostat to be tested The 3rd corresponding contact of ground terminal;
First moving plate of the voltage change-over switch is connected to the first contact of the IC fixtures, the voltage change-over switch The second moving plate be connected to the 3rd contact of the IC fixtures, the moving plate of the load transfer switch is connected to the IC fixtures Second contact.
Wherein in one embodiment, the IC fixtures adopt counnter attack inserting structure.
Wherein in one embodiment, also including box body, corresponding with the IC fixtures on the box body, is provided with One through hole, the corresponding third through-hole of second through hole corresponding with load transfer switch and the voltage change-over switch;
The IC fixtures are embedded in the first through hole;The voltage change-over switch is partially submerged in the box body, described Load transfer switch sections are embedded in the box body.
The invention has the beneficial effects as follows:
The manostat test fixture of the present invention, realizes the switching between multiple power supplys by setting voltage change-over switch, leads to The switching for arranging that load transfer switch is realized between multiple loads is crossed, is used to place manostat to be tested by arranging IC fixtures, When being tested, it is only necessary to which manostat to be tested is placed in IC fixtures, turned by operating voltage permutator and load Change switch and can complete test, it is to avoid loaded down with trivial details wiring and the operation for dismounting in test process, simplify the process of test, greatly Big improves testing efficiency.
Description of the drawings
Fig. 1 is the structure chart of one embodiment of manostat test fixture of the present invention;
Fig. 2 is the circuit theory diagrams of one embodiment of manostat test fixture of the present invention.
Specific embodiment
In order that technical scheme is clearer, below in conjunction with accompanying drawing, the manostat test fixture to the present invention It is described in further detail.It should be appreciated that specific embodiment described herein is only not used to limit to explain the present invention The fixed present invention.
Referring to Fig. 1 and Fig. 2, as shown in figure 1, the structure chart of one embodiment of manostat test fixture of the present invention, for steady The input voltage of depressor and the limit test of output loading, including box body 7, voltage change-over switch 1, load transfer switch 3 and IC (Integrated circuit, integrated circuit) fixture 6.Wherein, voltage change-over switch 1 is connected to multiple power supplys and IC fixtures 6 Between, for the switching in test process between multiple power supplys.Load transfer switch 3 be connected to it is multiple load and IC fixtures 6 it Between, for the switching in test process between multiple loads, IC fixtures 6 are used to place manostat to be tested 2.So, in test During, it is only necessary to manostat to be tested is placed in IC fixtures 6, multiple electricity are realized by operating voltage permutator 1 Switching between pressure, tests working condition of the manostat 2 to be tested when input voltage changes;By service load permutator 3 realize the switching between multiple loads, test working condition of the manostat to be tested 2 when bearing power changes.
Switching between multiple power supplys is realized by setting voltage change-over switch, it is many by arranging load transfer switch realization Switching between individual load, is used to place manostat to be tested by arranging IC fixtures, when being tested, it is only necessary to will be to be measured Examination manostat is placed in IC fixtures, can complete test by operating voltage permutator and load transfer switch, it is to avoid In test process, the operation of loaded down with trivial details wiring and dismounting, simplifies the process of test, greatly improves testing efficiency.
Used as a kind of embodiment, the quantity of power supply is two, respectively the first power supply 41 and second source 42, and the The voltage of one power supply 41 so can test manostat to be tested in high voltage and low electricity respectively higher than the voltage of second source 42 Working condition in the case of pressure.More preferably, the quantity of load is two, the respectively first load 51 and the second load 52, and the One load 51 power more than second load 52 power, so can test respectively manostat to be tested load power compared with Working condition in the case of big and load power is less.In other embodiments, the quantity of the quantity of power supply and load may be used also Being two or more.
More preferably, voltage change-over switch 1 is double-point double-throw switch, including two moving plates and four stills;Two moving plates point Not Wei the first moving plate b and the second moving plate e, it is quiet that four stills are respectively the first still a, the second still f, the 3rd still c and four Piece d;First still a, the first moving plate b of voltage change-over switch 1 and the 3rd still c form a single-pole double-throw switch (SPDT), and second is quiet Piece f, the second moving plate e and the 4th still D-shaped are into a single-pole double-throw switch (SPDT), and the first moving plate b and the second moving plate e is while action.
First moving plate b is connected to the input of manostat to be tested 2, and the second moving plate e is connected to connecing for manostat to be tested 2 Ground terminal;First still a is connected to the positive pole of the first power supply 41, and the second still f is connected to the negative pole of the first power supply 41.3rd still C is connected to the positive pole of second source 42, and the 4th still d is connected to the negative pole of second source 42.
When the moving plate of voltage change-over switch 1 is allocated to the first still and the second still, the input of manostat to be tested 2 connects The positive pole of the first power supply 41 is connected to, the earth terminal of manostat to be measured 2 is connected to the negative pole of the first power supply 41, now the first power supply 41 As the input voltage of manostat to be tested 2, working condition of the manostat to be tested when input voltage is higher can be tested.When When the moving plate of voltage change-over switch 1 is allocated to the 3rd still c and the 4th still d, the input of manostat to be tested 2 is connected to second The positive pole of power supply 42, the earth terminal of manostat to be tested 2 are connected to the negative pole of second source 42, now, 42 conduct of second source The input voltage of manostat to be tested 2, can test working condition of the manostat to be tested when input voltage is relatively low.It is preferred that Ground, voltage change-over switch 1 are DPDT toggle switch, which enhance the convenience for using.
More preferably, load transfer switchs 3 for single-pole double-throw switch (SPDT), including a moving plate a1 and two stills, two stills Respectively the 5th still b1 and the 6th still c1.Wherein, the moving plate a1 of load transfer switch 3 is connected to manostat to be tested 2 Outfan, the 5th still b1 of load transfer switch 3 are connected to the first end of the first load 51, and load transfer switchs the 6th of 3 Still c1 makees after being connected to the second end connection of the first end of the second load 52, the second end of the first load 51 and the second load 52 For the outfan of manostat test fixture.During test, can be by the outfan of manostat test fixture output electricity The situation of pressure judges whether manostat breaks down.
When the moving plate a1 of load transfer switch 3 is allocated to the 5th still b1, the outfan of manostat to be tested 2 is negative with first Carry 51 to connect, now output loading of first load 51 as manostat to be tested 2, manostat to be tested 2 can be tested negative The working condition when power of load is larger.When the moving plate of load transfer switch 3 is allocated to the 6th still c1, manostat to be tested 2 Outfan 52 be connected with the second load, now second load 52 as manostat to be tested 2 output loading, can test and treat Working condition of the test manostat 2 when the power of load is less.Preferably, load transfer switch 3 is opened for single-pole double throw button Close, which enhance the convenience for using.
More preferably, first contact corresponding with the input of manostat to be tested 2 and to be measured is provided with IC fixtures 6 Corresponding second contact of outfan and threeth contact corresponding with the earth terminal of manostat to be tested 2 of examination manostat 2.
The moving plate a1 of load transfer switch 3, the first moving plate b and the second moving plate e of voltage change-over switch 1 are connected to IC folders Tool 6.Wherein, the first moving plate b of voltage change-over switch 1 is connected to the first contact of IC fixtures 6, and the second of voltage change-over switch 1 Moving plate e is connected to the 3rd contact of IC fixtures 6, and the moving plate a1 of load transfer switch 3 is connected to the second contact of IC fixtures 6.This Sample, during test, only need to be placed on manostat to be tested in IC fixtures, realize treating by operating voltage permutator By service load permutator, test manostat and the connection of different electrical power, realize that manostat to be tested is connected with unequally loaded Connect, be not required to carry out the connection between manostat to be tested and voltage change-over switch and load transfer switch and dismounting, improve Testing efficiency.
More preferably, in the present embodiment, IC fixtures 6 adopt counnter attack inserting structure, this avoid in test process, to be tested The damage of 2 anti-plug of manostat or the slotting manostat to be tested for causing partially, it is ensured that the accuracy of test.It should be understood that this Manostat to be tested in embodiment is three terminal integrated voltage stabilizer.In other embodiments, manostat to be tested can also be which The manostat of his type, now, IC fixtures should be matched with manostat to be tested.
As a kind of embodiment, the first through hole corresponding with IC fixtures 6 on box body 7, is provided with, with load transfer Switch the corresponding third through-hole of 3 the second corresponding through holes and voltage change-over switch 1;IC fixtures 6 are embedded in first through hole;Electricity Pressure permutator 1 is partially submerged in the box body, and load transfer switch 3 is partially submerged in the box body.
The manostat test fixture of the present invention, realizes the switching between multiple power supplys by setting voltage change-over switch, leads to The switching for arranging that load transfer switch is realized between multiple loads is crossed, is used to place manostat to be tested by arranging IC fixtures, When being tested, it is only necessary to which manostat to be tested is placed in IC fixtures, turned by operating voltage permutator and load Change switch and can complete test, it is to avoid loaded down with trivial details wiring and the operation for dismounting in test process, simplify the process of test, greatly Big improves testing efficiency.
Embodiment described above only expresses the several embodiments of the present invention, and its description is more concrete and detailed, but and Therefore the restriction to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art For, without departing from the inventive concept of the premise, some deformations and improvement can also be made, these belong to the guarantor of the present invention Shield scope.Therefore, the protection domain of patent of the present invention should be defined by claims.

Claims (9)

1. a kind of manostat test fixture, it is characterised in that:
Including voltage change-over switch, load transfer switch and IC fixtures;
The voltage change-over switch is connected between multiple power supplys and the IC fixtures, in test process between multiple power supplys Switching;
Load transfer switch is connected between multiple loads and the IC fixtures, in test process between multiple loads Switching;The IC fixtures are used to place manostat to be tested;
Wherein, the quantity of the power supply is two, respectively the first power supply and second source;The voltage change-over switch is double-pole Commutator, including two moving plates and four stills;Two moving plates are respectively the first moving plate and the second moving plate, four still difference For the first still, the second still, the 3rd still and the 4th still;First still, first moving plate and described 3rd quiet Piece forms a single-pole double-throw switch (SPDT), and it is double that second still, second moving plate and the 4th still form a hilted broadsword Throw switch;
First moving plate is connected to the input of the manostat to be tested, and second moving plate is connected to described to be tested steady The earth terminal of depressor;First still is connected to the positive pole of first power supply, and second still is connected to described first The negative pole of power supply;3rd still is connected to the positive pole of the second source, and it is electric that the 4th still is connected to described second The negative pole in source.
2. manostat test fixture according to claim 1, it is characterised in that:
Voltage of the voltage of first power supply higher than the second source.
3. manostat test fixture according to claim 1, it is characterised in that:
The quantity of the load is two, and the respectively first load and second is loaded, and the power of first load is more than described The power of the second load.
4. manostat test fixture according to claim 1, it is characterised in that:
The voltage change-over switch is DPDT toggle switch.
5. manostat test fixture according to claim 3, it is characterised in that:
Load transfer switch is single-pole double-throw switch (SPDT), including a moving plate and two stills, and two stills are respectively 5th still and the 6th still;
The moving plate is connected to the outfan of the manostat to be tested, and the 5th still is connected to the of first load One end, the 6th still are connected to the first end of second load, the second end of first load and described second negative Carry the second end connection after as the manostat test fixture outfan.
6. manostat test fixture according to claim 5, it is characterised in that:
The load transfer switch is single-pole double throw toggle switch.
7. manostat test fixture according to claim 5, it is characterised in that:
First contact corresponding with the input of the manostat to be tested and described to be tested is provided with the IC fixtures The second corresponding contact of the outfan of manostat and threeth contact corresponding with the earth terminal of the manostat to be tested;
First moving plate of the voltage change-over switch is connected to the first contact of the IC fixtures, and the of the voltage change-over switch Two moving plates are connected to the 3rd contact of the IC fixtures, and the moving plate of the load transfer switch is connected to the second of the IC fixtures Contact.
8. manostat test fixture according to claim 7, it is characterised in that:
The IC fixtures adopt counnter attack inserting structure.
9. manostat test fixture according to claim 8, it is characterised in that:
Also include box body, the first through hole corresponding with the IC fixtures is provided with the box body, is opened with the load transfer Close the second corresponding through hole third through-hole corresponding with the voltage change-over switch;
The IC fixtures are embedded in the first through hole;The voltage change-over switch is partially submerged in the box body, the load Conversion switch part is embedded in the box body.
CN201410313333.XA 2014-07-02 2014-07-02 Voltage stabilizer testing tool Active CN104090243B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410313333.XA CN104090243B (en) 2014-07-02 2014-07-02 Voltage stabilizer testing tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410313333.XA CN104090243B (en) 2014-07-02 2014-07-02 Voltage stabilizer testing tool

Publications (2)

Publication Number Publication Date
CN104090243A CN104090243A (en) 2014-10-08
CN104090243B true CN104090243B (en) 2017-05-03

Family

ID=51637974

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410313333.XA Active CN104090243B (en) 2014-07-02 2014-07-02 Voltage stabilizer testing tool

Country Status (1)

Country Link
CN (1) CN104090243B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104749401B (en) * 2015-03-24 2018-04-27 格力电器(合肥)有限公司 detecting tool
CN105119133A (en) * 2015-09-14 2015-12-02 武汉锐科光纤激光技术股份有限公司 Driving debugging tool
CN106771986B (en) * 2017-03-04 2019-11-12 三峡电力职业学院 A kind of power electronic circuit automatic fault diagnosis device
CN108469583B (en) * 2018-05-28 2024-03-22 格力电器(郑州)有限公司 ICT tester
CN115097251B (en) * 2022-08-25 2022-11-25 深圳市首航新能源股份有限公司 Test system and method, control module and readable storage medium

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004236407A (en) * 2003-01-29 2004-08-19 Renesas Technology Corp Ground fault detecting circuit
CN2824048Y (en) * 2005-09-27 2006-10-04 比亚迪股份有限公司 Three-terminal voltage stabilizer tester
CN202676817U (en) * 2012-05-24 2013-01-16 深圳创维数字技术股份有限公司 Low dropout regulator testing device
CN203376413U (en) * 2013-07-03 2014-01-01 衢州三源汇能电子有限公司 Testing device simulating using environment of voltage stabilizer
CN203502524U (en) * 2013-10-22 2014-03-26 珠海格力电器股份有限公司 Detection apparatus and system for three-terminal voltage stabilizer
CN204101708U (en) * 2014-07-02 2015-01-14 格力电器(合肥)有限公司 Voltage stabilizer test fixture

Also Published As

Publication number Publication date
CN104090243A (en) 2014-10-08

Similar Documents

Publication Publication Date Title
CN104090243B (en) Voltage stabilizer testing tool
CN203164339U (en) A cable system testing table
CN103543336A (en) Test box for initiating explosive devices
CN201707413U (en) Electromagnetic compatibility testing device
AU2006235874A1 (en) Device for automatic detection of battery polarity
JP2014106157A (en) Charge/discharge testing device
CN204101708U (en) Voltage stabilizer test fixture
CN104145401A (en) Control module for an electrical energy accumulator, energy accumulator unit having such a control module, uninterruptible power supply unit and method for operating a control module
CN103529319A (en) Lithium battery protection plate testing system
CN105634057A (en) Battery, mobile terminal and battery control method
CN109459636B (en) Testing device of network control cabinet
CN104330748A (en) High-voltage switching power supply output ripple test circuit and test method thereof
CN201740835U (en) Wire testing device
CN101995557B (en) Method for testing bearing capability of short trouble in high-power converter
CN201576066U (en) Electrical insulation testing device
CN202330629U (en) Tester for electric power security tool
CN105116298A (en) High-efficiency type withstand voltage testing device for capacitor
CN204166111U (en) A kind of high-voltage switch power supply output ripple test circuit
CN103901340A (en) Chip testing method
CN204964567U (en) Full -bridge rectifier forward surge test fixture
CN205691741U (en) Master switch testing experiment instrument
CN203773019U (en) Chip test system
CN202854239U (en) Junction capacitance testing circuit for 130mm power device and apparatus
CN104167744A (en) Intelligent temperature control low-voltage power capacitor
CN202903894U (en) Junction capacitance test circuit and device for 62mm power device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant