CN104089483A - Intermediate frequency smelting furnace building technology - Google Patents

Intermediate frequency smelting furnace building technology Download PDF

Info

Publication number
CN104089483A
CN104089483A CN201410345780.3A CN201410345780A CN104089483A CN 104089483 A CN104089483 A CN 104089483A CN 201410345780 A CN201410345780 A CN 201410345780A CN 104089483 A CN104089483 A CN 104089483A
Authority
CN
China
Prior art keywords
furnace
intermediate frequency
cost
quartz sand
furnace building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410345780.3A
Other languages
Chinese (zh)
Inventor
王和迪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHONGSHAN HENGCHENG NODULAR CAST IRON CASTING Co Ltd
Original Assignee
ZHONGSHAN HENGCHENG NODULAR CAST IRON CASTING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGSHAN HENGCHENG NODULAR CAST IRON CASTING Co Ltd filed Critical ZHONGSHAN HENGCHENG NODULAR CAST IRON CASTING Co Ltd
Priority to CN201410345780.3A priority Critical patent/CN104089483A/en
Publication of CN104089483A publication Critical patent/CN104089483A/en
Pending legal-status Critical Current

Links

Landscapes

  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

The invention discloses an intermediate frequency smelting furnace building technology. The intermediate frequency smelting furnace building technology includes the following steps that 1 asbestos cloth is tailored in advance according to the size of an electric furnace, and a quartz sand mixture is prepared according to the size of an intermediate frequency furnace; 2 the asbestos cloth tailored in advance is arranged on a coil from top to bottom, wherein the coil is arranged in a cavity of a furnace body to be built; 3 daubing is conducted; 4 furnace baking and sintering are conducted. The intermediate frequency smelting furnace building technology is reasonable in process, simple to operate and low in production cost. After quartz sand and appropriate water are stirred and mixed, the adhesion is high, charging and daubing are convenient and simple, a furnace lining is high in compacting degree, and the service life of the furnace is prolonged. Furnace building is conducted by using the technology, the furnace building cost each time is 15000 RMB, the service life of a furnace built each time is about 430 years, the furnace building cost consumed by fusion per ton iron liquid on average is 11.63 RMB, the furnace building labor cost, the furnace building shut-down cost and the like are not included, and therefore the furnace building technology saves the furnace building cost and lowers the overall casting cost.

Description

A kind of intermediate frequency smelting furnace furnace building process
Technical field
The present invention relates to a kind of intermediate frequency smelting furnace furnace building process.
Background technology
Former intermediate frequency furnace lining is built, adopt quartz sand dry mixing process to carry out, the degree of packing of furnace lining is poor, stove is shorter service life, and the expense that each brickwork needs is about 12000 yuan, and average brickwork once can melting 150 stoves left and right, 3 tons of iron liquid of every stove, the brickwork expense that average Smelting of iron per ton expends is 26.67 yuan, cost height very, and the difficult quality guarantee of brickwork.
Summary of the invention
In order to overcome the deficiencies in the prior art, the invention provides a kind of intermediate frequency smelting furnace furnace building process
The technical solution adopted for the present invention to solve the technical problems is:
A kind of intermediate frequency smelting furnace furnace building process, comprises the following steps:
Step 1, first cut asbestos cloth by electric furnace size, and prepare quartz sand compound according to the size of intermediate frequency furnace, quartz sand compound adopts the puddle mixer stirring that adds water, and stirring extent is agglomerating as standard to pinch;
Step 2: the asbestos cloth cutting is in advance distributed on the coil for the treatment of in brickwork build chamber from top to bottom, and leveling, the about 50mm of lap width, then, stainless steel warning network, furnace bottom alarm and second layer asbestos cloth being installed, and the necessary open loop of warning network, must not collide with furnace bottom alarm;
Step 3: daubing: divide respectively and three times quartz sand compound is inserted to furnace bottom and pave and tie by butt hammer, form the quartz sand mixing bed of material of three layers;
Step 4, baker and sintering: after wet method brickwork completes, only toast with firewood, add several times in burner hearth, make it completing combustion consecutive numbers hour to furnace lining is toasted.
In described step 4, to burner hearth baking three hours.
The invention has the beneficial effects as follows: a kind of intermediate frequency smelting furnace furnace building process, comprises the steps: 1, first cuts asbestos cloth by electric furnace size, and prepare quartz sand compound according to the size of intermediate frequency furnace; 2, the asbestos cloth cutting is in advance distributed in from top to bottom on the coil for the treatment of in brickwork build chamber; 3, daubing; 4, baker and sintering; Flow process of the present invention is reasonable, simple to operate, and production cost is low; Quartz sand is after suitable quantity of water is uniformly mixed, adhesion is stronger, feed in raw material, tie a knot and be convenient and simple, the furnace lining degree of packing is high, stove improves service life, adopt technique brickwork of the present invention, each brickwork expense is 15000 yuan, each brickwork service life is 430 stoves left and right, the brickwork expense that average melting per ton expends is 11.63, stops work and expends etc., therefore adopt furnace building process of the present invention but also do not comprise reduced brickwork labour cost, brickwork, save the cost of brickwork, and reduced cast-in-block cost.
Detailed description of the invention
A kind of intermediate frequency smelting furnace furnace building process, comprises the following steps:
Step 1, first cut asbestos cloth by electric furnace size, and prepare quartz sand compound according to the size of intermediate frequency furnace, quartz sand compound adopts the puddle mixer stirring that adds water, and stirring extent is agglomerating as standard to pinch;
Step 2: the asbestos cloth cutting is in advance distributed on the coil for the treatment of in brickwork build chamber from top to bottom, and leveling, the about 50mm of lap width, then, stainless steel warning network, furnace bottom alarm and second layer asbestos cloth being installed, and the necessary open loop of warning network, must not collide with furnace bottom alarm;
Step 3: daubing: divide respectively and three times quartz sand compound is inserted to furnace bottom and pave and tie by butt hammer, form the quartz sand mixing bed of material of three layers;
Step 4, baker and sintering: after wet method brickwork completes, only toast with firewood, add several times in burner hearth, make it continuous three hours of completing combustion to furnace lining is toasted.
Flow process of the present invention is reasonable, simple to operate, and production cost is low; Quartz sand is after suitable quantity of water is uniformly mixed, adhesion is stronger, feed in raw material, tie a knot and be convenient and simple, the furnace lining degree of packing is high, stove improves service life, adopt technique brickwork of the present invention, each brickwork expense is 15000 yuan, each brickwork service life is 430 stoves left and right, and the brickwork expense that average melting per ton expends is 11.63, stops work and expends etc. but also do not comprise reduced brickwork labour cost, brickwork, therefore adopt furnace building process of the present invention, save the cost of brickwork, and reduced cast-in-block cost, improved the efficiency of casting.
Above better enforcement of the present invention is illustrated; certainly; the present invention can also adopt form different from the embodiment described above; the conversion being equal to that those of ordinary skill in the art do under the prerequisite without prejudice to spirit of the present invention or accordingly change, all should belong in protection scope of the present invention.

Claims (2)

1. an intermediate frequency smelting furnace furnace building process, is characterized in that: comprise the following steps:
Step 1, first cut asbestos cloth by electric furnace size, and prepare quartz sand compound according to the size of intermediate frequency furnace, quartz sand compound adopts the puddle mixer stirring that adds water, and stirring extent is agglomerating as standard to pinch;
Step 2: the asbestos cloth cutting is in advance distributed on the coil for the treatment of in brickwork build chamber from top to bottom, and leveling, the about 50mm of lap width, then, stainless steel warning network, furnace bottom alarm and second layer asbestos cloth being installed, and the necessary open loop of warning network, must not collide with furnace bottom alarm;
Step 3: daubing: divide respectively and three times quartz sand compound is inserted to furnace bottom and pave and tie by butt hammer, form the quartz sand mixing bed of material of three layers;
Step 4, baker and sintering: after wet method brickwork completes, only toast with firewood, add several times in burner hearth, make it completing combustion consecutive numbers hour to furnace lining is toasted.
2. a kind of intermediate frequency smelting furnace furnace building process according to claim 1, is characterized in that: in described step 4, to burner hearth baking three hours.
CN201410345780.3A 2014-07-18 2014-07-18 Intermediate frequency smelting furnace building technology Pending CN104089483A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410345780.3A CN104089483A (en) 2014-07-18 2014-07-18 Intermediate frequency smelting furnace building technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410345780.3A CN104089483A (en) 2014-07-18 2014-07-18 Intermediate frequency smelting furnace building technology

Publications (1)

Publication Number Publication Date
CN104089483A true CN104089483A (en) 2014-10-08

Family

ID=51637221

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410345780.3A Pending CN104089483A (en) 2014-07-18 2014-07-18 Intermediate frequency smelting furnace building technology

Country Status (1)

Country Link
CN (1) CN104089483A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104596290A (en) * 2013-10-30 2015-05-06 林州市林丰铝电有限责任公司 Method for prolonging furnace life of intermediate frequency furnace
CN108165701A (en) * 2017-12-28 2018-06-15 攀枝花钢城集团有限公司 New intermediate frequency furnace furnace drying method
CN113048790A (en) * 2021-05-05 2021-06-29 襄阳五二五泵业有限公司 Furnace building method for forming crucible
CN114688880A (en) * 2022-03-25 2022-07-01 滨州市宏诺新材料有限公司 Furnace building method capable of prolonging service life of intermediate frequency furnace

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104596290A (en) * 2013-10-30 2015-05-06 林州市林丰铝电有限责任公司 Method for prolonging furnace life of intermediate frequency furnace
CN108165701A (en) * 2017-12-28 2018-06-15 攀枝花钢城集团有限公司 New intermediate frequency furnace furnace drying method
CN113048790A (en) * 2021-05-05 2021-06-29 襄阳五二五泵业有限公司 Furnace building method for forming crucible
CN114688880A (en) * 2022-03-25 2022-07-01 滨州市宏诺新材料有限公司 Furnace building method capable of prolonging service life of intermediate frequency furnace

Similar Documents

Publication Publication Date Title
CN104089483A (en) Intermediate frequency smelting furnace building technology
CN103363807B (en) Method for forging, braking and sintering crucible in medium-frequency induction furnace
CN103435277A (en) Internal gas burning shaft kiln and method for producing light burned magnesia
CN104357650B (en) A kind of bath smelting quickly makes molten bath method
CN106747505A (en) A kind of carbon-free converter material for repairing
CN204151402U (en) A kind of vananum smelting furnace
CN102278888A (en) 0.5-1 ton intermediate frequency furnace building technology based on wet method
CN105777158B (en) Siliceous dry material for tundish for steel smelting as well as production method and construction method
CN100504265C (en) Furnace lining ramming material of electric arc furnace bottom electrode region and its production technology
CN106631056A (en) Magnesia-calcia tundish dry vibrating material and preparation method thereof
CN102134165B (en) Furnace lining of ferrovanadium smelting furnace and preparation method thereof
CN104291337A (en) Method and system utilizing melt residual heat for carbon thermal reduction
CN202329068U (en) Stainless steel anti-collision section of vertical furnace
CN102719677B (en) Method for producing iron-copper alloy micropowder by treating copper smelting slag in oxidizing atmosphere kiln
CN102173567B (en) Method for preparing fiber reinforced microcrystalline glass insulation material
CN103922758A (en) Electrode paste repairing material, and preparation method and use method thereof
CN109182735A (en) Highly crystalline water limonite sintering method
CN202779757U (en) Integrated-casting duck bill on edge of hot metal ladle
CN104030705A (en) Preparation method of dry-type composite furnace lining of intermediate frequency furnace
CN202204308U (en) Intermediate frequency furnace lining for casting silver
CN108033797A (en) A kind of method for producing tundish dry vibratory material
CN203782029U (en) All-electric melting furnace for producing mineral wool
CN104128596B (en) The ramming process method of middle-size and small-size refining ladle permanent layer
CN111041526A (en) 500KA electrolytic tank anode heat preservation covering material and preparation method thereof
CN207006868U (en) New furnace of calcium carbide blanking column

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 528400, Guangdong, Zhongshan Bay Town, Hong Kong Bay

Applicant after: Guangdong Heng Cheng Science and Technology Co., Ltd.

Address before: 528400, Guangdong, Zhongshan Bay Town, Hong Kong Bay

Applicant before: ZHONGSHAN HENGCHENG NODULAR CAST IRON CASTING CO., LTD.

COR Change of bibliographic data
RJ01 Rejection of invention patent application after publication

Application publication date: 20141008

RJ01 Rejection of invention patent application after publication