CN104076125B - The iron and steel rock core on reusable simulation fracture leakage stratum and application process - Google Patents

The iron and steel rock core on reusable simulation fracture leakage stratum and application process Download PDF

Info

Publication number
CN104076125B
CN104076125B CN201410286990.XA CN201410286990A CN104076125B CN 104076125 B CN104076125 B CN 104076125B CN 201410286990 A CN201410286990 A CN 201410286990A CN 104076125 B CN104076125 B CN 104076125B
Authority
CN
China
Prior art keywords
rock core
contiguous block
iron
steel
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410286990.XA
Other languages
Chinese (zh)
Other versions
CN104076125A (en
Inventor
李志勇
杨超
马攀
陈帅
李鸿飞
韦火云
张晋文
李洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Petroleum Beijing
Original Assignee
China University of Petroleum Beijing
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Petroleum Beijing filed Critical China University of Petroleum Beijing
Priority to CN201410286990.XA priority Critical patent/CN104076125B/en
Publication of CN104076125A publication Critical patent/CN104076125A/en
Application granted granted Critical
Publication of CN104076125B publication Critical patent/CN104076125B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sampling And Sample Adjustment (AREA)

Abstract

The invention discloses the iron and steel rock core on reusable simulation fracture leakage stratum, wherein rock core top contiguous block, rock core bottom contiguous block, on the left of rock core, on the right side of the fixing splicing block of fracture width and rock core, the fixing splicing block of fracture width can be bolted together composition cylinder, the one side of rock core top contiguous block and the one side of rock core bottom contiguous block are wave-like and are oppositely arranged, and the corrugated jog of opposing sides can be corresponding fit together, in the composition that is bolted together cylinder, on the left of rock core, fracture width is fixed the fixing splicing block of fracture width on the right side of splicing block and rock core and is stuck in rock core top contiguous block and contiguous block both sides, rock core bottom, make to leave spacing between the opposite face of rock core top contiguous block and rock core bottom contiguous block.After the invention has the beneficial effects as follows that can be effectively ensured rock core adds confined pressure, fracture width size constancy, can be repeated test.

Description

The iron and steel rock core on reusable simulation fracture leakage stratum and application process
Technical field
The invention belongs to formation fracture blocking technology field, relate to iron and steel rock core and the application process on reusable simulation fracture leakage stratum.
Background technology
When utilizing intrinsic fracture rock core or man-made fracture rock core to carry out leak stopping slurry plugging effect evaluation in indoor, when certain confined pressure exists, the size in crack is it is difficult to ensure that constant, it is impossible to accurately carry out different plugging fluid and same fracture width stratum plugging effect is evaluated relative analysis.Meanwhile, when the conventional chiltern rock core of application carries out leaking stoppage experiment, rock core is subject to the pollution of plugging fluid, causes the repeatable variation of test core.
Summary of the invention
It is an object of the invention to provide the reusable simulation fracture leakage iron and steel rock core on stratum and application, solve existing utilize intrinsic fracture rock core or man-made fracture rock core to carry out in indoor rock core gap in leak stopping slurry closure is yielding, vulnerable to pollution can not the problem of repeated trials.
It is a further object to provide iron and steel rock core and carry out the application process of leak stopping slurry closure experiment.
The iron and steel rock core on the present invention reusable simulation fracture leakage stratum be employed technical scheme comprise that to include the fixing splicing block of fracture width on the right side of the fixing splicing block of fracture width on the left of rock core top contiguous block, rock core bottom contiguous block, rock core and rock core;Wherein rock core top contiguous block, rock core bottom contiguous block, on the left of rock core, on the right side of the fixing splicing block of fracture width and rock core, the fixing splicing block of fracture width can be bolted together composition cylinder, the one side of rock core top contiguous block and the one side of rock core bottom contiguous block are wave-like and are oppositely arranged, and the corrugated jog of opposing sides can be corresponding fit together, in the composition that is bolted together cylinder, on the left of rock core, fracture width is fixed the fixing splicing block of fracture width on the right side of splicing block and rock core and is stuck in rock core top contiguous block and contiguous block both sides, rock core bottom, make to leave spacing between the opposite face of rock core top contiguous block and rock core bottom contiguous block.
Further, on the left of described rock core top contiguous block, rock core bottom contiguous block, rock core, on the right side of the fixing splicing block of fracture width and rock core, the length of the fixing splicing block of fracture width is 70mm, and these the four pieces cylinder section diameters being spliced into are 25mm;On the left of described rock core, fracture width fixes the width of the fixing splicing block of fracture width on the right side of splicing block and rock core is 16mm.
Further, between the opposite face of described rock core top contiguous block and rock core bottom contiguous block, spacing is 1-5mm.
The iron and steel rock core on the another kind reusable simulation fracture leakage stratum of the present invention, including rock core top contiguous block and rock core bottom contiguous block;Wherein rock core top contiguous block and rock core bottom contiguous block are the cylinders of cross section semicircular in shape, rock core top contiguous block and rock core bottom contiguous block are spliced to form cylinder, the Mosaic face edge of rock core top contiguous block and rock core bottom contiguous block is provided with projection, making there is distance between two Mosaic faces, the Mosaic face between projection is provided with the shallow slot of grid-shaped.
Further, described rock core top contiguous block and rock core bottom contiguous block length are 70mm.
Further, described grid-shaped is square or prismatic.
Further, described cylindrical diameter of section is 25mm, and the mesh width between described bossing is 20mm.
Further, the spacing of said two Mosaic face is 1-5mm.
According to the method that both above iron and steel rock core carries out leak stopping slurry closure experiment, carry out according to following steps:
Step 1: after rock core assembly is carried out before experiment assembling fastening, being wrapped in outside rock core with cellophane adhesive tape with fixing rock core is cylinder, ensure that each chunk will not scatter in the process put into core holding unit, put in the core holding unit of the dynamic filtration device of High Temperature High Pressure and add certain confined pressure
Step 2: closure bridge liquid is injected in the circulation vessel of high pressure high temperature filter tester, inject in the circulation vessel of high pressure high temperature filter tester;
Step 3: close leak stopping bridge slurry blood circulation, opening circulation instrument replacement leak stopping bridge slurry is conventional drilling liquid, is circulated breakthrough from the drilling fluid started with having configured by one end of the iron and steel crack rock core after closure liquid circulation;
Step 4: close closed loop system after the record maximum breakthrough pressure of drilling fluid and the wastage of certain time and let out confined pressure and complete once to test.
After the invention has the beneficial effects as follows that can be effectively ensured rock core adds confined pressure, fracture width size constancy, can be repeated test.
Accompanying drawing explanation
Fig. 1 is wave of the present invention seam shape iron and steel rock core axial cross-sectional views;
Fig. 2 is wave of the present invention seam shape iron and steel rock core radial section schematic diagram;
Fig. 3 is straight seam shape iron and steel rock core axial cross-sectional views of the present invention;
Fig. 4 is straight seam shape iron and steel rock core radial section schematic diagram of the present invention;
Fig. 5 is the shallow slot schematic diagram of straight seam shape iron and steel rock core Mosaic face grid-shaped of the present invention.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is described in detail.
As Figure 1-Figure 4, the waveform seam shape iron and steel rock core of the present invention includes the fixing splicing block 4 of fracture width on the right side of the fixing splicing block 3 of fracture width on the left of rock core top contiguous block 1, rock core bottom contiguous block 2, rock core and rock core;Wherein rock core top contiguous block 1, rock core bottom contiguous block 2, on the left of rock core, on the right side of the fixing splicing block 3 of fracture width and rock core, the fixing splicing block 4 of fracture width can be bolted together composition cylinder, the one side of rock core top contiguous block 1 and the one side of rock core bottom contiguous block 2 are wave-like and are oppositely arranged, and the corrugated jog of opposing sides can be corresponding fit together, in the composition that is bolted together cylinder, on the left of rock core, fracture width is fixed the fixing splicing block 4 of fracture width on the right side of splicing block 3 and rock core and is stuck in rock core top contiguous block 1 and contiguous block 2 both sides, rock core bottom, make to leave spacing between the opposite face of rock core top contiguous block 1 and rock core bottom contiguous block 2.
Further, on the left of described rock core top contiguous block 1, rock core bottom contiguous block 2, rock core, on the right side of the fixing splicing block 3 of fracture width and rock core, the length of the fixing splicing block 4 of fracture width is 70mm, and these the four pieces cylinder section diameters being spliced into are 25mm;On the left of described rock core, fracture width fixes the width of the fixing splicing block 4 of fracture width on the right side of splicing block 3 and rock core is 16mm.
Further, between described rock core top contiguous block 1 and the opposite face of rock core bottom contiguous block 2, spacing is 1-5mm.
The another kind of straight seam shape iron and steel rock core of the present invention, including rock core top contiguous block 1 and rock core bottom contiguous block 2;Wherein rock core top contiguous block 1 and rock core bottom contiguous block 2 are the cylinders of cross section semicircular in shape, rock core top contiguous block 1 and rock core bottom contiguous block 2 are spliced to form cylinder, the Mosaic face edge of rock core top contiguous block 1 and rock core bottom contiguous block 2 is provided with projection, making there is distance between two Mosaic faces, the Mosaic face between projection is provided with the shallow slot of grid-shaped.
Further, described rock core top contiguous block 1 and rock core bottom contiguous block 2 length are 70mm.
Further, described grid-shaped is square or prismatic.
Further, described cylindrical diameter of section is 25mm, and the mesh width between described bossing is 20mm.
Further, the spacing of said two Mosaic face is 1-5mm.
Iron and steel rock core carries out the method for leak stopping slurry closure experiment, carries out according to following steps:
Step 1: after rock core assembly is carried out before experiment assembling fastening, being wrapped in outside rock core with cellophane adhesive tape with fixing rock core is cylinder, ensure that each chunk will not scatter in the process put into core holding unit, put in the core holding unit of the dynamic filtration device of High Temperature High Pressure and add certain confined pressure
Step 2: closure bridge liquid is injected in the circulation vessel of high pressure high temperature filter tester, inject in the circulation vessel of high pressure high temperature filter tester;
Step 3: close leak stopping bridge slurry blood circulation, opening circulation instrument replacement leak stopping bridge slurry is conventional drilling liquid, is circulated breakthrough from the drilling fluid started with having configured by one end of the iron and steel crack rock core after closure liquid circulation;
Step 4: close closed loop system after the record maximum breakthrough pressure of drilling fluid and the wastage of certain time and let out confined pressure and complete once to test.
The present invention relates to a kind of simulation fracture situation iron and steel crack rock core, fracture width will not change because of confined pressure change, and can repeatedly use, miss the shut-off capacity on stratum with auxiliary evaluation leak stopping liquid fracture, be applied to the oilfield drilling field of petroleum exploration and development.The present invention relates to a kind of novel analog formation fracture and there is iron and steel rock core and the application thereof of situation, by designing the seam width of 1~5mm on iron and steel cylinder, simulate the fracture width of actual formation, utilize iron and steel self-strength, can being effectively ensured in experimentation, the width dimensions in crack is constant.And after being undertaken assembling by assembling sequence by four assemblies of rock core before the plugging effect of different leak stopping slurries is analyzed experiment and fastening, being wrapped in outside rock core with cellophane adhesive tape with fixing rock core is cylinder, it is ensured that each chunk will not scatter in the process put into core holding unit.By the width of the self-strength supporting crack of the fixing splicing block of rock core arranged on left and right sides steel fracture width, without worrying that rock core seam width reduces because added confined pressure is excessive.This rock core can carry out test of many times, and can improve plugging effect evaluation accuracy and reliability.The present invention efficiently solve because of intrinsic fracture rock core and man-made fracture rock core due to different confined pressures exist time, crack developed width changes, and causes experimental data poor repeatability or to Different Strata width fracture formation, the difficult problem that plugging effect evaluation analysis accuracy is low.Also the difficult problem that different leak stopping slurry plugging effect comparative evaluation's accuracy is low is solved.
Specific embodiment is set forth below, and the present invention will be described:
Embodiment 1:
Utilize High Temperature High Pressure to move filtration device, by iron and steel rock core, Simulation evaluation leak stopping liquid 1, No. 2 shut-off capacitys to 3mm fracture width iron and steel rock core, and carry out comparative evaluation.
1., after four assemblies of 3mm width iron and steel crack rock core being combined on request, put into and the core holding unit of the dynamic filtration device of High Temperature High Pressure adds certain confined pressure (due to the high intensity of of iron and steel rock core itself, therefore confined pressure controlled range is bigger).
2. No. 1 closure bridge liquid configured is injected in the circulation vessel of high pressure high temperature filter tester, start to carry out with leak stopping liquid fracture rock core the circulation closure of certain time, simulation reality leakage property formation shut-off flow process.
3. closing leak stopping bridge slurry blood circulation, opening circulation instrument replacement leak stopping bridge slurry is conventional drilling liquid, is circulated breakthrough from the drilling fluid started with having configured by one end of the iron and steel crack rock core after closure liquid circulation.
4. the maximum breakthrough pressure P of drilling fluid is recorded1And the wastage L of certain time1
5. close closed loop system and let out confined pressure, cleaning iron and steel crack rock core.Application leak stopping liquid 2, repeat step 1.~4., measure leak stopping liquid closure iron and steel rock core after, the maximum breakthrough pressure P of drilling fluid2And the wastage L of certain time2
Contrast leak stopping slurry 1, the breakthrough pressure P of No. 21、P2And wastage L1、L2, breakthrough pressure is more big, the plugging effect of wastage this leak stopping slurry of more little explanation is more good.
Embodiment 2:
Utilizing High Temperature High Pressure to move filtration device, by iron and steel rock core, 3mm and 5mm crack is blocked by the frozen glue A at Simulation evaluation 150 DEG C, evaluates its shut-off capacity to different in width crack.
1. by blender preparation leak stopping frozen glue A, colloid A is poured in high temperature ageing tank.
2. put in ageing can slurry after 3mm width crack iron and steel rock core being combined on request, utilize roller heating stove that aging filling is heated to 150 DEG C;
3. room temperature is after 5 hours, takes out aging filling and is cooled to room temperature, is now filled with leak stopping colloid in the crack of iron and steel rock core;
4. the iron and steel crack rock core blocked by colloid completely is put into and the core holding unit of the dynamic filtration device of High Temperature High Pressure adds certain confined pressure (owing to the intensity of iron and steel rock core own is high, therefore confined pressure controlled range is big), the state after loss circulation material is injected on simulation leakage property stratum.
5. in the one end of the iron and steel crack rock core blocked by colloid completely, it is circulated breakthrough with the drilling fluid configured, and observes leak-off situation and pressure change.
6. when the liquid outlet of the iron and steel crack rock core blocked by loss circulation material completely has drilling fluid to start to miss, illustrate that the loss circulation material in closure iron and steel rock core crack is broken, the breakthrough pressure P of record 3mm iron and steel crack rock core1
7. by instrument closedown, pressure release, 5mm iron and steel rock core is changed.Repeat 2.~6. step, record the breakthrough pressure P that the 5mm crack of leak stopping frozen glue A closure is2
8. P is compared1And P2Size, the more big explanation frozen glue of breakthrough pressure is more good to the plugging effect of this fracture width.

Claims (10)

1. the iron and steel rock core on reusable simulation fracture leakage stratum, it is characterised in that: include the fixing splicing block (4) of fracture width on the right side of the fixing splicing block (3) of fracture width on the left of rock core top contiguous block (1), rock core bottom contiguous block (2), rock core and rock core;Wherein rock core top contiguous block (1), rock core bottom contiguous block (2), on the right side of the fixing splicing block (3) of fracture width and rock core, fracture width is fixed splicing block (4) and can be bolted together composition cylinder on the left of rock core;The one side on rock core top contiguous block (1) and the one side of rock core bottom contiguous block (2) are wave-like and are oppositely arranged, and the corrugated jog of opposing sides can be corresponding fit together, two faces being provided with jog are arranged in cylinder;On the left of rock core, fracture width is fixed the fixing splicing block (4) of fracture width on the right side of splicing block (3) and rock core and is stuck in rock core top contiguous block (1) and contiguous block (2) both sides, rock core bottom, makes to leave spacing between the opposite face of rock core top contiguous block (1) and rock core bottom contiguous block (2).
2. the iron and steel rock core on reusable simulation fracture leakage stratum described in claim 1, it is characterized in that: on the left of described rock core top contiguous block (1), rock core bottom contiguous block (2), rock core, on the right side of the fixing splicing block (3) of fracture width and rock core, fracture width is fixed the length of splicing block (4) and is 70mm, and these the four pieces cylinder section diameters being spliced into are 25mm;On the left of described rock core, on the right side of the fixing splicing block (3) of fracture width and rock core, fracture width is fixed the width of splicing block (4) and is 16mm.
3. the iron and steel rock core on reusable simulation fracture leakage stratum described in claim 1, it is characterised in that: between described rock core top contiguous block (1) and the opposite face of rock core bottom contiguous block (2), spacing is 1-5mm.
4. apply the method that the iron and steel rock core of claim 1 carries out leak stopping slurry closure experiment, it is characterised in that carry out according to following steps:
Step 1: after rock core assembly is carried out before experiment assembling fastening, being wrapped in outside rock core with cellophane adhesive tape with fixing rock core is cylinder, ensure that each chunk will not scatter in the process put into core holding unit, put in the core holding unit of the dynamic filtration device of High Temperature High Pressure, add certain confined pressure;
Step 2: closure bridge liquid is injected in the circulation vessel of the dynamic filtration device of High Temperature High Pressure;
Step 3: close leak stopping bridge slurry blood circulation, opening circulation instrument replacement leak stopping bridge slurry is conventional drilling liquid, is circulated breakthrough from the drilling fluid started with having configured by one end of the iron and steel crack rock core after closure liquid circulation;
Step 4: close closed loop system after the record maximum breakthrough pressure of drilling fluid and the wastage of certain time and let out confined pressure and complete once to test.
5. the iron and steel rock core on reusable simulation fracture leakage stratum, it is characterised in that: include rock core top contiguous block (1) and rock core bottom contiguous block (2);Wherein rock core top contiguous block (1) and rock core bottom contiguous block (2) are that the cylinder of cross section semicircular in shape, rock core top contiguous block (1) and rock core bottom contiguous block (2) are spliced to form cylinder;The Mosaic face edge of rock core top contiguous block (1) and rock core bottom contiguous block (2) is provided with projection, makes there is distance between two Mosaic faces, and the Mosaic face between projection is provided with the shallow slot of grid-shaped.
6. the iron and steel rock core on reusable simulation fracture leakage stratum described in claim 5, it is characterised in that: the length of described rock core top contiguous block (1) and rock core bottom contiguous block (2) is 70mm.
7. the iron and steel rock core on reusable simulation fracture leakage stratum described in claim 5, it is characterised in that: described grid-shaped is square or prismatic.
8. the iron and steel rock core on reusable simulation fracture leakage stratum described in claim 5, it is characterised in that: described cylindrical diameter of section is 25mm, and the mesh width between described bossing is 20mm.
9. the iron and steel rock core on reusable simulation fracture leakage stratum described in claim 5, it is characterised in that: the distance between said two Mosaic face is 1-5mm.
10. the method that application iron and steel rock core described in claim 5 carries out leak stopping slurry closure experiment, it is characterised in that carry out according to following steps:
Step 1: after rock core assembly is carried out before experiment assembling fastening, being wrapped in outside rock core with cellophane adhesive tape with fixing rock core is cylinder, ensure that each chunk will not scatter in the process put into core holding unit, put in the core holding unit of the dynamic filtration device of High Temperature High Pressure, add certain confined pressure;
Step 2: closure bridge liquid is injected in the circulation vessel of the dynamic filtration device of High Temperature High Pressure;
Step 3: close leak stopping bridge slurry blood circulation, opening circulation instrument replacement leak stopping bridge slurry is conventional drilling liquid, is circulated breakthrough from the drilling fluid started with having configured by one end of the iron and steel crack rock core after closure liquid circulation;
Step 4: close closed loop system after the record maximum breakthrough pressure of drilling fluid and the wastage of certain time and let out confined pressure and complete once to test.
CN201410286990.XA 2014-06-24 2014-06-24 The iron and steel rock core on reusable simulation fracture leakage stratum and application process Expired - Fee Related CN104076125B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410286990.XA CN104076125B (en) 2014-06-24 2014-06-24 The iron and steel rock core on reusable simulation fracture leakage stratum and application process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410286990.XA CN104076125B (en) 2014-06-24 2014-06-24 The iron and steel rock core on reusable simulation fracture leakage stratum and application process

Publications (2)

Publication Number Publication Date
CN104076125A CN104076125A (en) 2014-10-01
CN104076125B true CN104076125B (en) 2016-07-27

Family

ID=51597531

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410286990.XA Expired - Fee Related CN104076125B (en) 2014-06-24 2014-06-24 The iron and steel rock core on reusable simulation fracture leakage stratum and application process

Country Status (1)

Country Link
CN (1) CN104076125B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106526076B (en) * 2016-11-02 2019-02-19 中国石油化工股份有限公司 A kind of adjustable slit width leak stopping instrument
CN108535161B (en) * 2018-03-10 2020-09-22 东北石油大学 Method for carrying out displacement experiment after fully saturated oil is carried out on matrix-high permeability strip rock core
CN109374826B (en) * 2018-09-18 2020-12-22 东北石油大学 Reusable steel core for multistage pre-shearing of chromium gel system
CN111561281B (en) * 2020-05-08 2022-04-29 中国海洋石油集团有限公司 Drilling fluid leak protection leaking stoppage effect evaluation experiment system
CN114414739A (en) * 2022-01-21 2022-04-29 西南石油大学 Evaluation method for plugging effect of combined width crack
CN115792189B (en) * 2022-11-11 2024-05-14 常州大学 Method for evaluating plugging effect of fracture expansion type leakage reservoir drilling fluid

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1724867A1 (en) * 1990-02-09 1992-04-07 Институт горного дела им.А.А.Скочинского Method of rock testing
CN201474690U (en) * 2009-08-06 2010-05-19 中国石油化工股份有限公司西南油气分公司工程技术研究院 Formation fracture simulation device
CN101968348A (en) * 2010-09-07 2011-02-09 中国石油大学(北京) Method for visually monitoring fracture crack
CN202092935U (en) * 2011-06-09 2011-12-28 青岛石大石仪科技有限责任公司 Core gripper capable of viewing core cracks
CN102350724A (en) * 2011-07-06 2012-02-15 张逸群 Manufacturing method of artificial core with crevices for simulated leaking stoppage experiment
CN102830214A (en) * 2012-08-15 2012-12-19 中国石油天然气股份有限公司 Dynamic physical simulation experiment method and device for water invasion of fractured bottom water gas reservoir

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1724867A1 (en) * 1990-02-09 1992-04-07 Институт горного дела им.А.А.Скочинского Method of rock testing
CN201474690U (en) * 2009-08-06 2010-05-19 中国石油化工股份有限公司西南油气分公司工程技术研究院 Formation fracture simulation device
CN101968348A (en) * 2010-09-07 2011-02-09 中国石油大学(北京) Method for visually monitoring fracture crack
CN202092935U (en) * 2011-06-09 2011-12-28 青岛石大石仪科技有限责任公司 Core gripper capable of viewing core cracks
CN102350724A (en) * 2011-07-06 2012-02-15 张逸群 Manufacturing method of artificial core with crevices for simulated leaking stoppage experiment
CN102830214A (en) * 2012-08-15 2012-12-19 中国石油天然气股份有限公司 Dynamic physical simulation experiment method and device for water invasion of fractured bottom water gas reservoir

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
岩石动态损伤模拟实验装置的研制;陈德春 等;《中国石油大学学报》;20070620;第31卷(第3期);第77-80页 *

Also Published As

Publication number Publication date
CN104076125A (en) 2014-10-01

Similar Documents

Publication Publication Date Title
CN104076125B (en) The iron and steel rock core on reusable simulation fracture leakage stratum and application process
Alsaba et al. Laboratory evaluation of sealing wide fractures using conventional lost circulation materials
CN205808844U (en) A kind of gap adjustable cement mortar leak stopping simulation experiment device of wind
CN105114049A (en) Experimental device for simulating hydrofracture action mechanism in steam assisted gravity drainage (SAGD) process
CN205047217U (en) Simulation annular space flow state's leaking stoppage experimental apparatus
Ho et al. The use of a pH-triggered polymer gelant to seal cement fractures in wells
Wang et al. Visualization study on plugging characteristics of temperature-resistant gel during steam flooding
Bai et al. Effects of fracture and matrix on propagation behavior and water shut-off performance of a polymer gel
CN108571314B (en) Visual supporting crack flow conductivity testing method
CN105628560A (en) Experimental device for measuring contact angles of CO2-saline water-rock system
CN205154123U (en) Experimental device for simulation SAGD in -process hydraulic fracturing mechanism
CN103592320A (en) Heating constant temperature method suitable for CT scanning rock core displacement experiment and capable of simulating oil reservoir conditions
CN104357033B (en) Blocking agent synergist, the gel containing the blocking agent synergist and preparation method and application
MX2015006448A (en) Method and apparatus for characterizing fluid channeling through a cement formation interface of a subterranian wellbore.
CN204804807U (en) Experimental model for simulating hydraulic fracturing crack water shutoff
CN105332683B (en) Fracturing experiments device and method
Fakher et al. Novel mathematical models to predict preformed particle gel placement and propagation through fractures
CN211115912U (en) Low pressure leakage gas well workover is with leaking stoppage test device
CN204402452U (en) Heavy Oil High Temperature high-pressure physics simulation injection-production well device
Zhao et al. Coreflooding evaluation of fiber-assisted recrosslinkable preformed particle gel using an open fracture model
CN203758993U (en) Full-diameter high-pressure intelligent plugging tester
Yang et al. Laboratory study and field application of fiber-based fracture reorientation technology
CN206386105U (en) A kind of pressure break horizontal wellbore integrality experimental provision
Liang et al. Interplay between viscous pressure and capillary pressure on polymer gel dehydration and water shutoff in hydraulically fractured reservoirs
CN114033334B (en) Temporary plugging well-killing experimental device for simulated gas well

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160727

Termination date: 20170624