CN104074169A - A temporary drainage method for water-sufficient areas of sandy land - Google Patents
A temporary drainage method for water-sufficient areas of sandy land Download PDFInfo
- Publication number
- CN104074169A CN104074169A CN201310098205.3A CN201310098205A CN104074169A CN 104074169 A CN104074169 A CN 104074169A CN 201310098205 A CN201310098205 A CN 201310098205A CN 104074169 A CN104074169 A CN 104074169A
- Authority
- CN
- China
- Prior art keywords
- water
- film
- films
- escape canal
- drainage method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A40/00—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
- Y02A40/10—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
- Y02A40/22—Improving land use; Improving water use or availability; Controlling erosion
Landscapes
- Foundations (AREA)
Abstract
The invention relates to the civil engineering field, especially relating to a temporary drainage method for water-sufficient areas of sandy land. A drainage channel, waterproof films and water stop rivets are adopted in the method. The temporary drainage method also comprises the following four steps. Step one: the drainage channel is dug according to a design drawing, and a reservoir that is connected with the drainage channel is constructed at the far end of the drainage channel. Stop two: the waterproof films are laid in the drainage channel in the water flow direction; at the connecting place of every two films, the edge of the upstream film covers the edge of the downstream film. Step three: the water stop rivets are hammered at the connecting place of every two films; Step four: the films that cover the embankment of the channel are covered with sand. With the design of the invention, for a deep foundation pit project, drained water cannot rapidly permeate back to the construction site through sandy land. After the foundation pit project is finished, backflow of underground water can be ensured after the films are removed, which can protect land quality.
Description
Technical field
The present invention relates to field of civil engineering, relate in particular to sand ground abundance of water region temporary drainage method.
Background technology
Because iron and steel, the energy, Resources Construction project have some demands in construction and production period to water resource, so region that general building project all can select water resource relatively to enrich, and due to the relation of sand ground geological characteristics, in the time carrying out above-mentioned a few intermediate item construction, there will be the underground deep-foundation pit engineering that the degree of depth is larger, while carrying out such engineering, drainage construction falls, but sand ground draining is without special drainage, the water of discharging can infiltrate very soon in sand ground and flow back to foundation ditch, and the underground water of simultaneously discharging also can cause adverse effect to the shallow foundation hole of closing on excavation.
Summary of the invention
The object of the invention is to, provide a kind of and reuse, place the Groundwater of discharging and can return the original former groundwater resources of underground maintenance and the impregnable sand ground abundance of water of environment region temporary drainage method.
In order to achieve the above object, the present invention is achieved in that
A kind of sand ground abundance of water region temporary drainage method, it comprises escape canal, fluid-tight film and sealing rivet; Also comprise the steps:
Step 1, press design drawing excavation escape canal, and at the distant place of escape canal terminal arranges and escape canal links reservoir;
Step 2, at the fluid-tight film of escape canal laid inside, film is laid along the direction of current direction, each film joint hides the edge of downstream membrane with the edge of upstream film;
Step 3, hammer into sealing rivet in the joint of each film;
Step 4, on the film being covered on irrigation canals and ditches embankment, cover sandy soil.
Described sand ground abundance of water region temporary drainage method, fluid-tight film is colour bar cloth or plastic foil.
Described sand ground abundance of water region temporary drainage method, sealing rivet comprises the nail bar of plastic material and the head of a nail of quality of rubber materials.
The present invention adopts above-mentioned design, after underground water is got rid of, deep foundation pit construction place and contiguous construction area just can not be subject to discharging the impact of rear a large amount of underground water, and the water in reservoir also can permeate the ground gradually and spread gradually towards periphery, after having constructed, falling draining stops, Groundwater infiltration sand ground, reclaims waterproof film in irrigation canals and ditches, the backfill of sand ground excavation part, completed deep foundation pit construction, made again the water and soil resources of sand ground not be affected.
Brief description of the drawings
Fig. 1 is structural representation of the present invention.
Fig. 2 is arrangement diagram of the present invention.
Fig. 3 is the structural representation of sealing rivet.
Detailed description of the invention
As shown in Figure 1 and Figure 2, a kind of sand ground abundance of water region temporary drainage method, it comprises escape canal 1, plastic sheeting 2 and sealing rivet 3; Also comprise the steps:
Step 1, press design drawing excavation escape canal 1, and the reservoir 4 linking at the terminal setting of the distant place of escape canal 1 and escape canal 1;
Step 2, at escape canal 1 laid inside plastic sheeting 2, plastic sheeting 2 is laid along the direction of current direction, the edge of covering downstream, the edge plastic sheeting 2 of upstream plastic sheetings 2 for each plastic sheeting 2 joints;
Step 3, hammer into sealing rivet 3 in the joint of each plastic sheeting 2;
Step 4, on the plastic sheeting 2 being covered on irrigation canals and ditches 1 embankment, cover sandy soil.
Described sand ground abundance of water region temporary drainage method, plastic sheeting 2 can also use colour bar cloth to substitute.
As shown in Figure 3, for ensureing the effect of sealing rivet 3, sealing rivet 3 comprises the nail bar 32 of plastic material and the head of a nail 31 of quality of rubber materials.
The present invention adopts above-mentioned design, after underground water is got rid of, deep foundation pit construction place and contiguous construction area just can not be subject to discharging the impact of rear a large amount of underground water, and the water in reservoir also can permeate the ground gradually and spread gradually towards periphery, after having constructed, falling draining stops, Groundwater infiltration sand ground, reclaims waterproof film in irrigation canals and ditches, the backfill of sand ground excavation part, completed deep foundation pit construction, made again the water and soil resources of sand ground not be affected.
Claims (3)
1. a sand ground abundance of water region temporary drainage method, it comprises escape canal, fluid-tight film and sealing rivet; It is characterized in that: also comprise the steps:
Step 1, press design drawing excavation escape canal, and at the distant place of escape canal terminal arranges and escape canal links reservoir;
Step 2, at the fluid-tight film of escape canal laid inside, film is laid along the direction of current direction, each film joint hides the edge of downstream membrane with the edge of upstream film;
Step 3, hammer into sealing rivet in the joint of each film;
Step 4, on the film being covered on irrigation canals and ditches embankment, cover sandy soil.
2. sand ground abundance of water according to claim 1 region temporary drainage method, is characterized in that: fluid-tight film is colour bar cloth or plastic foil.
3. sand ground abundance of water according to claim 1 region temporary drainage method, is characterized in that: sealing rivet comprises the nail bar of plastic material and the head of a nail of quality of rubber materials.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310098205.3A CN104074169A (en) | 2013-03-26 | 2013-03-26 | A temporary drainage method for water-sufficient areas of sandy land |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310098205.3A CN104074169A (en) | 2013-03-26 | 2013-03-26 | A temporary drainage method for water-sufficient areas of sandy land |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104074169A true CN104074169A (en) | 2014-10-01 |
Family
ID=51595745
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310098205.3A Pending CN104074169A (en) | 2013-03-26 | 2013-03-26 | A temporary drainage method for water-sufficient areas of sandy land |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104074169A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108934250A (en) * | 2018-06-15 | 2018-12-07 | 塔里木大学 | Sandy soil soil fertility promotes the circulatory system |
CN113389175A (en) * | 2021-07-12 | 2021-09-14 | 郑州大学 | Channel structure meeting multiple application scenes |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1632231A (en) * | 2004-12-27 | 2005-06-29 | 河海大学 | Landscape type multi-stage stepwise artificial wetland protection slope forming method |
WO2007027041A1 (en) * | 2005-09-01 | 2007-03-08 | Soo Ho Kim | Sloping ground construction work method and sloping ground construction fixed tool |
CN200961255Y (en) * | 2006-06-20 | 2007-10-17 | 王振铎 | Spliced aqueduct |
CN201582277U (en) * | 2009-12-25 | 2010-09-15 | 吕琳 | Vibration-damping screw nail |
CN102154997A (en) * | 2011-05-23 | 2011-08-17 | 东南大学 | Ecotypic bank revetment structure |
CN102561281A (en) * | 2012-03-12 | 2012-07-11 | 江苏省水利科学研究院 | Irrigation and drainage canal in coastal reclamation area |
KR101169023B1 (en) * | 2010-06-10 | 2012-07-30 | (주)대우건설 | Method for installing soil nailing and tunnel prevent hole for tidal plant |
CN202466544U (en) * | 2012-03-12 | 2012-10-03 | 江苏省水利科学研究院 | Irrigation and drainage ditch in coastal reclamation area |
-
2013
- 2013-03-26 CN CN201310098205.3A patent/CN104074169A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1632231A (en) * | 2004-12-27 | 2005-06-29 | 河海大学 | Landscape type multi-stage stepwise artificial wetland protection slope forming method |
WO2007027041A1 (en) * | 2005-09-01 | 2007-03-08 | Soo Ho Kim | Sloping ground construction work method and sloping ground construction fixed tool |
CN200961255Y (en) * | 2006-06-20 | 2007-10-17 | 王振铎 | Spliced aqueduct |
CN201582277U (en) * | 2009-12-25 | 2010-09-15 | 吕琳 | Vibration-damping screw nail |
KR101169023B1 (en) * | 2010-06-10 | 2012-07-30 | (주)대우건설 | Method for installing soil nailing and tunnel prevent hole for tidal plant |
CN102154997A (en) * | 2011-05-23 | 2011-08-17 | 东南大学 | Ecotypic bank revetment structure |
CN102561281A (en) * | 2012-03-12 | 2012-07-11 | 江苏省水利科学研究院 | Irrigation and drainage canal in coastal reclamation area |
CN202466544U (en) * | 2012-03-12 | 2012-10-03 | 江苏省水利科学研究院 | Irrigation and drainage ditch in coastal reclamation area |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108934250A (en) * | 2018-06-15 | 2018-12-07 | 塔里木大学 | Sandy soil soil fertility promotes the circulatory system |
CN108934250B (en) * | 2018-06-15 | 2021-09-24 | 塔里木大学 | Sand soil fertility promoting circulation system |
CN113389175A (en) * | 2021-07-12 | 2021-09-14 | 郑州大学 | Channel structure meeting multiple application scenes |
CN113389175B (en) * | 2021-07-12 | 2023-08-22 | 郑州大学 | Channel structure meeting various application scenes |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104878739B (en) | Drainage material assembly capable of being transversely connected with plastic drainage boards and method for constructing drainage material assembly | |
CN102767157B (en) | Diking method through filling sludge into mold bags and vacuum preloading | |
CN106381880B (en) | The processing method of the peat soil dam foundation | |
CN103290848B (en) | Large diameter arc-shaped steel sheet pile combined foundation pit retaining structure and construction method thereof | |
CN105179011A (en) | Tunnel plugging facility and tunnel plugging method | |
CN102071689B (en) | Optimized construction method of static pressure pile close to existing tunnel | |
CN208309566U (en) | A kind of water-stopping steel sheet pile | |
CN204849781U (en) | Lay prevention of seepage geomembrane perpendicularly and press excavation supporting system of irritating stake and combining together with superfluidity | |
CN106498959A (en) | Gutter for deep overburden | |
CN106193079A (en) | The preparation method of GCL vertical impermeable wall | |
CN202559363U (en) | Foundation pit supporting structure for underground diaphragm wall with steel structure | |
CN104074169A (en) | A temporary drainage method for water-sufficient areas of sandy land | |
CN105112652B (en) | A kind of rare earth ore in-situ leaching disposing mother liquor canal body structure | |
CN103967015A (en) | Water-stopping deep foundation pit excavation method and structure thereof | |
CN108086255B (en) | Seepage-proofing method for midline-type tailing damming dam body and midline-type tailing dam | |
CN107190709B (en) | Method for building river channel in newly dredged soil reclamation land-enclosed area | |
CN109853604A (en) | A kind of static pressure waterpower suction open caisson construction method | |
KR101262865B1 (en) | Construction method for cofferdam | |
CN105040707A (en) | Combined densely-arrayed pile deep foundation pit supporting and enclosure structure used as basement external wall | |
CN202466544U (en) | Irrigation and drainage ditch in coastal reclamation area | |
CN105064290B (en) | The rapid constructing method that asphalt concrete core of embankment dams superficial part leakage point is repaired | |
CN108914959B (en) | Foundation structure suitable for mountain house building and construction method thereof | |
CN204875755U (en) | Drainage body and solidification stratum society foundation structure | |
CN207277349U (en) | A kind of highway bridge construction cofferdam device | |
CN206189430U (en) | A escape canal for deep overburden ground |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20141001 |