CN104070656A - Manufacture method of hot-melt type red copper composite tube - Google Patents

Manufacture method of hot-melt type red copper composite tube Download PDF

Info

Publication number
CN104070656A
CN104070656A CN201410217610.7A CN201410217610A CN104070656A CN 104070656 A CN104070656 A CN 104070656A CN 201410217610 A CN201410217610 A CN 201410217610A CN 104070656 A CN104070656 A CN 104070656A
Authority
CN
China
Prior art keywords
tube
copper
manufacture method
type red
red copper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410217610.7A
Other languages
Chinese (zh)
Inventor
沈海娃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGBO MINDE BUILDING MATERIALS Co Ltd
Original Assignee
NINGBO MINDE BUILDING MATERIALS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGBO MINDE BUILDING MATERIALS Co Ltd filed Critical NINGBO MINDE BUILDING MATERIALS Co Ltd
Priority to CN201410217610.7A priority Critical patent/CN104070656A/en
Publication of CN104070656A publication Critical patent/CN104070656A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/06Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Extrusion Moulding Of Plastics Or The Like (AREA)

Abstract

The invention relates to a manufacture method of a pipe fitting, and particularly relates to a manufacture method of a hot-melt type red copper composite tube. The invention discloses a manufacture method of a hot-melt type red copper composite tube. The manufacture method is characterized by comprising a tube manufacturing step and an extruding step, and specifically comprises the following steps: 1. manufacturing a copper strip into a copper tube by using tube manufacturing equipment and performing seamless welding; 2. rounding an inner tube wall and an outer tube wall of the copper tube; 3. removing oil stains from the rounded copper tube; 4. respectively compounding EVA (ethylene vinyl acetate copolymer) glue and PPR (polypropylene) outside the copper tube through the extruding equipment; 5. carrying out water-cooling on the compounded copper tube; and 6. cutting, packaging, and storing. According to the manufacture method, the production process is simple, automatic production can be realized through the tube manufacturing equipment and the extruding equipment, and the manufacture method has the characteristics that percent of pass is high, the production cost is low, large-scale production can be realized, and the social use requirement is realized.

Description

Heat molten type red copper composite pipe production method
Technical field
The present invention relates to a kind of manufacture method of pipe fitting, refer in particular to a kind of heat molten type red copper composite pipe production method.
Background technology
The existing manufacture to red copper multiple tube is first to make finished product metal tube, manually metal tube is transported to extrusion equipment, then through complicated technique, carries out multiple glue.Every metal tube must not surpass 3 meters, and manual feed continuously, therefore need connect with special joint, also needs to take out joint after carrying out finished product, middlely as occurred, pauses, and tubing is scrapped and increased, and qualification rate is low, and tubing yields poorly, and is difficult for batch production.
Summary of the invention
The technical problem that one, will solve
The object of the invention is for the existing the problems referred to above of prior art, spy provides a kind of production technology simple, high and the heat molten type red copper composite pipe production method that can mass production of production efficiency.
Two, technical scheme
For solving the problems of the technologies described above, heat molten type red copper composite pipe production method of the present invention, wherein, is comprised of tubulation step and extrusion step, specific as follows:
1), by tubulation apparatus, copper strips is made to copper pipe and carried out seamless welding;
2), the inner tubal wall of copper pipe and outer tube wall are carried out to full circle;
3), the copper pipe after full circle is dispelled to the processing of greasy dirt;
4), by the extrusion equipment compound EVA glue of difference and PPR outside copper pipe;
5), the copper pipe after compound is processed through water-cooled;
6), cutting-packing-warehouse-in.
As optimization, above-mentioned electric current while carrying out seamless welding is 28Hz, and hauling speed is 4.2m/min, and passing into volume is 2cm 3argon gas.
As optimization, temperature when compound EVA glue and PPR is 200 ℃, and recombination velocity is 5Hz.
Three, beneficial effect of the present invention
Production technology is simple, by tubulation apparatus and extrusion equipment, realizes automated production, has the advantages that qualification rate is high, production cost is low, realizes mass production, meets social user demand.
The specific embodiment
Below heat molten type red copper composite pipe production method of the present invention is described further:
Embodiment one: heat molten type red copper composite pipe production method of the present invention, wherein, by tubulation step and extrusion step, formed, specific as follows: 1), by tubulation apparatus, copper strips is made to copper pipe and carried out seamless welding, electric current when carrying out seamless welding is 28Hz, hauling speed is 4.2m/min, and passing into volume is 2cm 3argon gas, guarantee the stable of voltage simultaneously; 2), the inner tubal wall of copper pipe and outer tube wall are carried out to full circle; 3), the copper pipe after full circle is dispelled to the processing of greasy dirt by baking oven; 4), by extrusion equipment respectively compound EVA glue and PPR outside copper pipe, and temperature when compound EVA glue and PPR is 200 ℃, recombination velocity is 5Hz; 5), the copper pipe after compound is processed through water-cooled; 6), to the finished product after full circle, by length, need to cut, its hauling speed is 4.2m/min, and the finished product after cutting is packed and put in storage.
The above is only the preferred embodiment of the present invention; it should be pointed out that for those skilled in the art, do not departing under the prerequisite of the technology of the present invention principle; can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (3)

1. a heat molten type red copper composite pipe production method, is characterized in that: by tubulation step and extrusion step, formed, specific as follows:
1), by tubulation apparatus, copper strips is made to copper pipe and carried out seamless welding;
2), the inner tubal wall of copper pipe and outer tube wall are carried out to full circle;
3), the copper pipe after full circle is dispelled to the processing of greasy dirt;
4), by the extrusion equipment compound EVA glue of difference and PPR outside copper pipe;
5), the copper pipe after compound is processed through water-cooled;
6), cutting-packing-warehouse-in.
2. heat molten type red copper composite pipe production method according to claim 1, is characterized in that: described in electric current while carrying out seamless welding be 28Hz, hauling speed is 4.2m/min, passing into volume is 2cm 3argon gas.
3. heat molten type red copper composite pipe production method according to claim 1, is characterized in that: temperature when compound EVA glue and PPR is 200 ℃, and recombination velocity is 5Hz.
CN201410217610.7A 2014-05-21 2014-05-21 Manufacture method of hot-melt type red copper composite tube Pending CN104070656A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410217610.7A CN104070656A (en) 2014-05-21 2014-05-21 Manufacture method of hot-melt type red copper composite tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410217610.7A CN104070656A (en) 2014-05-21 2014-05-21 Manufacture method of hot-melt type red copper composite tube

Publications (1)

Publication Number Publication Date
CN104070656A true CN104070656A (en) 2014-10-01

Family

ID=51592461

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410217610.7A Pending CN104070656A (en) 2014-05-21 2014-05-21 Manufacture method of hot-melt type red copper composite tube

Country Status (1)

Country Link
CN (1) CN104070656A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110657288A (en) * 2019-10-14 2020-01-07 杨金刚 Metal-plastic composite pipe system and manufacturing method thereof

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6030520A (en) * 1983-06-29 1985-02-16 Sumitomo Electric Ind Ltd Extrusion method of composite material
JPH04313463A (en) * 1990-10-17 1992-11-05 Itt Corp Method of manufacturing duplex wall pipe
JPH08290214A (en) * 1995-04-19 1996-11-05 Mitsubishi Materials Corp Manufacture of composite metallic bar and equipment therefor
JPH10286870A (en) * 1997-02-12 1998-10-27 Mitsubishi Chem Corp Production of laminated body
CN1312140A (en) * 2001-04-06 2001-09-12 上海申马铜业科技股份有限公司 Manufacture of specially shaped copper tube for computer to dissipate heat
CN101062591A (en) * 2006-04-27 2007-10-31 武汉金牛经济发展有限公司 Method and device for producing novel PP-R plastic-aluminum stationary pipe
CN101404350A (en) * 2008-11-14 2009-04-08 中天日立射频电缆有限公司 Broad band radiation type leak coaxial cable for subway and its production method
CN101699120A (en) * 2009-11-06 2010-04-28 周宝茂 Microporous plastic-covered PPR copper liner reinforced composite pipe and preparation method thereof
CN102107232A (en) * 2010-12-23 2011-06-29 江苏其元集团有限公司 Method for manufacturing steel-copper composite welded tube
CN102581060A (en) * 2012-02-20 2012-07-18 绍兴市力博电气有限公司 Method for processing copper tube having circular inside and quadrate outside
CN102635740A (en) * 2012-04-24 2012-08-15 林长青 PPR (polypropylene randon coplymer) compound pipe
CN103121290A (en) * 2013-01-28 2013-05-29 钭礼俊 Automatic production line of composite tube and production method thereof
CN103203391A (en) * 2013-01-06 2013-07-17 金龙精密铜管集团股份有限公司 Production method for copper-titanium composite tube

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6030520A (en) * 1983-06-29 1985-02-16 Sumitomo Electric Ind Ltd Extrusion method of composite material
JPH04313463A (en) * 1990-10-17 1992-11-05 Itt Corp Method of manufacturing duplex wall pipe
JPH08290214A (en) * 1995-04-19 1996-11-05 Mitsubishi Materials Corp Manufacture of composite metallic bar and equipment therefor
JPH10286870A (en) * 1997-02-12 1998-10-27 Mitsubishi Chem Corp Production of laminated body
CN1312140A (en) * 2001-04-06 2001-09-12 上海申马铜业科技股份有限公司 Manufacture of specially shaped copper tube for computer to dissipate heat
CN101062591A (en) * 2006-04-27 2007-10-31 武汉金牛经济发展有限公司 Method and device for producing novel PP-R plastic-aluminum stationary pipe
CN101404350A (en) * 2008-11-14 2009-04-08 中天日立射频电缆有限公司 Broad band radiation type leak coaxial cable for subway and its production method
CN101699120A (en) * 2009-11-06 2010-04-28 周宝茂 Microporous plastic-covered PPR copper liner reinforced composite pipe and preparation method thereof
CN102107232A (en) * 2010-12-23 2011-06-29 江苏其元集团有限公司 Method for manufacturing steel-copper composite welded tube
CN102581060A (en) * 2012-02-20 2012-07-18 绍兴市力博电气有限公司 Method for processing copper tube having circular inside and quadrate outside
CN102635740A (en) * 2012-04-24 2012-08-15 林长青 PPR (polypropylene randon coplymer) compound pipe
CN103203391A (en) * 2013-01-06 2013-07-17 金龙精密铜管集团股份有限公司 Production method for copper-titanium composite tube
CN103121290A (en) * 2013-01-28 2013-05-29 钭礼俊 Automatic production line of composite tube and production method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110657288A (en) * 2019-10-14 2020-01-07 杨金刚 Metal-plastic composite pipe system and manufacturing method thereof

Similar Documents

Publication Publication Date Title
CN101298084B (en) Technique for processing D type copper pipe with unequal-radius wall thickness or equal-radius wall thickness
CN104759786A (en) Multi-core seamless flux-cored silver wire
CN103916990A (en) Electric heating tube production process
CN102350614B (en) Machining method for seamless copper pipe
CN104070656A (en) Manufacture method of hot-melt type red copper composite tube
CN201933138U (en) Tin coating device with double tin furnaces for welding strip used for welding photovoltaic module
CN103624490B (en) A kind of processing method of bimetal composite single-weld-seam bend
CN203080045U (en) Welding strip tin plating device for welding photovoltaic modules
CN204450055U (en) A kind of curved pipe cutting on line frock
CN104175119A (en) Novel pipeline elbow automatic production line
CN203696199U (en) Arc welding equipment for hydraulic torque converter cover assembly
CN205057195U (en) Peeler for PE-RT aluminum alloy lining plastic pipe
CN104439644A (en) Inert gas shielded welding process of aluminum alloy thick plate with thickness being over 12 mm
CN203844239U (en) High-efficiency sintering furnace of polytetrafluoroethylene tubes
CN103611759B (en) Production process of hollow tube blank
CN102039327A (en) Technology for pressing metal into multi-way product by using liquid as medium
CN103658938A (en) Right angle welding process for large-diameter pipeline
CN104889474A (en) Pipe cutting device
CN104439642A (en) Inert gas arc welding technology applicable to aluminum and aluminum alloy plates with thickness ranging from 4 mm to 6 mm
CN103567240B (en) A kind of pipe drawing device of planet tube grimper
CN104588998A (en) Manufacturing method for short-pitch external thickened oil pipe with upset pipe ends
CN204237866U (en) Aluminium corrosive fluid production equipment
CN104368603B (en) Steel pipe forming device
CN203339100U (en) New type energy-saving lamp sealing machine
CN203936377U (en) On a kind of antimony powder industrial water is cold, prolong device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20141001

RJ01 Rejection of invention patent application after publication