CN104060620A - Karst fissure water control method for deep foundation pit - Google Patents

Karst fissure water control method for deep foundation pit Download PDF

Info

Publication number
CN104060620A
CN104060620A CN201310089926.8A CN201310089926A CN104060620A CN 104060620 A CN104060620 A CN 104060620A CN 201310089926 A CN201310089926 A CN 201310089926A CN 104060620 A CN104060620 A CN 104060620A
Authority
CN
China
Prior art keywords
water
collecting well
foundation ditch
foundation pit
grouting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310089926.8A
Other languages
Chinese (zh)
Other versions
CN104060620B (en
Inventor
杨前
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201310089926.8A priority Critical patent/CN104060620B/en
Publication of CN104060620A publication Critical patent/CN104060620A/en
Application granted granted Critical
Publication of CN104060620B publication Critical patent/CN104060620B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention relates to a drainage method for a deep foundation pit, particularly to a karst fissure water control method for the deep foundation pit. The control method comprises the steps as follows: the foundation pit is excavated, and meanwhile, a water-collecting well is arranged at the bottom of the foundation pit; water guide grooves communicated transversely and longitudinally are formed in rock stratum slopes of the foundation pit; reinforcing steel bars are bound, concrete pouring is performed, and meanwhile, grouting pipes are arranged at the bottom of the foundation pit; water is drained by a water pump, the well is sealed, after a concrete structure is sealed, the water pump in the water-collecting well is taken out, and underwater concrete is poured after the underground water level in the water-collecting well rises to the balance height; grouting is performed at the bottom of the foundation pit, cement slurry is injected from the grouting pipes arranged at the bottom of the foundation pit, valves of grouting drain pipes located at top ends of waterproof-membrane-covered positions are open to drain accumulated water during grouting, and the grouting pipes and the valves of the drain pipes are closed after the foundation pit is full of the cement slurry; cleaning is performed, after the cement slurry is solidified and reaches the strength, the water-collecting well, the grouting pipes and the grouting drain pipes are cut and leveled along the concrete structure. According to the control method, the control effect on underground water is good, and the normal proceeding of the foundation pit structure construction can be guaranteed.

Description

Deep foundation ditch Karst Fissures water controling method
Technical field
The present invention designs deep foundation ditch, relates in particular to the water discharge method that falls of deep foundation ditch.
Background technology
There are many ground alternating layers and full lithostratigraphy in south China area, that under this geological conditions, carries out that first underground deep foundation pit construction consider is excavation of foundation pit, goes along with sb. to guard him and groundwater control problem, and often there is a large amount of Karst Fissures water because of the crack in rock stratum or karst hole in this geological conditions, crevice water is because of the perforation of Karst Fissures transverse and longitudinal, most supply sources abundant with water resource communicate, during excavation of foundation pit, can pour in a large amount of Karst Fissures water, bring very big difficulty to excavation of foundation pit and structure construction.
Summary of the invention
The present invention is intended to overcome the defect of prior art, and a kind of deep foundation ditch Karst Fissures water controling method is provided.Groundwater control of the present invention is effective, can ensure normally carrying out of foundation pit structure construction.
In order to solve the problems of the technologies described above, a kind of deep foundation ditch Karst Fissures of the present invention water controling method, it comprises:
Excavation of foundation pit step, arranges collecting well at foundation ditch lower curtate simultaneously,
The guiding gutter step that transverse and longitudinal connects is set in the side slope of foundation ditch rock stratum, and guiding gutter is semicircle shape and is buckled in the side slope of foundation ditch rock stratum, is drilled with water guide filter opening on guiding gutter, and plane and collecting well that guiding gutter and guiding gutter cover connect, and guiding gutter top covers waterproof film;
Assembling reinforcement is also carried out concrete and is built step, in foundation ditch bottom, Grouting Pipe is set simultaneously;
Water pump draining with take out the step of shunting in a well after collecting well, the Karst Fissures water of waterproof film bottom is flowed in collecting well and is discharged by guiding gutter, after the sealing of concrete structure by collecting well in water pump take out, the interior groundwater table of collecting well rises to balance height after-pouring Underwater Concrete;
Foundation ditch bottom slip casting step, Underwater Concrete reaches after intensity, from being arranged on the Grouting Pipe injected water mud of foundation ditch bottom, opens and be positioned at waterproof film covering place top slip casting gutter valve and drain the water away when slip casting, after filling, cement paste closes the valve of Grouting Pipe, gutter, Grouting Pipe;
Cleanup step, cement paste solidifies and intensity reach after by collecting well, Grouting Pipe, slip casting gutter along the levelling of concrete structure cuts.
Described deep foundation ditch Karst Fissures water controling method, the inside and outside seal ring that is all welded with of described collecting well.
Described deep foundation ditch Karst Fissures water controling method, described collecting well height is higher than foundation ditch bottom level.
Described deep foundation ditch Karst Fissures water controling method, described collecting well height and foundation ditch bottom level maintain an equal level, shut-in well is to be positioned at collecting well bottom fillter section position welding steel and flange, itself and permeable place, shaft bottom are separated, after structure sealing, take out water pump, mounting flange blind plate, then directly builds concrete.。
Described deep foundation ditch Karst Fissures water controling method, described Grouting Pipe, slip casting gutter are welded with seal ring.
Groundwater control of the present invention is effective, can ensure normally carrying out of foundation pit structure construction.Can be used for the similar base pit engineering that underground water is larger.Principle is simple, easy operating.
Brief description of the drawings
Below in conjunction with accompanying drawing, the present invention is further illustrated:
Fig. 1 is first embodiment schematic diagram of the present invention;
Fig. 2 is second embodiment schematic diagram of the present invention;
Fig. 3 is A portion enlarged drawing in the middle of Fig. 1 or Fig. 2.。
Detailed description of the invention
The first embodiment:
Refer to Fig. 1 and in conjunction with Fig. 3, in digging process, in foundation ditch 6 bottoms, a collecting well 1 is set, in the foundation ditch rock stratum side slope of infiltrating at a large amount of Karst Fissures water, the guiding gutter 2 that transverse and longitudinal connects is set, guiding gutter is semicircle shape and is buckled in the side slope of rock stratum, on guiding gutter, be drilled with water guide filter opening, plane and collecting well that guiding gutter and guiding gutter cover connect, guiding gutter top covers waterproof film 3, carrying out like this reinforcing bar binding and concrete builds overall process and can carry out on the waterproof film top through water proof processing, construction period, concrete structure normally carried out, the Karst Fissures water of waterproof film bottom is flowed in collecting well and is discharged by guiding gutter, after concrete structure sealing by collecting well in water pump take out, in collecting well, groundwater table rises to balance height after-pouring Underwater Concrete, inside and outside collecting well, be welded with seal ring and can play waterproof action, Underwater Concrete reaches after intensity, from being arranged on the Grouting Pipe 4 injected water mud of foundation ditch bottom, when slip casting, open and be positioned at waterproof film covering place top slip casting gutter 5 valves and drain the water away, after filling, cement paste closes the valve of Grouting Pipe, gutter, Grouting Pipe, gutter are welded with seal ring 7 also can play waterproof action, and cement paste solidifies and intensity is prolonged the levelling of concrete structure cuts by collecting well, Grouting Pipe, slip casting gutter after reaching.
The second embodiment
Referring to Fig. 2, the present embodiment is the situation general or less for Karst Fissures water, be to catchment highly identical with well concrete structural base with the first embodiment difference, shut-in well is to be positioned at collecting well bottom fillter section position welding steel and blank flange 8, itself and permeable place, shaft bottom are separated, after structure sealing, take out water pump, mounting flange blind plate 8, then directly builds concrete.

Claims (5)

1. a deep foundation ditch Karst Fissures water controling method, is characterized in that, it comprises:
Excavation of foundation pit step, arranges collecting well at foundation ditch lower curtate simultaneously,
The guiding gutter step that transverse and longitudinal connects is set in the side slope of foundation ditch rock stratum, and guiding gutter is semicircle shape and is buckled in the side slope of foundation ditch rock stratum, is drilled with water guide filter opening on guiding gutter, and plane and collecting well that guiding gutter and guiding gutter cover connect, and guiding gutter top covers waterproof film;
Assembling reinforcement is also carried out concrete and is built step, in foundation ditch bottom, Grouting Pipe is set simultaneously;
Pump drainage with take out the step of shunting in a well after collecting well, the Karst Fissures water of waterproof film bottom is flowed in collecting well and is discharged by guiding gutter, after the sealing of concrete structure by collecting well in water pump take out, the interior groundwater table of collecting well rises to balance height after-pouring Underwater Concrete;
Foundation ditch bottom slip casting step, Underwater Concrete reaches after intensity, from being arranged on the Grouting Pipe injected water mud of foundation ditch bottom, when slip casting, open and be positioned at waterproof film covering place top slip casting gutter valve and drain the water away, after filling, cement paste closes the valve of Grouting Pipe, gutter;
Cleanup step, cement paste solidifies and intensity reach after by collecting well, Grouting Pipe, slip casting gutter along the levelling of concrete structure cuts.
2. deep foundation ditch Karst Fissures water controling method according to claim 1, is characterized in that the inside and outside seal ring that is all welded with of described collecting well.
3. deep foundation ditch Karst Fissures water controling method according to claim 1 and 2, is characterized in that, described collecting well height is higher than foundation ditch bottom level.
4. deep foundation ditch Karst Fissures water controling method according to claim 1 and 2, it is characterized in that, described collecting well height and foundation ditch bottom level maintain an equal level, shut-in well is to be positioned at collecting well bottom fillter section position welding steel and flange, itself and permeable place, shaft bottom are separated, after structure sealing, take out water pump, mounting flange blind plate, then directly builds concrete.
5. deep foundation ditch Karst Fissures water controling method according to claim 1, is characterized in that, described Grouting Pipe, slip casting gutter are welded with seal ring.
CN201310089926.8A 2013-03-20 2013-03-20 Deep basal pit Karst Fissures water controling method Active CN104060620B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310089926.8A CN104060620B (en) 2013-03-20 2013-03-20 Deep basal pit Karst Fissures water controling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310089926.8A CN104060620B (en) 2013-03-20 2013-03-20 Deep basal pit Karst Fissures water controling method

Publications (2)

Publication Number Publication Date
CN104060620A true CN104060620A (en) 2014-09-24
CN104060620B CN104060620B (en) 2016-08-10

Family

ID=51548534

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310089926.8A Active CN104060620B (en) 2013-03-20 2013-03-20 Deep basal pit Karst Fissures water controling method

Country Status (1)

Country Link
CN (1) CN104060620B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104294836A (en) * 2014-10-30 2015-01-21 中冶建工集团有限公司 Water table lowering method applied to situation that aquiclude of foundation pit is cracked
CN104846836A (en) * 2015-05-21 2015-08-19 中铁四局集团有限公司 Water supply and drainage device for deep foundation pit and construction method based on water supply and drainage device
CN105201002A (en) * 2015-10-23 2015-12-30 金磐集团有限公司 Underground structure seepage drainage system and construction method thereof
CN105625448A (en) * 2014-10-31 2016-06-01 龚展宇 Underground water drainage method and device for underground building
CN106012951A (en) * 2016-06-27 2016-10-12 李德群 Method for constructing reservoir away from karst caves in limestone areas and constructed reservoir structure
CN107217674A (en) * 2017-05-10 2017-09-29 山西四建集团有限公司 Cubic meter of stone foundation ditch enters rock non-explosive excavation construction method
CN111472347A (en) * 2020-04-17 2020-07-31 中铁六局集团有限公司 Leaking stoppage device for underground continuous wall water leakage position
CN111501767A (en) * 2020-03-24 2020-08-07 中铁隧道局集团建设有限公司 Foundation pit base surface hydration-free construction structure under sandy cobble and mudstone geological conditions
CN112281858A (en) * 2020-10-20 2021-01-29 中建八局发展建设有限公司 Mud rock natural foundation fissure water drainage construction method
CN113250219A (en) * 2021-05-18 2021-08-13 深圳市大升高科技工程有限公司 Foundation pit karst effluent treatment plant

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836232B (en) * 2017-03-30 2019-01-29 中国华西企业股份有限公司 Deep basal pit pressure-bearing water seal drainage construction technique

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06323100A (en) * 1993-05-17 1994-11-22 Shimizu Corp Underground water pressure reducing construction method
CN202530465U (en) * 2012-03-17 2012-11-14 孔蕾蕾 Foundation pit drainage structure
CN202730786U (en) * 2012-08-31 2013-02-13 天津住宅集团建设工程总承包有限公司 Well-sealing waterproof construction structure of dewatering well

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06323100A (en) * 1993-05-17 1994-11-22 Shimizu Corp Underground water pressure reducing construction method
CN202530465U (en) * 2012-03-17 2012-11-14 孔蕾蕾 Foundation pit drainage structure
CN202730786U (en) * 2012-08-31 2013-02-13 天津住宅集团建设工程总承包有限公司 Well-sealing waterproof construction structure of dewatering well

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
***: "简述水利工程建设中的基坑排水技术", 《民营科技》, no. 2, 28 February 2014 (2014-02-28) *
赵国厚: "降水井封堵施工技术", 《山西建筑》, vol. 37, no. 30, 31 October 2011 (2011-10-31) *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104294836A (en) * 2014-10-30 2015-01-21 中冶建工集团有限公司 Water table lowering method applied to situation that aquiclude of foundation pit is cracked
CN104294836B (en) * 2014-10-30 2016-06-22 中冶建工集团有限公司 There is the precipitation processing method in crack in foundation ditch water barrier
CN105625448A (en) * 2014-10-31 2016-06-01 龚展宇 Underground water drainage method and device for underground building
CN104846836A (en) * 2015-05-21 2015-08-19 中铁四局集团有限公司 Water supply and drainage device for deep foundation pit and construction method based on water supply and drainage device
CN105201002A (en) * 2015-10-23 2015-12-30 金磐集团有限公司 Underground structure seepage drainage system and construction method thereof
CN106012951A (en) * 2016-06-27 2016-10-12 李德群 Method for constructing reservoir away from karst caves in limestone areas and constructed reservoir structure
CN107217674A (en) * 2017-05-10 2017-09-29 山西四建集团有限公司 Cubic meter of stone foundation ditch enters rock non-explosive excavation construction method
CN111501767A (en) * 2020-03-24 2020-08-07 中铁隧道局集团建设有限公司 Foundation pit base surface hydration-free construction structure under sandy cobble and mudstone geological conditions
CN111501767B (en) * 2020-03-24 2021-10-26 中铁隧道局集团建设有限公司 Foundation pit base surface hydration-free construction structure under sandy cobble and mudstone geological conditions
CN111472347A (en) * 2020-04-17 2020-07-31 中铁六局集团有限公司 Leaking stoppage device for underground continuous wall water leakage position
CN112281858A (en) * 2020-10-20 2021-01-29 中建八局发展建设有限公司 Mud rock natural foundation fissure water drainage construction method
CN113250219A (en) * 2021-05-18 2021-08-13 深圳市大升高科技工程有限公司 Foundation pit karst effluent treatment plant

Also Published As

Publication number Publication date
CN104060620B (en) 2016-08-10

Similar Documents

Publication Publication Date Title
CN104060620A (en) Karst fissure water control method for deep foundation pit
KR101385563B1 (en) Drainage structure in tunnel and method constructing thereof
CN102797266B (en) Well sealing waterproof construction method for dewatering well
CN102418347B (en) Drainage construction method for blind drain and sump wells in deep foundation pit
CN205152968U (en) Precipitation tubular well structure
CN103088836A (en) Sedimentation control method for pumping water and performing reinjection in well casing simultaneously
CN103938512A (en) Reverse construction method of newly built road with existing expressway in underneath penetrating manner
CN102383412A (en) Construction method by adopting dewatering and water recharging to control sedimentation surrounding deep foundation pit
CN101881181A (en) Mine goaf tailing-filled concrete enclosing wall
CN105179011A (en) Tunnel plugging facility and tunnel plugging method
CN109519150A (en) One kind being directed to the biggish plugging dewatering well device and method of water yield
CN202247920U (en) Construction structure for water drainage of blind ditch and water collecting wells in deep foundation pit
CN105484277A (en) Component for tubular well precipitation construction in elevator foundation pit or sump and construction method
CN202809629U (en) Pressure-reduction and dewatering supplementary well completion structure in disturbance stratum inside foundation pit
CN109723071B (en) Construction method of double-layer steel drum drainage system built in basement floor post-cast strip
CN103147450A (en) Construction method for plugging partial steel pipe dewatering well by using flange plates for excavation of deep foundation pit
CN205205844U (en) Member is used in construction of tubular well precipitation in elevator foundation ditch or sump pit
CN105178342B (en) Precipitation well casing and method for blocking reserved hole of foundation pit through precipitation well casing
CN201747404U (en) Sand-seal water-filtering system for underground tailing fill
CN203768925U (en) Seal device for dewatering well in foundation pit
CN110670613B (en) Foundation pit elevator shaft water seepage prevention structure and construction method thereof
CN103993609B (en) The multi-functional fast hard concrement manual repair foundation pit waterproof curtain of silicon ash sand guide drainage
CN110185051A (en) Deep narrow excavation water discharge method
CN202055248U (en) Pile foundation mud pit
CN203066092U (en) Pumping and recharging dual-purpose well casing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant