CN104047630A - Technical method for mechanically mounting fully mechanized coal mining surface - Google Patents
Technical method for mechanically mounting fully mechanized coal mining surface Download PDFInfo
- Publication number
- CN104047630A CN104047630A CN201310582373.XA CN201310582373A CN104047630A CN 104047630 A CN104047630 A CN 104047630A CN 201310582373 A CN201310582373 A CN 201310582373A CN 104047630 A CN104047630 A CN 104047630A
- Authority
- CN
- China
- Prior art keywords
- hydraulic
- support
- mining
- installation
- crane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
- Machines For Laying And Maintaining Railways (AREA)
Abstract
The invention discloses a technical method for mechanically mounting a fully mechanized coal mining surface. A mining hydraulic crane, a middle groove hydraulic hoist, a four-corner passage assembly, a bracket mounting forklift and a hydraulic bracket lifting frame are adopted to mechanically mount the fully mechanized coal mining surface, wherein a power device of used equipment is a hydraulic system of the surface. The technical method comprises the following specific steps of 1, mounting parts, such as a loader, a crusher and a belt conveyor automatic moving machine tail, and detaching the rail on which the loader is mounted; 2, using the middle groove hydraulic hoist to mount a scraper machine middle groove; 3, mounting the hydraulic bracket; 4, mounting a coal mining machine and a coal mining machine rocker arm. The technical method has the advantages that due to mechanical operation, time and labor are saved, the working efficiency is greatly improved, the method is safe and convenient to perform, and the requirement on the modern coal mining mechanical development is met.
Description
Technical field
The present invention relates to mining mechanization mounting technique field, especially fully-mechanized mining working mechanization mounting process method.
Background technology
The installation of existing fully-mechanized mining working adopts and utilizes flat car that equipment is transported to scene, then adopt manually or electric block is installed, not only time-consuming, labour intensity is large, inefficiency, and usually there is casualty accident, the development of serious restrained force coal-mining technique, therefore, in the urgent need to a kind of fully-mechanized mining working mechanization mounting process method.
Summary of the invention
For solving the problems of the technologies described above, the object of the invention is a kind of open fully-mechanized mining working mechanization mounting process method, the contents are as follows: adopt mining hydraulic crane, intermediate channel hydraulic hoisting car, Si Jiao road assembly, support installation fork truck, hydraulic support upending frame to carry out mechanization installation, the power set of device therefor adopt the hydraulic system of work plane; Concrete installation steps are as follows:
Step 1. is transported to Yun Shun lane by mining hydraulic crane elevating conveyor position is installed; Utilize mining hydraulic crane that the parts such as elevating conveyor intermediate channel, crushing engine, conveyor self-movable foot end are installed successively; Then remove elevating conveyor part rail is installed;
Step 2. is transferred to scraper conveyor middle groove in front carriage with intermediate channel hydraulic hoisting car, after being transported to assigned address, install, remove traction rail apart from track, and by the track mounting bracket assembling fork Car Track of removing, support assembling fork Car Track gauge is 1500mm or 2000mm, with intermediate channel hydraulic hoisting car, scraper conveyor middle groove is installed, is removed afterwards intermediate channel hydraulic hoisting car, Si Jiao road assembly is installed and is assembled support installation fork truck with mining hydraulic crane; Forklift transport scrapper conveyor head is installed with support, is installed with mining hydraulic crane;
Step 3. is assembled the tail boom of hydraulic support, main body, front fine strain of millet with hydraulic support upending frame, and the hydraulic support after assembling is pulled to hydraulic support on support installation fork truck and is transported to assigned address by winch or traction forklift and installs; Removing length is that after 3 meters of rails, installation length is 1.5 meters of rails, and then transition bracket and ordinary stent are installed successively; After hydraulic support installation, striking is installed the facilities such as fork truck, Si Jiao road assembly and hydraulic support upending frame;
Step 4. is installed coal-winning machine, rocker arm of coal mining machine is installed with mining hydraulic crane, and body is installed, and then, miscellaneous part is installed successively; With mining hydraulic crane, scrapper conveyor tail is installed again, finally mining hydraulic crane is put in place to other facilities of dismounting down-hole or gug at any time.
In described step 3, as inadequate in lanewidth degree degree, can install on fork truck hydraulic support is carried out to tuning at support, be then transported to assigned address and carry out tuning installation.
In described step 4, install when rocker arm of coal mining machine, need fix with support, prevent that it from toppling over.
Described mining hydraulic crane adopts Liaoning Xinfeng Coal Mine Electrical Equipment Manufacturing Co., Ltd.'s product.
Described intermediate channel hydraulic hoisting car adopts Liaoning Xinfeng Coal Mine Electrical Equipment Manufacturing Co., Ltd.'s product.
Described Si Jiao road assembly adopts Liaoning Xinfeng Coal Mine Electrical Equipment Manufacturing Co., Ltd.'s product.
Described support is installed fork truck and is adopted Liaoning Xinfeng Coal Mine Electrical Equipment Manufacturing Co., Ltd.'s product.
Described hydraulic support upending frame adopts Liaoning Xinfeng Coal Mine Electrical Equipment Manufacturing Co., Ltd.'s product.
Advantage of the present invention is: adopt mechanized operation, and time saving and energy saving, not only greatly improve work efficiency, and safe ready, meet the demand that modern mining mechanization develops.
Brief description of the drawings
Fig. 1 is the schematic diagram of step 1;
Fig. 2 is the schematic diagram of step 2;
Fig. 3 is the schematic diagram of step 3;
Fig. 4 is the schematic diagram of step 4;
In figure, 1 is the lane of rolling back and rationalizing, and 2 for cutting eye, 3 Wei Yunshun lanes, 4 is flat car, and 5 is mining hydraulic crane, and 6 is winch, and 7 is conveyor self-movable foot end, 8 is elevating conveyor intermediate channel, and 9 is crushing engine, and 10 is intermediate channel hydraulic hoisting car, and 11 is parking lot, 12 is scrapper conveyor, and 13 is hydraulic support, and 14 is high-strength spacing pillow, 15 Wei Sijiao road assemblies, 16 install fork truck for support, and 17 is triangulation point, 18 is coal-winning machine, and 19 is scrapper conveyor tail, and 20 are
Detailed description of the invention
Illustrate the present invention below in conjunction with accompanying drawing, as Figure 1-Figure 4, the lane 1 width 4.6-5m that rolls back and rationalize, high 3-4.2m, cuts eye 2 width 5.5-7.5m, Yun Shun lane 3 width 4.6-5m, high 3-4.2m, lays 38 kilograms of rails, and gauge is 600mm or 900mm; Adopt mining hydraulic crane 5, intermediate channel hydraulic hoisting car 10, Si Jiao road assembly 15, support installation fork truck 16, hydraulic support upending frame to carry out mechanization installation, the power set of device therefor adopt the hydraulic system of work plane; Concrete installation steps are as follows:
Step 1. is transported to Yun Shun lane 3 by mining hydraulic crane 5 use flat cars 4 elevating conveyor position is installed; Utilize mining hydraulic crane 5 that the parts such as elevating conveyor intermediate channel 8, crushing engine 9, conveyor self-movable foot end 7 are installed successively; Then remove elevating conveyor part rail is installed;
Step 2. is transferred to scraper conveyor middle groove in front carriage with intermediate channel hydraulic hoisting car 10, after being transported to assigned address, install, remove traction rail apart from track, and by the track mounting bracket assembling fork Car Track of removing, support assembling fork Car Track gauge is 1500mm or 2000mm, with intermediate channel hydraulic hoisting car 10, scraper conveyor middle groove is installed, is removed afterwards intermediate channel hydraulic hoisting car 10, with mining hydraulic crane 5 Si Jiao road assembly 15 is installed and assemble support install fork truck 16; With support, fork truck 16 is installed and is transported scrapper conveyor head, install with mining hydraulic crane 5;
Step 3. is assembled the tail boom of hydraulic support 13, main body, front fine strain of millet with hydraulic support upending frame, and the hydraulic support 13 after assembling is pulled to hydraulic support 13 on support installation fork truck 16 and is transported to assigned address by winch 6 or traction forklift and installs; Removing length is that after 3 meters of rails, installation length is 1.5 meters of rails, and then transition bracket and ordinary stent are installed successively; After hydraulic support 13 installations, striking is installed the facilities such as fork truck 16, Si Jiao road assembly 15 and hydraulic support upending frame;
Step 4. is installed coal-winning machine 18, rocker arm of coal mining machine is installed with mining hydraulic crane 5, and body is installed, and then, miscellaneous part is installed successively; With mining hydraulic crane 5, scrapper conveyor tail 19 is installed again, finally mining hydraulic crane 5 is put in place to other facilities of dismounting down-hole or gug at any time.
In described step 3, as inadequate in lanewidth degree degree, can install on fork truck 16 hydraulic support 13 is carried out to tuning at support, be then transported to assigned address and carry out tuning installation.
In described step 4, install when rocker arm of coal mining machine, need fix with support, prevent that it from toppling over.
Described mining hydraulic crane adopts Liaoning Xinfeng Coal Mine Electrical Equipment Manufacturing Co., Ltd.'s product.
Described intermediate channel hydraulic hoisting car adopts Liaoning Xinfeng Coal Mine Electrical Equipment Manufacturing Co., Ltd.'s product.
Described Si Jiao road assembly adopts Liaoning Xinfeng Coal Mine Electrical Equipment Manufacturing Co., Ltd.'s product.
Described support is installed fork truck and is adopted Liaoning Xinfeng Coal Mine Electrical Equipment Manufacturing Co., Ltd.'s product.
Described hydraulic support upending frame adopts Liaoning Xinfeng Coal Mine Electrical Equipment Manufacturing Co., Ltd.'s product.
Claims (8)
1. a fully-mechanized mining working mechanization mounting process method, it is characterized in that: adopt mining hydraulic crane, intermediate channel hydraulic hoisting car, Si Jiao road assembly, support installation fork truck, hydraulic support upending frame to carry out mechanization installation, the power set of device therefor adopt the hydraulic system of work plane; Concrete installation steps are as follows:
Step 1. is transported to Yun Shun lane by mining hydraulic crane elevating conveyor position is installed; Utilize mining hydraulic crane that the parts such as elevating conveyor intermediate channel, crushing engine, conveyor self-movable foot end are installed successively; Then remove elevating conveyor part rail is installed;
Step 2. is transferred to scraper conveyor middle groove in front carriage with intermediate channel hydraulic hoisting car, after being transported to assigned address, install, remove traction rail apart from track, and by the track mounting bracket assembling fork Car Track of removing, support assembling fork Car Track gauge is 1500mm or 2000mm, with intermediate channel hydraulic hoisting car, scraper conveyor middle groove is installed, is removed afterwards intermediate channel hydraulic hoisting car, Si Jiao road assembly is installed and is assembled support installation fork truck with mining hydraulic crane; Forklift transport scrapper conveyor head is installed with support, is installed with mining hydraulic crane;
Step 3. is assembled the tail boom of hydraulic support, main body, front fine strain of millet with hydraulic support upending frame, and the hydraulic support after assembling is pulled to hydraulic support on support installation fork truck and is transported to assigned address by winch or traction forklift and installs; Removing length is that after 3 meters of rails, installation length is 1.5 meters of rails, and then transition bracket and ordinary stent are installed successively; After hydraulic support installation, striking is installed the facilities such as fork truck, Si Jiao road assembly and hydraulic support upending frame;
Step 4. is installed coal-winning machine, rocker arm of coal mining machine is installed with mining hydraulic crane, and body is installed, and then, miscellaneous part is installed successively; With mining hydraulic crane, scrapper conveyor tail is installed again, finally mining hydraulic crane is put in place to other facilities of dismounting down-hole or gug at any time.
2. method according to claim 1, is characterized in that: in described step 3, as inadequate in lanewidth degree degree, can install on fork truck hydraulic support is carried out to tuning at support, and be then transported to assigned address and carry out tuning installation.
3. method according to claim 1, is characterized in that: in described step 4, install when rocker arm of coal mining machine, need fix with support, prevent that it from toppling over.
4. method according to claim 1, is characterized in that: described mining hydraulic crane adopts Liaoning Xinfeng Coal Mine Electrical Equipment Manufacturing Co., Ltd.'s product.
5. method according to claim 1, is characterized in that: described intermediate channel hydraulic hoisting car adopts Liaoning Xinfeng Coal Mine Electrical Equipment Manufacturing Co., Ltd.'s product.
6. method according to claim 1, is characterized in that: described Si Jiao road assembly adopts Liaoning Xinfeng Coal Mine Electrical Equipment Manufacturing Co., Ltd.'s product.
7. method according to claim 1, is characterized in that: described support is installed fork truck and adopted Liaoning Xinfeng Coal Mine Electrical Equipment Manufacturing Co., Ltd.'s product.
8. method according to claim 1, is characterized in that: described hydraulic support upending frame adopts Liaoning Xinfeng Coal Mine Electrical Equipment Manufacturing Co., Ltd.'s product.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310582373.XA CN104047630B (en) | 2013-11-19 | 2013-11-19 | A kind of fully-mechanized mining working mechanization mounting process method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310582373.XA CN104047630B (en) | 2013-11-19 | 2013-11-19 | A kind of fully-mechanized mining working mechanization mounting process method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104047630A true CN104047630A (en) | 2014-09-17 |
CN104047630B CN104047630B (en) | 2017-03-15 |
Family
ID=51500981
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310582373.XA Active CN104047630B (en) | 2013-11-19 | 2013-11-19 | A kind of fully-mechanized mining working mechanization mounting process method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104047630B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104612738A (en) * | 2015-03-04 | 2015-05-13 | 山东良庄矿业有限公司 | Quick removal and transport method for hydraulic support of fully mechanized coal mining face |
CN105089692A (en) * | 2014-05-14 | 2015-11-25 | 四川省华蓥山煤业股份有限公司绿水洞煤矿 | Safe and quick installation method of steeply inclined fully mechanized mining equipment |
CN107035392A (en) * | 2017-06-15 | 2017-08-11 | 淮南矿业(集团)有限责任公司 | A kind of hydraulic support fortune is along entering frame installing mechanism and installation method |
CN107355248A (en) * | 2017-09-05 | 2017-11-17 | 淮南矿业(集团)有限责任公司 | A kind of fully mechanized coal face fully-mechanized mining equipment method for rapidly mounting |
CN109230336A (en) * | 2018-08-07 | 2019-01-18 | 兖矿集团有限公司 | A kind of coal transfer device |
CN112096439A (en) * | 2020-09-18 | 2020-12-18 | 淮南矿业(集团)有限责任公司 | Synchronous mounting method for forepoling support and reversed loader |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3301530A1 (en) * | 1983-01-19 | 1984-07-19 | Gewerkschaft Eisenhütte Westfalia, 4670 Lünen | Bracing device for a shiftable conveying and/or winning installation, in particular a plough installation |
DE4426406C1 (en) * | 1994-07-26 | 1995-11-02 | Beukenberg Maschf | Transfer device for coal |
CN2398424Y (en) * | 1999-10-14 | 2000-09-27 | 王宝民 | Special equipment for underground hydraulic support assembling and resolving |
CN1865657A (en) * | 2005-05-19 | 2006-11-22 | 兖矿集团有限公司 | Comprehensive coal-mining process by using long wall mining method |
-
2013
- 2013-11-19 CN CN201310582373.XA patent/CN104047630B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3301530A1 (en) * | 1983-01-19 | 1984-07-19 | Gewerkschaft Eisenhütte Westfalia, 4670 Lünen | Bracing device for a shiftable conveying and/or winning installation, in particular a plough installation |
DE4426406C1 (en) * | 1994-07-26 | 1995-11-02 | Beukenberg Maschf | Transfer device for coal |
CN2398424Y (en) * | 1999-10-14 | 2000-09-27 | 王宝民 | Special equipment for underground hydraulic support assembling and resolving |
CN1865657A (en) * | 2005-05-19 | 2006-11-22 | 兖矿集团有限公司 | Comprehensive coal-mining process by using long wall mining method |
Non-Patent Citations (1)
Title |
---|
***等: "机械化快速安装工艺在综采工作面的应用", 《煤矿机械》 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105089692A (en) * | 2014-05-14 | 2015-11-25 | 四川省华蓥山煤业股份有限公司绿水洞煤矿 | Safe and quick installation method of steeply inclined fully mechanized mining equipment |
CN104612738A (en) * | 2015-03-04 | 2015-05-13 | 山东良庄矿业有限公司 | Quick removal and transport method for hydraulic support of fully mechanized coal mining face |
CN107035392A (en) * | 2017-06-15 | 2017-08-11 | 淮南矿业(集团)有限责任公司 | A kind of hydraulic support fortune is along entering frame installing mechanism and installation method |
CN107035392B (en) * | 2017-06-15 | 2019-06-21 | 淮南矿业(集团)有限责任公司 | A kind of hydraulic support fortune is suitable into frame installing mechanism and installation method |
CN107355248A (en) * | 2017-09-05 | 2017-11-17 | 淮南矿业(集团)有限责任公司 | A kind of fully mechanized coal face fully-mechanized mining equipment method for rapidly mounting |
CN107355248B (en) * | 2017-09-05 | 2019-04-09 | 淮南矿业(集团)有限责任公司 | A kind of fully mechanized coal face fully-mechanized mining equipment method for rapidly mounting |
CN109230336A (en) * | 2018-08-07 | 2019-01-18 | 兖矿集团有限公司 | A kind of coal transfer device |
CN112096439A (en) * | 2020-09-18 | 2020-12-18 | 淮南矿业(集团)有限责任公司 | Synchronous mounting method for forepoling support and reversed loader |
CN112096439B (en) * | 2020-09-18 | 2022-10-25 | 淮南矿业(集团)有限责任公司 | Synchronous mounting method for forepoling support and reversed loader |
Also Published As
Publication number | Publication date |
---|---|
CN104047630B (en) | 2017-03-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104047630A (en) | Technical method for mechanically mounting fully mechanized coal mining surface | |
CN101985885B (en) | Traction machine for removing coal-mine hydraulic support | |
CN103742192A (en) | Fully-mechanized-coal-mining-face mechanization withdrawing method | |
CN105155370A (en) | Continuous rail changing operation train and operation method thereof | |
CN103410540A (en) | Loader for hydraulic supports of fully-mechanized coal mining faces of coal mines | |
CN104670838A (en) | Open-pit mine belt conveyor head segment transverse moving device | |
CN102094673A (en) | Method for quickly moving fully mechanized mining face under special geological condition | |
CN114542153A (en) | Mounting and dismounting device and mounting and dismounting method for mining hydraulic support | |
CN103612983B (en) | Underground coal mine automatic moving type telpher | |
CN204959513U (en) | Trade rail operation train in succession | |
CN100567134C (en) | Double-track four-crane conveyor | |
CN202611727U (en) | Hydraulic chain type plastering rack platform | |
CN104002116B (en) | Spiral welded pipe fly welding tractor wheel replacing options | |
CN203624851U (en) | Self-moving electric monorail hoist in coal mine | |
CN206156620U (en) | Movable track hoisting trolley of usefulness is demolishd with temporary track to shield tunnel construction | |
CN201963312U (en) | Automatic walking device used for walking on uneven ground | |
CN201723234U (en) | Underground work surface hydraulic support frame dismounting and installing work station for mines | |
CN101787404B (en) | Blast-furnace tuyere maintenance vehicle | |
CN204644820U (en) | Protective device built by pavement concrete | |
CN204506903U (en) | Rail transport quick despatch car device | |
CN103708370B (en) | The pneumatic lift rope supporting device of mining inclined tunnel | |
CN203096572U (en) | Automatic charging system of bituminous pavement maintenance truck | |
CN203020329U (en) | Self-moving system of equipment trains for fully mechanized coal face | |
CN101537982A (en) | Underground orbital transfer hydraulic crane truck | |
CN202688892U (en) | Special groove-erecting machine for erecting water conservancy aqueduct |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||