The vertical heating conversion boiler that supplies water
The invention belongs to boiler plant technical field for technical field, and in particular to a kind of vertical heating conversion boiler that supplies water.
In the prior art, with the progress of society and the development of urbanization, the living standard of people progressively carries background technology
Height, the service of heating factory offer central heating can be enjoyed in the winter people of cold, without enduring severe cold again, but for one
For the local people that a little central heatings are unable to reach, warming often uses small-sized coal dust ball stove or boiler, this small moulded coal
Ball stove provides heat by burning coal briquette, and the toxic gases such as carbon monoxide can be produced in combustion process, endanger pole after human body suction
Greatly, security is poor, and boiler is insufficient due to exchanging heat in combustion, causes heat to be largely lost in, heat exchange efficiency is low, after burning
Caused waste gas also has very big pollution to environment;Meanwhile this boiler only has heating or supplying hot water simple function, Wu Fagen
It can be heated and can supplying hot water according to the needs of people, multi-use.And need special messenger and carry out not timing and check water level, so as to
Inflow is adjusted, it is very inconvenient using process.
The content of the invention has that security is poor, pollution is big, heating effect is poor, work(present invention aim to address prior art
Single, the awkward technical problem of energy, there is provided a kind of vertical heating conversion boiler that supplies water, with overcome the deficiencies in the prior art.
To achieve these goals, a kind of vertical heating conversion boiler that supplies water of the present invention, it includes the body of heater with water interlayer,
The cinder chamber with air inlet, fire grate, the combustion chamber with feeding port, Heat Room and preheating are sequentially provided with the body of heater from down to up
Room;Its main points is that the heat exchange coil connected with water interlayer is provided with the combustion chamber and Heat Room;In the preheating chamber by it is interior to
The 3rd smoke blowing pipe, first of water interlayer, second smoke blowing pipe, second water interlayer and first of smoke blowing pipe are sequentially provided with outside,
The Heat Room is connected by smoke blowing hole with first of smoke blowing pipe, the top of the 3rd smoke blowing pipe and the row with air-introduced machine
Smoke pipe connects;The top of the preheating chamber is provided with the water inlet pipe connected with first of water interlayer, the water folder of the preheating chamber outer wall
The top of layer with water interlayer of the valvular mozzle respectively with Heat Room and outer wall of combustion chamber by connecting;The combustion chamber and
The side of the water interlayer of heat exchange chamber outer wall is respectively equipped with the soil cleaning port with temperature-sensing probe;The outer wall of combustion chamber water interlayer is removed contamination
Heating outlet pipe and hot water outlet pipe are respectively equipped with the soil cleaning port of mouth and heat exchange chamber outer wall water interlayer;The air-introduced machine, temperature-sensitive
Probe and valve are connected by wire with electronic controller respectively.
The junction of the heating outlet pipe and soil cleaning port is provided with check-valves, heating guide pump and valve;It is described to heat out
The other end of water pipe mutually interconnects with the water inlet pipe at the top of the water return outlet and preheating chamber of outer wall of combustion chamber water interlayer opposite side respectively
It is logical;The other end of the water inlet pipe is connected by valve with automatic water-supply pressurized tank;The automatic water-supply pressurized tank is provided with pressure
Power table and the oral siphon with valve;The top of the preheating chamber is provided with the measurement mouth with temperature-sensing probe connected with smoke blowing pipe;Institute
The upper and lower part for stating preheating chamber is respectively equipped with the dust removal port connected with smoke blowing pipe;The hot water outlet pipe connects with hot water reservoir
It is logical;The bottom of the outer wall of combustion chamber water interlayer and heat exchange chamber outer wall water interlayer is respectively equipped with blow-off pipe.
The circuit board with input port and output port is provided with the electronic controller;The circuit board is provided with control
Chip and power transformer;The control chip is connected by wire with heating pump contactor and blower fan contactor;The heating
Pump contactor and blower fan contactor are connected by wire and input terminal row.
The interconnected string water pipe of the water interlayer peripheral hardware of the combustion chamber and heat exchange chamber outer wall.
The present invention it is rational in infrastructure, novel in design, due to preheating chamber water interlayer by the mozzle with valve respectively with combustion
Burn chamber outer wall water interlayer and the chamber outer wall water interlayer that exchanges heat connects, can be heated respectively as needed or supplying hot water, by abundant
Temperature when flue gas after heat exchange is discharged by smoke exhaust pipe is low, and heat waste is few, and heat exchange efficiency is high, and pollution is small;And Electronic Control
Device can be detected by temperature-sensing probe to the water temperature in stove, so as to adjust inflow, water velocity and the rotating speed of blower fan, behaviour
Facilitate.The present invention solves that prior art security is poor, pollution is big, heating effect is poor, can not carry out supplying hot water and confession respectively
Warm, awkward technical problem.
It is schematic structural view of the invention to illustrate Fig. 1;
Fig. 2 is the structural representation front sectional view of body of heater of the present invention;
Fig. 3 is the structural representation front view of body of heater of the present invention;
Fig. 4 is the structural representation left view of body of heater of the present invention.
1, air-introduced machine 2, smoke exhaust pipe 3, preheating chamber 4, water inlet pipe 5, mozzle 6, dust removal port 7, valve 8, valve in figure
Door 9, valve 10, valve 11, automatic water-supply pressurized tank 12, pressure gauge 13, electronic controller 14, valve 15, oral siphon
16th, valve 17, Heat Room 18, feeding port 19, combustion chamber 20, air inlet 21, blow-off pipe 22, soil cleaning port 23, heat out
Water pipe 24, check-valves 25, warm-air circulating pump 26, valve 27, soil cleaning port 28, hot water outlet pipe 29, hot water reservoir
30th, the 3rd smoke blowing pipe 31, first of water interlayer 32, second water interlayer 33, water interlayer 34, second smoke blowing pipe 35,
First of smoke blowing pipe 36, smoke blowing hole 37, water interlayer 38, water interlayer 39, fire grate 40, heat exchange coil 41, temperature-sensing probe
42nd, string water pipe 43, temperature-sensing probe 44, measurement mouth 45, water return outlet 46, cinder chamber
Embodiment reference picture 1, Fig. 2, Fig. 3 and Fig. 4, the present invention it include the body of heater with water interlayer, the body of heater
The cinder chamber 46 with air inlet 20, fire grate 39, the combustion chamber 19 with feeding port 18, the and of Heat Room 17 are inside sequentially provided with from down to up
Preheating chamber 3;The heat exchange coil 40 connected with water interlayer 38,37 is provided with the combustion chamber 19 and Heat Room 17;The preheating chamber 3
The 3rd smoke blowing pipe 30, first of water interlayer 31, second smoke blowing pipe 34, second water interlayer 32 are inside sequentially provided with from inside to outside
With first of smoke blowing pipe 35, the Heat Room 17 is connected by smoke blowing hole 36 with first of smoke blowing pipe 35, the 3rd smoke blowing
The top of pipe 30 connects with the smoke exhaust pipe 2 with air-introduced machine 1;The top of the preheating chamber 3 is provided with to be connected with first of water interlayer 31
Logical water inlet pipe 4, the top of the water interlayer 33 of the outer wall of preheating chamber 3 by with valvular mozzle 5 respectively with positioned at changing
Hot cell 17 connects with the water interlayer 37,38 of the outer wall of combustion chamber 19;The combustion chamber 19 and the water interlayer 37,38 of the outer wall of Heat Room 17
Side be respectively equipped with the soil cleaning port 22,27 with temperature-sensing probe 41,43;The soil cleaning port 22 of the outer wall water interlayer 38 of combustion chamber 19
With heating outlet pipe 23 and hot water outlet pipe 28 is respectively equipped with the soil cleaning port 27 of the outer wall water interlayer 37 of Heat Room 17;The air inducing
Machine 1, temperature-sensing probe 41,43 and valve 26,16,7,8,9,10,14 are connected by wire with electronic controller 13 respectively.
The junction of the heating outlet pipe 23 and soil cleaning port 22 is provided with check-valves 24, warm-air circulating pump 25 and valve 26;
The other end respectively with the water return outlet 45 of the opposite side of outer wall of combustion chamber water interlayer 38 and the phase of water inlet pipe 4 at the top of preheating chamber 3
It is intercommunicated;The other end of the water inlet pipe 4 is connected by valve 10 with automatic water-supply pressurized tank 11;The automatic water-supply pressurized tank
11 are provided with pressure gauge 12 and the oral siphon 15 with valve 14;The top of the preheating chamber 3 is provided with the band sense connected with smoke blowing pipe
The measurement mouth 44 of temperature probe;The upper and lower part of the preheating chamber 3 is respectively equipped with the dust removal port 6 connected with smoke blowing pipe;The heat
Water outlet pipe 23 connects with hot water reservoir 29;The bottom of the outer wall of combustion chamber water interlayer 38 and heat exchange chamber outer wall water interlayer 37
It is respectively equipped with blow-off pipe 21;
The circuit board with input port and output port is provided with the electronic controller 13;The circuit board is provided with control
Coremaking piece and power transformer;The control chip is connected by wire with heating pump contactor and blower fan contactor;It is described to take
Warming-up contactor and blower fan contactor are connected by wire and input terminal row.
The interconnected string water pipe 42 of the water interlayer 38 of the combustion chamber 19 and the outer wall of Heat Room 17,37 peripheral hardwares.
Operation principle:Before use, checking whether circuit and pipeline are normal, turn on the power and set required temperature, burn
Caused high temperature pyrotechnics enters in the Heat Room 17 communicated therewith at first in room 19, then again by Heat Room 17 and preheating chamber 3
Between first of the smoke blowing pipe 35 entering in preheating chamber of smoke blowing hole 36, due to first of smoke blowing pipe 35, second smoke blowing pipe
34 and the 3rd smoke blowing pipe 30 be interconnected, high temperature pyrotechnics can in preheating chamber 3 gyration to extend cigarette to greatest extent
The run duration of fire, so as to improve rate of heat exchange, can be substantially reduced, and drawn by band by the pyrotechnics temperature of the 3rd smoke blowing pipe 30
The smoke exhaust pipe 2 of blower fan 1 is discharged;Water is then entered in automatic water-supply pressurized tank 11 at first by oral siphon 15, then passes through preheating chamber 3 again
First of water interlayer 31 that the water inlet pipe 4 at top enters in preheating chamber 3, due to first of water interlayer 31, second water interlayer 32
It is interconnected with the water interlayer 33 at Heat Room position, the water in water interlayer can absorb the heat of high temperature pyrotechnics in smoke blowing pipe, so as to
The water temperature in water interlayer is improved, not wasted heat, further heated to enter in the water interlayer 37 of Heat Room 17;Preheating chamber
Water in water interlayer 33 after preheating by mozzle 5 respectively with heat exchange chamber outer wall water interlayer 37 and outer wall of combustion chamber water interlayer
38 connections, tilting heat exchange coil 40 can absorb substantial amounts of heat, and the aqueous phase in water interlayer can be made mutually to circulate heat exchange,
Due to heat exchange chamber outer wall water interlayer 37 and outer wall of combustion chamber water interlayer 38 be by body of heater outside string water pipe 42 be interconnected, make
The water flowing velocity of chamber outer wall water interlayer 37 and outer wall of combustion chamber water interlayer 38 of must exchanging heat slows down, and extends water residence time, from
And further improve heat exchange efficiency;The side of heat exchange chamber outer wall water interlayer 37 and outer wall of combustion chamber water interlayer 38 is respectively equipped with hot water
Outlet pipe 28 and heating outlet pipe 23, water in body of heater thus respectively heating using and bathing use;Due to valve 26,16,7,
8th, 9,10,14 it is controlled by electronic controller, when heating and supplying hot water are simultaneously in use, electronic controller is by valve 7,8
Open, the water of the water interlayer 33 of preheating chamber 3 respectively enters heat exchange chamber outer wall water interlayer 37 and outer wall of combustion chamber water interlayer 38, and passes through
Hot water outlet pipe 28 and the heating discharge of outlet pipe 23 use;Hot water outlet pipe 28 will be standby in hot water importing hot water reservoir 29,
After radiator, outer wall of combustion chamber water interlayer 38 is recycled into through pipeline by warm-air circulating pump 25 for heating outlet pipe 23
Or first of the water interlayer 31 entered through pipeline in preheating chamber 3 recycles;When independent supplying hot water, valve 7,9,16,26 closes
Closing, valve 8,10,14 is opened, and the water of the outer wall water interlayer of preheating chamber 3 enters the water interlayer 38 of the outer wall of combustion chamber 19 by valve 8,
Enter the water interlayer 37 of the outer wall of Heat Room 17 by string water pipe 42 after heat exchange, then discharged and used by hot water outlet pipe 28;When
Individually during heating, valve 7,9,10,14,26 is opened, and valve 8,16 is closed, and the water of the outer wall water interlayer 33 of preheating chamber 3 is entered by valve 7
Enter and absorbed heat in the outer wall water interlayer 37 of Heat Room 17, enter by string water pipe 42 in the outer wall water interlayer 38 of combustion chamber 19 inhale again afterwards
Heat, and fin is entered by the heating outlet pipe 23 with warm-air circulating pump 25 and carries out heat radiation heating, pass through the pipe with valve 9 afterwards
First of water interlayer 31 that road enters in preheating chamber 3, and preheated in preheating chamber 3, then entered again by valve 7 and exchanged heat
The water interlayer 37 of the outer wall of room 17 carries out repetitive cycling heat absorption;In operation, temperature-sensing probe 41,43 can monitor the temperature of water in real time
The temperature of degree and body of heater, when temperature is too high, electronic controller can reduce water temperature by improving the inflow of cold water, also may be used
To adjust in-service pipeline of the water in body of heater by controlling the open and-shut mode of different valves, so as to adjust the temperature of water;Together
When, required temperature can also be set, the rotating speed of blower fan is adjusted by electronic controller 13, so as to the size of air output
To adjust temperature;Caused incrustation scale can pass through the water interlayer for the chamber outer wall that exchanges heat and the water interlayer of outer wall of combustion chamber during use
On soil cleaning port 22,27 and blow-off pipe 21 incrustation scale is discharged, to keep the circulation in water interlayer smooth, water cleaning, prevent
Only block;Caused waste residue can be connected the dust removal port 6 of smoke blowing pipe with preheating chamber top and the bottom by air inlet 20 and be discharged in burning.
The Heat Room and combustion chamber of the present invention is interconnected, but exchange heat chamber outer wall water interlayer and outer wall of combustion chamber water interlayer sheet
Body does not connect, but is interconnected by the string water pipe outside body of heater, so as to extend flowing time of the water in body of heater, slows down
Flowing velocity, heat exchange efficiency is increased, improve the utilization rate of the energy;Also, the flow of water can be adjusted by the opening and closing of valve, with
Just regulation individually heating or supplying hot water, also can simultaneously heat and heat water supplying;Electronic controller can easily adjust water temperature and air output,
Temperature-sensing probe can detect the change of water temperature, and so as to the opening and closing of control valve and the inflow of cold water, the water temperature control in stove is existed
One stationary temperature, securely and reliably.
Flue-gas temperature that the present invention discharges is low, heat waste is few, heat exchange efficiency is high, pollution is small, easy to operate, user
Just, it is adapted to large-scale promotion to use.