CN104032841A - 混凝土墙水平施工缝的处理方法 - Google Patents

混凝土墙水平施工缝的处理方法 Download PDF

Info

Publication number
CN104032841A
CN104032841A CN201410312484.3A CN201410312484A CN104032841A CN 104032841 A CN104032841 A CN 104032841A CN 201410312484 A CN201410312484 A CN 201410312484A CN 104032841 A CN104032841 A CN 104032841A
Authority
CN
China
Prior art keywords
concrete wall
construction joint
template
horizontal construction
split bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410312484.3A
Other languages
English (en)
Inventor
张鹏飞
张生雨
李平旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201410312484.3A priority Critical patent/CN104032841A/zh
Publication of CN104032841A publication Critical patent/CN104032841A/zh
Pending legal-status Critical Current

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

本发明涉及一种混凝土墙水平施工缝的处理方法,其处理方法包括如下步骤:⑴在施工先浇注混凝土墙时,距要留设的施工缝处150mm预埋对拉螺栓,同时将先浇注混凝土墙上方浇注形成凹形顶面;⑵拆除先浇注混凝土墙的模板,在混凝土凹形顶面两端弹线并用角磨机磨平,去掉毛刺,并于水平施工缝与预埋对拉螺栓之间的先浇注混凝土墙面上贴双面胶;⑶安装连接模板,模板下半部与预埋对拉螺栓固定,上半部再加设一排对拉螺栓,也距水平施工缝150mm;⑷在连接模板上方安装后浇注混凝土墙的模板,混凝土墙水平施工缝处理完毕,本发明操作简单,设计合理,省时省力,有效提高了混凝土的施工质量。

Description

混凝土墙水平施工缝的处理方法
技术领域
本发明属混凝土墙施工领域,尤其是一种混凝土墙水平施工缝的处理方法。
背景技术
在建筑施工中,现浇混凝土墙是一种常见构件,尤其是一些公共建筑如图书馆、博物馆、会展中心等,混凝土墙往往设计的厚而高大,而且施工质量要求高,施工时一次难以浇注成型,这时就需要留设水平施工缝分两次或多次浇注。水平施工缝处如果处理不当,在上面墙体施工时,会出现胀模、流浆、错台等现象,影响混凝土的施工质量及后道工序的正常进行。以往的做法是在下方混凝土墙体施工完后,拆模,按常规方法支设上方墙体模板,在水平施工缝的加固不牢,造成上述问题。或者是下方墙体模板不拆除,继续上方模板安装进行施工,这样模板一次性投入量大,无法进行周转。
发明内容
本发明的目的在于克服现有技术的不足,提供一种混凝土墙水平施工缝的处理方法,该处理方法操作简单,设计合理,省时省力,有效提高了混凝土的施工质量。
本发明解决其技术问题是通过以下技术方案实现的:
一种混凝土墙水平施工缝的处理方法,其处理方法包括如下步骤:
⑴、在施工先浇注混凝土墙时,距要留设的施工缝处150mm预埋对拉螺栓,同时将先浇注混凝土墙上方浇注形成凹形顶面;
⑵、拆除先浇注混凝土墙的模板,在混凝土凹形顶面两端弹线并用角磨机磨平,去掉毛刺,并于水平施工缝与预埋对拉螺栓之间的先浇注混凝土墙面上贴双面胶;
⑶、安装连接模板,模板下半部与预埋对拉螺栓固定,上半部再加设一排对拉螺栓,也距水平施工缝150mm;
⑷、在连接模板上方安装后浇注混凝土墙的模板,混凝土墙水平施工缝处理完毕。
本发明的优点和有益效果为:
本混凝土墙水平施工缝的处理方法,其处理方法包括如下步骤:⑴、在施工先浇注混凝土墙时,距要留设的施工缝处150mm预埋对拉螺栓,同时将先浇注混凝土墙上方浇注形成凹形顶面;⑵、拆除先浇注混凝土墙的模板,在混凝土凹形顶面两端弹线并用角磨机磨平,去掉毛刺,并于水平施工缝与预埋对拉螺栓之间的先浇注混凝土墙面上贴双面胶;⑶、安装连接模板,模板下半部与预埋对拉螺栓固定,上半部再加设一排对拉螺栓,也距水平施工缝150mm;⑷、在连接模板上方安装后浇注混凝土墙的模板,混凝土墙水平施工缝处理完毕,本发明主要通过在施工缝处加设双排对拉螺栓,并对先浇注混凝土面进行细部处理来避免了接缝处出现跑浆、错台、不齐的现象,本发明操作简单,设计合理,省时省力,有效提高了混凝土的施工质量。
附图说明
图1为本发明混凝土墙水平施工缝施工示意图。
具体实施方式
下面通过具体实施例对本发明作进一步详述,以下实施例只是描述性的,不是限定性的,不能以此限定本发明的保护范围。
一种混凝土墙水平施工缝的处理方法,其处理方法包括如下步骤:
⑴、在施工先浇注混凝土墙1时,距要留设的施工缝处150mm预埋对拉螺栓2,同时将先浇注混凝土墙上方浇注形成凹形顶面6;
⑵、拆除先浇注混凝土墙的模板,在混凝土凹形顶面两端弹线并用角磨机磨平,去掉毛刺,并于水平施工缝与预埋对拉螺栓之间的先浇注混凝土墙面上贴双面胶3;有利于安装连接模板时与先浇注墙体贴合紧密;
⑶、安装连接模板4,模板下半部与预埋对拉螺栓固定,上半部再加设一排对拉螺栓,也距水平施工缝150mm;连接模板要选用刚度大的模板进行制作,与双排对拉螺栓同时工作保证模板在不变形;
⑷、在连接模板上方安装后浇注混凝土墙5的模板,混凝土墙水平施工缝处理完毕。进行后序墙体施工。

Claims (1)

1.一种混凝土墙水平施工缝的处理方法,其特征在于:该处理方法包括如下步骤:
⑴、在施工先浇注混凝土墙时,距要留设的施工缝处150mm预埋对拉螺栓,同时将先浇注混凝土墙上方浇注形成凹形顶面;
⑵、拆除先浇注混凝土墙的模板,在混凝土凹形顶面两端弹线并用角磨机磨平,去掉毛刺,并于水平施工缝与预埋对拉螺栓之间的先浇注混凝土墙面上贴双面胶;
⑶、安装连接模板,模板下半部与预埋对拉螺栓固定,上半部再加设一排对拉螺栓,也距水平施工缝150mm;
⑷、在连接模板上方安装后浇注混凝土墙的模板,混凝土墙水平施工缝处理完毕。
CN201410312484.3A 2014-07-02 2014-07-02 混凝土墙水平施工缝的处理方法 Pending CN104032841A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410312484.3A CN104032841A (zh) 2014-07-02 2014-07-02 混凝土墙水平施工缝的处理方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410312484.3A CN104032841A (zh) 2014-07-02 2014-07-02 混凝土墙水平施工缝的处理方法

Publications (1)

Publication Number Publication Date
CN104032841A true CN104032841A (zh) 2014-09-10

Family

ID=51463813

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410312484.3A Pending CN104032841A (zh) 2014-07-02 2014-07-02 混凝土墙水平施工缝的处理方法

Country Status (1)

Country Link
CN (1) CN104032841A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019656A (zh) * 2015-08-07 2015-11-04 山东金城建设有限公司 楼盖混凝土后浇带悬挂模板施工方法
CN107542170A (zh) * 2016-12-22 2018-01-05 深圳建业工程集团股份有限公司 一种现浇钢筋混凝土墙或梁施工缝表面施工方法
CN111305399A (zh) * 2020-03-24 2020-06-19 福建省永泰建筑工程公司 一种地下室外墙后浇带体系及其施工方法
CN111411774A (zh) * 2020-04-27 2020-07-14 五冶集团上海有限公司 一种防止施工缝错台漏浆的模板结构及施工方法
CN113789949A (zh) * 2021-08-26 2021-12-14 黑龙江省建工集团有限责任公司 一种模板拼接无水平施工缝的施工方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08144522A (ja) * 1994-11-17 1996-06-04 Taisei Corp 逆打コンクリートの底打継ぎ部型枠
JPH11131502A (ja) * 1997-10-29 1999-05-18 Toyota Soken Co Ltd コンクリート製地下室の成形工法
CN2921135Y (zh) * 2006-04-07 2007-07-11 上海捷特防水技术有限公司 混凝土施工缝专用混凝土裂缝诱导带
CN102409701A (zh) * 2011-08-12 2012-04-11 天津二十冶建设有限公司 一种砼墙壁施工缝处理方法及结构
CN202530763U (zh) * 2011-08-29 2012-11-14 浙江城建建设集团有限公司 一种现浇混凝土结构变形缝模板施工装置
CN102777031A (zh) * 2012-08-06 2012-11-14 中国建筑第六工程局有限公司 一种无对拉螺栓孔模板施工方法
CN203160283U (zh) * 2013-02-22 2013-08-28 中国建筑材料科学研究总院 一种地下建筑防水外墙水平施工缝的构造

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08144522A (ja) * 1994-11-17 1996-06-04 Taisei Corp 逆打コンクリートの底打継ぎ部型枠
JPH11131502A (ja) * 1997-10-29 1999-05-18 Toyota Soken Co Ltd コンクリート製地下室の成形工法
CN2921135Y (zh) * 2006-04-07 2007-07-11 上海捷特防水技术有限公司 混凝土施工缝专用混凝土裂缝诱导带
CN102409701A (zh) * 2011-08-12 2012-04-11 天津二十冶建设有限公司 一种砼墙壁施工缝处理方法及结构
CN202530763U (zh) * 2011-08-29 2012-11-14 浙江城建建设集团有限公司 一种现浇混凝土结构变形缝模板施工装置
CN102777031A (zh) * 2012-08-06 2012-11-14 中国建筑第六工程局有限公司 一种无对拉螺栓孔模板施工方法
CN203160283U (zh) * 2013-02-22 2013-08-28 中国建筑材料科学研究总院 一种地下建筑防水外墙水平施工缝的构造

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
兹留柱,齐建忠,梁晓威: "浅谈混凝土外墙剪力墙施工缝施工质量的控制", 《科技信息》 *
李汝引: "浅谈混凝土外墙剪力墙施工缝施工质量的控制", 《建筑与装饰》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019656A (zh) * 2015-08-07 2015-11-04 山东金城建设有限公司 楼盖混凝土后浇带悬挂模板施工方法
CN105019656B (zh) * 2015-08-07 2017-04-12 山东金城建设有限公司 楼盖混凝土后浇带悬挂模板施工方法
CN107542170A (zh) * 2016-12-22 2018-01-05 深圳建业工程集团股份有限公司 一种现浇钢筋混凝土墙或梁施工缝表面施工方法
CN111305399A (zh) * 2020-03-24 2020-06-19 福建省永泰建筑工程公司 一种地下室外墙后浇带体系及其施工方法
CN111411774A (zh) * 2020-04-27 2020-07-14 五冶集团上海有限公司 一种防止施工缝错台漏浆的模板结构及施工方法
CN113789949A (zh) * 2021-08-26 2021-12-14 黑龙江省建工集团有限责任公司 一种模板拼接无水平施工缝的施工方法

Similar Documents

Publication Publication Date Title
CN104032841A (zh) 混凝土墙水平施工缝的处理方法
CN204024679U (zh) 一种隧道衬砌环向中埋式止水带固定装置
CN205100120U (zh) 一种箱涵中埋式止水带的安装结构
CN203945479U (zh) 一种防漏浆t梁预制台座
CN205894656U (zh) 一种不规则曲面清水混凝土用钢板肋龙骨木模体系
CN209779560U (zh) 农田水利混凝土渠道用钢模板
CN204753398U (zh) 一种开孔模板堵漏的施工装置
CN202672726U (zh) 一种清水混凝土浇筑模板的拼接结构
CN108571167A (zh) 用于混凝土浇筑的模板防漏拉杆
CN206277487U (zh) 一种管廊模具
CN203271148U (zh) 新型混凝土输送泵管道自动换向装置
CN203947419U (zh) 一种高速铁路桥梁垫石模板
CN203669378U (zh) 一种用于构造柱顶部和大截面梁柱收口的浇筑装置
CN101649746A (zh) 一种隧洞封堵堵头周边止水片的设置方法
CN207808036U (zh) 梯形特殊预制板制作定型装置
CN202483172U (zh) 一种大钢模拼接装置
CN205291221U (zh) 混凝土护栏的预制模具
CN206545390U (zh) 一种建筑外侧梁的梁侧壳板边角装置
CN206438408U (zh) 一种桥梁用混凝土施工模板
CN205444884U (zh) 一种土木工程用墙板
CN104929050A (zh) 一种开孔模板堵漏的施工装置及施工方法
CN204609907U (zh) 一种钢模台车柔性搭接模板
CN203626247U (zh) 一种用于浇筑上层墙或柱的铝合金模板底座
CN202831248U (zh) 混凝土钢管柱与“h”型钢梁连接结构
CN209211897U (zh) 一种防止漏浆的模板连接结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20140910