CN104015177A - Large high-temperature bolt placing frame of steam turbine - Google Patents

Large high-temperature bolt placing frame of steam turbine Download PDF

Info

Publication number
CN104015177A
CN104015177A CN201410280507.7A CN201410280507A CN104015177A CN 104015177 A CN104015177 A CN 104015177A CN 201410280507 A CN201410280507 A CN 201410280507A CN 104015177 A CN104015177 A CN 104015177A
Authority
CN
China
Prior art keywords
bolts
bolt
large high
steam turbine
placing frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410280507.7A
Other languages
Chinese (zh)
Inventor
赵立波
郝长山
宋桂石
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEPCO1 Electric Power Construction Co Ltd
Original Assignee
SEPCO1 Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEPCO1 Electric Power Construction Co Ltd filed Critical SEPCO1 Electric Power Construction Co Ltd
Priority to CN201410280507.7A priority Critical patent/CN104015177A/en
Publication of CN104015177A publication Critical patent/CN104015177A/en
Pending legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention discloses a large high-temperature bolt placing frame of a steam turbine. The large high-temperature bolt placing frame comprises a cuboid frame formed by vertical columns and cross beams in a welding manner, wherein the two opposite cross beams at the top part of the cuboid frame are respectively provided with a clamping groove with an inward opening; a plurality of supporting plates capable of moving along the clamping grooves are horizontally arranged between the two clamping grooves; the two ends of the supporting plates are positioned in the two clamping grooves, respectively; the four corners of the top part of the cuboid frame are respectively provided with a movable lifting lug. The large high-temperature bolt placing frame disclosed by the invention has the beneficial effects that the structure is simple, the design is reasonable, the problem of disordered stacking of bolts is solved, the bolts are placed in order, the potential safety hazard is reduced and the promotion and the application are convenient; all the bolts are placed separately, so that the convenience is brought for checking whether the bolts have the quality problems of damaged wires, burrs and the like; different bolt frames are used for holding different types of bolts, so that the rummage is not needed when the bolts are fetched, the mistake is unlikely to occur and labor is saved; the bolt frames can be wholly lifted and transported, so that the labor efficiency is improved.

Description

Steam turbine large high-temperature bolt rack
Technical field
The present invention relates to a kind of steam turbine large high-temperature bolt rack.
Background technology
Along with the development of science and technology and equipment manufacture, the continuous increase of modern large turbo-type generator group single-machine capacity.Operational factor and device structure are also constantly changing, and the profile of cylinder bolt and weight are progressively increasing, and material, requirement on machining accuracy are also more and more higher, and assembling quantity is more and more, and manufacturing cost involves great expense.In installation and repairing process, how effectively to put, protect cylinder bolt to become the most important thing.Existing bolt disposing way is generally at platform pad puts the lumps of wood or rubber; bolt is put to the lumps of wood or rubber surface, and this kind of bolt disposing way floor space is large, and trouble is cleared up, taken to bolt; also, so that the mutual damaged in collision of double-screw bolt screw thread to occur, be unfavorable for the protection of bolt screw thread.When maintenance installation or bolts assemblies, adjustment need be planned in place, and also to bolt, carrying brings difficulty.
Summary of the invention
For solving above technical deficiency, the invention provides a kind of occupation of land little, pick and place steam turbine large high-temperature bolt rack easily.
The present invention is achieved by the following measures:
A kind of steam turbine large high-temperature bolt rack of the present invention, comprise the cuboid framework being become with beam welding by column, two relative crossbeams of described cuboid frame roof are provided with the inside draw-in groove of opening, between two draw-in grooves, horizontal drain has some gripper shoes that can move along draw-in groove, the two ends of described gripper shoe lay respectively in two draw-in grooves, on four angles of described cuboid frame roof, are provided with mobile hanger.
 
Between the adjacent column in above-mentioned cuboid framework bottom, be provided with screw thread protection plate.
On above-mentioned cuboid framework, be provided with bolt model nameplate.
The invention has the beneficial effects as follows: simple in structure, reasonable in design, solve the problem that bolt is stacked carelessly, make it put clean and tidy and reduce potential safety hazard, be easy to be extended and applied.Each bolt is separately put, and is convenient to check whether bolt exists the quality problems such as bad silk silk, burr.On different bolt framves, for depositing dissimilar bolt, while getting bolt, without ransacing, be difficult for makeing mistakes and saving manpower.Bolt frame can Integral lifting, has improved efficiency.
Brief description of the drawings
Fig. 1 is structural representation of the present invention.
Fig. 2 is cut-away section structural representation.
Wherein: 1 crossbeam, 2 columns, 3 bolt model nameplates, 4 gripper shoes, 5 move hanger, 6 screw thread protection plates, 7 cover type nuts, 8 double-screw bolts.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is done to further detailed description:
As shown in Figure 1, 2, a kind of steam turbine large high-temperature bolt rack of the present invention, comprise the cuboid framework being welded into by column 2 and crossbeam 1, two relative crossbeams 1 of cuboid frame roof are provided with the inside draw-in groove of opening, between two draw-in grooves, horizontal drain has some gripper shoes that can move along draw-in groove 4, the two ends of gripper shoe 4 lay respectively in two draw-in grooves, and gripper shoe 4 spacing can be placed the diameter of bolt according to need and be determined flexibly.Spacing distance between adjacent two gripper shoes 4 is greater than double-screw bolt 8 diameters of this bolt and is less than cover type nut 7 diameters of this bolt.Bolt is shelved between two adjacent gripper shoes 4.Can place the turbine bolt of different size model.Facilitate turbine bolt to take and take care of.
Between the adjacent column 2 in cuboid framework bottom, be provided with screw thread protection plate 6.Can prevent that other construction operation metallic hard things from running into deposits bolt lower thread.When baffle also plays on-the-spot watering dust suppression, spray splashes on double-screw bolt 8, and corrosion occurs.On cuboid framework, be provided with bolt model nameplate 3.Be convenient to different bolts and store classifiedly, improve turbine bolt managerial skills.
On four angles of cuboid frame roof, be provided with mobile hanger 5.Steam turbine high-temperature bolt, in the time of needs integrated moving or cylinder assembling fastening bolt, can directly adopt maintenance driving, and Integral lifting, to cylinder side, has been avoided the disadvantage of handling time and effort consuming one by one.Four root posts 2, crossbeam 1 and gripper shoe 4 all adopt channel-section steel to make, and mobile hanger 5 adopts steel plate, not only simple in structure, and have further saved manufacturing cost.
The above is only the preferred embodiment of this patent; it should be pointed out that for those skilled in the art, do not departing under the prerequisite of the art of this patent principle; can also make some improvement and replacement, these improvement and replacement also should be considered as the protection domain of this patent.

Claims (3)

1. a steam turbine large high-temperature bolt rack, is characterized in that: comprise by column and beam welding
The cuboid framework becoming, two relative crossbeams of described cuboid frame roof are provided with the inside draw-in groove of opening, between two draw-in grooves, horizontal drain has some gripper shoes that can move along draw-in groove, the two ends of described gripper shoe lay respectively in two draw-in grooves, on four angles of described cuboid frame roof, are provided with mobile hanger.
2. steam turbine large high-temperature bolt rack according to claim 1, is characterized in that: between the adjacent column in described cuboid framework bottom, be provided with screw thread protection plate.
3. steam turbine large high-temperature bolt rack according to claim 1, is characterized in that: on described cuboid framework, be provided with bolt model nameplate.
CN201410280507.7A 2014-06-23 2014-06-23 Large high-temperature bolt placing frame of steam turbine Pending CN104015177A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410280507.7A CN104015177A (en) 2014-06-23 2014-06-23 Large high-temperature bolt placing frame of steam turbine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410280507.7A CN104015177A (en) 2014-06-23 2014-06-23 Large high-temperature bolt placing frame of steam turbine

Publications (1)

Publication Number Publication Date
CN104015177A true CN104015177A (en) 2014-09-03

Family

ID=51432328

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410280507.7A Pending CN104015177A (en) 2014-06-23 2014-06-23 Large high-temperature bolt placing frame of steam turbine

Country Status (1)

Country Link
CN (1) CN104015177A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105922222A (en) * 2016-06-29 2016-09-07 广西玉柴机器股份有限公司 Special bracket for tool bolts
CN114589666A (en) * 2022-03-25 2022-06-07 重庆钢铁股份有限公司 Continuous temperature measurement stick strorage device of continuous casting

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040084342A1 (en) * 2002-11-01 2004-05-06 Tsung-Chieh Chang Magnetic positioning plate of toolbox
CN202384940U (en) * 2011-12-27 2012-08-15 南车株洲电机有限公司 Megawatt iron core prepressing screw bracket car
CN202825807U (en) * 2012-09-27 2013-03-27 淮南师范学院 Tool rack
DE202013101622U1 (en) * 2013-04-16 2013-04-24 Josef Koch Gmbh Tool carrier system, tool holding elements and marking carrier therefor
CN103213114A (en) * 2013-04-01 2013-07-24 浙江吉利汽车研究院有限公司杭州分公司 Part material frame
CN203919025U (en) * 2014-06-23 2014-11-05 山东电力建设第一工程公司 Steam turbine large high-temperature bolt rack

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040084342A1 (en) * 2002-11-01 2004-05-06 Tsung-Chieh Chang Magnetic positioning plate of toolbox
CN202384940U (en) * 2011-12-27 2012-08-15 南车株洲电机有限公司 Megawatt iron core prepressing screw bracket car
CN202825807U (en) * 2012-09-27 2013-03-27 淮南师范学院 Tool rack
CN103213114A (en) * 2013-04-01 2013-07-24 浙江吉利汽车研究院有限公司杭州分公司 Part material frame
DE202013101622U1 (en) * 2013-04-16 2013-04-24 Josef Koch Gmbh Tool carrier system, tool holding elements and marking carrier therefor
CN203919025U (en) * 2014-06-23 2014-11-05 山东电力建设第一工程公司 Steam turbine large high-temperature bolt rack

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105922222A (en) * 2016-06-29 2016-09-07 广西玉柴机器股份有限公司 Special bracket for tool bolts
CN114589666A (en) * 2022-03-25 2022-06-07 重庆钢铁股份有限公司 Continuous temperature measurement stick strorage device of continuous casting

Similar Documents

Publication Publication Date Title
CN206288544U (en) A kind of storage goods storage rack
CN203802116U (en) Goods shelf capable of preventing wrapping cloth from sliding and convenient to disassemble and assemble
CN205168845U (en) Building berth carries on with outboard equipment bracket
CN201771417U (en) Convenient step ladder
CN203919025U (en) Steam turbine large high-temperature bolt rack
CN104015177A (en) Large high-temperature bolt placing frame of steam turbine
CN204800262U (en) Screw up machine
CN204368690U (en) A kind of locomotive wheel storage rack
CN204384194U (en) A kind of easy-to-dismount shelf
CN205555342U (en) Portable steel sheet mould strorage device
CN204078415U (en) Press workshop push rod storage rack special
CN203936899U (en) Tiltedly drawer shelf
CN203048003U (en) Pipe belt conveyor truss walkway rail free-of-welding assembling structure
CN204342251U (en) Steel plate rack
CN203864728U (en) Gear storage and transportation tool
CN104648876B (en) The cantilever design of a kind of cantilever type storage rack and method to set up thereof
CN203063982U (en) Conveying vehicle
CN203728223U (en) Support device applicable to bucket-wheel stacker reclaimer assembly
CN207046207U (en) Steel wire rope storage rack
CN203092033U (en) Die for manufacturing steel structural platforms
CN204473657U (en) A kind of cantilever design of cantilever type storage rack
CN105459254A (en) Mold stripping device
CN203626213U (en) Platform for hoisting equipment
CN206218483U (en) A kind of tyre goods shelf component
CN206049350U (en) A kind of fixed cell for fuel tank of passenger car

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140903