CN104009542A CN201410191065.9A CN201410191065A CN104009542A CN 104009542 A CN104009542 A CN 104009542A CN 201410191065 A CN201410191065 A CN 201410191065A CN 104009542 A CN104009542 A CN 104009542A
Authority
CN
China
Prior art keywords
information
goose
operation information
intelligent substation
alarm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410191065.9A
Other languages
Chinese (zh)
Inventor
曾剑锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING SP-NICE SCIENTECH DEVELOPMENT CO., LTD.
Original Assignee
SP-NICE SYSTEM CONTROL Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SP-NICE SYSTEM CONTROL Inc filed Critical SP-NICE SYSTEM CONTROL Inc
Priority to CN201410191065.9A priority Critical patent/CN104009542A/en
Publication of CN104009542A publication Critical patent/CN104009542A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a method and system for analyzing the transmission rationality of operation information of an intelligent substation. The method mainly comprises the steps of carrying out analytical judgment on GOOSE information virtual change and analog quantity information flying spots, and conducting alerting and recording on unusual conditions in the GOOSE information virtual change and the analog quantity information flying spots. Thus, the GOOSE information virtual change and the analog quantity information flying spots in the operation information generated in an operation process of the intelligent substation can be analytically processed, and follow-up analyzing, positioning and handling carried out by handlers on operation faults of the substation are facilitated.

Description

Intelligent substation operation information transmission analysis on its rationality method and analytical system
Technical field
The present invention relates to electrical equipment technical field, relate in particular to a kind of intelligent substation operation information transmission analysis on its rationality method and analytical system.
Background technology
, often there is background monitoring, Unattended Centralized Control Substation and the remote signalling of dispatching automation main station system in the uniting and adjustment of tradition electric substation automation system and in service or event is imperfect, remote control is unsuccessful, measure the situations such as transition.When the reactive voltage that occurs in a distant place or local automated closed-loop control when these situations is controlled the system such as (AVQC), automatic generation control (AGC) automatically, its seriousness is just more outstanding.Practice shows, these situations are mostly because communication failure causes, but owing to lacking effective technology means, and the communication process while cannot reproduction problem generation, is therefore often difficult to problem judge, locate and process.
For example, and along with the development of intelligent substation, the communication technology more and more becomes the key of the automation of transformation substations, the electric substation automation system based on IEC61850 standard.Wherein, IEC61850 standard is the international standard of the electric substation automation system based on universal network communication platform; in this substandard electric substation automation system; the equal Adoption Network communication mode of the functions such as the breaker tripping and closing of connection locking, relaying protection and the automatics of analog acquisition signal, supervisory control system is realized; traditional secondary circuit is converted to network service process completely by cable connection directly perceived, and the connection of various signals and transmission change communication modes into by traditional hardwire mode and realize.Particularly along with the appearance of the Intelligent transformer station of applying electronic formula electric current, voltage transformer and intelligent breaker product, design, installation, debugging and the operation maintenance of electric substation automation system will produce deep change, and system is moved the communication that places one's entire reliance upon.The operation information transmitting has likely departed from actual running status, and then cause the misoperation of relevant device, therefore need transmitted operation information to carry out analysis on its rationality in real time, and to extremely reporting to the police, and these unusual conditions are mainly manifested in, GOOSE information is empty to be become and analog quantity information flying spot.
Summary of the invention
The present invention provides a kind of intelligent substation operation information transmission analysis on its rationality method and analytical system for solving the problems of the technologies described above, can there is empty become and analog quantity information flying spot be analysed processing to GOOSE information in the operation information producing in substation operation process, be conducive to subsequent treatment personnel to the operation troubles of transformer station analyze, localization process.
For solving the problems of the technologies described above, the invention provides a kind of intelligent substation operation information transmission analysis on its rationality method, comprise the steps: to obtain the operation information of transformer station; From the described operation information getting, extract GOOSE information; Judge whether GOOSE information is empty change; If GOOSE information is empty change, sends alarm, and record described warning information.
Further, be whether in the empty step becoming in the described GOOSE of judgement information, comprising: obtain the SQNUM value of present frame, wherein, and the displacement of described SQNUM value representation switching value, described SQNUM value initialization value is 1; If described SQMUM value returns 0, nose in described GOOSE information whether displacement of the data in actual message; If the data in described GOOSE information in actual message do not have displacement, judge that obtaining described GOOSE information becomes for empty.
Further, extract the step of GOOSE information from the described operation information getting after, comprising: gather double sampling measured value at same sampled point; Judge that whether double sampling measured value is consistent; If double sampling measured value is inconsistent, alarm, and record described warning information.
Further, extract the step of GOOSE information from the described operation information getting after, comprising: gather sampled measurement at sampled point; Obtain the length of described sampled measurement, and with Application service element in the length desired value that configures contrast; If the length of described sampled measurement is different from described length desired value, alarm, and record described warning information.
Further, extract the step of GOOSE information from the described operation information getting after, comprising: the sampled point by analog quantity channel gathers sampled measurement; Judge whether current described sampled measurement is greater than the specified multiple of configurable specified effective value; If current described sampled measurement is greater than the specified multiple of configurable specified effective value, judge flying spot, and carry out alarm, record described warning information simultaneously.
Further, if be greater than the specified multiple of configurable specified effective value at current described sampled measurement, judge flying spot, after carrying out the step of alarm, comprise: if sampled measurement is less than or equal to the specified multiple of configurable specified effective value described in rear one, report recovers; If sampled measurement is still greater than the specified multiple of configurable specified effective value described in rear one, do not carry out separately alarm.
Further, judge that the data content of described GOOSE information actual transmissions is whether consistent with the data content of configuration; If the data content of described GOOSE information actual transmissions and the data content of configuration are inconsistent, carry out alarm, and record described warning information.
Further, extract the step of GOOSE information from the described operation information getting after, comprising: the source MAC that obtains present frame and former frame; Whether the MAC Address that judges two frames is identical; If the MAC Address difference of two frames, alarm, and record described warning information.
Further, extract the step of GOOSE information from the described operation information getting after, comprising: the data set that obtains GOOSE information; Whether the data set that judges described GOOSE information conforms to the definition of configuration; If the data set of described GOOSE information and the definition of configuration are not inconsistent, alarm, and record described warning information.
For solving the problems of the technologies described above, the present invention also provides a kind of intelligent substation operation information to transmit rational analytical system, comprising: data access module, for obtaining the operation information of transformer station; Data extraction module, for extracting GOOSE information data data processing module from the described operation information getting, for judging that whether GOOSE information is empty change, if GOOSE information is empty change, sends alarm; And storage medium, for recording warning information.
Intelligent substation operation information transmission analysis on its rationality method of the present invention and analytical system: by judging whether GOOSE information is empty change; If GOOSE information is empty change, send alarm, and record described warning information, and then empty change occurred the operation information producing in substation operation process to analyse processing, be conducive to subsequent treatment personnel to the operation troubles of transformer station analyze, localization process.
Brief description of the drawings
Fig. 1 is the flow chart of intelligent substation operation information transmission analysis on its rationality method execution mode of the present invention.
Fig. 2 is the empty flow chart that becomes determination methods of GOOSE signal in the operation information of intelligent substation shown in Fig. 1 transmission analysis on its rationality method execution mode.
Fig. 3 is the flow chart of another execution mode of intelligent substation operation information transmission analysis on its rationality method of the present invention.
Fig. 4 is the structural representation that intelligent substation operation information of the present invention transmits rational analytical system execution mode.
Embodiment
Below in conjunction with drawings and embodiments, the present invention is described in detail.
Consult Fig. 1, the intelligent substation operation information transmission analysis on its rationality method of embodiment of the present invention, comprises the steps:
Step S1, obtains the operation information of transformer station.Wherein, continue to obtain the real-time operation information of transformer station.
Step S2 extracts GOOSE information from the operation information getting.Wherein, operation information comprises polytype information, and step S2 is for selecting out the GOOSE information that can reflect more operation troubles.
Step S31, judges whether GOOSE information is empty change.
Particularly, as shown in Figure 2, step S31 comprises following sub-step:
Step S310, obtains the SQNUM value of present frame, wherein, the displacement of SQNUM value representation switching value, SQNUM value initialization value is 1.
Step S311, if SQMUM value returns 0, noses in GOOSE information whether displacement of the data in actual message.
Step S312, if the data in actual message do not have displacement in GOOSE information, judges that obtaining GOOSE information becomes for empty.
Step S32, if in step S312, judges that obtaining GOOSE information becomes for empty, sends alarm, and records warning information.In addition, in step S32, thrown by the overall situation and mono signal data set mistake function and move back pressing plate control.
Further, if this GOOSE information is the first frame receiving, and SQNUM is 0, represents that the analytical parameters of this GOOSE information is in the state of no initializtion, now do not carry out alarm.
The intelligent substation operation information transmission analysis on its rationality method of embodiment of the present invention, by judging whether GOOSE information is empty change; Judging that obtaining GOOSE information becomes for empty, send alarm, and record described warning information, and then be there is to empty change in the operation information producing in substation operation process and analyse processing, be conducive to subsequent treatment personnel to the operation troubles of transformer station analyze, localization process.
In an application implementation mode, consult Fig. 3, concrete, after step S2, comprise and judge that whether the two AD of SMV (Sample Measure Value, sampled measurement) are consistent, specifically comprise following sub-step:
Step S41, gathers double sampling measured value at same sampled point.
Step S42, judges that whether double sampling measured value is consistent.
Step S43, if double sampling measured value is inconsistent, alarm, and record warning information.
In an application implementation mode, continue to consult Fig. 3, concrete, after step S2, comprise and judge that whether SMV ASDU (Application Service Data Unit, application service data cell) length is illegal, specifically comprise following sub-step:
Step S51, gathers sampled measurement at sampled point.
Step S52, obtains the length of sampled measurement, and with Application service element in the length desired value that configures contrast.
Step S53, if the length of sampled measurement is different from length desired value, alarm, and record warning information.Wherein, in step S53, thrown by the overall situation and mono signal ASDU function and move back pressing plate control.
In an application implementation mode, continue to consult Fig. 3, concrete, after step S2, further comprise and judge whether sampled measurement (being analog quantity information) is flying spot, whether departs from the waveform of sampled measurement, specifically comprises following sub-step:
Step S61, gathers sampled measurement by the sampled point of analog quantity channel.
Step S62, judges whether current sampled measurement is greater than the specified multiple of configurable specified effective value.
Step S63, if current sampled measurement is greater than the specified multiple of configurable specified effective value, judges flying spot, and carries out alarm, records warning information simultaneously.
In addition, after step S3, also further comprise: if a rear sampled measurement is less than or equal to the specified multiple of configurable specified effective value, report recovers; If a rear sampled measurement is still greater than the specified multiple of configurable specified effective value, do not carry out separately alarm.
In an application implementation mode, continue to consult Fig. 3, concrete, after step S2, comprise and judge in GOOSE information, whether actual transmissions is consistent with definition, specifically comprises following sub-step:
Step S71, judges that whether the data content of GOOSE information actual transmissions is consistent with the data content of configuration.
Step S72, if the data content of GOOSE information actual transmissions and the data content of configuration are inconsistent, carry out alarm, and records warning information.
In an application implementation mode, continue to consult Fig. 3, concrete, after step S2, further comprise and judge that whether GOOSE information is replicated, and particularly comprises following sub-step:
Step S81, obtains the source MAC of present frame and former frame.
Step S82, judges that whether the MAC Address of two frames is identical.
Step S83, if the MAC Address difference of two frames, alarm, and record warning information.
In an application implementation mode, continue to consult Fig. 3, concrete, after step S2, further comprise and judge that GOOSE data set and definition are not inconsistent or change, and particularly comprise following sub-step:
Step S91, obtains the data set of GOOSE information.
Step S92, judges whether the data set of GOOSE information conforms to the definition of configuration.Concrete, refer to that whether judge present frame port number identical with the data set entry number of configuration.
And step S93, if the data set of GOOSE information and the definition of configuration are not inconsistent, alarm, and record warning information.Concrete, if the first frame receiving represents that the analytical parameters of this information is in the state of no initializtion, not alarm.The information having configured only receiving this information and changing Times once for the second time, and the information of configuration can not produce this alarm.Further, the data set and the definition that obtain GOOSE information when judgement are not inconsistent, alarm function locking, and when the data set recovery of GOOSE information is consistent with definition, alarm function is removed.
The present invention also provides a kind of analytical system of intelligent substation operation troubles.
Consult Fig. 3, intelligent substation operation information of the present invention transmits rational analytical system execution mode and comprises:
Data access module 1, for obtaining the operation information of transformer station.
Data extraction module 2, for extracting GOOSE information data from the operation information getting.
Data processing module 3, for judging that whether GOOSE information is empty change, if GOOSE information is empty change, sends alarm.
And storage medium 4, for recording warning information.
Certainly, this data processing module 3 can also be used for the processing procedure described in above-mentioned arbitrary execution mode, and it is no longer repeated herein.
These are only embodiments of the present invention; not thereby limit the scope of the claims of the present invention; every equivalent structure or conversion of equivalent flow process that utilizes specification of the present invention and accompanying drawing content to do; or be directly or indirectly used in other relevant technical fields, be all in like manner included in scope of patent protection of the present invention.

Claims (10)

1. an intelligent substation operation information transmission analysis on its rationality method, is characterized in that, comprises the steps:
Obtain the operation information of transformer station;
From the described operation information getting, extract GOOSE information;
Judge whether GOOSE information is empty change;
If GOOSE information is empty change, sends alarm, and record described warning information.
2. whether intelligent substation operation information transmission analysis on its rationality method according to claim 1, is characterized in that, be in the empty step becoming in the described GOOSE of judgement information, comprising:
Obtain the SQNUM value of present frame, wherein, the displacement of described SQNUM value representation switching value, described SQNUM value initialization value is 1;
If described SQMUM value returns 0, nose in described GOOSE information whether displacement of the data in actual message;
If the data in described GOOSE information in actual message do not have displacement, judge that obtaining described GOOSE information becomes for empty.
3. intelligent substation operation information transmission analysis on its rationality method according to claim 1, is characterized in that, extract the step of GOOSE information from the described operation information getting after, comprising:
Gather double sampling measured value at same sampled point;
Judge that whether double sampling measured value is consistent;
If double sampling measured value is inconsistent, alarm, and record described warning information.
4. intelligent substation operation information transmission analysis on its rationality method according to claim 1, is characterized in that, extract the step of GOOSE information from the described operation information getting after, comprising:
Gather sampled measurement at sampled point;
Obtain the length of described sampled measurement, and with Application service element in the length desired value that configures contrast;
If the length of described sampled measurement is different from described length desired value, alarm, and record described warning information.
5. intelligent substation operation information transmission analysis on its rationality method according to claim 1, is characterized in that, extract the step of GOOSE information from the described operation information getting after, comprising:
Sampled point by analog quantity channel gathers sampled measurement;
Judge whether current described sampled measurement is greater than the specified multiple of configurable specified effective value;
If current described sampled measurement is greater than the specified multiple of configurable specified effective value, judge flying spot, and carry out alarm, record described warning information simultaneously.
6. intelligent substation operation information transmission analysis on its rationality method according to claim 5, it is characterized in that, if be greater than the specified multiple of configurable specified effective value at current described sampled measurement, judge flying spot, after carrying out the step of alarm, comprising:
If sampled measurement is less than or equal to the specified multiple of configurable specified effective value described in rear one, report recovers;
If sampled measurement is still greater than the specified multiple of configurable specified effective value described in rear one, do not carry out separately alarm.
7. intelligent substation operation information transmission analysis on its rationality method according to claim 1, is characterized in that, extract the step of GOOSE information from the described operation information getting after, comprising:
Whether the data content that judges described GOOSE information actual transmissions is consistent with the data content of configuration;
If the data content of described GOOSE information actual transmissions and the data content of configuration are inconsistent, carry out alarm, and record described warning information.
8. intelligent substation operation information transmission analysis on its rationality method according to claim 1, is characterized in that, extract the step of GOOSE information from the described operation information getting after, comprising:
Obtain the source MAC of present frame and former frame;
Whether the MAC Address that judges two frames is identical;
If the MAC Address difference of two frames, alarm, and record described warning information.
9. intelligent substation operation information transmission analysis on its rationality method according to claim 1, is characterized in that, extract the step of GOOSE information from the described operation information getting after, comprising:
Obtain the data set of GOOSE information;
Whether the data set that judges described GOOSE information conforms to the definition of configuration;
If the data set of described GOOSE information and the definition of configuration are not inconsistent, alarm, and record described warning information.
10. intelligent substation operation information transmits a rational analytical system, it is characterized in that, comprising:
Data access module, for obtaining the operation information of transformer station;
Data extraction module, for extracting GOOSE information from the described operation information getting
Data data processing module, for judging that whether GOOSE information is empty change, if GOOSE information is empty change, sends alarm;
And storage medium, for recording warning information.
CN201410191065.9A 2014-05-07 2014-05-07 Method and system for analyzing transmission rationality of operation information of intelligent substation Pending CN104009542A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410191065.9A CN104009542A (en) 2014-05-07 2014-05-07 Method and system for analyzing transmission rationality of operation information of intelligent substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410191065.9A CN104009542A (en) 2014-05-07 2014-05-07 Method and system for analyzing transmission rationality of operation information of intelligent substation

Publications (1)

Publication Number Publication Date
CN104009542A true CN104009542A (en) 2014-08-27

Family

ID=51370084

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410191065.9A Pending CN104009542A (en) 2014-05-07 2014-05-07 Method and system for analyzing transmission rationality of operation information of intelligent substation

Country Status (1)

Country Link
CN (1) CN104009542A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106506259A (en) * 2016-10-13 2017-03-15 中国电力科学研究院 The pilot system and method for the abnormal big value of simulation intelligent substation SV sampling messages

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101409463A (en) * 2008-12-02 2009-04-15 江西省电力科学研究院 Protection and video system gang control method for electric power system digitalization transforming plant
CN101969229A (en) * 2010-09-16 2011-02-09 广东电网公司茂名供电局 On-line monitoring method for secondary circuit
CN102175940A (en) * 2011-01-28 2011-09-07 四川电力科学研究院 Testing method of digital protection tester with fault data model base for protection testing
CN103296757A (en) * 2013-05-21 2013-09-11 国家电网公司 Multi-parameter identification based secondary system fault diagnosing method for intelligent substation
CN103684903A (en) * 2013-11-08 2014-03-26 山东大学 GOOSE message anomaly online detection method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101409463A (en) * 2008-12-02 2009-04-15 江西省电力科学研究院 Protection and video system gang control method for electric power system digitalization transforming plant
CN101969229A (en) * 2010-09-16 2011-02-09 广东电网公司茂名供电局 On-line monitoring method for secondary circuit
CN102175940A (en) * 2011-01-28 2011-09-07 四川电力科学研究院 Testing method of digital protection tester with fault data model base for protection testing
CN103296757A (en) * 2013-05-21 2013-09-11 国家电网公司 Multi-parameter identification based secondary system fault diagnosing method for intelligent substation
CN103684903A (en) * 2013-11-08 2014-03-26 山东大学 GOOSE message anomaly online detection method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106506259A (en) * 2016-10-13 2017-03-15 中国电力科学研究院 The pilot system and method for the abnormal big value of simulation intelligent substation SV sampling messages

Similar Documents

Publication Publication Date Title
CN107181319B (en) Intelligent inspection method for state of hard pressing plate of transformer substation
CN107749667B (en) Real-time monitoring method for information and state of intelligent substation protection pressing plate
CN104104151B (en) The cut-in method of distribution terminal facility information
CN101316051A (en) Internetwork communication log analysis system and method based on IEC61850 transforming plant automatization system
CN108287278A (en) Fault detection method and system, the storage medium and processor of substation
CN110930669B (en) Monitoring and early warning system and method for tripping and closing loop of transformer substation
CN106921522B (en) Networking information model detection device of intelligent substation network message recording and analyzing device
CN108512730B (en) Intelligent substation telecontrol system equipment testing method, device and system
CN102788915A (en) Feeder automation online simulation method based on maintenance workstation
CN105510754A (en) Dual AD sampling inconsistency judging method for intelligent substation
CN103401312A (en) Redundancy warning system and control method for goose network communication of intelligent transformer station
CN108767989A (en) A kind of working status monitoring system and analysis method of electrical power distribution automatization system
CN113343446A (en) Data analysis and verification method and system for transformer substation monitoring system
CN204425046U (en) The intelligent monitor system of transmission & distribution transformer station
CN104734353A (en) Intelligent substation hovering fault monitoring method based on network message
CN103715769A (en) Distribution network intelligent warning method
CN103279520B (en) Power substation secondary system failure reconnaissance method
CN106899084A (en) A kind of distributor track website on off state analytical technology based on video intelligent identification
CN201994724U (en) Universal type remote monitoring device for automation channel
CN104008214B (en) The storage method and storage system of intelligent substation real-time traffic information
CN103795146A (en) Power distribution terminal conformance testing method
CN105446248A (en) Power grid power distribution security auxiliary monitoring system
CN109633332B (en) Automatic regular inspection method for equipment in power system and fault recording device
CN104009542A (en) Method and system for analyzing transmission rationality of operation information of intelligent substation
CN105703479B (en) Main website, the method for substation automation equipment linkage from top to bottom are realized in passage extension

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: NANJING STATE GRID NICE TECHNOLOGY DEVELOPMENT CO.

Free format text: FORMER OWNER: SP-NICE SYSTEM CONTROL INC.

Effective date: 20150710

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20150710

Address after: Jiangsu province Nanjing City Shuige road 211100 Jiangning economic and Technological Development Zone No. 18

Applicant after: NANJING SP-NICE SCIENTECH DEVELOPMENT CO., LTD.

Address before: 518000, Guangdong, Nanshan District hi tech Zone, Shenzhen, Shenzhen Wei new software technology park, building 2, 3 southwest wing

Applicant before: SP-NICE System Control Inc.

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140827