CN103993701B - A kind of petal concrete column and construction method thereof - Google Patents

A kind of petal concrete column and construction method thereof Download PDF

Info

Publication number
CN103993701B
CN103993701B CN201410240040.3A CN201410240040A CN103993701B CN 103993701 B CN103993701 B CN 103993701B CN 201410240040 A CN201410240040 A CN 201410240040A CN 103993701 B CN103993701 B CN 103993701B
Authority
CN
China
Prior art keywords
cap
fitting
built
embedded part
embedded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410240040.3A
Other languages
Chinese (zh)
Other versions
CN103993701A (en
Inventor
徐小洋
吕福磊
白贺昶
王伟
郑文涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201410240040.3A priority Critical patent/CN103993701B/en
Publication of CN103993701A publication Critical patent/CN103993701A/en
Application granted granted Critical
Publication of CN103993701B publication Critical patent/CN103993701B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The present invention relates to the realm of building construction, be specifically related to a kind of petal concrete column and construction method thereof. A kind of petal concrete column, comprises shaft and cap, and described shaft bottom is solid cylinder, is up divided into two, and two are divided into four then, and described cap is annular cap, is embedded with respectively built-in fitting at annular cap end face and bottom surface. The construction method that the invention also discloses a kind of petal concrete column, comprises the steps: the first step, formulates reasonable construction flow process; Second step, built-in fitting is made; The 3rd step, cylinder and the processing of cap reinforcing bar; The 4th step, template is installed; The 5th step, reinforcement installation; The 6th step, installs embedded part; The 7th step, concreting and maintenance. From top to down, bearing capacity is more and more stronger for petal post of the present invention; From below to up, hole is increasing, has both met installation requirement, also meets structural safety requirement. Accurate embedded part is synchronizeed with structure construction, and the equipment of can realizing is accurately installed.

Description

A kind of petal concrete column and construction method thereof
Technical field
The present invention relates to the realm of building construction, be specifically related to a kind of petal concrete column and construction method thereof.
Background technology
The gallery of show field is provided with rotary seat, and being determined by Stage Design effect will be at the inner equipment of realizing seat rotation of installing of chair supporting column. Different from general post, this post requires shaft up/down perforation, left and right perforate. And install for meeting equipment, shaft has built-in fitting up and down, embedded part One's name is legion, and required precision is strict, and difficulty of construction is relatively large.
In order to meet Chinese show theatre chair installation requirement, rod structure requires up/down perforation, left and right perforate. The prior art that can realize hollow form is generally steel pipe column, annulus reinforced column etc. Immediate technical scheme is common circular ring type reinforced column, and punches in both sides. The shortcoming of general circular ring type reinforced column: be only applicable to require the post of up/down perforation, realize both sides perforation if want and meet the necessary perforate of special installation installation. Not only destroy shaft structure, be also difficult to the required precision that the equipment that reaches is installed.
Summary of the invention
For addressing the above problem, the invention discloses a kind of petal concrete column, this post is reinforced concrete structure post, the post self structure of this form is stable, can meet again the installation requirement of special installation. Concrete solution is:
A kind of petal concrete column, comprises shaft and cap, and described shaft bottom is solid cylinder, is up divided into two, and two are divided into four then, and described cap is annular cap, is embedded with respectively built-in fitting at annular cap end face and bottom surface.
As preferably, built-in fitting comprises pre-embedded steel slab and dowel, and pre-embedded steel slab is rectangular steel plates and curved plate, and dowel region is identical with pre-embedded steel slab shape, and pre-embedded steel slab and dowel adopt the welding of T shape; Be imbedded on the arc of cap end face the pre-embedded steel slab of built-in fitting on built-in fitting and rectangle and be provided with vibrate hole and air-vent, vibrate hole and air-vent are evenly arranged, and this hole of vibrating polishes with material roundlet divided edge of steel plate plug welding polishing with uniform thickness after casting and compacting of concrete;
As preferably, under rectangle, built-in fitting is imbedded at cap lower surface and across is symmetrical arranged.
The invention also discloses a kind of construction method of petal concrete column. Comprise the steps:
The first step, formulates reasonable construction flow process.
Second step, built-in fitting is made: when dowel diameter is not more than 20mm, should adopt pressure submerged-arc welding, when dowel diameter is greater than 20mm, should adopt perforation plug welding to polish.
The 3rd step, cylinder and the processing of cap reinforcing bar: the working height of stirrup is 930~940mm; Setting-out at the scene before steel hoop processing, processes according to lofting ruler little progress row.
The 4th step, template is installed: template installation Hou Ying organization steel structural units checks Template Location, size; Before reinforcement installation, on bed die, emit the location of steel hoop and the location of beam face built-in fitting dowel, so that follow-up construction; Setting-out work should carry out an acceptance inspection.
The 5th step, reinforcement installation: in installation process, the reinforcing bar that steel pipe or implanted diameter are not less than 32mm can be set at the dowel place of plate face embedded part, so that follow-up embedded part is installed. After reinforcement installation completes, carry out an acceptance inspection.
The 6th step, installs embedded part: after reinforcement installation completes, extract steel pipe or the reinforcing bar of location use out, embedded part is in place; After whole installations, then carry out an acceptance inspection.
The 7th step, concreting and maintenance: when pouring concrete, in embedded part plate and near should strengthen vibrating, guarantee that under embedded part plate, concrete is full of closely knit.
Beneficial effect: from top to down, bearing capacity is more and more stronger for petal post of the present invention; From below to up, hole is increasing, forms the version of up/down perforation, left and right perforate, meets the installation requirement of the equipment such as lifting shaft in post, also meets structural safety requirement simultaneously. Accurate embedded part is synchronizeed with structure construction, and the equipment of can realizing is accurately installed.
Brief description of the drawings
Fig. 1 is concrete solid cylinder profile;
Fig. 2 is two points of post profiles of concrete;
Fig. 3 is concrete petal post profile;
Fig. 4 is annular cap;
Fig. 5 is built-in fitting layout drawing on annular cap;
Fig. 6 is built-in fitting layout drawing under annular cap;
Fig. 7 is built-in fitting schematic diagram on arc;
Fig. 8 is built-in fitting schematic diagram on long rectangle;
Fig. 9 is built-in fitting schematic diagram on rectangle;
Figure 10 is built-in fitting schematic diagram under rectangle;
Figure 11 is built-in fitting heeling-in drawing;
In figure, 11, solid cylinder; 12, two points of posts; 13, petal post; 2, cap; 3, through hole; 41, built-in fitting on arc; 42, built-in fitting on rectangle; 43, built-in fitting on long rectangle; 5, built-in fitting under rectangle; 61, dowel; 62, the hole of vibrating; 63, pre-embedded steel slab.
Detailed description of the invention
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is described.
Shown in Fig. 1, Fig. 2, Fig. 3, petal concrete column of the present invention comprises shaft and cap, shaft bottom is solid cylinder, up be divided into two into two points of posts, then two are divided into four one-tenth petal posts, and shown in Fig. 4, Fig. 5, Fig. 6, described cap is annular cap, cap has through hole, is embedded with respectively built-in fitting at annular cap end face and bottom surface. Shown in Fig. 7, Fig. 8, Fig. 9, Figure 10, Figure 11, built-in fitting comprises pre-embedded steel slab and dowel, and pre-embedded steel slab is rectangular steel plates and curved plate, and dowel region is identical with pre-embedded steel slab shape, and pre-embedded steel slab and dowel adopt the welding of T shape; Being imbedded on the arc of cap upper surface built-in fitting presses close to interior annulus and is symmetrical arranged, upper built-in fitting is respectively along X-axis, Y-axis and Z axis setting, pre-embedded steel slab is provided with vibrate hole and air-vent, vibrate hole and air-vent is evenly arranged, and this hole of vibrating polishes with material roundlet divided edge of steel plate plug welding polishing with uniform thickness after casting and compacting of concrete; Under rectangle, built-in fitting is imbedded at cap lower surface and is symmetrical arranged along X-axis and Y-axis across.
The construction method of petal concrete column of the present invention, comprises the steps:
The first step, formulates reasonable construction flow process.
Second step, built-in fitting is made: when dowel diameter is not more than 20mm, should adopt pressure submerged-arc welding, when dowel diameter is greater than 20mm, should adopt perforation plug welding to polish. And should accomplish: 1. before construction, will accurately locate, and require composition entirety between each embedded part of cap top and bottom; 2. at the bottom of the flat cap face of the embedded part face of built-in fitting or cap; Built-in fitting plan-position admissible error is ± 10mm; Embedded part requires to bury underground smooth; Cap face embedded part absolute altitude admissible error is+0~-10mm; At the bottom of cap, embedded part face absolute altitude admissible error is+0~+ 10mm; Cylinder embedded part requires fine finishining, and especially arc built-in fitting should reach 9 class precisions, whole board plane degree < 0.2mm; Build rear whole board plane degree < 2mm; 3. for ensureing pouring concrete quality, the part embedded part plate setting air-vent that vibrates; The air-vent radius 80mm that vibrates, application uniform thickness polishes with material roundlet divided edge of steel plate plug welding polishing.
The 3rd step, cylinder and the processing of cap reinforcing bar: the working height of stirrup is 930 ~ 940mm, the most very much not should exceed 950mm; Setting-out at the scene before steel hoop processing, processes according to lofting ruler little progress row.
The 4th step, template is installed: template installation Hou Ying organization steel structural units checks Template Location, size; Before reinforcement installation, on bed die, emit the location of steel hoop and the location of beam face built-in fitting dowel, so that follow-up construction; Setting-out work should carry out an acceptance inspection; Described template is the large thick and high-strength degree of prefabrication steel form, and steel form is shaped to every of high 500mm/, adopts on-the-spot connecting method to assemble, and ensures stability, compactness that template is installed simultaneously.
The 5th step, reinforcement installation: in installation process, the reinforcing bar that steel pipe or implanted diameter are not less than 32mm can be set at the dowel place of plate face embedded part, so that follow-up embedded part is installed. After reinforcement installation completes, carry out an acceptance inspection.
The 6th step, installs embedded part: after reinforcement installation completes, extract steel pipe or the reinforcing bar of location use out, embedded part is in place; After whole installations, then carry out an acceptance inspection.
The 7th step, concreting and maintenance: when pouring concrete, in embedded part plate and near should strengthen vibrating, guarantee that under embedded part plate, concrete is full of closely knit.

Claims (4)

1. a petal concrete column, comprises shaft and cap, it is characterized in that, described shaft bottom is solid cylinder, is up divided into two, and two are divided into four then, and described cap is annular cap, is embedded with respectively built-in fitting at annular cap end face and bottom surface;
Described built-in fitting comprises pre-embedded steel slab and dowel,
Described pre-embedded steel slab is rectangular steel plates and curved plate, and dowel region is identical with pre-embedded steel slab shape, and pre-embedded steel slab and dowel adopt the welding of T shape;
Be imbedded on the arc of cap end face the pre-embedded steel slab of built-in fitting on built-in fitting and rectangle and be provided with vibrate hole and air-vent, vibrate hole and air-vent are evenly arranged, and this hole of vibrating polishes with material roundlet divided edge of steel plate plug welding polishing with uniform thickness after casting and compacting of concrete;
Under rectangle, built-in fitting is imbedded at cap lower surface and across is symmetrical arranged.
2. a construction method for petal concrete column, is characterized in that, comprises the steps:
The first step, formulates reasonable construction flow process;
Second step, built-in fitting is made: when dowel diameter is not more than 20mm, should adopt pressure submerged-arc welding, when dowel diameter is greater than 20mm, should adopt perforation plug welding to polish;
The 3rd step, cylinder and the processing of cap reinforcing bar: the working height of stirrup is 930~940mm; Setting-out at the scene before steel hoop processing, processes according to lofting ruler little progress row;
The 4th step, template is installed: template installation Hou Ying organization steel structural units checks Template Location, size; Before reinforcement installation, on bed die, emit the location of steel hoop and the location of beam face built-in fitting dowel, so that follow-up construction; Setting-out work should carry out an acceptance inspection;
The 5th step, reinforcement installation: in installation process, the reinforcing bar that steel pipe or implanted diameter are not less than 32mm can be set at the dowel place of plate face embedded part, so that follow-up embedded part is installed, after reinforcement installation completes, carry out an acceptance inspection;
The 6th step, installs embedded part: after reinforcement installation completes, extract steel pipe or the reinforcing bar of location use out, embedded part is in place; After whole installations, then carry out an acceptance inspection;
The 7th step, concreting and maintenance: when pouring concrete, in embedded part plate and near should strengthen vibrating, guarantee that under embedded part plate, concrete is full of closely knit.
3. construction method according to claim 2, is characterized in that, in second step, should accomplish:
1. before construction, to accurately locate, and require composition entirety between each embedded part of cap top and bottom;
2. at the bottom of the flat cap face of the embedded part face of built-in fitting or cap; Embedded part plan-position admissible error is ± 10mm; Built-in fitting requires to bury underground smooth; Cap face embedded part absolute altitude admissible error is+0~-10mm; At the bottom of cap, embedded part face absolute altitude admissible error is+0~+ 10mm; Cylinder embedded part requires fine finishining, 9 class precisions, whole board plane degree < 0.2mm; Build rear whole board plane degree < 2mm;
3. for ensureing pouring concrete quality, the part embedded part plate setting air-vent that vibrates; The air-vent radius 80mm that vibrates, application uniform thickness polishes with material roundlet divided edge of steel plate plug welding polishing.
4. construction method according to claim 2, is characterized in that, in the 4th step, described template is the large thick and high-strength degree of prefabrication steel form, and steel form is shaped to every of high 500mm/, adopt on-the-spot connecting method to assemble, ensure stability, compactness that template is installed simultaneously.
CN201410240040.3A 2014-06-03 2014-06-03 A kind of petal concrete column and construction method thereof Expired - Fee Related CN103993701B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410240040.3A CN103993701B (en) 2014-06-03 2014-06-03 A kind of petal concrete column and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410240040.3A CN103993701B (en) 2014-06-03 2014-06-03 A kind of petal concrete column and construction method thereof

Publications (2)

Publication Number Publication Date
CN103993701A CN103993701A (en) 2014-08-20
CN103993701B true CN103993701B (en) 2016-05-18

Family

ID=51308016

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410240040.3A Expired - Fee Related CN103993701B (en) 2014-06-03 2014-06-03 A kind of petal concrete column and construction method thereof

Country Status (1)

Country Link
CN (1) CN103993701B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1994028263A2 (en) * 1993-05-28 1994-12-08 Rossi Jean Louis Method for fabricating construction elements for the erection of pillars and elements obtained according to such method
CN2474607Y (en) * 2001-03-27 2002-01-30 天津大学 Steel concrete separated column for high storey building
WO2003054321A1 (en) * 2001-12-14 2003-07-03 Usinor Prefabricated composite post for constructing a building vertical support structure consisting of at least a hollow cylindrical steel section
CN2806624Y (en) * 2005-06-27 2006-08-16 扬州大学 Reinforced concrete damping column
CN202265937U (en) * 2011-09-20 2012-06-06 新世纪建设集团有限公司 Decorative roman column structure
CN102493647A (en) * 2011-12-05 2012-06-13 中冶天工集团有限公司 Construction method for high-rise concrete structure
CN202401665U (en) * 2011-09-18 2012-08-29 烟台大学 Self-adapting split column
CN103088915A (en) * 2012-08-16 2013-05-08 杨众 Cast-in-site column with column cap and construction method
CN103276895A (en) * 2013-06-06 2013-09-04 金陵科技学院 Reversed-cone-shaped column cap die and die supporting method thereof

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1994028263A2 (en) * 1993-05-28 1994-12-08 Rossi Jean Louis Method for fabricating construction elements for the erection of pillars and elements obtained according to such method
CN2474607Y (en) * 2001-03-27 2002-01-30 天津大学 Steel concrete separated column for high storey building
WO2003054321A1 (en) * 2001-12-14 2003-07-03 Usinor Prefabricated composite post for constructing a building vertical support structure consisting of at least a hollow cylindrical steel section
CN2806624Y (en) * 2005-06-27 2006-08-16 扬州大学 Reinforced concrete damping column
CN202401665U (en) * 2011-09-18 2012-08-29 烟台大学 Self-adapting split column
CN202265937U (en) * 2011-09-20 2012-06-06 新世纪建设集团有限公司 Decorative roman column structure
CN102493647A (en) * 2011-12-05 2012-06-13 中冶天工集团有限公司 Construction method for high-rise concrete structure
CN103088915A (en) * 2012-08-16 2013-05-08 杨众 Cast-in-site column with column cap and construction method
CN103276895A (en) * 2013-06-06 2013-09-04 金陵科技学院 Reversed-cone-shaped column cap die and die supporting method thereof

Also Published As

Publication number Publication date
CN103993701A (en) 2014-08-20

Similar Documents

Publication Publication Date Title
CN100476142C (en) Construction method for combined V-shape steel pipe concrete pile
CN204703182U (en) Crab-bolt stock
CN103835373B (en) The construction method of a kind of annular cap built-in fitting and annular concrete cap
CN102535849A (en) Constructional column top concreting method
CN203247603U (en) High-position foundation bolt positioning device
CN203891058U (en) Built-in foundation bolt positioning tool for fixed type tower crane foundation
CN108035594A (en) The prefabricated decompression cone construction method of concrete silo structure
CN102433996A (en) Method for constructing wafer board with SMC (Sheet Molding Compound) hole forming mould
CN104131704A (en) Steel pipe column concrete lateral pouring method and steel pipe column structure used in method
CN103255918A (en) Concrete double-curved-surface thin shell cylinder construction method
CN107491619A (en) A kind of old project steel construction that changes based on BIM technology positions construction method for hanging
CN103696439B (en) A kind of immersed tube pouring procedure
CN104164951B (en) Stair landing and construction method thereof
CN105970804A (en) Structure and construction method of fan-shaped tenon joints of prefabricated assembly pier
CN206245763U (en) The positioner of live assembling reinforcement in precast construction
CN103993701B (en) A kind of petal concrete column and construction method thereof
CN202266034U (en) Fixing device for anchor bolts of embedded type diamond combined steel and concrete column feet
CN205907609U (en) Supplementary utensil in pre -buried hole of bridge supporting base stone location
CN206329032U (en) Template suitable for pouring section after assembled beam-column
CN202265906U (en) Fixing device for anchor bolts of embedded type steel tube concrete column feet
CN203209591U (en) Standard processing device for big-diameter extra-long pile foundation full pre-assembly reinforcement cage
CN104912333B (en) wall construction system and construction method
CN203834809U (en) Steel pipe column structure for steel pipe column concrete side pouring method
CN205343431U (en) Prefabricated wall body grout sleeve strip solid matter exposes accurate positioning die of reinforcing bar
CN202787992U (en) Constructional column top concrete pouring structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160518

Termination date: 20170603