CN103985509A - Rack for transformer - Google Patents

Rack for transformer Download PDF

Info

Publication number
CN103985509A
CN103985509A CN201410238942.3A CN201410238942A CN103985509A CN 103985509 A CN103985509 A CN 103985509A CN 201410238942 A CN201410238942 A CN 201410238942A CN 103985509 A CN103985509 A CN 103985509A
Authority
CN
China
Prior art keywords
strut
support
extension
placing frame
transformer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410238942.3A
Other languages
Chinese (zh)
Other versions
CN103985509B (en
Inventor
朱利军
步勇军
杨帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAICANG POWER SUPPLY Co OF JIANGSU ELECTRIC POWER Co
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Suzhou Power Supply Co Ltd of Jiangsu Electric Power Co
Original Assignee
TAICANG POWER SUPPLY Co OF JIANGSU ELECTRIC POWER Co
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Suzhou Power Supply Co Ltd of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAICANG POWER SUPPLY Co OF JIANGSU ELECTRIC POWER Co, State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Suzhou Power Supply Co Ltd of Jiangsu Electric Power Co filed Critical TAICANG POWER SUPPLY Co OF JIANGSU ELECTRIC POWER Co
Priority to CN201410238942.3A priority Critical patent/CN103985509B/en
Publication of CN103985509A publication Critical patent/CN103985509A/en
Application granted granted Critical
Publication of CN103985509B publication Critical patent/CN103985509B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Housings And Mounting Of Transformers (AREA)

Abstract

The invention relates to a rack for a transformer. The rack is used for allowing the transformer to be arranged on a telegraph pole and a supporting pole. The rack comprises supporting frames on two sides and connectors used for enabling the two ends of the supporting frames on the two sides to be arranged on the telegraph pole and the supporting pole respectively. In particular, the rack further comprises an extending frame which is arranged at the top of the supporting pole and can extend in the arrangement direction of the supporting pole, wherein the two ends of each supporting frame are connected with the extending frame and the telegraph pole respectively through the corresponding connectors, and the lower end of the extending frame can be locked at the top of the supporting pole along with changing of the outer diameter of the supporting pole. According to the rack for the transformer, the original supporting pole does not need to be replaced, due to arrangement of the extending frame, installation intensity of the transformer is reduced, and meanwhile the rack is simple in structure, convenient to operate and very practical.

Description

A kind of placing frame of transformer
Technical field
the invention belongs to electric equipment field, be specifically related to a kind of for placing the placing frame of transformer.
Background technology
at present, for the placement of transformer, generally to be provided with special power distribution room, then establish according to actual needs the rack of differing heights, but, also there is another situation, that is exactly to be erected on outdoor electric pole, concrete employing two wire bars, one wire bar is for frame high-voltage line or electric wire, the second wire bar plays a part strut, simultaneously its highly general if after transformer is set up and the distance on ground to be greater than 2.5m just passable, that is to say, placing frame is for being erected at electric pole and strut by transformer, concrete placing frame comprises the support that is positioned at both sides, for the both ends that are positioned at both sides support are arranged on respectively to the connector on electric pole and strut, the base of transformer is connected on support, the both ends of support are connected on two wire bars by connector, but along with the transformation of environment, in the time the ground at electric pole place be set be raised, due to the limitation in height of strut, cause transformer apart from the distance on ground do not reach safe distance requirement, if change strut, its working strength is larger, simultaneously in the time that ground changes again, need to again change strut, thereby bring great inconvenience to the installation of transformer.
Summary of the invention
technical problem to be solved by this invention is to overcome the deficiencies in the prior art, and a kind of placing frame of improved transformer is provided, and this placing frame, without changing original strut, reduces transformer installation strength, simultaneously simple in structure, easy to operate, and very practical.
for solving the problems of the technologies described above, the present invention takes following technical scheme:
a kind of placing frame of transformer, it is for being erected at electric pole and strut by transformer, this placing frame comprise be positioned at the support of both sides, for the both ends of both sides support are arranged on respectively to the connector on electric pole and strut, particularly, placing frame also comprise be erected at strut top and can along the setting party of strut to extend Extension support, connector is connected to the both ends of support respectively on Extension support and electric pole, and the bottom of Extension support can be locked in along with the variation of strut external diameter the top of strut.
according to concrete an enforcement and preferred aspect of the present invention, Extension support comprises that many rhizospheres are located at the periphery of strut and along the setting party of strut to the extension rod extending and be separately positioned on the first connecting portion and second connecting portion at the many upper and lower two ends of extension rod, wherein the both sides of the first connecting portion are connected with the end of both sides support respectively, and the second connecting portion is for being fixed on extension rod the upper end of strut.
preferably, extension rod has four, the rectangular periphery that is distributed in strut in horizontal cross-section of four extension rods, and four inner cavitys that form of extension rod, and the upper end of strut is arranged in cavity.
further, preferably, the second connecting portion comprises along any two relative edges of rectangular extension rod and is located at the connecting rod in cavity and is arranged on connecting rod below for four extension rods being locked in to multiple anchor ears of strut periphery, wherein connecting rod in the time that Extension support is erected on strut and the top of strut inconsistent.
in addition, being also provided with spacing anchor ear on electric pole, conflicts on spacing anchor ear in the end of both sides support.Prevent the downslide of placing frame, alleviate simultaneously and be arranged on the stressed of electric pole upper connector, extend the useful life of connector.
due to the enforcement of above technical scheme, the present invention compared with prior art tool has the following advantages:
the present invention, without changing original strut, by the setting of Extension support, reduces transformer installation strength, simultaneously of the present invention simple in structure, easy to operate, and very practical.
Brief description of the drawings
below in conjunction with accompanying drawing and specific embodiment, the present invention will be further described in detail.
fig. 1 is that the master of placing frame of the present invention looks schematic diagram;
fig. 2 be in Fig. 1 A-A to enlarged diagram;
wherein: 1, transformer; 2, electric pole; 3, strut; 4, support; 5, connector; 6, Extension support; 60, extension rod; 60a, cavity; 61, the first connecting portion; 62, the second connecting portion; 620, connecting rod; 621, anchor ear; 7, spacing anchor ear.
Embodiment
as depicted in figs. 1 and 2, the placing frame of the transformer of the present embodiment, its for by transformer 1 be erected at electric pole 2 and strut 3, this placing frame comprise be positioned at the support 4 of both sides, for the both ends of both sides support 4 being arranged on respectively to the connector 5 on electric pole 2 and strut 3 and being erected at strut 3 tops and can be along the setting party of strut 3 to the Extension support 6 extending.
in this example, transformer 1 is erected on both sides support 4, electric pole 2 and strut 3 are respectively the length bar of cylindricality, support 4 opposing parallel settings, and support 4 is always in level, and connector 5 adopts common bolt and bracing piece respectively the two ends of support 4 to be connected to electric pole 2(stock) and Extension support 6 on, simultaneously, the height of Extension support 6 arranges according to actual dimensional requirement, and Extension support 6 can be locked in along with the variation of strut 3 external diameters the top of strut 3.
concrete, Extension support 6 comprises that many rhizospheres are located at the periphery of strut 3 and along the setting party of strut 3 to the extension rod 60 extending, and be separately positioned on the first connecting portion 61 and second connecting portion 62 at many extension rods two ends Shang Xia 60, in this example, extension rod 60 has four, the rectangular periphery that is distributed in strut 3 in horizontal cross-section of four extension rods 60, and four inner cavity 60a that form of extension rod 60, the upper end of strut 3 is arranged in cavity 60a, the both sides of the first connecting portion 61 are connected with the end of both sides support 4 respectively, the second connecting portion 62 is for being fixed on extension rod 60 upper end of strut 3.
further, the second above-mentioned connecting portion 62 comprises along any two relative edges of rectangular extension rod 60 and is located at the connecting rod 620 in cavity 60a and is arranged on connecting rod 620 belows for four extension rods 60 being locked in to multiple anchor ears 621 of strut 3 peripheries, wherein connecting rod 620 in the time that Extension support 6 is erected on strut 3 and the top of strut 3 inconsistent.That is to say, by the setting of connecting rod 620 and anchor ear 621, make the lower end of Extension support 6 can be locked in along with the variation of strut 3 external diameters the top of strut 3.The anchor ear 621 adopting in this example has two, and is evenly distributed on connecting rod 620 between extension rod 60 bottoms, can be close to the semicircle anchor ear of strut 3 peripheries when anchor ear 621 adopts two halves to close up simultaneously.
in addition, being also provided with spacing anchor ear 7 on electric pole 2, conflicts on spacing anchor ear 7 in the end of both sides support 4.Prevent the downslide of placing frame, alleviate simultaneously and be arranged on the stressed of electric pole 2 upper connectors 5, extend the useful life of connector 5.
the above embodiments are only explanation structure and characteristics of the present invention; its object is to allow the personage who is familiar with this art can understand content of the present invention and be implemented; can not limit the scope of the invention with this; the equivalence that all Spirit Essences according to the present invention are done changes or modifies, and all should be encompassed in protection scope of the present invention.

Claims (5)

1. the placing frame of a transformer, described placing frame is for being erected at electric pole (2) and strut (3) by described transformer (1), and described placing frame comprises the support (4) that is positioned at both sides, for the both ends of support described in both sides (4) are arranged on respectively to the connector (5) on described electric pole (2) and described strut (3), it is characterized in that: described placing frame also comprise be erected at strut (3) top and can along the setting party of described strut (3) to extend Extension support (6), described connector (5) is connected to the both ends of described support (4) respectively on described Extension support (6) and described electric pole (2), the bottom of described Extension support (6) can be locked in along with the variation of described strut (3) external diameter the top of described strut (3).
2. the placing frame of transformer according to claim 1, it is characterized in that: described Extension support (6) comprises that many rhizospheres are located at the periphery of described strut (3) and along the setting party of described strut (3) to the extension rod (60) extending, and be separately positioned on the first connecting portion (61) and second connecting portion (62) at the upper and lower two ends of many described extension rods (60), the both sides of described the first connecting portion (61) are connected with the end of support described in both sides (4) respectively, described the second connecting portion (62) is for being fixed on described extension rod (60) upper end of described strut (3).
3. the placing frame of transformer according to claim 2, it is characterized in that: described extension rod (60) has four, the rectangular periphery that is distributed in described strut (3) in horizontal cross-section of four described extension rods (60), and the inner cavity (60a) that forms of four described extension rods (60), the upper end of described strut (3) is arranged in described cavity (60a).
4. the placing frame of transformer according to claim 3, it is characterized in that: described the second connecting portion (62) comprises along any two relative edges of rectangular described extension rod (60) and be located at the connecting rod (620) in described cavity (60a) and be arranged on described connecting rod (620) below for four described extension rods (60) being locked in to multiple anchor ears (621) of described strut (3) periphery, wherein said connecting rod (620) is erected at described strut (3) at described Extension support (6), and when the upper and top of described strut (3) is inconsistent.
5. the placing frame of transformer according to claim 1, is characterized in that: on described electric pole (2), be also provided with spacing anchor ear (7), conflict on described spacing anchor ear (7) in the end of support (4) described in both sides.
CN201410238942.3A 2014-05-30 2014-05-30 A kind of placing frame of transformer Active CN103985509B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410238942.3A CN103985509B (en) 2014-05-30 2014-05-30 A kind of placing frame of transformer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410238942.3A CN103985509B (en) 2014-05-30 2014-05-30 A kind of placing frame of transformer

Publications (2)

Publication Number Publication Date
CN103985509A true CN103985509A (en) 2014-08-13
CN103985509B CN103985509B (en) 2016-03-09

Family

ID=51277440

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410238942.3A Active CN103985509B (en) 2014-05-30 2014-05-30 A kind of placing frame of transformer

Country Status (1)

Country Link
CN (1) CN103985509B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105257966A (en) * 2015-11-12 2016-01-20 江苏省电力公司苏州供电公司 Rack of power transmission and distribution equipment
CN106098315A (en) * 2016-08-05 2016-11-09 国网山东省电力公司龙口市供电公司 A kind of power equipment installing mechanism
CN114772511A (en) * 2022-05-10 2022-07-22 田林政 Lifting type power equipment maintenance device and use method thereof

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107453234B (en) * 2017-09-06 2019-09-27 东阳市阳涛电子科技有限公司 Power distribution cabinet support structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012005376A (en) * 2010-06-22 2012-01-12 Chugoku Electric Power Co Inc:The Device for preventing bird damage
CN202142796U (en) * 2011-07-29 2012-02-08 温县供电有限责任公司 Novel transformer platform
CN103035368A (en) * 2012-12-14 2013-04-10 伊川县电业局 10kV transformer frame
CN202977082U (en) * 2012-12-04 2013-06-05 周心德 Transformer table frame
CN203882767U (en) * 2014-05-30 2014-10-15 国家电网公司 Transformer rack

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012005376A (en) * 2010-06-22 2012-01-12 Chugoku Electric Power Co Inc:The Device for preventing bird damage
CN202142796U (en) * 2011-07-29 2012-02-08 温县供电有限责任公司 Novel transformer platform
CN202977082U (en) * 2012-12-04 2013-06-05 周心德 Transformer table frame
CN103035368A (en) * 2012-12-14 2013-04-10 伊川县电业局 10kV transformer frame
CN203882767U (en) * 2014-05-30 2014-10-15 国家电网公司 Transformer rack

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105257966A (en) * 2015-11-12 2016-01-20 江苏省电力公司苏州供电公司 Rack of power transmission and distribution equipment
CN105257966B (en) * 2015-11-12 2017-09-01 江苏省电力公司苏州供电公司 Equipment for power transmission and distribution stand
CN106098315A (en) * 2016-08-05 2016-11-09 国网山东省电力公司龙口市供电公司 A kind of power equipment installing mechanism
CN108039265A (en) * 2016-08-05 2018-05-15 国网山东省电力公司龙口市供电公司 A kind of power equipment installing mechanism
CN108039265B (en) * 2016-08-05 2019-06-07 国网山东省电力公司龙口市供电公司 A kind of power equipment installing mechanism
CN114772511A (en) * 2022-05-10 2022-07-22 田林政 Lifting type power equipment maintenance device and use method thereof
CN114772511B (en) * 2022-05-10 2023-12-15 杭州电力设备制造有限公司 Lifting type power equipment overhauling device and using method thereof

Also Published As

Publication number Publication date
CN103985509B (en) 2016-03-09

Similar Documents

Publication Publication Date Title
CN103985509A (en) Rack for transformer
CN204205502U (en) The outlet of ultra-high voltage converter station direct current and suspension type capacitor share framework
CN204927037U (en) Dry -type transformer high -pressure coil's stay mounting structure
CN203882767U (en) Transformer rack
CN203659573U (en) Electric equipment hoisting device
CN203536911U (en) Double loop high-voltage power line through rod
CN203571610U (en) Multifunctional vertical rod for construction
CN102717945B (en) Storage rack applicable to cement lamp post
CN203911347U (en) Cable lifting push sleeve
CN204232715U (en) A kind of display structure for itinerant exhibition
CN203924847U (en) A kind of power transmission and transformation line terminal transmission tower
CN203339187U (en) Device suitable for placing solar cell panels
CN204663028U (en) Ater-casting lattice column bracing frame
CN201893520U (en) Paying-off spanning rack
CN204590745U (en) A kind of antitheft good windproof electric pole
CN204703578U (en) Bar stepped on by gate framework type cable
CN103986091B (en) A kind of frame of cable rises top cover and frame lifting method
CN202172214U (en) Low voltage combined mutual inductor universal connecting rack
CN203684772U (en) 220 kV/110 kV quadruple-loop cable terminal steel pipe pole
CN203497843U (en) High-voltage ground wire coiler
CN203891559U (en) Combined type double-pole cross arm structure
CN203373858U (en) Metal structure connection part
CN203498046U (en) Vertical lifting device
CN104078855B (en) A kind of Novel splicing formula transformation cabinet
CN203422996U (en) Hollow high-voltage ignition cable

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant