CN103967995A - 矿用液态co2相变致裂装备减震杆及装备 - Google Patents
矿用液态co2相变致裂装备减震杆及装备 Download PDFInfo
- Publication number
- CN103967995A CN103967995A CN201410212661.0A CN201410212661A CN103967995A CN 103967995 A CN103967995 A CN 103967995A CN 201410212661 A CN201410212661 A CN 201410212661A CN 103967995 A CN103967995 A CN 103967995A
- Authority
- CN
- China
- Prior art keywords
- electrode
- sleeve
- rod
- decoupling rod
- fluid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Springs (AREA)
- Manufacturing Of Electrical Connectors (AREA)
Abstract
本发明公开一种矿用液态CO2相变致裂装备减震杆及装备,减震杆包括推接杆、压紧套、套筒、注液阀接头、第一碟簧、第二碟簧和锁紧套杆,套筒一端安装有注液阀接头,套筒另一端插装有推接杆,推接杆上套装有压紧套,压紧套设置在推接杆和套筒之间,第一碟簧内插装有锁紧套杆,锁紧套杆安装在推接杆上,锁紧套杆尾部和注液阀接头之间设有第二碟簧,推接杆内设有电极连接筒,电极连接筒套装在绝缘筒外侧,绝缘筒内设有第一输入电极,第二输入电极连接在电极连接筒上,注液阀接头内设有绝缘块,绝缘块内安装有第一输出电极和第二输出电极,第一输入电极和第一输出电极通过导线电连接,第二输入电极和第二输出电极通过导线电连接。
Description
技术领域
本发明公开一种减震装置,特别是一种矿用液态CO2相变致裂装备减震杆及装备。
背景技术
液态CO2相变致裂技术是目前煤矿中广泛采用的技术,其主要原理是通过对液态CO2进行加热,通过液态CO2受热膨胀而产生强大的冲击力,使煤层产生松动,从而达到致裂的效果。现有技术中,使液态CO2发生相变,主要是通过电加热器对液态CO2进行加热,使其发生相变。液态CO2相变致裂装备在使用过程中,需要将其***煤层孔洞中,其在***过程中容易产生振动,需要通过减震装置对其进行减震处理,由于煤层中结构比较特殊,现有技术中采用减震结构往往不能满足需求。
发明内容
针对上述提到的现有技术中的减震结构不能满足煤层减震的特殊要求的缺点,本发明提供一种新的矿用液态CO2相变致裂装备减震杆及装备,其通过特殊的结构设计,可完全满足矿用液态CO2相变致裂装备对减震的要求。
本发明解决其技术问题采用的技术方案是:一种矿用液态CO2相变致裂装备减震杆,减震杆包括推接杆、压紧套、套筒、注液阀接头、第一碟簧、第二碟簧和锁紧套杆,套筒一端安装有注液阀接头,套筒另一端插装有推接杆,推接杆上套装有压紧套,压紧套设置在推接杆和套筒之间,第一碟簧内插装有锁紧套杆,锁紧套杆安装在推接杆上,锁紧套杆尾部和注液阀接头之间设有第二碟簧,推接杆内设有电极连接筒,电极连接筒套装在绝缘筒外侧,绝缘筒内设有第一输入电极,第二输入电极连接在电极连接筒上,注液阀接头内设有绝缘块,绝缘块内安装有第一输出电极和第二输出电极,第一输入电极和第一输出电极通过导线电连接,第二输入电极和第二输出电极通过导线电连接。
一种矿用液态CO2相变致裂装备,致裂装备包括如上述的减震杆,减震杆设置在致裂装备中间位置处,减震杆的推接杆上连接有连接杆,连接杆后端连接有延长杆,与第一输入电极和第二输入电极分别通过导线电连接有控制器,减震杆的注液阀接头上固定连接有注液阀,注液阀上连接有用于灌装CO2的储液管,储液管内安装有加热器,加热器分别与第一输出电极和第二输出电极电连接,储液管前端连接有释放头,释放头上开有释放孔。
本发明解决其技术问题采用的技术方案进一步还包括:
所述的压紧套上套装有防尘圈,防尘圈设置在压紧套和推接杆相接位置处。
所述的第一碟簧包括有六对碟簧片依次层叠设置在一起形成。
所述的第二碟簧包括有四对碟簧片依次层叠设置在一起形成。
所述的电极连接筒呈环形筒状。
本发明的有益效果是:本发明结构简单,实现方便,可根据实际需要具体调整减震装置的弹性大小,且其更加适合在煤矿中使用。
下面将结合附图和具体实施方式对本发明做进一步说明。
附图说明
图1为本发明中减震杆剖面结构示意图。
图2为本发明中矿用液态CO2相变致裂装备。
图中,1-推接杆,2-防尘圈,3-压紧套,4-套筒,5-注液阀接头,6-第一碟簧,7-锁紧套杆,8-第二碟簧,9-第一输入电极,10-第二输入电极,11-绝缘垫,12-绝缘筒,13-电极连接筒,14-第一输出电极,15-第二输出电极,16-绝缘块,17-连接杆,18-控制器,19-延长杆,20-注液阀,21-注液孔,22-储液管,23-加热器,24-液态CO2,25-连接头,26释放头,27-释放孔。
具体实施方式
本实施例为本发明优选实施方式,其他凡其原理和基本结构与本实施例相同或近似的,均在本发明保护范围之内。
请参看附图1,本发明中的减震杆主要包括推接杆1、防尘圈2、压紧套3、套筒4、注液阀接头5、第一碟簧6、第二碟簧8和锁紧套杆7,其中,套筒4为减震杆的主体部分,套筒4一端安装有注液阀接头5,套筒4另一端插装有推接杆1,推接杆1上套装有压紧套3,压紧套3设置在推接杆1和套筒4之间,压紧套3上套装有防尘圈2,防尘圈2设置在压紧套3和推接杆1相接位置处。本实施例中,在套筒4内设有弹性装置,本实施例中,弹性装置采用碟簧,其长度可自由设置,本实施例中,弹性装置包括第一碟簧6和第二碟簧8,第一碟簧6包括有六对碟簧片依次层叠设置在一起形成,第一碟簧6内插装有锁紧套杆7,锁紧套杆7呈中空螺栓状,第一碟簧6套装在锁紧套杆7上,锁紧套杆7安装在推接杆1上,锁紧套杆7尾部和注液阀接头5之间设有第二碟簧8,第二碟簧8包括有四对碟簧片依次层叠设置在一起形成。本实施例中,在减震杆两端分别设有连接电极,其中输入电极设置在推接杆1内,中心电极为第一输入电极9,第一输入电极9外侧套装有绝缘筒12,绝缘筒12外侧套装有电极连接筒13,电极连接筒13呈环形筒状,第二输入电极10连接在电极连接筒13上。输出电极设置在注液阀接头5上,第一输出电极14为中心弹性电极,第二输出电极15为环形电极,第一输出电极14和第二输出电极15分别安装在绝缘块16上,本实施例中,第一输入电极9和第一输出电极14通过导线电连接,第二输入电极10和第二输出电极15通过导线电连接。
本发明同时保护一种液态CO2相变致裂装备,请参看附图2,减震杆设置在致裂装备中间位置处,减震杆的推接杆1上连接有连接杆17,连接杆17后端连接有延长杆19,本实施例中,还设有用于控制本发明工作的控制器18,控制器18分别通过导线与第一输入电极9和第二输入电极10电连接。减震杆的注液阀接头5上固定连接有注液阀20,注液阀20上连接有储液管22,储液管22内灌装有液态CO224,储液管22内还安装有加热器23,加热器23分别与第一输出电极14和第二输出电极15电连接,储液管22前端连接有释放头26,释放头26上开有释放孔27。
本发明结构简单,实现方便,可根据实际需要具体调整减震装置的弹性大小,且其更加适合在煤矿中使用。
Claims (6)
1.一种矿用液态CO2相变致裂装备减震杆,其特征是:所述的减震杆包括推接杆、压紧套、套筒、注液阀接头、第一碟簧、第二碟簧和锁紧套杆,套筒一端安装有注液阀接头,套筒另一端插装有推接杆,推接杆上套装有压紧套,压紧套设置在推接杆和套筒之间,第一碟簧内插装有锁紧套杆,锁紧套杆安装在推接杆上,锁紧套杆尾部和注液阀接头之间设有第二碟簧,推接杆内设有电极连接筒,电极连接筒套装在绝缘筒外侧,绝缘筒内设有第一输入电极,第二输入电极连接在电极连接筒上,注液阀接头内设有绝缘块,绝缘块内安装有第一输出电极和第二输出电极,第一输入电极和第一输出电极通过导线电连接,第二输入电极和第二输出电极通过导线电连接。
2.根据权利要求1所述的矿用液态CO2相变致裂装备减震杆,其特征是:所述的压紧套上套装有防尘圈,防尘圈设置在压紧套和推接杆相接位置处。
3.根据权利要求1所述的矿用液态CO2相变致裂装备减震杆,其特征是:所述的第一碟簧包括有六对碟簧片依次层叠设置在一起形成。
4.根据权利要求1所述的矿用液态CO2相变致裂装备减震杆,其特征是:所述的第二碟簧包括有四对碟簧片依次层叠设置在一起形成。
5.根据权利要求1所述的矿用液态CO2相变致裂装备减震杆,其特征是:所述的电极连接筒呈环形筒状。
6.一种矿用液态CO2相变致裂装备,其特征是:所述的致裂装备包括如权利要求1至5中任意一项所述的减震杆,减震杆设置在致裂装备中间位置处,减震杆的推接杆上连接有连接杆,连接杆后端连接有延长杆,与第一输入电极和第二输入电极分别通过导线电连接有控制器,减震杆的注液阀接头上固定连接有注液阀,注液阀上连接有用于灌装CO2的储液管,储液管内安装有加热器,加热器分别与第一输出电极和第二输出电极电连接,储液管前端连接有释放头,释放头上开有释放孔。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410212661.0A CN103967995B (zh) | 2014-05-20 | 2014-05-20 | 矿用液态co2相变致裂装备减震杆及装备 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410212661.0A CN103967995B (zh) | 2014-05-20 | 2014-05-20 | 矿用液态co2相变致裂装备减震杆及装备 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103967995A true CN103967995A (zh) | 2014-08-06 |
CN103967995B CN103967995B (zh) | 2015-11-25 |
Family
ID=51237867
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410212661.0A Expired - Fee Related CN103967995B (zh) | 2014-05-20 | 2014-05-20 | 矿用液态co2相变致裂装备减震杆及装备 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103967995B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105680261A (zh) * | 2016-01-07 | 2016-06-15 | 北京中煤矿山工程有限公司 | 一种二氧化碳致裂器用连接器 |
CN106948816A (zh) * | 2017-03-21 | 2017-07-14 | 太原理工大学 | 自动储能高压注液co2相变脉冲煤岩体致裂方法 |
CN107035346A (zh) * | 2016-02-04 | 2017-08-11 | 中石化石油工程技术服务有限公司 | 一种用于电缆输送射孔减震器 |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201273159Y (zh) * | 2008-09-27 | 2009-07-15 | 刘中军 | 液气大钳移送气缸双向缓冲装置 |
CN101787858A (zh) * | 2010-03-04 | 2010-07-28 | 中国石油大学(华东) | 井下钻柱减振增压装置 |
RU2455454C1 (ru) * | 2011-05-20 | 2012-07-10 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Противополетное устройство для электроцентробежного насоса |
US8286700B1 (en) * | 2009-12-22 | 2012-10-16 | Franchini Jacob M | Damping and sealing device for a well pipe having an inner flow passage and method of using thereof |
WO2012142891A1 (zh) * | 2011-04-21 | 2012-10-26 | 中国石油大学(华东) | 一种利用钻柱振动提高钻井速度的方法及*** |
CN203081894U (zh) * | 2013-01-16 | 2013-07-24 | 湖南汉寿中煤科技有限公司 | 一种二氧化碳致裂装置推进器 |
CN203081491U (zh) * | 2013-01-16 | 2013-07-24 | 湖南汉寿中煤科技有限公司 | 二氧化碳致裂装置电路封闭联接结构 |
CN203285330U (zh) * | 2013-04-24 | 2013-11-13 | 南阳二机石油装备(集团)有限公司 | 一种煤层气钻机缓冲传动装置 |
CN103573182A (zh) * | 2012-07-23 | 2014-02-12 | 宜昌市五环钻机具有限责任公司 | 一种活塞导向套式无阀双缸型潜孔冲击器 |
-
2014
- 2014-05-20 CN CN201410212661.0A patent/CN103967995B/zh not_active Expired - Fee Related
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201273159Y (zh) * | 2008-09-27 | 2009-07-15 | 刘中军 | 液气大钳移送气缸双向缓冲装置 |
US8286700B1 (en) * | 2009-12-22 | 2012-10-16 | Franchini Jacob M | Damping and sealing device for a well pipe having an inner flow passage and method of using thereof |
CN101787858A (zh) * | 2010-03-04 | 2010-07-28 | 中国石油大学(华东) | 井下钻柱减振增压装置 |
WO2012142891A1 (zh) * | 2011-04-21 | 2012-10-26 | 中国石油大学(华东) | 一种利用钻柱振动提高钻井速度的方法及*** |
RU2455454C1 (ru) * | 2011-05-20 | 2012-07-10 | Открытое акционерное общество "Татнефть" имени В.Д. Шашина | Противополетное устройство для электроцентробежного насоса |
CN103573182A (zh) * | 2012-07-23 | 2014-02-12 | 宜昌市五环钻机具有限责任公司 | 一种活塞导向套式无阀双缸型潜孔冲击器 |
CN203081894U (zh) * | 2013-01-16 | 2013-07-24 | 湖南汉寿中煤科技有限公司 | 一种二氧化碳致裂装置推进器 |
CN203081491U (zh) * | 2013-01-16 | 2013-07-24 | 湖南汉寿中煤科技有限公司 | 二氧化碳致裂装置电路封闭联接结构 |
CN203285330U (zh) * | 2013-04-24 | 2013-11-13 | 南阳二机石油装备(集团)有限公司 | 一种煤层气钻机缓冲传动装置 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105680261A (zh) * | 2016-01-07 | 2016-06-15 | 北京中煤矿山工程有限公司 | 一种二氧化碳致裂器用连接器 |
CN105680261B (zh) * | 2016-01-07 | 2018-01-23 | 北京中煤矿山工程有限公司 | 一种二氧化碳致裂器用连接器 |
CN107035346A (zh) * | 2016-02-04 | 2017-08-11 | 中石化石油工程技术服务有限公司 | 一种用于电缆输送射孔减震器 |
CN106948816A (zh) * | 2017-03-21 | 2017-07-14 | 太原理工大学 | 自动储能高压注液co2相变脉冲煤岩体致裂方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103967995B (zh) | 2015-11-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103967995A (zh) | 矿用液态co2相变致裂装备减震杆及装备 | |
MY169185A (en) | Wire clamp with piezoelectric actuator and method and apparatus for applying a preload force to the piezoelectric actuator | |
CN104078908A (zh) | 一种可调频式充液防振锤 | |
CN104074499A (zh) | 一种压裂杆连接装置 | |
CN104913000A (zh) | 一种带弹性保护的弹簧板 | |
CN104779483B (zh) | 一种防脱插座 | |
CN104696642A (zh) | 带夹紧装置的软管接头 | |
CN203098713U (zh) | 一种新型减震装置 | |
CN203326193U (zh) | 一种防震端子连接器 | |
CN205178434U (zh) | 一种输电线路上的防震锤追回装置 | |
CN204328302U (zh) | 快速接头 | |
CN204152453U (zh) | 防阻卡扶正器 | |
CN204118584U (zh) | 一种更换直线合成绝缘子取销器 | |
CN203334980U (zh) | 钳头抓取机构 | |
CN205714018U (zh) | 一种动力钳的扶正装置 | |
CN208330449U (zh) | 一种气相压裂器材止飞装置 | |
CN204135977U (zh) | 用于钻具拆装的金刚石自由钳结构 | |
CN204139967U (zh) | 造斜扩孔钻具 | |
CN103541654A (zh) | 一种液动冲击器 | |
CN203703366U (zh) | 固定卡箍 | |
CN105402213A (zh) | 一种经济实用的连接装置 | |
CN104617625A (zh) | 一种充电器连接头 | |
CN205765991U (zh) | 轻型电锤的方柄钻头快装*** | |
CN107185234B (zh) | 一种有线游戏控制器信号线与主板的连接结构 | |
RU2016113377A (ru) | Модификация ударной волны в устройстве и способе для ударно-поворотного бурения |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180411 Address after: 415000 Hunan Changde Hanshou Economic Development Zone Tianxing neighborhood committee Golden Road 9 Patentee after: Hunan Hanshou Zhongmei Technology Co.,Ltd. Address before: 415900 No. 3 Ring Road, Longyang Town, Hanshou County, Changde, Hunan Patentee before: Hunan Hanshou Coal Mine Machinery Co., Ltd. |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151125 Termination date: 20210520 |
|
CF01 | Termination of patent right due to non-payment of annual fee |