CN103967286A - Large-sized stone installing and transferring clamp - Google Patents

Large-sized stone installing and transferring clamp Download PDF

Info

Publication number
CN103967286A
CN103967286A CN201410145010.4A CN201410145010A CN103967286A CN 103967286 A CN103967286 A CN 103967286A CN 201410145010 A CN201410145010 A CN 201410145010A CN 103967286 A CN103967286 A CN 103967286A
Authority
CN
China
Prior art keywords
bar
stone material
transferring
adjusting
conveying clamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410145010.4A
Other languages
Chinese (zh)
Inventor
徐庆明
王永
倪超
张世堂
陈丰慧
董克健
方红亚
方腾飞
顾海明
胡美钢
康猛
李飞
李义
李玉
解成红
刘长东
冯遵刚
吴迪
丁燊
付刚
刘卉芸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Gold Mantis Construction Decoration Co Ltd
Original Assignee
Suzhou Gold Mantis Construction Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Gold Mantis Construction Decoration Co Ltd filed Critical Suzhou Gold Mantis Construction Decoration Co Ltd
Priority to CN201410145010.4A priority Critical patent/CN103967286A/en
Publication of CN103967286A publication Critical patent/CN103967286A/en
Pending legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention discloses a large-sized stone installing and transferring clamp which comprises transferring rod assemblies and stone (13), wherein a connecting hole (8) is formed in each transferring rod assembly, the two transferring rod assemblies are arranged in a cross mode and are connected in a rotary mode through the connecting holes (8) and a connecting bolt (7), an angle clamp body (6) is connected to the lower end of each transferring rod assembly, the stone (13) is clamped through the angle clamp bodies (6) during transferring, and each transferring rod assembly comprises an arm strength rod (2), a connecting rod (3), an inner adjusting rod (4) and an outer adjusting rod (5). According to the large-sized stone installing and transferring clamp, using is convenient, safety is guaranteed, large-sized stone installing and transferring efficiency is improved greatly during construction, production efficiency is improved, cost is reduced, safety during production is improved, and competitiveness in domestic and foreign markets is improved.

Description

Large specification stone material is installed conveying clamp
Technical field
The present invention relates to a kind of large specification stone material conveying clamp is installed.
Background technology
Along with social progress, the development of building trade, the use of stone material is more and more, has occurred a large amount of large specification stone materials in the process of construction of indoor and outdoor decorative engineering, landscape engineering, road and bridge engineering, engineering process becomes increasingly complex, changeable, the engineering construction time is shorter and shorter.Up to the present the stone material of large specification is installed carrying also without good instrument and method, mostly will lean on manpower hand to lift transport and installation exercise, the easy fracture damage of product, and carrying personnel require great effort greatly, dangerous, easily hinder operating personnel.How can effectively avoid this problem, development new tool, thus enhance productivity, reduce costs, improve the safety in manufacturing process, strengthen the competitiveness of domestic and international market, could increase wound benefit.
There is following drawback in the conventional stone material conveying clamp using:
1, conventional conveying clamp can only be carried 85 bricks, and conveying clamp is less, and limitation is larger, can only be used for loading and unloading small-sized brick or stone material, is unfavorable for that stone material uses in installation process.
2, in all kinds of engineerings, conventionally large specification stone material is people's carrying often in the process that carrying is installed, because specification is larger, it is more painstaking that carrying is got up, and more difficult in the process of installing, in the situation that a people cannot carry and install, need two people to coordinate, these class methods two people's mismatees can come off from hand, injure human body by a crashing object, and while installation, be easily pressed onto finger, efficiency of construction is extremely low simultaneously.
Summary of the invention
The object of the invention is: provide a kind of large specification stone material that conveying clamp is installed, it is not only easy to use, has safety simultaneously, has greatly improved the installation handling efficiency of large specification stone material in work progress.
Technical scheme of the present invention is: a kind of large specification stone material is installed conveying clamp, and it comprises carrying assembly bar, stone material; On described carrying assembly bar, be provided with connecting hole, two carrying assembly bars are arranged in a crossed manner, be rotatably connected by connecting hole and connecting bolt; Described carrying assembly bar lower end is connected with angle folder, when carrying, by angle clamping stone material.
Below technique scheme is further expalined:
Described carrying assembly bar comprises that arm strength is dry, bar in connecting rod, adjusting, regulate outer bar; The dry lower end of described arm strength and connecting rod one end are fixed; The connecting rod other end is fixed with regulating interior bar one end; What in regulating, the bar other end was adjustable inserts in the outer bar of adjusting; Regulate the outer bar other end and angle clamping fixed.
In described adjusting, on bar and the outer bar of adjusting, be provided with adjustment hole, adjustment hole is inserted with adjusting bolt; In the time regulating, by bar in telescopic adjustment, make adjustment hole alignment, the adjusting bolt that termination is provided with blocked hole inserts in adjustment hole, fixes by clamping bolt.
The dry end of described arm strength is installed on rubber handle.
Described carrying assembly bar is bending.
The section of described angle folder is L shaped.
Advantage of the present invention is: large specification stone material of the present invention is installed conveying clamp, it is not only easy to use, there is safety simultaneously, greatly improve the installation handling efficiency of large specification stone material in work progress, improve production efficiency, reduce cost, improved the safety in manufacturing process, strengthened the competitiveness of domestic and international market.
Brief description of the drawings
Below in conjunction with drawings and Examples, the present invention is described further:
Fig. 1 is the overall structure front perspective view of the embodiment of the present invention;
Fig. 2 is the overall structure side perspective view of the embodiment of the present invention;
Fig. 3 is the carrying assembly bar structural representation of the embodiment of the present invention;
Fig. 4 is the angle clamping structure schematic diagram of the embodiment of the present invention;
Fig. 5 is the connecting bolt structural representation of the embodiment of the present invention;
Fig. 6 is the clamping bolt arrangement schematic diagram of the embodiment of the present invention;
Fig. 7 is the adjusting bolt structural representation of the embodiment of the present invention;
Wherein: 1 rubber handle; 2 arm strengths are dry; 3 connecting rods; 4 regulate interior bar; 5 regulate outer bar; 6 jiaos of folders; 7 connecting bolts; 8 connecting holes; 9 adjusting bolts; 10 adjustment holes; 11 clamping bolts; 12 blocked holes; 13 stone materials.
Detailed description of the invention
Embodiment: as shown in Figure 1: a kind of large specification stone material is installed conveying clamp, it comprises carrying assembly bar, stone material 13.
As shown in Figure 2, on carrying assembly bar, be provided with 8, two carrying assembly bars of connecting hole arranged in a crossed manner, be rotatably connected by connecting hole 8 and connecting bolt 7; Carrying assembly bar lower end is connected with angle folder 6, when carrying, presss from both sides 6 clamping stone materials 13 by angle.
Be illustrated in figure 5 the structural representation of connecting bolt 7.
As shown in Figure 3, carrying assembly bar is bending.Carrying assembly bar comprises that arm strength is dry 2, connecting rod 3, regulate in bar 4, regulate outer bar 5; Dry 2 lower ends of arm strength and connecting rod 3 one end are welded and fixed; Connecting rod 3 other ends are fixed with regulating interior bar 4 one end; What in regulating, bar 4 other ends were adjustable inserts in the outer bar 5 of adjusting; Regulate one end of outer bar 5 to be connected with the middle part of angle folder 6.In regulating, on bar 4 and the outer bar 5 of adjusting, be provided with adjustment hole 10, adjustment hole 10 is inserted with adjusting bolt 9; In the time regulating, by bar in telescopic adjustment 4, adjustment hole 10 is alignd, adjustment hole 10 is inserted brigadier's adjusting bolt 9, clamping bolt 11 is inserted to blocked hole 12 simultaneously its each parts are connected to become to entirety.This partial content is made two covers, and placement is in the other direction inserted two connecting holes 8 fixing to brigadier's connecting bolt 7, and a complete large specification stone material is installed conveying clamp and just completed.
Dry 2 ends of arm strength are installed on rubber handle 1.Two people are used in conjunction with, and hold separately rubber handle 1, regulate the angle of arm strength dry 2, and the setting of rubber handle 1 not only increases the comfort of holding, and prevents landing.In regulating, the setting of bar 4, the outer bar 5 of adjusting can carry out according to the size of stone material 13 length of adjusting rod simultaneously, is convenient to the folder fortune of stone material folder, and meets instructions for use.
As shown in Figure 4, to press from both sides 6 sections be L shaped at angle.
If Fig. 6 is clamping bolt 11 structural representations.
If Fig. 7 is adjusting bolt 9 structural representations.
In specific design and while implementing, the in the situation that of using stone material conveying clamp according to ergonomics under human body standing state, simultaneously calculate conveying clamp entirety specification, model according to the specification of stone material 13 and shape, load; According to large specification stone material, conveying clamp entirety specification is installed, calculates the specifications and models of each parts.Under the state of standing people, determine the length of arm strength bar 2, the bar footpath of calculating arm strength bar 2 according to the carrying specification of stone material 13 and shape, weight, determine the specification of rubber handle 1 according to arm strength bar footpath, for easy to make at the scene, can will regulate outer bar 5 to cancel, bar 4 in adjusting is welded direct on the folder of angle, so not only easy to make, save cost simultaneously, can perfect realize the installation carrying of large specification stone material.
It should be pointed out that for the present invention through absolutely proving, also can there is the embodiment of multiple conversion and remodeling, be not limited to above-mentioned specific embodiment.Above-described embodiment is as just explanation of the present invention, instead of limitation of the present invention.In a word, protection scope of the present invention should comprise those apparent conversion or alternative and remodeling to those skilled in the art.

Claims (6)

1. large specification stone material is installed a conveying clamp, it is characterized in that: it comprises carrying assembly bar, stone material (13); On described carrying assembly bar, be provided with connecting hole (8), two carrying assembly bars are arranged in a crossed manner, be rotatably connected by connecting hole (8) and connecting bolt (7); Described carrying assembly bar lower end is connected with angle folder (6), when carrying, presss from both sides (6) clamping stone materials (13) by angle.
2. large specification stone material according to claim 1 is installed conveying clamp, it is characterized in that: described carrying assembly bar comprise arm strength do (2), connecting rod (3), regulate in bar (4), the outer bar of adjusting (5); Dry (2) lower end of described arm strength and connecting rod (3) one end are fixed; Connecting rod (3) other end is fixed with regulating interior bar (4) one end; What in regulating, bar (4) other end was adjustable inserts in the outer bar of adjusting (5); Regulate outer bar (5) other end and angle folder (6) fixing.
3. large specification stone material according to claim 2 is installed conveying clamp, it is characterized in that: in described adjusting, on bar (4) and the outer bar of adjusting (5), be provided with adjustment hole (10), adjustment hole (10) is inserted with adjusting bolt (9); In the time regulating, by bar in telescopic adjustment (4), make adjustment hole (10) alignment, the adjusting bolt (9) that termination is provided with blocked hole (12) inserts in adjustment hole (10), fixing by clamping bolt (11).
4. large specification stone material according to claim 2 is installed conveying clamp, it is characterized in that: dry (2) end of described arm strength is installed on rubber handle (1).
5. large specification stone material according to claim 1 is installed conveying clamp, it is characterized in that: described carrying assembly bar is bending.
6. large specification stone material according to claim 1 is installed conveying clamp, it is characterized in that: the section of described angle folder (6) is L shaped.
CN201410145010.4A 2014-04-14 2014-04-14 Large-sized stone installing and transferring clamp Pending CN103967286A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410145010.4A CN103967286A (en) 2014-04-14 2014-04-14 Large-sized stone installing and transferring clamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410145010.4A CN103967286A (en) 2014-04-14 2014-04-14 Large-sized stone installing and transferring clamp

Publications (1)

Publication Number Publication Date
CN103967286A true CN103967286A (en) 2014-08-06

Family

ID=51237251

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410145010.4A Pending CN103967286A (en) 2014-04-14 2014-04-14 Large-sized stone installing and transferring clamp

Country Status (1)

Country Link
CN (1) CN103967286A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105108629A (en) * 2015-09-15 2015-12-02 陈楚均 Stone material line polisher and polishing method thereof
CN105836364A (en) * 2016-04-27 2016-08-10 李健 Engineering road repairing device and repairing method through engineering road repairing device
CN109625753A (en) * 2018-12-10 2019-04-16 中国五冶集团有限公司 A kind of stone material handbarrow

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1162251A (en) * 1997-08-26 1999-03-05 Sankyo Trading:Kk Manually holding type hoisting device
CA2555093A1 (en) * 2006-08-01 2008-02-01 Joseph R. Anzaldua Brick gripping device
CN201574588U (en) * 2009-12-25 2010-09-08 金苹果(宁波)汽车部件有限公司 Brick clamping device
CN202450788U (en) * 2012-02-03 2012-09-26 荆长东 Multifunctional brick clip
CN103498564A (en) * 2013-10-22 2014-01-08 太荣兵 Auxiliary kerbstone handling device
CN203795876U (en) * 2014-04-14 2014-08-27 苏州金螳螂建筑装饰股份有限公司 Mounting and carrying clamp for large-sized stones

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1162251A (en) * 1997-08-26 1999-03-05 Sankyo Trading:Kk Manually holding type hoisting device
CA2555093A1 (en) * 2006-08-01 2008-02-01 Joseph R. Anzaldua Brick gripping device
CN201574588U (en) * 2009-12-25 2010-09-08 金苹果(宁波)汽车部件有限公司 Brick clamping device
CN202450788U (en) * 2012-02-03 2012-09-26 荆长东 Multifunctional brick clip
CN103498564A (en) * 2013-10-22 2014-01-08 太荣兵 Auxiliary kerbstone handling device
CN203795876U (en) * 2014-04-14 2014-08-27 苏州金螳螂建筑装饰股份有限公司 Mounting and carrying clamp for large-sized stones

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105108629A (en) * 2015-09-15 2015-12-02 陈楚均 Stone material line polisher and polishing method thereof
CN105836364A (en) * 2016-04-27 2016-08-10 李健 Engineering road repairing device and repairing method through engineering road repairing device
CN105836364B (en) * 2016-04-27 2018-02-02 李健 A kind of method that utilizing works road maintenance device carries out road maintenance
CN109625753A (en) * 2018-12-10 2019-04-16 中国五冶集团有限公司 A kind of stone material handbarrow

Similar Documents

Publication Publication Date Title
CN204645024U (en) Pile foundation steel bar cage skeleton processing moulding bed
CN103967286A (en) Large-sized stone installing and transferring clamp
CN203795876U (en) Mounting and carrying clamp for large-sized stones
CN202192565U (en) Adjustable fixture for fixing workpieces
CN206654438U (en) A kind of construction site carrying brick clamping device
CN205778885U (en) A kind of shield machine reaction frame
CN204435674U (en) A kind of pin-connected panel column
CN206888517U (en) A kind of cast-in-place support component for building
CN203794430U (en) Lifting appliance for binding vertical reinforcing steel bars
CN204983681U (en) Novel reinforcing bar hopper
CN207657178U (en) A kind of TGXG tensioner
CN203958199U (en) A kind of floor truck for round charging basket
CN203475834U (en) Passing opening clamp for construction of cast-in-place concrete wall
CN204726468U (en) A kind of clean area transport carriage
CN203959647U (en) Whole spelling formula wood formwork plate hoisting ring
CN107201826A (en) A kind of new type formwork reinforcement tools
CN207392054U (en) Side stand group in portable concreting in lifts mould bases
CN209079945U (en) A kind of novel transporting device for semi-finished product small-sized precast block
CN203448583U (en) Straightening barrel of waste steel wire straightening machine
CN206487143U (en) Fixed handle
CN210412294U (en) Simple and easy bar straightening device
CN207988559U (en) A kind of template fixed support device of construction
CN207295538U (en) A kind of road closed structure of municipal administration
CN207486218U (en) A kind of portable dismounting connector of pipeline construction
CN207647277U (en) Electric pole

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20140806

RJ01 Rejection of invention patent application after publication