CN103967286A - Large-sized stone installing and transferring clamp - Google Patents
Large-sized stone installing and transferring clamp Download PDFInfo
- Publication number
- CN103967286A CN103967286A CN201410145010.4A CN201410145010A CN103967286A CN 103967286 A CN103967286 A CN 103967286A CN 201410145010 A CN201410145010 A CN 201410145010A CN 103967286 A CN103967286 A CN 103967286A
- Authority
- CN
- China
- Prior art keywords
- bar
- stone material
- transferring
- adjusting
- conveying clamp
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The invention discloses a large-sized stone installing and transferring clamp which comprises transferring rod assemblies and stone (13), wherein a connecting hole (8) is formed in each transferring rod assembly, the two transferring rod assemblies are arranged in a cross mode and are connected in a rotary mode through the connecting holes (8) and a connecting bolt (7), an angle clamp body (6) is connected to the lower end of each transferring rod assembly, the stone (13) is clamped through the angle clamp bodies (6) during transferring, and each transferring rod assembly comprises an arm strength rod (2), a connecting rod (3), an inner adjusting rod (4) and an outer adjusting rod (5). According to the large-sized stone installing and transferring clamp, using is convenient, safety is guaranteed, large-sized stone installing and transferring efficiency is improved greatly during construction, production efficiency is improved, cost is reduced, safety during production is improved, and competitiveness in domestic and foreign markets is improved.
Description
Technical field
The present invention relates to a kind of large specification stone material conveying clamp is installed.
Background technology
Along with social progress, the development of building trade, the use of stone material is more and more, has occurred a large amount of large specification stone materials in the process of construction of indoor and outdoor decorative engineering, landscape engineering, road and bridge engineering, engineering process becomes increasingly complex, changeable, the engineering construction time is shorter and shorter.Up to the present the stone material of large specification is installed carrying also without good instrument and method, mostly will lean on manpower hand to lift transport and installation exercise, the easy fracture damage of product, and carrying personnel require great effort greatly, dangerous, easily hinder operating personnel.How can effectively avoid this problem, development new tool, thus enhance productivity, reduce costs, improve the safety in manufacturing process, strengthen the competitiveness of domestic and international market, could increase wound benefit.
There is following drawback in the conventional stone material conveying clamp using:
1, conventional conveying clamp can only be carried 85 bricks, and conveying clamp is less, and limitation is larger, can only be used for loading and unloading small-sized brick or stone material, is unfavorable for that stone material uses in installation process.
2, in all kinds of engineerings, conventionally large specification stone material is people's carrying often in the process that carrying is installed, because specification is larger, it is more painstaking that carrying is got up, and more difficult in the process of installing, in the situation that a people cannot carry and install, need two people to coordinate, these class methods two people's mismatees can come off from hand, injure human body by a crashing object, and while installation, be easily pressed onto finger, efficiency of construction is extremely low simultaneously.
Summary of the invention
The object of the invention is: provide a kind of large specification stone material that conveying clamp is installed, it is not only easy to use, has safety simultaneously, has greatly improved the installation handling efficiency of large specification stone material in work progress.
Technical scheme of the present invention is: a kind of large specification stone material is installed conveying clamp, and it comprises carrying assembly bar, stone material; On described carrying assembly bar, be provided with connecting hole, two carrying assembly bars are arranged in a crossed manner, be rotatably connected by connecting hole and connecting bolt; Described carrying assembly bar lower end is connected with angle folder, when carrying, by angle clamping stone material.
Below technique scheme is further expalined:
Described carrying assembly bar comprises that arm strength is dry, bar in connecting rod, adjusting, regulate outer bar; The dry lower end of described arm strength and connecting rod one end are fixed; The connecting rod other end is fixed with regulating interior bar one end; What in regulating, the bar other end was adjustable inserts in the outer bar of adjusting; Regulate the outer bar other end and angle clamping fixed.
In described adjusting, on bar and the outer bar of adjusting, be provided with adjustment hole, adjustment hole is inserted with adjusting bolt; In the time regulating, by bar in telescopic adjustment, make adjustment hole alignment, the adjusting bolt that termination is provided with blocked hole inserts in adjustment hole, fixes by clamping bolt.
The dry end of described arm strength is installed on rubber handle.
Described carrying assembly bar is bending.
The section of described angle folder is L shaped.
Advantage of the present invention is: large specification stone material of the present invention is installed conveying clamp, it is not only easy to use, there is safety simultaneously, greatly improve the installation handling efficiency of large specification stone material in work progress, improve production efficiency, reduce cost, improved the safety in manufacturing process, strengthened the competitiveness of domestic and international market.
Brief description of the drawings
Below in conjunction with drawings and Examples, the present invention is described further:
Fig. 1 is the overall structure front perspective view of the embodiment of the present invention;
Fig. 2 is the overall structure side perspective view of the embodiment of the present invention;
Fig. 3 is the carrying assembly bar structural representation of the embodiment of the present invention;
Fig. 4 is the angle clamping structure schematic diagram of the embodiment of the present invention;
Fig. 5 is the connecting bolt structural representation of the embodiment of the present invention;
Fig. 6 is the clamping bolt arrangement schematic diagram of the embodiment of the present invention;
Fig. 7 is the adjusting bolt structural representation of the embodiment of the present invention;
Wherein: 1 rubber handle; 2 arm strengths are dry; 3 connecting rods; 4 regulate interior bar; 5 regulate outer bar; 6 jiaos of folders; 7 connecting bolts; 8 connecting holes; 9 adjusting bolts; 10 adjustment holes; 11 clamping bolts; 12 blocked holes; 13 stone materials.
Detailed description of the invention
Embodiment: as shown in Figure 1: a kind of large specification stone material is installed conveying clamp, it comprises carrying assembly bar, stone material 13.
As shown in Figure 2, on carrying assembly bar, be provided with 8, two carrying assembly bars of connecting hole arranged in a crossed manner, be rotatably connected by connecting hole 8 and connecting bolt 7; Carrying assembly bar lower end is connected with angle folder 6, when carrying, presss from both sides 6 clamping stone materials 13 by angle.
Be illustrated in figure 5 the structural representation of connecting bolt 7.
As shown in Figure 3, carrying assembly bar is bending.Carrying assembly bar comprises that arm strength is dry 2, connecting rod 3, regulate in bar 4, regulate outer bar 5; Dry 2 lower ends of arm strength and connecting rod 3 one end are welded and fixed; Connecting rod 3 other ends are fixed with regulating interior bar 4 one end; What in regulating, bar 4 other ends were adjustable inserts in the outer bar 5 of adjusting; Regulate one end of outer bar 5 to be connected with the middle part of angle folder 6.In regulating, on bar 4 and the outer bar 5 of adjusting, be provided with adjustment hole 10, adjustment hole 10 is inserted with adjusting bolt 9; In the time regulating, by bar in telescopic adjustment 4, adjustment hole 10 is alignd, adjustment hole 10 is inserted brigadier's adjusting bolt 9, clamping bolt 11 is inserted to blocked hole 12 simultaneously its each parts are connected to become to entirety.This partial content is made two covers, and placement is in the other direction inserted two connecting holes 8 fixing to brigadier's connecting bolt 7, and a complete large specification stone material is installed conveying clamp and just completed.
Dry 2 ends of arm strength are installed on rubber handle 1.Two people are used in conjunction with, and hold separately rubber handle 1, regulate the angle of arm strength dry 2, and the setting of rubber handle 1 not only increases the comfort of holding, and prevents landing.In regulating, the setting of bar 4, the outer bar 5 of adjusting can carry out according to the size of stone material 13 length of adjusting rod simultaneously, is convenient to the folder fortune of stone material folder, and meets instructions for use.
As shown in Figure 4, to press from both sides 6 sections be L shaped at angle.
If Fig. 6 is clamping bolt 11 structural representations.
If Fig. 7 is adjusting bolt 9 structural representations.
In specific design and while implementing, the in the situation that of using stone material conveying clamp according to ergonomics under human body standing state, simultaneously calculate conveying clamp entirety specification, model according to the specification of stone material 13 and shape, load; According to large specification stone material, conveying clamp entirety specification is installed, calculates the specifications and models of each parts.Under the state of standing people, determine the length of arm strength bar 2, the bar footpath of calculating arm strength bar 2 according to the carrying specification of stone material 13 and shape, weight, determine the specification of rubber handle 1 according to arm strength bar footpath, for easy to make at the scene, can will regulate outer bar 5 to cancel, bar 4 in adjusting is welded direct on the folder of angle, so not only easy to make, save cost simultaneously, can perfect realize the installation carrying of large specification stone material.
It should be pointed out that for the present invention through absolutely proving, also can there is the embodiment of multiple conversion and remodeling, be not limited to above-mentioned specific embodiment.Above-described embodiment is as just explanation of the present invention, instead of limitation of the present invention.In a word, protection scope of the present invention should comprise those apparent conversion or alternative and remodeling to those skilled in the art.
Claims (6)
1. large specification stone material is installed a conveying clamp, it is characterized in that: it comprises carrying assembly bar, stone material (13); On described carrying assembly bar, be provided with connecting hole (8), two carrying assembly bars are arranged in a crossed manner, be rotatably connected by connecting hole (8) and connecting bolt (7); Described carrying assembly bar lower end is connected with angle folder (6), when carrying, presss from both sides (6) clamping stone materials (13) by angle.
2. large specification stone material according to claim 1 is installed conveying clamp, it is characterized in that: described carrying assembly bar comprise arm strength do (2), connecting rod (3), regulate in bar (4), the outer bar of adjusting (5); Dry (2) lower end of described arm strength and connecting rod (3) one end are fixed; Connecting rod (3) other end is fixed with regulating interior bar (4) one end; What in regulating, bar (4) other end was adjustable inserts in the outer bar of adjusting (5); Regulate outer bar (5) other end and angle folder (6) fixing.
3. large specification stone material according to claim 2 is installed conveying clamp, it is characterized in that: in described adjusting, on bar (4) and the outer bar of adjusting (5), be provided with adjustment hole (10), adjustment hole (10) is inserted with adjusting bolt (9); In the time regulating, by bar in telescopic adjustment (4), make adjustment hole (10) alignment, the adjusting bolt (9) that termination is provided with blocked hole (12) inserts in adjustment hole (10), fixing by clamping bolt (11).
4. large specification stone material according to claim 2 is installed conveying clamp, it is characterized in that: dry (2) end of described arm strength is installed on rubber handle (1).
5. large specification stone material according to claim 1 is installed conveying clamp, it is characterized in that: described carrying assembly bar is bending.
6. large specification stone material according to claim 1 is installed conveying clamp, it is characterized in that: the section of described angle folder (6) is L shaped.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410145010.4A CN103967286A (en) | 2014-04-14 | 2014-04-14 | Large-sized stone installing and transferring clamp |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410145010.4A CN103967286A (en) | 2014-04-14 | 2014-04-14 | Large-sized stone installing and transferring clamp |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103967286A true CN103967286A (en) | 2014-08-06 |
Family
ID=51237251
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410145010.4A Pending CN103967286A (en) | 2014-04-14 | 2014-04-14 | Large-sized stone installing and transferring clamp |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103967286A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105108629A (en) * | 2015-09-15 | 2015-12-02 | 陈楚均 | Stone material line polisher and polishing method thereof |
CN105836364A (en) * | 2016-04-27 | 2016-08-10 | 李健 | Engineering road repairing device and repairing method through engineering road repairing device |
CN109625753A (en) * | 2018-12-10 | 2019-04-16 | 中国五冶集团有限公司 | A kind of stone material handbarrow |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1162251A (en) * | 1997-08-26 | 1999-03-05 | Sankyo Trading:Kk | Manually holding type hoisting device |
CA2555093A1 (en) * | 2006-08-01 | 2008-02-01 | Joseph R. Anzaldua | Brick gripping device |
CN201574588U (en) * | 2009-12-25 | 2010-09-08 | 金苹果(宁波)汽车部件有限公司 | Brick clamping device |
CN202450788U (en) * | 2012-02-03 | 2012-09-26 | 荆长东 | Multifunctional brick clip |
CN103498564A (en) * | 2013-10-22 | 2014-01-08 | 太荣兵 | Auxiliary kerbstone handling device |
CN203795876U (en) * | 2014-04-14 | 2014-08-27 | 苏州金螳螂建筑装饰股份有限公司 | Mounting and carrying clamp for large-sized stones |
-
2014
- 2014-04-14 CN CN201410145010.4A patent/CN103967286A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1162251A (en) * | 1997-08-26 | 1999-03-05 | Sankyo Trading:Kk | Manually holding type hoisting device |
CA2555093A1 (en) * | 2006-08-01 | 2008-02-01 | Joseph R. Anzaldua | Brick gripping device |
CN201574588U (en) * | 2009-12-25 | 2010-09-08 | 金苹果(宁波)汽车部件有限公司 | Brick clamping device |
CN202450788U (en) * | 2012-02-03 | 2012-09-26 | 荆长东 | Multifunctional brick clip |
CN103498564A (en) * | 2013-10-22 | 2014-01-08 | 太荣兵 | Auxiliary kerbstone handling device |
CN203795876U (en) * | 2014-04-14 | 2014-08-27 | 苏州金螳螂建筑装饰股份有限公司 | Mounting and carrying clamp for large-sized stones |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105108629A (en) * | 2015-09-15 | 2015-12-02 | 陈楚均 | Stone material line polisher and polishing method thereof |
CN105836364A (en) * | 2016-04-27 | 2016-08-10 | 李健 | Engineering road repairing device and repairing method through engineering road repairing device |
CN105836364B (en) * | 2016-04-27 | 2018-02-02 | 李健 | A kind of method that utilizing works road maintenance device carries out road maintenance |
CN109625753A (en) * | 2018-12-10 | 2019-04-16 | 中国五冶集团有限公司 | A kind of stone material handbarrow |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204645024U (en) | Pile foundation steel bar cage skeleton processing moulding bed | |
CN103967286A (en) | Large-sized stone installing and transferring clamp | |
CN203795876U (en) | Mounting and carrying clamp for large-sized stones | |
CN202192565U (en) | Adjustable fixture for fixing workpieces | |
CN206654438U (en) | A kind of construction site carrying brick clamping device | |
CN205778885U (en) | A kind of shield machine reaction frame | |
CN204435674U (en) | A kind of pin-connected panel column | |
CN206888517U (en) | A kind of cast-in-place support component for building | |
CN203794430U (en) | Lifting appliance for binding vertical reinforcing steel bars | |
CN204983681U (en) | Novel reinforcing bar hopper | |
CN207657178U (en) | A kind of TGXG tensioner | |
CN203958199U (en) | A kind of floor truck for round charging basket | |
CN203475834U (en) | Passing opening clamp for construction of cast-in-place concrete wall | |
CN204726468U (en) | A kind of clean area transport carriage | |
CN203959647U (en) | Whole spelling formula wood formwork plate hoisting ring | |
CN107201826A (en) | A kind of new type formwork reinforcement tools | |
CN207392054U (en) | Side stand group in portable concreting in lifts mould bases | |
CN209079945U (en) | A kind of novel transporting device for semi-finished product small-sized precast block | |
CN203448583U (en) | Straightening barrel of waste steel wire straightening machine | |
CN206487143U (en) | Fixed handle | |
CN210412294U (en) | Simple and easy bar straightening device | |
CN207988559U (en) | A kind of template fixed support device of construction | |
CN207295538U (en) | A kind of road closed structure of municipal administration | |
CN207486218U (en) | A kind of portable dismounting connector of pipeline construction | |
CN207647277U (en) | Electric pole |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140806 |
|