CN103952970A - Oversized pier-position pull rod and foundation structure - Google Patents

Oversized pier-position pull rod and foundation structure Download PDF

Info

Publication number
CN103952970A
CN103952970A CN201410151773.XA CN201410151773A CN103952970A CN 103952970 A CN103952970 A CN 103952970A CN 201410151773 A CN201410151773 A CN 201410151773A CN 103952970 A CN103952970 A CN 103952970A
Authority
CN
China
Prior art keywords
pull rod
bridge
pier
pull bar
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410151773.XA
Other languages
Chinese (zh)
Other versions
CN103952970B (en
Inventor
韩振勇
张振学
崔志刚
仇高山
李杲
洪全
郭会国
汤洪雁
陈占良
陈惟珍
马玉洲
徐建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN URBAN CONSTRUCTION DESIGN INSTITUTE Co Ltd
Original Assignee
TIANJIN URBAN CONSTRUCTION DESIGN INSTITUTE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN URBAN CONSTRUCTION DESIGN INSTITUTE Co Ltd filed Critical TIANJIN URBAN CONSTRUCTION DESIGN INSTITUTE Co Ltd
Priority to CN201410151773.XA priority Critical patent/CN103952970B/en
Publication of CN103952970A publication Critical patent/CN103952970A/en
Application granted granted Critical
Publication of CN103952970B publication Critical patent/CN103952970B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to an oversized pier-position pull rod and foundation structure, comprising a pull rod, a pull rod upper lifting lug, a pull rod lower lifting lug, a pull rod cross beam, a reinforcing rib and a pull rod foundation, wherein the upper lifting lug is connected with a main beam, the lower lifting lug is connected with a lower bearing platform, a pile foundation is arranged below the lower bearing platform, and the pull rod is connected with the upper part and the lower part of a bridge through dowels. The pull rod and the foundation are arranged at a side span of an arch bridge, so that vertical counter forces of the side span are directly balanced, and the negative counter forces of abutment piers are avoided. An abutment pier support is changed into a common compression support from a tensile support, so that subsequent support replacement is facilitated, and the time and the expense for replacing the support are reduced. Through adopting the oversized pier-position pull rod and foundation structure, the span of the side span is reduced, the bending moment and the shearing force of the side span are lowered, the design difficulty of the side span is lowered, and the engineering cost of the side span and the main beam is reduced. The oversized pier-position pull rod is arranged in the transverse direction of the bridge according to the overall width of the bridge, so that the restriction force of the bridge in the transverse direction of the bridge is stronger, the distribution of a natural vibration mode of the bridge is changed, and the occurrence of a torsional mode is retarded.

Description

Super large pier position pull bar and foundation structure
Technical field
The present invention relates to a kind of super large pier position pull bar and foundation structure.
Background technology
In bridge construction, arch bridge, as one of the most basic structural system, has unique glamour.In modern arch bridge, fly the favor that swallow arch is received people more and more.Be subject to landform, neighboring buildings conditioned disjunction to build demand attractive in appearance, fly the general main span of swallow arch bridge very large, end bay is relatively little, to reach good architectural effect.This makes arranging across footpath of arch bridge out of proportion, and negative reaction easily appears in end bay buttress place.At abutment pier, occur that negative reaction is that bridge design is reluctant.At end bay, occur negative reaction, if adopt stretching resistance bearing scheme, due to the design period much smaller than bridge bearing service life, with the replacing of rear support, be difficult to again realize, pulling force bearing is not a kind of good solution.At end bay, occur negative reaction, the conventional form of ballast that adopts solves, but because end bay is relatively short, deck-molding is limited, and under least favorable load case, ballast is difficult to solve the problem of end bay negative reaction.
Summary of the invention
The object of the present invention is to provide a kind of super large pier position pull bar and foundation structure, can overcome above-mentioned the deficiencies in the prior art, this super large pier position pull bar and foundation structure have solved the problem of abutment pier negative reaction, reduced simultaneously end bay across footpath, reduced the bending and shearing of end bay.The present invention is by arch bridge end bay place, powerful pull bar being set, and under pull bar, cushion cap and pile foundation is set, and forms powerful tension system, solved the technical problem that flies swallow arch bridge abutment pier negative reaction.The present invention reduced end bay across footpath, reduced the bending and shearing of end bay, reduced the design difficulty of end bay, reduce end bay girder construction costs.Super large pier position pull bar arranges that at direction across bridge pressing bridge overall with arranges, makes bridge more powerful in direction across bridge constraint, has changed the distribution of bridge static mode, has delayed the appearance of torsion mode.
Super large pier position pull bar provided by the invention and foundation structure mainly comprise pull bar, upper hanger, pin, pull bar, lower hanger, pin, bottom foundation platform and pile foundation.Upper hanger is connected with girder, and lower hanger is connected with bottom cushion cap, under cushion cap, pile foundation is set, and pull bar couples together the top and the bottom of bridge by pin.
The vertical counter-force of super large pier position pull bar provided by the invention and the direct balance end bay of foundation structure, has avoided the appearance of abutment pier negative reaction.Abutment pier bearing becomes general resistance to compression bearing from mode tensile supporting seat, facilitates later bearing replacement, and reduces time and the expense of changing bearing, and resistance to compression bearing is compared with mode tensile supporting seat in addition, and cost and application life all will get well.By super large pier position pull bar and basis, reduced end bay across footpath, reduced the bending and shearing of end bay, reduced the design difficulty of end bay, reduce end bay girder construction costs.Super large pier position pull bar arranges that at direction across bridge pressing bridge overall with arranges, makes bridge more powerful in direction across bridge constraint, has changed the distribution of bridge static mode, has delayed the appearance of torsion mode.
Accompanying drawing explanation
Fig. 1 is integral bridge structural representation of the present invention.
Fig. 2 is each position connection diagram of the present invention.
Fig. 3 is pull bar of the present invention.
Fig. 4 is upper hanger of the present invention.
Fig. 5 is lower hanger of the present invention.
Fig. 6 is pin of the present invention.
Fig. 7 is bottom of the present invention foundation platform.
The specific embodiment
The present invention is described in detail as follows with reference to accompanying drawing, it should be noted that the accessory using in the present invention do not indicate especially in situation and be commercially available prod.Do not have the structure indicating all to adopt known element structure and manufactured materials.The present embodiment is descriptive, is not determinate, can not limit thus protection scope of the present invention.
As shown in the figure: 1, main arch, 2, girder, 3, pull bar, 4, upper hanger, 5, lower hanger, 6, pin, 7, bottom foundation platform, 8, abutment pier bearing (tension/resistance to compression).
Super large pier position pull bar provided by the invention and foundation structure mainly comprise: main arch 1, girder 2, pull bar 3, upper hanger 4, lower hanger 5, pin 6, cushion cap 7.
As shown in Figure 1, a kind of super large pier position Tiebar structure is set between the reverse diagonal brace of end bay span centre and abutment pier, in order to reduce end bay internal force, realizes the balance of bridge construction on support reaction, increase bridge in the constraint of direction across bridge simultaneously, realize the lateral stability of bridge construction.
As shown in Figure 2 be a kind of super large pier position Tiebar structure, comprise pull bar 3, upper hanger 4, lower hanger 5, pin 6, bottom foundation platform 7.Upper hanger 4 is connected with girder 1, and lower hanger 5 is connected with bottom foundation platform 7, and cushion cap arranges pile foundation 7 times, and pull bar 3 couples together the top and the bottom of bridge by pin 6.
Super large pier position pull bar provided by the invention and hanger need to machine by design drawing and universal method in steel work processing factory, are transported to job site.Because pull bar need to bear the pulling force that bridge design load produces, the installation of pull bar was installed before girder and main arch carrying.First be the construction on basis, main bridge bottom, comprise pull bar basis, and hanger built-in fitting under pull bar is installed.Set up main arch and girder full framing, the gravity load of bridge should be born by support.The upper hanger of pull bar top girder has welded in engineering in advance, the girder of constructing in order, and pull bar and main arch are installed.After all bridge members install, from main span span centre, sequentially tear frame open, make pull bar progressively bear bridge load.
The invention provides a kind of super large pier position pull bar and foundation structure, comprise on pull bar, pull bar hanger under hanger, pull bar, pull bar crossbeam, stiffening rib and pull bar basis; Upper hanger is connected with girder, and lower hanger is connected with bottom cushion cap, under cushion cap, pile foundation is set, and pull bar connects the top and the bottom of bridge by pin.
The present invention is by arch bridge end bay place, pull bar and basis being set, and directly the vertical counter-force of balance end bay, has avoided the appearance of abutment pier negative reaction.Abutment pier bearing becomes general resistance to compression bearing from mode tensile supporting seat, facilitates later bearing replacement, and reduces time and the expense of changing bearing, and resistance to compression bearing is compared with mode tensile supporting seat in addition, and cost and application life all will get well.By super large pier position pull bar and basis, reduced end bay across footpath, reduced the bending and shearing of end bay, reduced the design difficulty of end bay, reduce end bay girder construction costs.Super large pier position pull bar arranges that at direction across bridge pressing bridge overall with arranges, makes bridge more powerful in direction across bridge constraint, has changed the distribution of bridge static mode, has delayed the appearance of torsion mode.

Claims (1)

1. large pier position pull bar and a foundation structure, is characterized in that it mainly comprises pull bar, upper hanger, pin, pull bar, lower hanger, pin, bottom foundation platform and pile foundation; Upper hanger is connected with girder, and lower hanger is connected with bottom cushion cap, under cushion cap, pile foundation is set, and pull bar connects the top and the bottom of bridge by pin.
CN201410151773.XA 2014-04-16 2014-04-16 Oversized pier-position pull rod and foundation structure Active CN103952970B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410151773.XA CN103952970B (en) 2014-04-16 2014-04-16 Oversized pier-position pull rod and foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410151773.XA CN103952970B (en) 2014-04-16 2014-04-16 Oversized pier-position pull rod and foundation structure

Publications (2)

Publication Number Publication Date
CN103952970A true CN103952970A (en) 2014-07-30
CN103952970B CN103952970B (en) 2017-02-01

Family

ID=51330307

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410151773.XA Active CN103952970B (en) 2014-04-16 2014-04-16 Oversized pier-position pull rod and foundation structure

Country Status (1)

Country Link
CN (1) CN103952970B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104120658A (en) * 2014-08-01 2014-10-29 武船重型工程股份有限公司 Machining method of space warping bridge and space warping bridge
CN106065562A (en) * 2016-07-06 2016-11-02 中铁二院工程集团有限责任公司 Bridge rigid pulling force is put
CN113605232A (en) * 2021-08-03 2021-11-05 中铁大桥勘测设计院集团有限公司 Inhaul cable weight structure and design method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2040245C3 (en) * 1970-08-13 1979-04-12 Industriewerk Schaeffler Ohg, 8522 Herzogenaurach Device for centering the pins of a universal joint in the fork eyes of the fork arms of a cardan shaft
DE2556769B1 (en) * 1975-12-17 1976-12-23 Loehr & Bromkamp Gmbh SEAL FOR SEALING A UNIVERSAL JOINT
CN201151874Y (en) * 2008-01-22 2008-11-19 中交第二公路勘察设计研究院有限公司 Rope-suspension bridge suspending rod type support device
CN103132462B (en) * 2013-03-08 2015-06-24 中国建筑第六工程局有限公司 Combination tool for controlling down-warping of components and installation and usage method of combination tool
CN103614966B (en) * 2013-11-21 2015-08-12 中交第二航务工程局有限公司 Suspension bridge steel box-girder hoisting appliance
CN204112210U (en) * 2014-04-16 2015-01-21 天津城建设计院有限公司 Super large pier position pull bar and foundation structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104120658A (en) * 2014-08-01 2014-10-29 武船重型工程股份有限公司 Machining method of space warping bridge and space warping bridge
CN104120658B (en) * 2014-08-01 2016-04-13 武船重型工程股份有限公司 A kind of spatial warping bridge processing method and spatial warping bridge
CN106065562A (en) * 2016-07-06 2016-11-02 中铁二院工程集团有限责任公司 Bridge rigid pulling force is put
CN113605232A (en) * 2021-08-03 2021-11-05 中铁大桥勘测设计院集团有限公司 Inhaul cable weight structure and design method

Also Published As

Publication number Publication date
CN103952970B (en) 2017-02-01

Similar Documents

Publication Publication Date Title
CN203904851U (en) Continuous beam side span straight section hanger support system
CN202688888U (en) Deck type reversely hung template hanging frame
CN102021889A (en) Bridge erection method
CN105332452A (en) Dragline curtain wall support system with steel truss at top and construction method thereof
CN202787047U (en) Deck type triangular steel truss composite beam
CN103952970A (en) Oversized pier-position pull rod and foundation structure
CN106760073A (en) Assembly concrete lining structural assembly
CN102425099B (en) Large cantilever wave-purlin combined PC bridge and manufacture method thereof
CN104047234A (en) Self load bearing side span closure construction method for corrugated steel web plate continuous rigid frame bridge
CN103898834A (en) Concrete-filled steel tube composite beam and trussed cable tower cable-stayed bridge and construction method thereof
CN103835238B (en) A kind of high pier cable stayed bridge No. 0 block non-stand construction method and the structure in constructing
CN203403558U (en) Shear wall
CN106906750B (en) Multi-functional across the railway line swing bridge girder closing construction mould bases of one kind and its construction method
CN203546599U (en) Pier-side bracket
CN104847016A (en) Suspending transfer layer of stayed cable beam
CN206052554U (en) A kind of Construction Supporting System for square twin columns great cantilever bent cap
CN104695317A (en) Multi-span rigid frame bowstring arch bridge
CN204112210U (en) Super large pier position pull bar and foundation structure
CN204266394U (en) The semi-girder damping system of the rear Self-resetting of shake is realized in super highrise building
CN204475179U (en) Bridge construction Cast-in-situ Beam, bent cap, binder concrete attaching prestressed girder support
CN106638265A (en) Steel reinforced concrete beam rigid framework bridge
CN103669193B (en) A kind of laterally assembled Wavelike steel webplate combination T beam and construction method
CN206599729U (en) A kind of Single column pier bridge anti-overturning devices based on structure self-balancing
CN104562937A (en) Temporary hinged structure for arched continuous beam bridge, as well as construction method thereof
CN204509972U (en) Multispan rigid framed arch

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant