CN103950811A - People and cargo elevator mounting structure of complicated external building structure and mounting method thereof - Google Patents
People and cargo elevator mounting structure of complicated external building structure and mounting method thereof Download PDFInfo
- Publication number
- CN103950811A CN103950811A CN201410175491.3A CN201410175491A CN103950811A CN 103950811 A CN103950811 A CN 103950811A CN 201410175491 A CN201410175491 A CN 201410175491A CN 103950811 A CN103950811 A CN 103950811A
- Authority
- CN
- China
- Prior art keywords
- building structure
- people
- complicated appearance
- sustaining wall
- appearance building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 12
- 230000007246 mechanism Effects 0.000 claims abstract description 28
- 229910000831 Steel Inorganic materials 0.000 claims description 25
- 239000010959 steel Substances 0.000 claims description 25
- 238000010276 construction Methods 0.000 claims description 19
- 238000009434 installation Methods 0.000 claims description 12
- 230000003014 reinforcing effect Effects 0.000 claims description 7
- 238000000926 separation method Methods 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 abstract 1
- 239000010410 layer Substances 0.000 description 40
- 230000008901 benefit Effects 0.000 description 4
- 230000007812 deficiency Effects 0.000 description 4
- 230000001788 irregular Effects 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 239000004566 building material Substances 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000011900 installation process Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000032258 transport Effects 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 240000007594 Oryza sativa Species 0.000 description 1
- 235000007164 Oryza sativa Nutrition 0.000 description 1
- 238000004873 anchoring Methods 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 239000011229 interlayer Substances 0.000 description 1
- 235000009566 rice Nutrition 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a people and cargo elevator mounting structure of a complicated external building structure and a mounting method thereof. The people and cargo elevator mounting structure comprises a plurality of connection structures, wherein each connection structure comprises an additional sustaining wall rack, an inclined strut and a landing gap bridge mechanism; two ends of the additional sustaining wall rack are fixedly connected with a corresponding layer structure of the complicated external building structure and a corresponding own sustaining wall rack of a people and cargo elevator respectively; one end of the inclined strut supports the additional sustaining wall rack, and the other end of the inclined strut is fixedly connected with a next layer structure of the complicated external building structure; one end of the landing gap bridge mechanism is fixedly connected with the complicated external building structure; the landing gap bridge mechanism is arranged above the additional sustaining wall rack and the own sustaining wall rack; the lengths of the additional sustaining wall racks in all the connection structures are set according to distances between all the own sustaining wall racks and the corresponding layer structures of the complicated external building structure; the shortcoming of the length of the own sustaining wall rack of a people and cargo elevator is overcome, the safety and the stability of the people and cargo elevator are guaranteed, the on-site operation is facilitated, the mounting progress of the people and cargo elevator can be accelerated, and the engineering manufacturing cost can be lowered.
Description
Technical field
The present invention relates to the realm of building construction, relate in particular to a kind of people's Cargo Lift mounting structure and installation method thereof of complicated appearance building structure.
Background technology
At present, structure external form is changed to little building structure, self sustaining wall frame (being sustaining wall support) of conventional people's Cargo Lift can regulate self length within the specific limits, or can make people's Cargo Lift guide rail bracket slant setting of people's Cargo Lift, remain in the scope that sustaining wall frame allows with structure sideline.Described self sustaining wall frame is horizontally disposed with, and its one end is fixedly connected with people's Cargo Lift guide rail bracket, and the other end is connected with the respective layer structure of building structure.Cage moves up and down along people's Cargo Lift guide rail bracket, transports workmen and building materials.
But for the peculiarly shaped building of topside, its structure sideline is irregular curve, interlayer turnover is very large, causes the length of original self the sustaining wall frame of people's Cargo Lift cannot meet the requirement of existing engineering actual distance.
At present main handling is factory's custom-made with people's Cargo Lift of self sustaining wall frame of various Len reqs or in the reserved construction of each structure wallboard hole.For the former, factory's custom-made not only can affect job schedule, and produce in factory is acquired a certain degree of difficulty, and can cause cost significantly to increase.For the latter, the reserved construction of wallboard hole, not only location difficulty, work progress inconvenience, and also later stage repairing quality is difficult to ensure.
Therefore, how to provide a kind of solution to change compared with the people's Cargo Lift construction difficult problem causing greatly because of structure external form, execute-in-place is convenient, guarantee structural safety firm, can accelerating construction progress and people's Cargo Lift mounting structure and the installation method thereof that can reduce the complicated appearance building structure of construction costs be this area technical matters urgently to be resolved hurrily.
Summary of the invention
The present invention solves complicated appearance building structure to change compared with the people's Cargo Lift construction difficult problem causing greatly because of structure external form, can people's Cargo Lift is safe, the outside that is installed on firmly, easily complicated appearance building structure.
To achieve the above object, the present invention adopts following technical scheme:
A kind of people's Cargo Lift mounting structure of complicated appearance building structure, for people's Cargo Lift being installed on to a side of complicated appearance building structure, described people's Cargo Lift comprises people's Cargo Lift guide rail bracket, cage and some self sustaining wall framves, described self sustaining wall frame is horizontally disposed with and is vertically arranged at intervals at a side of the close complicated appearance building structure of described people's Cargo Lift guide rail bracket, described people's Cargo Lift mounting structure comprises some connection structures, each connection structure comprises additional sustaining wall frame, diagonal brace and stop gap bridge mechanism, the two ends of described additional sustaining wall frame are fixedly connected with corresponding self sustaining wall frame of the respective layer structure of complicated appearance building structure and people's Cargo Lift respectively, described additional sustaining wall frame is supported in one end of described diagonal brace, the other end is fixedly connected with lower one deck structure of described complicated appearance building structure, one end of described stop gap bridge mechanism is fixedly connected with described complicated appearance building structure, and described stop gap bridge mechanism is arranged at the top of described additional sustaining wall frame and self sustaining wall frame, the length of the additional sustaining wall frame in each connection structure is according to the distance setting between each self sustaining wall frame and the respective layer structure of complicated appearance building structure.
Preferably, described stop gap bridge mechanism comprises and somely stretching out and spaced Cantilever Beams, pipe link, pulling rope and guardrail handrail from level in the floor of complicated appearance building structure, each Cantilever Beams connects by some described pipe links, one end of each Cantilever Beams is all fixedly connected with the respective layer structure of described complicated appearance building structure, wherein the other end away from described complicated appearance building structure of a part of Cantilever Beams is connected in by described pulling rope in the last layer structure of described complicated appearance building structure, and described guardrail handguard is arranged on the Cantilever Beams of outside.
Preferably, embedded U-shaped reinforcing bar unloading clip in the last layer structure of described complicated appearance building structure, the upper end of described pulling rope is connected in the last layer structure of described complicated appearance building structure by embedded U-shaped reinforcing bar unloading clip, on described Cantilever Beams, is provided with the ear piece for the lower end of fixing described pulling rope.
Preferably, the quantity of described pulling rope is two, is connected between the outside of both sides Cantilever Beams and last layer structure.
Preferably, described pipe link is mutually vertical with described Cantilever Beams, and the top of described pipe link and described Cantilever Beams arranges the current plate for workmen.
Preferably, described additional sustaining wall frame is the grillage being connected to form by some steel poles.
Preferably, in people's Cargo Lift mounting structure of above-mentioned complicated appearance building structure, also comprise built-in fitting, described built-in fitting comprises that the length that steel plate and some perpendicular separations are located on described steel plate buries pin, described length is buried pin and is embedded in advance in the respective layer structure of described complicated appearance building structure, and one end of described additional sustaining wall frame is fixedly connected in the respective layer structure of complicated appearance building structure by the described steel plate of described built-in fitting.
Preferably, the outside of the respective layer structure of described complicated appearance building structure has bridging piece, and the steel plate of described built-in fitting is horizontally placed on described bridging piece, between described bridging piece and described Cantilever Beams, is lined with wooden unit.
Preferably, the steel plate of described built-in fitting vertically arranges.
The installation method that the invention also discloses a kind of people's Cargo Lift mounting structure of described complicated appearance building structure as above, comprises as follows:
Between complicated appearance building structure and people's Cargo Lift, connection structure is set from the bottom to top, wherein, the construction method of each connection structure comprises the steps:
Step 1 is provided for the additional sustaining wall frame that connects between corresponding self sustaining wall frame of the respective layer structure of complicated appearance building structure and people's Cargo Lift, and the length of additional sustaining wall frame is set according to distance between the two;
Step 2 arranges diagonal brace below additional sustaining wall frame, and described additional sustaining wall frame is supported in one end of described diagonal brace, and the other end is fixedly connected with lower one deck structure of described complicated appearance building structure;
Step 3, above additional sustaining wall frame and self sustaining wall frame, stop gap bridge mechanism is set, described stop gap bridge mechanism comprises and somely stretching out and spaced Cantilever Beams from level in the floor of complicated appearance building structure, pipe link, pulling rope and guardrail handrail, each Cantilever Beams connects by some described pipe links, one end of each Cantilever Beams is all fixedly connected with the respective layer structure of described complicated appearance building structure, wherein the other end away from described complicated appearance building structure of a part of Cantilever Beams is connected in by described pulling rope in the last layer structure of described complicated appearance building structure, described guardrail handguard is arranged on the Cantilever Beams of outside.
People's Cargo Lift mounting structure and the installation method thereof of complicated appearance building structure provided by the invention, be applicable to building structure peculiarly shaped, structure sideline is people's Cargo Lift installation of irregular curve, can solve in people's Cargo Lift installation process of construction, because building structure external form changes excessive, self sustaining wall frame length of people's Cargo Lift cannot meet the technical matters of actual requirement, this connection structure can be used as the extension of people's Cargo Lift self sustaining wall frame, make up the deficiency of self sustaining wall frame length, can according to people's Cargo Lift and structure pitch from different, the on-the-spot length of directly installing and adjust connection structure, the length of connection structure changes along with the variation of the length of additional wall-attached frame, it is compared with existing people's Cargo Lift mounting structure, there is people's Cargo Lift of Len req self wall-attached frame without factory's custom-made, need in building structure, not reserve construction hole yet, only need be in each connection structure, select the additional wall-attached frame of different length that self sustaining wall frame of people's Cargo Lift is fixedly connected with building structure, and utilize diagonal brace to reinforce and arrange stop gap bridge mechanism, can realize the safety and firmness of people's Cargo Lift installs, operate easier, safety and intensity all can meet specification and operating needs, not only save the time, accelerate progress, also reduce construction costs, can create good economic benefit.
Brief description of the drawings
People's Cargo Lift of the present invention and sustaining wall connection structure thereof and installation method thereof are provided by following embodiment and accompanying drawing.
Fig. 1 is the structural representation of people's Cargo Lift mounting structure of the complicated appearance building structure of one embodiment of the invention;
Fig. 2 is the structural representation of the connection structure of people's Cargo Lift mounting structure of the complicated appearance building structure of one embodiment of the invention;
Fig. 3 is the structural arrangement birds-eye view of the additional wall-attached frame of one embodiment of the invention;
Fig. 4 is Cantilever Beams in the stop gap bridge mechanism of one embodiment of the invention and the structural arrangement birds-eye view of pipe link;
Fig. 5 is the schematic side view of the stop gap bridge mechanism of one embodiment of the invention;
Fig. 6 is the structural representation of the built-in fitting of one embodiment of the invention;
Fig. 7 is the upward view of Fig. 6;
Fig. 8 is the structural representation of the connection structure of people's Cargo Lift mounting structure of the complicated appearance building structure of another embodiment of the present invention.
In figure, 100-connection structure, the additional sustaining wall frame of 110-, 120-diagonal brace, 131-Cantilever Beams, 132-pipe link, 133-pulling rope, 134-guardrail handrail, 135-built-in fitting, 1351-steel plate, 1352-length are buried pin, 136-U steel bar unloading clip, 137-ear piece, 138-wooden unit, 139-to connecting bolt, the building structure of 200-complicated appearance, 210-bridging piece, 310-people's Cargo Lift guide rail bracket, 320-self sustaining wall frame, 330-cage.
Detailed description of the invention
Below people's Cargo Lift mounting structure and installation method thereof to complicated appearance building structure of the present invention are described in further detail.
Embodiment 1
Refer to Fig. 1 to Fig. 7, the present embodiment provides a kind of people's Cargo Lift mounting structure of complicated appearance building structure, for people's Cargo Lift being installed on to a side of complicated appearance building structure 200, described people's Cargo Lift comprises people's Cargo Lift guide rail bracket 310, cage 330 and some self sustaining wall framves 320, described cage 330 moves up and down along people's Cargo Lift guide rail bracket 310, in order to transport workmen and building materials, described self sustaining wall frame 320 is horizontally disposed with and is vertically arranged at intervals at a side of the close complicated appearance building structure 200 of described people's Cargo Lift guide rail bracket 310.Described people's Cargo Lift mounting structure comprises some connection structures 100, each connection structure 100 comprises additional sustaining wall frame 110, diagonal brace 120 and stop gap bridge mechanism, the two ends of described additional sustaining wall frame 110 are fixedly connected with corresponding self sustaining wall frame 320 of the respective layer structure of complicated appearance building structure 200 and people's Cargo Lift respectively, described additional sustaining wall frame 110 is supported in one end of described diagonal brace 120, the other end is fixedly connected with lower one deck structure of described complicated appearance building structure 200, by being set, diagonal brace 120 can play a supporting role to additional sustaining wall frame 110, make people's Cargo Lift guide rail bracket 310 can more firmly be installed on a side of described complicated appearance building structure 200, one end of described stop gap bridge mechanism is fixedly connected with described complicated appearance building structure 200, and described stop gap bridge mechanism is arranged at the top of described additional sustaining wall frame 110 and self sustaining wall frame 320, described stop gap bridge mechanism is as being communicated with between the respective layer structure of complicated appearance building structure 200 and people's Cargo Lift for transporting the passage of workmen and material.Because the length of the additional sustaining wall frame 110 in each connection structure 100 is set according to the distance between self sustaining wall frame 320 of correspondence and the respective layer structure of complicated appearance building structure 200, that is to say, for complicated appearance building structure 200, distance between each of people's Cargo Lift self sustaining wall frame 320 and the respective layer structure of complicated appearance building structure 200 is different, this connection structure 100 is as the extension of self sustaining wall frame 320 of people's Cargo Lift, make up the deficiency of self sustaining wall frame 320 length, each self the sustaining wall frame 320 that can realize people's Cargo Lift by the additional sustaining wall frame 110 of different length is set firmly docks with the convenience of complicated appearance building structure 200, that is to say, can according to the respective layer structure pitch of people's Cargo Lift and complicated appearance building structure 200 from different, the on-the-spot length of directly installing and adjust additional sustaining wall frame 110 and stop gap bridge mechanism, its type of attachment is reliable, easy and simple to handle, safety and intensity all can meet specification and operating needs, can make on-the-spot people's Cargo Lift energy normal mounting, reliability service, under the prerequisite of guaranteeing safe construction, not only save the time, accelerate progress, also reduce construction costs, can create good economic benefit.
Preferably, please consult Fig. 3 by emphasis, in people's Cargo Lift mounting structure of above-mentioned complicated appearance building structure, described additional sustaining wall frame 110 is the grillages that connected to form by some steel poles.Between described steel pole, can adopt the mode of welding to connect.For proof strength, described steel pole is selected channel-section steel No. 14.
Please consult Fig. 4 and Fig. 5 by emphasis, and incorporated by reference to Fig. 1 to Fig. 3, described stop gap bridge mechanism comprises and somely stretching out and spaced Cantilever Beams 131 from level in the floor of complicated appearance building structure 200, pipe link 132, pulling rope 133 and guardrail handrail 134, each Cantilever Beams 131 connects by some described pipe links 132, one end of each Cantilever Beams 131 is all fixedly connected with by the mode of welding or anchoring with the respective layer structure of described complicated appearance building structure 200, in the present embodiment, one end of each Cantilever Beams 131 is all by being fixedly connected with the respective layer structure of described complicated appearance building structure 200 connecting bolt 139.Different according to people's Cargo Lift and building structure spacing, by selecting the Cantilever Beams 131 of different length, on-the-spot directly install, no matter the variation of building structure external form is much, self sustaining wall frame 320 of people's Cargo Lift effectively can be connected with complicated appearance building structure 200.Wherein the other end away from described complicated appearance building structure 200 of a part of Cantilever Beams 131 is connected in the last layer structure of described complicated appearance building structure 200 by described pulling rope 133.Described guardrail handguard 134 is arranged on the Cantilever Beams 131 of outside.By being set, pulling rope 133 can make the fabricate block of the Cantilever Beams 131 being connected by pipe link 132 more steady, the danger that can prevent that by guardrail handguard 134 is set current workmen from falling.
Please consult Fig. 2 by emphasis, for the convenient pulling rope 133 of firmly fixing, embedded U-shaped reinforcing bar unloading clip 136 in the last layer structure of described complicated appearance building structure 200, concrete, embedded U-shaped reinforcing bar unloading clip 136 in the bridging piece 210 of the last layer structure of described complicated appearance building structure 200, workmen is connected in the upper end of described pulling rope 133 in the last layer structure of described complicated appearance building structure 200 by embedded U-shaped reinforcing bar unloading clip 136.
Preferably, in people's Cargo Lift mounting structure of above-mentioned complicated appearance building structure, for the ease of securely the lower end of pulling rope 133 being fixed, on described Cantilever Beams 131, be provided with the ear piece 137 for the lower end of fixing described pulling rope 133.
Preferably, in people's Cargo Lift mounting structure of above-mentioned complicated appearance building structure, the quantity of described pulling rope 133 is two, is connected between the outside of both sides Cantilever Beams 131 and the last layer structure of complicated appearance building structure 200.Two pulling ropes 133 like this stressed evenly, can improve the stability of whole connection structure 100.In addition,, due to being connected between the outside of both sides Cantilever Beams 131 and last layer structure of two described pulling ropes 133, can avoid pulling rope 133 to affect workmen current between building structure and people's Cargo Lift.
Preferably, please emphasis consult Fig. 4, in order to make to be connected conveniently and firm between pipe link 132 and Cantilever Beams 133, described pipe link 132 is mutual vertical with described Cantilever Beams 131.Described pipe link 132 arranges the plate (not shown) current for workmen with the top of described Cantilever Beams 131.In the present embodiment, between adjacent pipe link 132, be spaced apart 1.5-2.5 rice, described Cantilever Beams 131 is selected I-beam section No. 16, and described pipe link 132 is selected channel-section steel No. 10.
Please consult Fig. 6 and Fig. 7 by emphasis, and incorporated by reference to consulting Fig. 1 to Fig. 5, in people's Cargo Lift mounting structure of above-mentioned complicated appearance building structure, also comprise built-in fitting 135, described built-in fitting 135 comprises that the length that steel plate 1351 and some perpendicular separations are located on described steel plate 1351 buries pin 1352, described length is buried pin 1352 and is embedded in advance in the respective layer structure of described complicated appearance building structure 200, and one end of described additional sustaining wall frame 110 is fixedly connected in the respective layer structure of complicated appearance building structure by the described steel plate 1351 of described built-in fitting 135.By the built-in fitting 135 of said structure is set, can make to be connected firm stable more between additional sustaining wall frame 110 and complicated appearance building structure 200.In the present embodiment, the size 200mm*150mm of described steel plate 1351, thickness is 10mm.The quantity that described length is buried pin 1352 is 8, and length is respectively 100mm.
Please consult Fig. 2 by emphasis, the outside of the respective layer structure of described complicated appearance building structure 200 has bridging piece 210, and described built-in fitting 135 can be embedded on described bridging piece 210 in advance, and the steel plate 1351 of described built-in fitting 135 is horizontally placed on described bridging piece 210.In addition, can between described bridging piece 210 and described Cantilever Beams 131, be lined with wooden unit 138.By wooden unit 138 is set, can makes bridging piece 210 play a supporting role to Cantilever Beams 131, thereby improve the Area of bearing that is subject to of Cantilever Beams 131, and then make Cantilever Beams 131 more stable.
Please continue to refer to Fig. 1 to Fig. 7, the present embodiment also discloses a kind of installation method of people's Cargo Lift mounting structure of complicated appearance building structure as above, comprises as follows:
Between complicated appearance building structure 200 and people's Cargo Lift, connection structure 100 is set from the bottom to top, wherein, the construction method of each connection structure 100 comprises the steps:
Step 1, between corresponding self sustaining wall frame 320 of the respective layer structure of complicated appearance building structure 200 and people's Cargo Lift, additional sustaining wall frame 110 is set, between corresponding self sustaining wall frame of the respective layer structure of complicated appearance building structure and people's Cargo Lift, be provided for the additional sustaining wall frame connecting, the length of additional sustaining wall frame is set according to distance between the two, and the length of additional sustaining wall frame 110 is according to the distance setting between self sustaining wall frame 320 of correspondence and the respective layer structure of complicated appearance building structure 200.For complicated appearance building structure 200, distance between each of people's Cargo Lift self sustaining wall frame 320 and the respective layer structure of complicated appearance building structure 200 is different, this connection structure 100 is as the extension of self sustaining wall frame 320 of people's Cargo Lift, make up the deficiency of self sustaining wall frame 320 length, each self the sustaining wall frame 320 that can realize people's Cargo Lift by the additional sustaining wall frame 110 of different length is set firmly docks with the convenience of complicated appearance building structure 200, that is to say, can according to the respective layer structure pitch of people's Cargo Lift and complicated appearance building structure 200 from different, length is directly installed and is adjusted at scene, its type of attachment is reliable, easy and simple to handle, safety and intensity all can meet specification and operating needs, can make on-the-spot people's Cargo Lift energy normal mounting, reliability service, under the prerequisite of guaranteeing safe construction, not only save the time, accelerate progress, also reduce construction costs, can create good economic benefit.
Step 2 arranges diagonal brace 120 below additional sustaining wall frame 110, and described additional sustaining wall frame 110 is supported in one end of described diagonal brace 120, and the other end is fixedly connected with lower one deck structure of described complicated appearance building structure 200.Can play a supporting role to additional sustaining wall frame 110 by diagonal brace 120 is set, make people's Cargo Lift guide rail bracket 310 can more firmly be installed on a side of described complicated appearance building structure 200.
Step 3 arranges stop gap bridge mechanism above additional sustaining wall frame 110 and self sustaining wall frame 320, described stop gap bridge mechanism as be communicated with between the respective layer structure of complicated appearance building structure 200 and people's Cargo Lift for transporting the passage of workmen and material.Described stop gap bridge mechanism comprises and somely stretching out and spaced Cantilever Beams 131 from level in the floor of complicated appearance building structure 200, pipe link 132, pulling rope 133 and guardrail handrail 134, each Cantilever Beams 131 connects by some described pipe links 132, one end of each Cantilever Beams 131 all with the respective layer structure of described complicated appearance building structure 200 by connecting bolt 139 is fixedly connected with, wherein the other end away from described complicated appearance building structure 200 of a part of Cantilever Beams 131 is connected in by described pulling rope 133 in the last layer structure of described complicated appearance building structure 200, described guardrail handguard 134 is arranged on the Cantilever Beams 131 of outside.By being set, pulling rope 133 can make the fabricate block of the Cantilever Beams 131 being connected by pipe link 132 more steady, the danger that can prevent that by guardrail handguard 134 is set current workmen from falling.
Embodiment 2
Refer to Fig. 8, and incorporated by reference to Fig. 1, Fig. 2 to Fig. 7, the difference of the present embodiment and embodiment 1 is, the outside of the respective layer structure of described complicated appearance building structure does not arrange bridging piece, in such cases, described built-in fitting 135 is applicable to being sidelong, and the steel plate 1351 of described built-in fitting 135 vertically arranges, and so arranges to realize being fixedly connected with of respective layer structure of additional sustaining wall frame 110 and complicated appearance building structure 200.
In sum, people's Cargo Lift mounting structure and the installation method thereof of complicated appearance building structure provided by the invention, be applicable to building structure peculiarly shaped, structure sideline is people's Cargo Lift installation of irregular curve, can solve in people's Cargo Lift installation process of construction, because building structure external form changes excessive, self sustaining wall frame length of people's Cargo Lift cannot meet the technical matters of actual requirement, this connection structure can be used as the extension of people's Cargo Lift self sustaining wall frame, make up the deficiency of self sustaining wall frame length, can according to people's Cargo Lift and structure pitch from different, the on-the-spot length of directly installing and adjust connection structure, the length of connection structure changes along with the variation of the length of additional wall-attached frame, it is compared with existing people's Cargo Lift mounting structure, there is people's Cargo Lift of Len req self wall-attached frame without factory's custom-made, need in building structure, not reserve construction hole yet, only need be in each connection structure, select the additional wall-attached frame of different length that self sustaining wall frame of people's Cargo Lift is fixedly connected with building structure, and utilize diagonal brace to reinforce and arrange stop gap bridge mechanism, can realize the safety and firmness of people's Cargo Lift installs, operate easier, safety and intensity all can meet specification and operating needs, not only save the time, accelerate progress, also reduce construction costs, can create good economic benefit.
Obviously, those skilled in the art can carry out various changes and modification and not depart from the spirit and scope of the present invention the present invention.Like this, if these amendments of the present invention and within modification belongs to the scope of the claims in the present invention and equivalent technologies thereof, the present invention is also intended to comprise these changes and modification interior.
Claims (10)
1. people's Cargo Lift mounting structure of a complicated appearance building structure, for people's Cargo Lift being installed on to a side of complicated appearance building structure, described people's Cargo Lift comprises people's Cargo Lift guide rail bracket, cage and some self sustaining wall framves, described self sustaining wall frame is horizontally disposed with and is vertically arranged at intervals at a side of the close complicated appearance building structure of described people's Cargo Lift guide rail bracket, it is characterized in that, described people's Cargo Lift mounting structure comprises some connection structures, each connection structure comprises additional sustaining wall frame, diagonal brace and stop gap bridge mechanism, the two ends of described additional sustaining wall frame are fixedly connected with corresponding self sustaining wall frame of the respective layer structure of complicated appearance building structure and people's Cargo Lift respectively, described additional sustaining wall frame is supported in one end of described diagonal brace, the other end is fixedly connected with lower one deck structure of described complicated appearance building structure, one end of described stop gap bridge mechanism is fixedly connected with described complicated appearance building structure, and described stop gap bridge mechanism is arranged at the top of described additional sustaining wall frame and self sustaining wall frame, the length of the additional sustaining wall frame in each connection structure is according to the distance setting between each self sustaining wall frame and the respective layer structure of complicated appearance building structure.
2. people's Cargo Lift mounting structure of complicated appearance building structure according to claim 1, it is characterized in that, described stop gap bridge mechanism comprises and somely stretching out and spaced Cantilever Beams from level in the floor of complicated appearance building structure, pipe link, pulling rope and guardrail handrail, each Cantilever Beams connects by some described pipe links, one end of each Cantilever Beams is all fixedly connected with the respective layer structure of described complicated appearance building structure, wherein the other end away from described complicated appearance building structure of a part of Cantilever Beams is connected in by described pulling rope in the last layer structure of described complicated appearance building structure, described guardrail handguard is arranged on the Cantilever Beams of outside.
3. people's Cargo Lift mounting structure of complicated appearance building structure according to claim 2, it is characterized in that, embedded U-shaped reinforcing bar unloading clip in the last layer structure of described complicated appearance building structure, the upper end of described pulling rope is connected in the last layer structure of described complicated appearance building structure by embedded U-shaped reinforcing bar unloading clip, on described Cantilever Beams, is provided with the ear piece for the lower end of fixing described pulling rope.
4. people's Cargo Lift mounting structure of complicated appearance building structure according to claim 2, is characterized in that, the quantity of described pulling rope is two, is connected between the outside of both sides Cantilever Beams and last layer structure.
5. people's Cargo Lift mounting structure of complicated appearance building structure according to claim 2, is characterized in that, described pipe link is mutually vertical with described Cantilever Beams, and the top of described pipe link and described Cantilever Beams arranges the current plate for workmen.
6. people's Cargo Lift mounting structure of complicated appearance building structure according to claim 1, is characterized in that, described additional sustaining wall frame is the grillage being connected to form by some steel poles.
7. people's Cargo Lift mounting structure of complicated appearance building structure according to claim 1, it is characterized in that, also comprise built-in fitting, described built-in fitting comprises that the length that steel plate and some perpendicular separations are located on described steel plate buries pin, described length is buried pin and is embedded in advance in the respective layer structure of described complicated appearance building structure, and one end of described additional sustaining wall frame is fixedly connected in the respective layer structure of complicated appearance building structure by the described steel plate of described built-in fitting.
8. people's Cargo Lift mounting structure of complicated appearance building structure according to claim 7, it is characterized in that, the outside of the respective layer structure of described complicated appearance building structure has bridging piece, the steel plate of described built-in fitting is horizontally placed on described bridging piece, between described bridging piece and described Cantilever Beams, is lined with wooden unit.
9. people's Cargo Lift mounting structure of complicated appearance building structure according to claim 7, is characterized in that, the steel plate of described built-in fitting vertically arranges.
As described in any one in claim 1-9 as described in the installation method of people's Cargo Lift mounting structure of complicated appearance building structure, comprising:
Between complicated appearance building structure and people's Cargo Lift, connection structure is set from the bottom to top, wherein, the construction method of each connection structure comprises the steps:
Step 1 is provided for the additional sustaining wall frame that connects between corresponding self sustaining wall frame of the respective layer structure of complicated appearance building structure and people's Cargo Lift, and the length of additional sustaining wall frame is set according to distance between the two;
Step 2 arranges diagonal brace below additional sustaining wall frame, and described additional sustaining wall frame is supported in one end of described diagonal brace, and the other end is fixedly connected with lower one deck structure of described complicated appearance building structure;
Step 3, above additional sustaining wall frame and self sustaining wall frame, stop gap bridge mechanism is set, described stop gap bridge mechanism comprises and somely stretching out and spaced Cantilever Beams from level in the floor of complicated appearance building structure, pipe link, pulling rope and guardrail handrail, each Cantilever Beams connects by some described pipe links, one end of each Cantilever Beams is all fixedly connected with the respective layer structure of described complicated appearance building structure, wherein the other end away from described complicated appearance building structure of a part of Cantilever Beams is connected in by described pulling rope in the last layer structure of described complicated appearance building structure, described guardrail handguard is arranged on the Cantilever Beams of outside.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410175491.3A CN103950811B (en) | 2014-04-29 | 2014-04-29 | The people's Cargo Lift mounting structure and its installation method of complicated appearance building structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410175491.3A CN103950811B (en) | 2014-04-29 | 2014-04-29 | The people's Cargo Lift mounting structure and its installation method of complicated appearance building structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103950811A true CN103950811A (en) | 2014-07-30 |
CN103950811B CN103950811B (en) | 2018-01-23 |
Family
ID=51328206
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410175491.3A Expired - Fee Related CN103950811B (en) | 2014-04-29 | 2014-04-29 | The people's Cargo Lift mounting structure and its installation method of complicated appearance building structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103950811B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106144832A (en) * | 2016-08-31 | 2016-11-23 | 中建四局第六建筑工程有限公司 | A kind of special extended type wall-attached frame and preparation method thereof |
CN106185579A (en) * | 2016-10-09 | 2016-12-07 | 中国建筑第八工程局有限公司 | Material vertical transit system for high-rise building |
CN108298407A (en) * | 2018-04-03 | 2018-07-20 | 上海宝冶集团有限公司 | Elevator assistance platform and its construction method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08301549A (en) * | 1995-04-28 | 1996-11-19 | Hitachi Building Syst Eng & Service Co Ltd | Scaffolding device for elevator installation and assembling method thereof |
CN201400500Y (en) * | 2009-03-24 | 2010-02-10 | 中国建筑科学研究院建筑机械化研究分院 | Multifunctional lifter with platform for abnormal high building construction |
CN201649608U (en) * | 2010-03-24 | 2010-11-24 | 陕西建工集团总公司 | Novel attached lifting scaffold |
CN103291066A (en) * | 2013-06-01 | 2013-09-11 | 山东天齐置业集团股份有限公司 | Auxiliary device for wall-attached frame for construction lifts, and strengthening method of auxiliary device |
CN103303772A (en) * | 2013-06-19 | 2013-09-18 | 泰兴市第一建筑安装工程有限公司 | Ultra-long wall attaching device of construction lift |
CN203855278U (en) * | 2014-04-29 | 2014-10-01 | 上海建工四建集团有限公司 | People and goods elevator installation structure of complicated exterior building structure |
-
2014
- 2014-04-29 CN CN201410175491.3A patent/CN103950811B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08301549A (en) * | 1995-04-28 | 1996-11-19 | Hitachi Building Syst Eng & Service Co Ltd | Scaffolding device for elevator installation and assembling method thereof |
CN201400500Y (en) * | 2009-03-24 | 2010-02-10 | 中国建筑科学研究院建筑机械化研究分院 | Multifunctional lifter with platform for abnormal high building construction |
CN201649608U (en) * | 2010-03-24 | 2010-11-24 | 陕西建工集团总公司 | Novel attached lifting scaffold |
CN103291066A (en) * | 2013-06-01 | 2013-09-11 | 山东天齐置业集团股份有限公司 | Auxiliary device for wall-attached frame for construction lifts, and strengthening method of auxiliary device |
CN103303772A (en) * | 2013-06-19 | 2013-09-18 | 泰兴市第一建筑安装工程有限公司 | Ultra-long wall attaching device of construction lift |
CN203855278U (en) * | 2014-04-29 | 2014-10-01 | 上海建工四建集团有限公司 | People and goods elevator installation structure of complicated exterior building structure |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106144832A (en) * | 2016-08-31 | 2016-11-23 | 中建四局第六建筑工程有限公司 | A kind of special extended type wall-attached frame and preparation method thereof |
CN106185579A (en) * | 2016-10-09 | 2016-12-07 | 中国建筑第八工程局有限公司 | Material vertical transit system for high-rise building |
CN108298407A (en) * | 2018-04-03 | 2018-07-20 | 上海宝冶集团有限公司 | Elevator assistance platform and its construction method |
Also Published As
Publication number | Publication date |
---|---|
CN103950811B (en) | 2018-01-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102979313B (en) | Steel truss upper air installing construction method that conversion layer is overweight | |
CN106088662B (en) | Concrete frame structure Vierendeel girder, superimposed sheet Construction of Supporting method | |
CN102900022A (en) | Hydraulic climbing formwork construction method for leaning tower of cable-stayed bridge | |
CN103195256A (en) | Hanging column type steel structure jig frame construction method | |
CN105569242A (en) | Assembling method for composite floor slabs | |
WO2020052291A1 (en) | Construction elevator wall-attaching frame mounting platform attached to steel platform formwork and method therefor | |
CN102337782B (en) | Lift system for constructing truss platform on top of tall and large space | |
CN104032967B (en) | Prefabricated assembled frame structure component construction method for hanging | |
CN102296837A (en) | Multistoried building with prefabricated members and semi-prefabricating construction method of multistoried building | |
CN107476583A (en) | A kind of concrete assembled building builds construction method | |
CN104264706B (en) | External elevator steel beam foundation structure and construction method thereof | |
CN204435820U (en) | From steady buckle type elevator shaft Mobile operating platform | |
MX2009012985A (en) | Automatic system for construction of buildings. | |
CN103950811A (en) | People and cargo elevator mounting structure of complicated external building structure and mounting method thereof | |
CN104929353A (en) | Detachable stepwise automatic climbing operating platform for elevator shafts | |
CN203855278U (en) | People and goods elevator installation structure of complicated exterior building structure | |
CN105347142A (en) | Plate penetrating installing method for installing construction lifting machine on basement top plate | |
CN108894509B (en) | Steel structure assembly type house prefabricated sandwich heat-insulation external wall panel construction method without external frame | |
CN204282843U (en) | The sliding hoisted in position device of steel girder erection in a kind of stiffness combination construction | |
CN107975144A (en) | A kind of assembled industrialization house | |
JP5756000B2 (en) | Spiral staircase mounting structure | |
CN112942789B (en) | Water drop type curtain wall construction method | |
CN212359061U (en) | PC staircase safety protection operation platform | |
CN213174742U (en) | Top bracing steel stand structure | |
CN204199659U (en) | Integral lifting building construction of lift well operating system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180123 |