CN103941669A - Novel dry quenching data processing and prewarning device - Google Patents

Novel dry quenching data processing and prewarning device Download PDF

Info

Publication number
CN103941669A
CN103941669A CN201410112725.XA CN201410112725A CN103941669A CN 103941669 A CN103941669 A CN 103941669A CN 201410112725 A CN201410112725 A CN 201410112725A CN 103941669 A CN103941669 A CN 103941669A
Authority
CN
China
Prior art keywords
data processing
dry quenching
data
interface
prediction module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410112725.XA
Other languages
Chinese (zh)
Inventor
邵克志
周莉
王斌
陈辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jigang Group International Engineering Technology Co., Ltd.
Original Assignee
Jigang Group International Engineering Technology Co., Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jigang Group International Engineering Technology Co., Ltd. filed Critical Jigang Group International Engineering Technology Co., Ltd.
Priority to CN201410112725.XA priority Critical patent/CN103941669A/en
Publication of CN103941669A publication Critical patent/CN103941669A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Coke Industry (AREA)

Abstract

The invention provides a novel dry quenching data processing and prewarning device. The novel dry quenching data processing and prewarning device comprises a database. The database is connected with a communication server, the communication server is connected with a data processing and predicting module, the data processing and predicting module is connected with an OPC server, and the OPC server is connected with a distributed control system. By the adoption of the device, real-time prediction of dry quenching production data is achieved, and operators on the scene can conveniently know the production status in time and conduct prewarning. Compared with the dry quenching production data and real-time indexes, prediction data which are not within an index limitation range are warned, the operators on the scene can conveniently adjust the control thought in time, and therefore accidents are reduced. The novel dry quenching data processing and prewarning device has the advantages of being simple and compact in structure, low in manufacturing cost and easy and convenient to use.

Description

A kind of New-style Coke Dry Quenching data processing and prior-warning device
Technical field
The present invention relates to a kind of prior-warning device, specifically a kind of New-style Coke Dry Quenching data processing and prior-warning device.
Background technology
Dry Quenching Technology is the committed step of metallurgical engineering, to the accurate control of this technology, can improve production efficiency and product quality, and reduce pollutant emission.Along with industry spot automatization level improves gradually, the impact of the normal production of the real-time response of data on industry and operation is more and more important.PLC equipment gathers every numerical value and the index at commercial production scene, and upload and save data by OPC host-host protocol, indices and real time data need to be processed in time and turn back in operation interface, thereby convenient operation personnel operate in time, data prediction can facilitate the antedating response of field staff to industrial situations accurately in real time simultaneously, enhance productivity, reduce accident rate.
Summary of the invention
The object of this invention is to provide a kind of New-style Coke Dry Quenching data processing and prior-warning device, can solve production efficiency and product quality low, can not be in real time the problem of deal with data accurately.
The present invention for achieving the above object, be achieved through the following technical solutions: comprise database, database is connected with communication server, communication server is connected with data processing and prediction module, data processing is connected with opc server with prediction module, and opc server is connected with scattered control system.
In order further to realize object of the present invention, can also be by the following technical solutions: described data processing and prediction module comprise arm processor, arm processor connects respectively TPC interface two, UI circuit, DDR2RAM, power reset circuit, RS232 interface, NANDFlash circuit, RS232/485 interface, TPC interface one, TPC interface one is connected with communication server, and TPC interface two is connected with opc server.The connected mode of the TPC interface one of described communication server and data processing and prediction module is wireless connections.The TPC interface two of described data processing and prediction module is wireless connections with the connected mode of opc server.
The invention has the advantages that: the present invention has realized the real-time estimate to dry coke quenching production data, be convenient to site operation personnel and understand in time production status, and carry out and give warning in advance; The present invention contrasts dry coke quenching production data and real-time index, to not reporting to the police in the predicted data of index limited field, is convenient to site operation personnel and adjusts in time control thinking, and minimizing accident occurs.The present invention also has advantages of compactness simple for structure, cheap for manufacturing cost and easy to use.
Brief description of the drawings
Fig. 1 is structural representation of the present invention;
Fig. 2 is the structural representation of data processing of the present invention and prediction module.
In accompanying drawing: the 1st, database 2 is that TPC interface 1 is that communication server 4 is that data processing and prediction module 5 are that opc server 6 is that scattered control system 7 is that RS232/485 interface 8 is that TPC interface 29 is that UI circuit 10 is that arm processor 11 is that DDR2RAM 12 is that power reset circuit 13 is that RS232 interface 14 is NANDFlash circuit.
Embodiment
A kind of New-style Coke Dry Quenching data processing and prior-warning device, as shown in Figure 1 and Figure 2, comprise database 1, database 1 is connected with communication server 3, communication server 3 is connected with data processing and prediction module 4, data processing is connected with opc server 5 with prediction module 4, and opc server 5 is connected with scattered control system 6.Described data processing and prediction module 4 comprise arm processor 10, arm processor 10 connects respectively TPC interface 28, UI circuit 9, DDR2RAM11, power reset circuit 12, RS232 interface 13, NANDFlash circuit 14, RS232/485 interface 7, TPC interface 1, TPC interface 1 is connected with communication server 3, and TPC interface 28 is connected with opc server 5.Described communication server 3 is wireless connections with the connected mode of the TPC interface 1 of data processing and prediction module 4.The TPC interface 28 of described data processing and prediction module 4 is wireless connections with the connected mode of opc server 5.Described data processing and prediction module 4 gather the data on opc server 5, process and the real-time production data index of prediction industry spot, and provide in time alarm; Arm processor 10 is responsible for supervision and the control of whole communication converter.
Data acquisition and the Forecasting Methodology of a kind of New-style Coke Dry Quenching data processing of the present invention and prior-warning device realize by following steps:
1. operational system, power reset circuit 12 provides the work of system modules needed power supply, solidification software code in operation NANDFlash circuit 14;
2. utilize data processing and prediction module 4 to carry out parameter configuration, comprise IP address, device name, server identification, the username and password of service; The label that OPC gathers is called the roll, data type; Maximum configuration collection point, the equipment of allowing of equipment allows image data type;
3. scattered control system 6 is issued to OPC client data acquisition module by TCP interface 28 configuration file, and moves opc server 5 and data processing and prediction module 4;
4. data processing and prediction module 4 are carried out data processing to the data in real-time data base, and by model bank, prediction dry coke quenching index;
5. predicted data and real time data are sent to communication server 3;
6. the data that obtain are sent to database 1 by communication server 3;
7. analysis result is offered to on-the-spot operating personnel or remote transmission to person skilled.
Described data processing and prediction module 4 are processed and are predicted that the real-time production data index of industry spot comprises the following steps:
A, data processing and prediction module 4 detect opc server 5 states;
B, data processing and prediction module 4 are utilized mathematical model rejecting abnormalities data, and by mathematical algorithm, the index of correlation value of prediction real time data;
The communication state of c, detection data processing and prediction module 4 and communication server 3, if communication is normal, data upload is to database 1; If communication state is abnormal, equipment, by gathered data buffer storage, is waited for data re-transmitting;
After d, communication recover, system is by the data cached communication server 3 that is uploaded to;
E, communication server 3 data backups are to background data base 1;
F, analysis result is offered to on-the-spot operating personnel or remote transmission to person skilled.
TPC interface 1 and TPC interface 28 can be conveniently by device predicted result by being wirelessly transmitted in one-level field control system, convenient operation personnel make response in time, enhance productivity.Described UI circuit 9 configures pilot lamp, and after system arranges successfully, UI circuit 9 shows configuration successful by this pilot lamp.ARM microprocessor 10 is responsible for supervision and the control of communication.Power reset circuit 12 provides power supply and reseting logic for ARM microprocessor 10.DDR2RAM11 moves memory headroom is provided for system.NANDFlash14, as external memory storage, solidifies code for system, and power down save data provides storage space.Data processing and prediction module 4 can configure Information Monitoring, facility information and communication information, and can online fetch equipment configuration information.Data processing and prediction module 4 gather the OPC SERVER data taking PLC as representative on industry control network by OPC agreement, and carry out data processing according to the data rule of response, Exception Filter data, set up corresponding mathematical model real-time estimate dry coke quenching index, and each index is given warning in advance, early warning information is sent in staff's operation interface simultaneously.Data processing and prediction module 4, by resolving configuration file, obtain configuration information.The present invention has realized the real-time estimate to dry coke quenching production data, is convenient to site operation personnel and understands in time production status, and carry out and give warning in advance; The present invention contrasts dry coke quenching production data and real-time index, to not reporting to the police in the predicted data of index limited field, is convenient to site operation personnel and adjusts in time control thinking, and minimizing accident occurs.The present invention also has advantages of compactness simple for structure, cheap for manufacturing cost and easy to use.
Technical scheme of the present invention is not restricted in the scope of embodiment of the present invention.The present invention not technology contents of detailed description is known technology.

Claims (4)

1. a New-style Coke Dry Quenching data processing and prior-warning device, it is characterized in that: comprise database (1), database (1) is connected with communication server (3), communication server (3) is connected with data processing and prediction module (4), data processing is connected with opc server (5) with prediction module (4), and opc server (5) is connected with scattered control system (6).
2. a kind of New-style Coke Dry Quenching data processing according to claim 1 and prior-warning device, it is characterized in that: described data processing and prediction module (4) comprise arm processor (10), arm processor (10) connects respectively TPC interface two (8), UI circuit (9), DDR2RAM (11), power reset circuit (12), RS232 interface (13), NANDFlash circuit (14), RS232/485 interface (7), TPC interface one (2), TPC interface one (2) is connected with communication server (3), TPC interface two (8) is connected with opc server (5).
3. a kind of New-style Coke Dry Quenching data processing according to claim 2 and prior-warning device, is characterized in that: described communication server (3) is wireless connections with the connected mode of the TPC interface one (2) of data processing and prediction module (4).
4. a kind of New-style Coke Dry Quenching data processing according to claim 2 and prior-warning device, is characterized in that: the TPC interface two (8) of described data processing and prediction module (4) is wireless connections with the connected mode of opc server (5).
CN201410112725.XA 2014-03-25 2014-03-25 Novel dry quenching data processing and prewarning device Pending CN103941669A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410112725.XA CN103941669A (en) 2014-03-25 2014-03-25 Novel dry quenching data processing and prewarning device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410112725.XA CN103941669A (en) 2014-03-25 2014-03-25 Novel dry quenching data processing and prewarning device

Publications (1)

Publication Number Publication Date
CN103941669A true CN103941669A (en) 2014-07-23

Family

ID=51189377

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410112725.XA Pending CN103941669A (en) 2014-03-25 2014-03-25 Novel dry quenching data processing and prewarning device

Country Status (1)

Country Link
CN (1) CN103941669A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101887255A (en) * 2009-05-14 2010-11-17 宝山钢铁股份有限公司 Real-time data transmission device and method thereof
CN201654503U (en) * 2009-10-12 2010-11-24 浙江艾博申科控制技术有限公司 Energy-saving network universal controller
CN101928579A (en) * 2009-06-19 2010-12-29 中冶成工上海五冶建设有限公司 Installing method of dry quenching fire automatic alarm system
CN102495642A (en) * 2011-12-05 2012-06-13 济南钢铁股份有限公司 Dry quenching automatic control system of coke dry quenching furnace and control method thereof
CN103064382A (en) * 2012-12-21 2013-04-24 南京富岛信息工程有限公司 Optical proximity correction (OPC) embedded-type remote data collecting system and method based on ARM framework
CN202929421U (en) * 2012-11-09 2013-05-08 大连宝信起重技术有限公司 Unmanned control equipment for coke dry quenching lifting machine

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101887255A (en) * 2009-05-14 2010-11-17 宝山钢铁股份有限公司 Real-time data transmission device and method thereof
CN101928579A (en) * 2009-06-19 2010-12-29 中冶成工上海五冶建设有限公司 Installing method of dry quenching fire automatic alarm system
CN201654503U (en) * 2009-10-12 2010-11-24 浙江艾博申科控制技术有限公司 Energy-saving network universal controller
CN102495642A (en) * 2011-12-05 2012-06-13 济南钢铁股份有限公司 Dry quenching automatic control system of coke dry quenching furnace and control method thereof
CN202929421U (en) * 2012-11-09 2013-05-08 大连宝信起重技术有限公司 Unmanned control equipment for coke dry quenching lifting machine
CN103064382A (en) * 2012-12-21 2013-04-24 南京富岛信息工程有限公司 Optical proximity correction (OPC) embedded-type remote data collecting system and method based on ARM framework

Similar Documents

Publication Publication Date Title
CN105261079A (en) Portable intelligent electric power inspection device
JP2019530084A (en) Factory equipment monitoring system and method using active black box
CN104216293B (en) B/S and C/S architectural pattern based information monitoring and measuring method for tunnels and underground constructions
CN109491341B (en) Monitoring and data analysis system for oil field operation equipment
CN103034213A (en) Remote monitoring and controlling system
CN109612760A (en) A kind of Working condition detecting method of mechanical equipment, device and storage medium
CN110995783B (en) Remote monitoring system
CN110988559A (en) Online monitoring method for full life cycle of transformer substation direct current system based on Internet of things
CN108303934A (en) Dust concentration TT&C system based on cloud framework
CN102073291A (en) Water supply information acquisition control system
CN111882071A (en) Prestress steel member monitoring method based on machine learning
CN101833328A (en) Wireless sensor network smt manufacturing execution control system
CN110266784A (en) A kind of intelligent plant data acquisition management system interacted
CN117235443A (en) Electric power operation safety monitoring method and system based on edge AI
CN105353744A (en) Boiler monitoring method based on Internet of things
CN214067660U (en) Monitoring system based on Internet of things
CN111722601A (en) Cement production line real-time monitoring system
CN109412872B (en) Remote monitoring device for traditional equipment
CN104330193A (en) Temperature measurement and control device for stored and stacked materials
CN103941669A (en) Novel dry quenching data processing and prewarning device
CN116611953A (en) Electric energy meter production and manufacturing real-time data management method and system based on Internet of things
CN115436865A (en) Current transformer secondary loop monitoring system and method based on infrared thermal imaging
CN105258100A (en) Boiler monitoring system based on Internet of Things
CN113011698A (en) Intelligent equipment management and control platform
CN204086959U (en) PREDICTIVE CONTROL realizes field produces well pattern intelligence managing and control system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140723

WD01 Invention patent application deemed withdrawn after publication