CN103939112A - 下穿沟谷隧道双层超前支护结构 - Google Patents

下穿沟谷隧道双层超前支护结构 Download PDF

Info

Publication number
CN103939112A
CN103939112A CN201410189986.1A CN201410189986A CN103939112A CN 103939112 A CN103939112 A CN 103939112A CN 201410189986 A CN201410189986 A CN 201410189986A CN 103939112 A CN103939112 A CN 103939112A
Authority
CN
China
Prior art keywords
tunnel
self
cheuch
rock mass
small guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410189986.1A
Other languages
English (en)
Inventor
张剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Survey and Design Institute Group Ltd
Original Assignee
China Railway First Survey and Design Institute Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Survey and Design Institute Group Ltd filed Critical China Railway First Survey and Design Institute Group Ltd
Priority to CN201410189986.1A priority Critical patent/CN103939112A/zh
Publication of CN103939112A publication Critical patent/CN103939112A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

本发明涉及一种下穿沟谷隧道双层超前支护结构。下穿沟谷隧道顶部埋深比较小,地层稳定性较差,容易塌方冒顶,地表水倒灌入隧道。本发明隧道内壁沿纵向设置多道环向的钢架,并喷涂喷射混凝土覆盖钢架;向隧道拱部的围岩内沿纵向打设多环自进式管棚,横向相邻的自进式管棚之间打设一个小导管,纵向相邻的自进式管棚之间打设四个小导管;在小导管内压注固结浆液,与拱部上部岩体结合形成注浆固结岩体;小导管的外插角度大于自进式管棚的外插角度。本发明将长管棚与短导管的优势充分结合,并通过预注浆固结岩体,充分利用了岩层自承能力,从而形成一种经济合理、安全可靠的保护壳,使得隧道施工处于安全状态。

Description

下穿沟谷隧道双层超前支护结构
技术领域
    本发明属于隧道交通工程技术领域,具体涉及一种下穿沟谷隧道双层超前支护结构。
背景技术
山区铁路、公路等交通工程需要修建大量的隧道工程,以提高线路标准和改善运营条件,隧道穿过的山脉地表往往沟壑发育,不少沟谷还有常年流水,隧道工程在沟谷下方通过时,主要存在的问题是:隧道顶部埋深比较小,沟内多为冲积物,下伏基岩也是风化层,地层稳定性比较差;地层自稳能力低、时间短,施工需要快速支护封闭,往往很难做到。稍有不当,很容易塌方冒顶,地表水倒灌入隧道,对施工安全造成巨大危害,建成后隧道结构也存在开裂、渗漏水等病害隐患,因此,选择合理的超前支护措施,充分利用围岩自承能力,最大限度的减少扰动,对安全通过沟谷段的施工至关重要。
发明内容
本发明的目的是提供一种下穿沟谷隧道双层超前支护结构,有效预防塌方冒顶和地表水倒灌入隧道。
本发明所采用的技术方案是:
下穿沟谷隧道双层超前支护结构,其特征在于:
于隧道内壁沿纵向设置多道环向的钢架,并喷涂喷射混凝土覆盖钢架;
向隧道拱部的围岩内沿纵向打设多环自进式管棚,横向相邻的自进式管棚之间打设一个小导管,纵向相邻的自进式管棚之间打设四个小导管;在小导管内压注固结浆液,与拱部上部岩体结合形成注浆固结岩体。
小导管的外插角度大于自进式管棚的外插角度。
本发明具有以下优点:
本发明充分研究了下穿沟谷段的地形地质条件和施工难度,将长管棚与短导管的优势充分结合,并通过预注浆固结岩体,充分利用了岩层自承能力,从而形成一种经济合理、安全可靠的保护壳,使得隧道施工处于安全状态。 
附图说明
图1是本发明的正面布置图。
图2是本发明的纵向面布置图。
图中,1-注浆固结岩体,2-喷射混凝土,3-钢架,4-自进式管棚,5-小导管。
具体实施方式
下面结合具体实施方式对本发明进行详细的说明。
本发明涉及一种下穿沟谷隧道双层超前支护结构,于隧道内壁沿纵向设置多道环向的钢架3,并喷涂喷射混凝土2覆盖钢架3,形成一层保护。向隧道拱部的围岩内沿纵向打设多环自进式管棚4,自进式管棚4为自带钻头装置,直接打孔安设,横向相邻的自进式管棚4之间打设一个小导管5,纵向相邻的自进式管棚4之间打设四个小导管5;在小导管5内压注固结浆液,与拱部上部岩体结合形成注浆固结岩体1,形成另一层保护,最终完成双层支护措施,在拱部形成安全保护壳,可有效控制隧道拱部坍塌,确保施工和结构安全。小导管5的外插角度(10~15°)大于自进式管棚4的外插角度(3~5°)。隧道开挖应在上一环的保护下进行,自进式管棚4与小导管5纵向均应适当搭接重叠一定范围。
本发明的内容不限于实施例所列举,本领域普通技术人员通过阅读本发明说明书而对本发明技术方案采取的任何等效的变换,均为本发明的权利要求所涵盖。

Claims (2)

1.下穿沟谷隧道双层超前支护结构,其特征在于:
于隧道内壁沿纵向设置多道环向的钢架(3),并喷涂喷射混凝土(2)覆盖钢架(3);
向隧道拱部的围岩内沿纵向打设多环自进式管棚(4),横向相邻的自进式管棚(4)之间打设一个小导管(5),纵向相邻的自进式管棚(4)之间打设四个小导管(5);在小导管(5)内压注固结浆液,与拱部上部岩体结合形成注浆固结岩体(1)。
2.根据权利要求1所述的下穿沟谷隧道双层超前支护结构,其特征在于:
小导管(5)的外插角度大于自进式管棚(4)的外插角度。
CN201410189986.1A 2014-05-07 2014-05-07 下穿沟谷隧道双层超前支护结构 Pending CN103939112A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410189986.1A CN103939112A (zh) 2014-05-07 2014-05-07 下穿沟谷隧道双层超前支护结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410189986.1A CN103939112A (zh) 2014-05-07 2014-05-07 下穿沟谷隧道双层超前支护结构

Publications (1)

Publication Number Publication Date
CN103939112A true CN103939112A (zh) 2014-07-23

Family

ID=51186958

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410189986.1A Pending CN103939112A (zh) 2014-05-07 2014-05-07 下穿沟谷隧道双层超前支护结构

Country Status (1)

Country Link
CN (1) CN103939112A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105781557A (zh) * 2016-03-25 2016-07-20 广东水电二局股份有限公司 一种暗挖隧道化学灌浆固结砂层的施工方法
CN108798718A (zh) * 2018-07-09 2018-11-13 中铁十七局集团第四工程有限公司 隧道前承后继注浆方法
CN109145412A (zh) * 2018-08-03 2019-01-04 中南大学 浅埋隧道施工双层超前支护结构一体化计算模型与计算方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201241712Y (zh) * 2008-08-22 2009-05-20 中铁第一勘察设计院集团有限公司 大变形地层隧道初期支护结构
CN101614125A (zh) * 2009-07-23 2009-12-30 中铁九局集团有限公司 V级围岩隧道施工方法
CN201786361U (zh) * 2010-08-09 2011-04-06 中铁第一勘察设计院集团有限公司 一种特大断面黄土隧道下穿铁路的支护结构
CN102213099A (zh) * 2011-05-23 2011-10-12 中铁二院工程集团有限责任公司 四线大跨台基复合拱形隧道衬砌构造
CN203476347U (zh) * 2013-07-24 2014-03-12 中南大学 一种用于湿陷性黄土隧道的初期支护装置
CN203835406U (zh) * 2014-05-07 2014-09-17 中铁第一勘察设计院集团有限公司 一种下穿沟谷隧道双层超前支护结构

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201241712Y (zh) * 2008-08-22 2009-05-20 中铁第一勘察设计院集团有限公司 大变形地层隧道初期支护结构
CN101614125A (zh) * 2009-07-23 2009-12-30 中铁九局集团有限公司 V级围岩隧道施工方法
CN201786361U (zh) * 2010-08-09 2011-04-06 中铁第一勘察设计院集团有限公司 一种特大断面黄土隧道下穿铁路的支护结构
CN102213099A (zh) * 2011-05-23 2011-10-12 中铁二院工程集团有限责任公司 四线大跨台基复合拱形隧道衬砌构造
CN203476347U (zh) * 2013-07-24 2014-03-12 中南大学 一种用于湿陷性黄土隧道的初期支护装置
CN203835406U (zh) * 2014-05-07 2014-09-17 中铁第一勘察设计院集团有限公司 一种下穿沟谷隧道双层超前支护结构

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105781557A (zh) * 2016-03-25 2016-07-20 广东水电二局股份有限公司 一种暗挖隧道化学灌浆固结砂层的施工方法
CN105781557B (zh) * 2016-03-25 2018-10-02 广东水电二局股份有限公司 一种暗挖隧道化学灌浆固结砂层的施工方法
CN108798718A (zh) * 2018-07-09 2018-11-13 中铁十七局集团第四工程有限公司 隧道前承后继注浆方法
CN108798718B (zh) * 2018-07-09 2020-11-10 中铁十七局集团第四工程有限公司 隧道前承后继注浆方法
CN109145412A (zh) * 2018-08-03 2019-01-04 中南大学 浅埋隧道施工双层超前支护结构一体化计算模型与计算方法
CN109145412B (zh) * 2018-08-03 2022-04-19 中南大学 浅埋隧道施工双层超前支护结构一体化计算方法

Similar Documents

Publication Publication Date Title
CN205857201U (zh) 一种锚杆微型桩多级支护结构
CN102748040B (zh) 地铁大跨度车站主体结构及其柱拱法施工方法
CN104120686B (zh) 一种高弹模垫座式复合坝
AU2014308405A1 (en) An artificial dam of distributed coal mine underground reservoir and its constructing method
CN103821167A (zh) 一种地铁车站主体的施工方法
CN102758642A (zh) 上软下硬地层大跨隧道叠合承载拱结构及其施工方法
CN104047623A (zh) 一种大跨洞室开挖施工方法
CN207633352U (zh) 一种用于快速抢险施工的边坡加固结构
CN104265295B (zh) 倾斜中厚煤层无人工巷旁充填及无煤柱沿空留巷方法
CN205677631U (zh) 具有疏水功能的箱式隧底复合拱形隧道衬砌构造
CN110905530B (zh) 穿越断层破碎带的富水软岩隧道稳定性控制施工方法
CN108049896B (zh) 一种综放工作面沿空留巷方法
CN209924998U (zh) 一种浅覆土盾构隧道下穿道路加固保护结构
CN102322266A (zh) 一种隧道开挖施工方法
CN105370289A (zh) 一种复杂环境既有管线超长浅埋暗挖施工方法
CN110761811A (zh) 一种层状软岩隧道非对称支护结构及施工方法
CN104612696A (zh) 大断面暗挖地铁车站在粉细砂层中穿越高架桥柱洞法施工方法
CN109518699A (zh) 微型钢管桩加格栅喷锚深基坑联合支护体系及其施工方法
CN104653195A (zh) 一种冲沟地貌隧道洞口结构及其施工方法
CN103939112A (zh) 下穿沟谷隧道双层超前支护结构
CN102720511A (zh) 隧道泄水沉沙施工结构
CN104863588A (zh) 超前预设墩柱沿空留巷方法
CN204492847U (zh) 一种地下空间逆作法施工的支护结构
CN107420115A (zh) 一种浅埋暗挖隧道冒顶塌方换拱处理装置及其处理方法
CN203835406U (zh) 一种下穿沟谷隧道双层超前支护结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140723