CN103924623A - Main reinforcement distribution ring for uplifting of foundation pile - Google Patents
Main reinforcement distribution ring for uplifting of foundation pile Download PDFInfo
- Publication number
- CN103924623A CN103924623A CN201310009594.8A CN201310009594A CN103924623A CN 103924623 A CN103924623 A CN 103924623A CN 201310009594 A CN201310009594 A CN 201310009594A CN 103924623 A CN103924623 A CN 103924623A
- Authority
- CN
- China
- Prior art keywords
- main
- foundation pile
- reinforcements
- distribution ring
- main reinforcement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The invention relates to a foundation pile main reinforcement distribution ring applied to foundation file uplifting-resistant static load tests and anchor pile method foundation pile compression-resistant static load tests. In above tests, the main reinforcements of the foundation pile are firmly connected with a counterforce device. An existing connection manner is that a hanging plate is lap-welded with steel reinforcements. The connection manner has the defects that: 1, the filed welding quality is difficult to ensure; 2, when loading, the reinforcements are not straight and parallel, such that the main reinforcements is nonuniform in stress, and the individual main reinforcement may be broken in advance, and thus causing the test failure. The main reinforcement distribution ring is formed by hole rings 1, a central steel cylinder 2 and connection rib plates 3 welded together (referring to the attached drawing of the abstract). The hole rings are formed by cutting a thin steel plate, and the holes are distributed in accordance with the foundation pile main reinforcements. After penetrating through the hole rings 2, the main reinforcements are clamped by anchorage devices or nuts. When in use, drawing force from a main pull rod penetrating through the central steel cylinder 2 is uniformly distributed to main reinforcements by the main reinforcement distribution ring.
Description
Technical field
The present invention can be used for the technical fields such as extracting of foundation pile resistance to plucking static loading test, anchored pile-testing method foundation pile compressive static load test and foundation pile.
Background technology
Foundation pile resistance to plucking static loading test, anchored pile-testing method foundation pile compressive static load test need to firmly be connected the main muscle of foundation pile with counterforce device.Existing connected mode is mainly link plate+bar splicing weldering.There is following disadvantage in this connected mode: 1. Site Welding difficult quality guarantee; 2. while loading, each main muscle is in non-straight, not parallel state.Due to the main muscle unbalance stress of foundation pile, easily cause indivedual main muscle to be pulled off in advance, make test failure.Therefore, need to there is a kind of new connected mode, can make main muscle uniform stressed, ensure that above-mentioned success of the test carries out.
Summary of the invention
The present invention is welded to form by orifice ring 1, center steel cylinder 2 and some connection gussets 3.Orifice ring 2 is formed by steel plate cutting, and the distribution in hole is consistent with the distribution of the main muscle of foundation pile.Main muscle is through after orifice ring, and available ground tackle or nut clamp.When use, the pulling capacity transmitting through the main tie of center steel cylinder is assigned on every main muscle equably by main muscle distribution rings.
Brief description of the drawings
Fig. 1 is a kind of main muscle distribution rings schematic diagram for foundation pile drawing.
Claims (1)
1. be by the custom-designed main muscle distribution rings of drawing foundation pile, center main pull bar can be transmitted pulling capacity be assigned to equably on every main muscle by this main muscle distribution rings.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310009594.8A CN103924623A (en) | 2013-01-11 | 2013-01-11 | Main reinforcement distribution ring for uplifting of foundation pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310009594.8A CN103924623A (en) | 2013-01-11 | 2013-01-11 | Main reinforcement distribution ring for uplifting of foundation pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103924623A true CN103924623A (en) | 2014-07-16 |
Family
ID=51143003
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310009594.8A Pending CN103924623A (en) | 2013-01-11 | 2013-01-11 | Main reinforcement distribution ring for uplifting of foundation pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103924623A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2677455Y (en) * | 2003-06-12 | 2005-02-09 | 邹东峰 | Device for connecting anchor pile and secondary beam in foundation piles static-load testing |
KR20050111445A (en) * | 2004-05-20 | 2005-11-25 | 김대학 | Pile toe hydraulic cylinder load transfer test by side type telltale casing |
CN201258494Y (en) * | 2008-08-27 | 2009-06-17 | 湖南省第六工程有限公司 | Loading unit for single-pile vertical anti-pulling static load test |
CN201310102Y (en) * | 2008-12-05 | 2009-09-16 | 中国建筑东北设计研究院有限公司 | Static load test conversion beam |
CN201381519Y (en) * | 2008-12-24 | 2010-01-13 | 关喜才 | Uplift pile load testing device |
-
2013
- 2013-01-11 CN CN201310009594.8A patent/CN103924623A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2677455Y (en) * | 2003-06-12 | 2005-02-09 | 邹东峰 | Device for connecting anchor pile and secondary beam in foundation piles static-load testing |
KR20050111445A (en) * | 2004-05-20 | 2005-11-25 | 김대학 | Pile toe hydraulic cylinder load transfer test by side type telltale casing |
CN201258494Y (en) * | 2008-08-27 | 2009-06-17 | 湖南省第六工程有限公司 | Loading unit for single-pile vertical anti-pulling static load test |
CN201310102Y (en) * | 2008-12-05 | 2009-09-16 | 中国建筑东北设计研究院有限公司 | Static load test conversion beam |
CN201381519Y (en) * | 2008-12-24 | 2010-01-13 | 关喜才 | Uplift pile load testing device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202522475U (en) | Steel wire rope breaking force test fixture | |
CN103967008A (en) | Clip type pre-stress anchor cable active clip feeding and tension locking device and use method | |
CN104990720B (en) | A kind of domes finder charge loading device and its application method | |
CN210194710U (en) | Hollow precast pile static load pulling resistance test structure | |
CN103615258A (en) | Supporting structure and method of middle rock pillar of roadway junction point | |
CN104777096A (en) | Improved testing device and method for testing FRP-concrete interface property | |
CN204514597U (en) | A kind of wind power blade bolt pull-out test device | |
CN106289977B (en) | Bolt concrete tensile test device and test method | |
CN108195682A (en) | For the experimental rig and its test method of the research of coal petrography tunnel mesomechanics | |
CN106120792A (en) | A kind of pile foundation pile crown concrete prestripping assembly and construction method | |
CN105571958A (en) | Large-diameter high-strength composite circular tube torsion test device and test method thereof | |
CN104807699A (en) | In-situ rock tensile strength test device and test method | |
CN102677710B (en) | Reaction frame testing method for earth nail drawing tests | |
CN106124321B (en) | A kind of detachable anchor rod anchored features Testbed | |
CN204000972U (en) | A kind of fixture of pile for prestressed pipe resistance to plucking test | |
CN204570686U (en) | The subdivision tensioning system of pressure dispersing anchorage cable | |
CN103924623A (en) | Main reinforcement distribution ring for uplifting of foundation pile | |
CN206488992U (en) | A kind of self-drilling type anchor system nut tension test frock | |
CN106149715A (en) | Anchoring engineering stream line prestressing force compensates or method for stretching | |
CN204903304U (en) | Tensile test device is opened by prestressing force carbon fiber plate ground tackle system for structural strengthening | |
CN204302118U (en) | A kind of expansive concrete tensile creep test device | |
CN203129190U (en) | Foundation pile drawing anchorage device | |
CN108168870B (en) | Device and method suitable for testing fatigue performance of anchor connector | |
CN206873515U (en) | A kind of device for realizing the loading of screw pile foundation fast load-keeping method and dynamometry | |
CN206337588U (en) | A kind of large-section in-situ concrete pile pulling resistance testing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20140716 |