CN103912004A - Rivet pile - Google Patents

Rivet pile Download PDF

Info

Publication number
CN103912004A
CN103912004A CN201310318072.6A CN201310318072A CN103912004A CN 103912004 A CN103912004 A CN 103912004A CN 201310318072 A CN201310318072 A CN 201310318072A CN 103912004 A CN103912004 A CN 103912004A
Authority
CN
China
Prior art keywords
pile
rivet
stake
concrete
wall pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310318072.6A
Other languages
Chinese (zh)
Inventor
刘春原
刘明泉
母焕胜
赵梦璇
高岭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310318072.6A priority Critical patent/CN103912004A/en
Publication of CN103912004A publication Critical patent/CN103912004A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to a novel soft soil foundation processing technology, discloses a rivet pile and belongs to a novel foundation processing method in civil engineering soft soil foundation reinforcement. A flexible pile (mixing pile, gravel pile and the like) and rigid pile (pre-stressed concrete thin-wall pipe pile and cast-in-place concrete thin-wall pipe pile) composite foundation method is used for current soft soil foundation reinforcement processing. The flexible piles are cheap, but the quality is difficult to control; the rigid pile is reliable in quality, but the cost is increased; site qualities of cast-in-place concrete thin-wall pipe piles are difficult to control. According to the rivet pile, pre-stressed concrete thin-wall pipe piles and cast-in-place concrete thin-wall pipe piles are replaced by common concrete pipe piles, so that the cost can be reduced. The rivet pile has the advantages of being easy to fabricate, simple to construct, low in cost, wide in application range and the like and can be used for soft soil foundation processing of industrial and civic buildings.

Description

Rivet stake
Technical field
The present invention relates to civil engineering reinforced soft soil ground technology, be specially design and the construction method of Soft Ground concrete rivet stake.
Background technology
Reinforced soft soil ground is processed the normal thin tubular piles produced by prestressed concrete that adopts hereinafter to be referred as PTC stake.PTC stake belongs to rigid pile, and stake end stress is concentrated obviously, easily produce larger on the amount of thrusting, cause the differential settlement of superstructure, affect the normal use of superstructure.For addressing the above problem, conventionally at stake end reserved steel bar, cast-in-situ concrete pile cap, so not only increases cost, improves construction difficulty but also can affect construction speed.For the PTC stake with pile cover, its pile spacing is 7 times to 8 times an of footpath, is mainly used in the control of sedimentation, but bearing capacity is improved seldom, lacks the benefit of rigid pile.
Summary of the invention
For the deficiencies in the prior art, the technical problem that the present invention solves is just to provide a kind of design and construction method of rivet stake.It uses ordinary concrete pile tube to substitute prestressed concrete pipe pile, can effectively reduce costs; Use prefabricated rivet shape concrete pile follower to replace cast-in-situ concrete pile cover, pile body is connected fast and reliable with pile cover, eliminates reserved steel bar construction technology and speed of application are impacted.
Rivet pile spacing involved in the present invention than determining, is generally 2 times to 3 times pile cover diameters by common stake stake footpath, can improve the bearing capacity of soft foundation simultaneously and reduce sedimentation, gives full play to the performance of rigid pile.Rivet stake embodiment technical-economic index involved in the present invention is compared as follows: suppose the long 12m of being all of stake, width of subgrade 50m, presses apart from end of the bridge 30m range computation.The former deep-mixed pile that is designed to, stake footpath 500mm, pilespacing is respectively 1100m, 1300mm, 1500mm, and triangle lays out pile, and the every linear meter(lin.m.) comprehensive unit price of deep-mixed pile is 30 yuan.1010 of total amount of pile, total linear meter(lin.m.) 12120m, 1500 square metres of reinforcing expenses are 363600 yuan, it is 242.4 yuan that unit square is reinforced.Optimal design is rivet stake, stake footpath 480mm, and wall thickness 40mm, pilespacing is respectively 2000mm, 2500mm, 3000mm, and the every linear meter(lin.m.) comprehensive unit price of rivet stake is about 102 yuan.294 of total amount of pile, total linear meter(lin.m.) 3528m, 1500 square metres of reinforcing expenses are 359856 yuan, it is 239.9 yuan that unit square is reinforced.Based on more visible above, two kinds of reinforcing and processing methods of deep-mixed pile and rivet stake, rivet stake cost is lower, and rivet stake has ground strong adaptability, construction quality is easily controlled, and bearing capacity is high, total settlement is little, be easy to quality examination etc. is the incomparable advantage of deep-mixed pile.The inventive method has handling ease, and construction is simple, with low cost, pollution-free, the features such as applied range.Rivet stake is applicable to the Soft Ground of highway construction and industrial civil building.
The present invention provides a kind of construction method that is applicable to described rivet stake simultaneously.At the scene in construction, become pile tube technique with respect to shaking into method, the present invention adopts merogenesis static pressure mode, without mud, without oil gas, noiselessness, pollution such as shockproof grade, on facing mutually building foundation also without impact, integrated cost is low, is particularly suitable for using in the urban construction high in environmental requirement, municipal administration or highway construction project and concealed work, has broad application prospects and huge market value.
Accompanying drawing explanation
Fig. 1 is rivet stake profile of the present invention.
The specific embodiment
Below in conjunction with embodiment and accompanying drawing, the present invention is further described:
Designed rivet stake and the construction method of the present invention comprises: the activitiess such as pile and piling.These activitiess and prior art do not have essential distinction, mean that these prior aries are basic technologies of the present invention simultaneously yet.Pile shaft material adopts common coagulation according to design, and pile body diameter is determined according to designing requirement, adopts centrifugal process to produce.Every section of pile body length should not exceed 6 meters, and wall thickness should not be less than 40 millimeters.While not establishing principal rod in pile cover, can adopt plain concrete, while establishing principal rod in pile cover, carry out by existing relevant specification of country.Pile cover diameter is 2: 1 with the ratio of pile body diameter.Pile cover shape should be identical with pile body shape, can adopt circular or square.Construction method is as follows:
1 by designing requirement fixed pile;
Prefabricated tubular rivet stake merogenesis is depressed into projected depth by 2 use pile presss;
3 by 0.5 meter of soil of stake end hollow position soil layer hand excavation, builds after 0.2 meter of plain concrete, places precast concrete pile cover;
4 after concrete strength reaches age phase, lays folder muscle Base with Sand Gravel Cushion, form compound foundation on it.

Claims (6)

1. Soft Ground new technology-rivet stake, comprise and use ordinary concrete pile tube to substitute prestressed concrete pipe pile, use prefabricated rivet shape concrete pile follower to replace cast-in-situ concrete pile cover, rivet pile spacing is determined by common stake stake footpath ratio, a kind of construction method of applicable rivet stake.
2. the design of rivet stake according to claim 1, pile shaft material adopts common coagulation according to design, and pile body diameter is determined according to designing requirement, adopts centrifugal process to produce.Every section of pile body length should not exceed 6 meters, and wall thickness should not be less than 40 millimeters.
3. the design of rivet stake according to claim 1, while not establishing principal rod, can adopt plain concrete in pile cover, while establishing principal rod, carries out by existing relevant specification of country in pile cover.Pile cover diameter is 2: 1 with the ratio of pile body diameter.Pile cover shape should be identical with pile body shape, can adopt circular or square.
4. the design of rivet stake according to claim 1, rivet pile spacing than determining, is generally 2 times to 3 times pile cover diameters by common stake stake footpath.It is characterized by bearing capacity high, and be multi-column pier foundation, settling amount is very little.
5. the construction method of rivet stake according to claim 1, its feature adopts the mode of merogenesis static pressure, adopt merogenesis static pressure mode, without mud, without oil gas, noiselessness, pollution such as shockproof grade, on facing mutually building foundation also without impact, integrated cost is low, is particularly suitable for using in the urban construction high in environmental requirement, municipal administration or highway construction project and concealed work.
6. the construction method of rivet stake according to claim 1, construction method is as follows: by designing requirement fixed pile; Prefabricated tubular rivet stake merogenesis is depressed into projected depth with pile press; By 0.5 meter of soil of stake end hollow position soil layer hand excavation, build after 0.2 meter of plain concrete, place precast concrete pile cover; After concrete strength reaches age phase, on it, lay folder muscle Base with Sand Gravel Cushion, form compound foundation.
CN201310318072.6A 2013-07-18 2013-07-18 Rivet pile Pending CN103912004A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310318072.6A CN103912004A (en) 2013-07-18 2013-07-18 Rivet pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310318072.6A CN103912004A (en) 2013-07-18 2013-07-18 Rivet pile

Publications (1)

Publication Number Publication Date
CN103912004A true CN103912004A (en) 2014-07-09

Family

ID=51037975

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310318072.6A Pending CN103912004A (en) 2013-07-18 2013-07-18 Rivet pile

Country Status (1)

Country Link
CN (1) CN103912004A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106958176A (en) * 2017-01-25 2017-07-18 建华建材(江苏)有限公司 Quick prefabricated pin-connected panel soft base processing method
CN114293556A (en) * 2021-12-14 2022-04-08 中铁第一勘察设计院集团有限公司 Prefabricated screw pile construction drilling tool and pile forming method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003253687A (en) * 2002-03-05 2003-09-10 Taisei Corp Supporting structure for concrete foundation
CN1912253A (en) * 2006-06-21 2007-02-14 闫雪晖 Construction method of prestressed tubular pile
CN102493472A (en) * 2011-12-13 2012-06-13 中交第二公路工程局有限公司 Deepwater soft soil foundation reverse construction method low pile cap composite foundation construction process for bridge
CN202450517U (en) * 2012-02-20 2012-09-26 中交第一航务工程勘察设计院有限公司 Large cross-section tube-sinking cast-in-place concrete post pressure-grouting hollow square pile
CN202830954U (en) * 2012-09-02 2013-03-27 中铁二院工程集团有限责任公司 Karst area light frame roadbed pile plate structure construction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003253687A (en) * 2002-03-05 2003-09-10 Taisei Corp Supporting structure for concrete foundation
CN1912253A (en) * 2006-06-21 2007-02-14 闫雪晖 Construction method of prestressed tubular pile
CN102493472A (en) * 2011-12-13 2012-06-13 中交第二公路工程局有限公司 Deepwater soft soil foundation reverse construction method low pile cap composite foundation construction process for bridge
CN202450517U (en) * 2012-02-20 2012-09-26 中交第一航务工程勘察设计院有限公司 Large cross-section tube-sinking cast-in-place concrete post pressure-grouting hollow square pile
CN202830954U (en) * 2012-09-02 2013-03-27 中铁二院工程集团有限责任公司 Karst area light frame roadbed pile plate structure construction

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘福臣等: "《地基基础处理技术与实例》", 31 January 2013, 化学工业出版社 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106958176A (en) * 2017-01-25 2017-07-18 建华建材(江苏)有限公司 Quick prefabricated pin-connected panel soft base processing method
CN114293556A (en) * 2021-12-14 2022-04-08 中铁第一勘察设计院集团有限公司 Prefabricated screw pile construction drilling tool and pile forming method

Similar Documents

Publication Publication Date Title
CN106592585B (en) A kind of expansion body compaction pile and construction method for eliminating pile foundation negative friction force
CN202559376U (en) Near-river municipal administration road structure below viaduct bridge
CN100439600C (en) Treatment method of newly built high way railway engineering soft foundation
CN101139834B (en) Concrete pile structure
CN103696416A (en) Novel foundation treatment method
CN108951615A (en) Reinforced concrete sleeve stake and its construction method
CN103912004A (en) Rivet pile
CN104762956A (en) Method for forming novel pile based on construction waste recycled aggregate
CN203684022U (en) Prefabricated pipe pile embankment structure
Wang et al. Performance of screw piles in thick collapsible loess
CN202492776U (en) Compound ion soil curing agent and road structure paved by acetylene sludge
CN202543757U (en) Filling structure for blown sand road foundation
CN201406681Y (en) Pre-reinforcement processing device of mixed hydraulic reclamation soft soil foundation
CN209025072U (en) Reinforced concrete sleeve stake
CN203498828U (en) Top reinforced cast-in-place concrete thin-wall pipe pile
CN102966095A (en) Compound pile cast with concrete on site and filled with sand and construction method thereof
CN202175948U (en) Anti-corrosion precast pile
CN202298605U (en) Cast-in-place concrete and sand filling compound pile
CN207017170U (en) A kind of corrugated steel pipe steel-concrete combined structure suitable for high roadbed engineering
CN204662417U (en) A kind of Deep Thick Soft Ground district pool roadbed foundation reinforcing structure
CN103215964A (en) Method of industrial systematic treatment of foundation through prestressed concrete solid pre-formed piles
CN204551444U (en) Steel pipe tubaeform cast-in-situ major diameter pipe pile bilayer sleeve device in a kind of
CN204040009U (en) Settlement observation plate and displacement observation pilework
CN217869782U (en) Concrete permeates water with pouring basic unit's structure that permeates water
CN108978654B (en) Integrated pile pier construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140709