CN103901482A - Method of quickly acquiring continuous underground medium electric change information - Google Patents

Method of quickly acquiring continuous underground medium electric change information Download PDF

Info

Publication number
CN103901482A
CN103901482A CN201210576169.2A CN201210576169A CN103901482A CN 103901482 A CN103901482 A CN 103901482A CN 201210576169 A CN201210576169 A CN 201210576169A CN 103901482 A CN103901482 A CN 103901482A
Authority
CN
China
Prior art keywords
survey
observation
change information
laid
underground medium
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210576169.2A
Other languages
Chinese (zh)
Inventor
腰善丛
张濡亮
乔宝强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Research Institute of Uranium Geology
Original Assignee
Beijing Research Institute of Uranium Geology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Research Institute of Uranium Geology filed Critical Beijing Research Institute of Uranium Geology
Priority to CN201210576169.2A priority Critical patent/CN103901482A/en
Publication of CN103901482A publication Critical patent/CN103901482A/en
Pending legal-status Critical Current

Links

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

The invention belongs to the technical field of applied geophysics of the field of geological mineral exploration, and particularly relates to a method of quickly acquiring continuous underground medium electric change information. The method comprises the following steps of firstly surveying and mapping a surveyed area and controlling horizontal and vertical accuracy of topographic surveying and mapping data to be within meter-grade range, laying a geophysical survey network in the surveyed area, carrying out audio magnetotelluric survey on each section of the laid geophysical survey network, carrying out high-density resistivity survey on each section of the laid geophysical survey network, inversing data acquired by the above two survey methods, and integrating the acquired inversion geoelectric model to draw a geoelectric model with continuous medium change, wherein the main survey lines inside the survey network and the main tectonic direction of the work area are vertical or intersected at a large angle and extension of two ends of the survey line exceeds more than 20% of the length of the surveyed area.

Description

The method of the electrically continuous change information of a kind of quick obtaining underground medium
Technical field
The invention belongs to the applied geophysics technical field of geological and mineral Exploration Domain, be specifically related to the method for the electrically continuous change information of a kind of quick obtaining underground medium.
Background technology
Applied geophysics is take physics principle as technical foundation, solves the problem relevant with the earth, its objective is the understanding earth.Geological and mineral exploration is that to find mineral wealth be object activity in production.
Along with the development of economic construction, many underground engineerings are carried out in succession.Some engineering is positioned at the area of complicated topographical conditions, and special landform altitude changes violent, and the helpless or effect of general geophysical techniques means and efficiency are not good.In addition, underground engineering is also relatively dark.In order to grasp the underground geologic hidden peril that whether exists, particularly understand from earth's surface to the continuous situation of change of underground medium within the scope of underground hundreds of meters, make observation data there is no to contain the geologic body of underground hundreds of meters of scopes, be significant to underground works " dead angle ".
Therefore, the method of needing the electrically continuous change information of a kind of quick obtaining underground medium badly, merges advanced audio-frequency magnetotelluric magnetic technology (AMT), to increase work efficiency, obtain the geological information of underground thousands of meters, thereby realize the object of delineation Polymetallic Mineralization fast.
Summary of the invention
The technical problem to be solved in the present invention is: a kind of electrically continuously method of change information of quick obtaining underground medium is provided, realize convenient, rapidly underground works is carried out to geophysics prospecting.
In order to realize this purpose, the technical scheme that the present invention takes is:
A method for the electrically continuous change information of quick obtaining underground medium, comprises the following steps:
(1) first survey and draw reconnoitring area, the level of control topographic mapping data and vertical precision are within the scope of meter level;
(2) prospecting district is laid to geophysics survey grid, or the intersect with large-angle vertical with the outstanding tectonic direction of workspace of the main survey line in survey grid; The two ends extension of survey line exceedes prospecting the more than 20% of section length;
(3) every section of laid geophysics survey grid is carried out to audio magnetotelluric method observation;
(4) every section of laid geophysics survey grid is carried out to high-density electric observation;
(5) the above-mentioned two kinds of observation procedure institute image data of inverting, inversion result will guarantee that the ground electric model that two kinds of observation procedures obtain is consistent, otherwise does inverting after revising observation data or refutation process again, consistent to the inversion result of two kinds of methods till;
(6) the inverting ground electric model comprehensively having obtained, draws underground medium continually varying ground electric model.
Further, the method for the electrically continuous change information of a kind of quick obtaining underground medium as above, wherein: between step (5) and step (6), carry out ground high precision magnetic method observation.
Further, the method of the electrically continuous change information of a kind of quick obtaining underground medium as above, wherein: in step (2), the main survey line in survey grid and the outstanding tectonic direction intersect with large-angle of workspace refer to crossing angle between 75 ° ~ 90 °.
Further, the method of the electrically continuous change information of a kind of quick obtaining underground medium as above, wherein: in step (3), when being carried out to audio magnetotelluric method observation, every section of laid geophysics survey grid controls following parameter area: measurement point distance is between 25m to 50m, spread of electrodes is 50m, adopts tensor to lay measuring station mode; The minimum effective frequency of observation data is not more than 10Hz, and the highest effective frequency is not less than 8000Hz; Every measurement point time series data recording is not less than 25 minutes; Calculate the impedance information of each measuring point by Robust method, impedance data has 10 frequencies at least and is uniformly distributed in the order of magnitude of each frequency.
Further, the method of the electrically continuous change information of a kind of quick obtaining underground medium as above, wherein: in step (4), when being carried out to high-density electric observation, every section of laid geophysics survey grid controls following parameter area: effectively Observational depth >=120m, and effectively the length of observation covers whole piece section; Spread of electrodes length≤5 meter; Many 2 times of stack observation frequency.
Technical solution of the present invention provide a kind of under complicated earth condition, to the electrical Continuous Observation of underground medium, engineering geophysics surveying method effectively and easily.Advanced audio-frequency magnetotelluric magnetic technology (AMT) and two kinds of methods of high-density electric are merged in the present invention, realize complex-terrain area is even gone up to the electrical situation of change of km depth range Continuous Observation underground medium from earth's surface to underground hundreds of rice, in regions with complex terrain, more can show the superiority of this technology.
Embodiment
Below technical solution of the present invention is elaborated.
The present invention seeks to disclose to engineering geophysics prospecting field a kind of technology of new mineralising position, quick location.This method is divided into two steps: first in working range, carry out the terraced surface sweeping work in electricity that swashs, thus the induced polarization anomaly in delineation Chu Ce district; Then, lay audio-frequency magnetotelluric magnetic survey engineering according to induced polarization anomaly, obtain electric structural information accordingly.According to the result of these two steps, may there is the positional information of mineralising in delineation.
Concrete technical scheme is: the method for the electrically continuous change information of a kind of quick obtaining underground medium, comprises the following steps:
(1) first survey and draw reconnoitring area, the level of control topographic mapping data and vertical precision are within the scope of meter level;
(2) prospecting district is laid to geophysics survey grid, or the intersect with large-angle vertical with the outstanding tectonic direction of workspace of the main survey line in survey grid; The two ends extension of survey line exceedes prospecting the more than 20% of section length; Main survey line in survey grid and the outstanding tectonic direction intersect with large-angle of workspace refer to crossing angle between 75 ° ~ 90 °.
(3) every section of laid geophysics survey grid is carried out to audio magnetotelluric method observation; When being carried out to audio magnetotelluric method observation, every section of laid geophysics survey grid controls following parameter area: measurement point, apart from being that between 25m to 50m, spread of electrodes is 50m, adopts tensor to lay measuring station mode; The minimum effective frequency of observation data is not more than 10Hz, and the highest effective frequency is not less than 8000Hz; Every measurement point time series data recording is not less than 25 minutes; Calculate the impedance information of each measuring point by Robust method, impedance data has 10 frequencies at least and is uniformly distributed in the order of magnitude of each frequency.
(4) every section of laid geophysics survey grid is carried out to high-density electric observation; When being carried out to high-density electric observation, every section of laid geophysics survey grid controls following parameter area: effectively Observational depth >=120m, and effectively the length of observation covers whole piece section; Spread of electrodes length≤5 meter; Many 2 times of stack observation frequency.
(5) the above-mentioned two kinds of observation procedure institute image data of inverting, inversion result will guarantee that the ground electric model that two kinds of observation procedures obtain is consistent, otherwise does inverting after revising observation data or refutation process again, consistent to the inversion result of two kinds of methods till;
(6) the inverting ground electric model comprehensively having obtained, draws underground medium continually varying ground electric model.
Further, the method of the electrically continuous change information of a kind of quick obtaining underground medium as above, if the prospecting district in subsurface geology situation complexity (what is for complicated) carries out relevant work, between step (5) and step (6), carry out ground high precision magnetic method observation, explain auxiliary foundation is provided for above-mentioned ground electric model.

Claims (5)

1. a method for the electrically continuous change information of quick obtaining underground medium, is characterized in that, comprises the following steps:
(1) first survey and draw reconnoitring area, the level of control topographic mapping data and vertical precision are within the scope of meter level;
(2) prospecting district is laid to geophysics survey grid, or the intersect with large-angle vertical with the outstanding tectonic direction of workspace of the main survey line in survey grid; The two ends extension of survey line exceedes prospecting the more than 20% of section length;
(3) every section of laid geophysics survey grid is carried out to audio magnetotelluric method observation;
(4) every section of laid geophysics survey grid is carried out to high-density electric observation;
(5) the above-mentioned two kinds of observation procedure institute image data of inverting, inversion result will guarantee that the ground electric model that two kinds of observation procedures obtain is consistent, otherwise does inverting after revising observation data or refutation process again, consistent to the inversion result of two kinds of methods till;
(6) the inverting ground electric model comprehensively having obtained, draws underground medium continually varying ground electric model.
2. the method for the electrically continuous change information of a kind of quick obtaining underground medium as claimed in claim 1, is characterized in that: between step (5) and step (6), carry out ground high precision magnetic method observation.
3. the method for the electrically continuous change information of a kind of quick obtaining underground medium as claimed in claim 1, it is characterized in that: in step (2), the main survey line in survey grid and the outstanding tectonic direction intersect with large-angle of workspace refer to crossing angle between 75 ° ~ 90 °.
4. the method for the electrically continuous change information of a kind of quick obtaining underground medium as claimed in claim 1, it is characterized in that: in step (3), when being carried out to audio magnetotelluric method observation, every section of laid geophysics survey grid controls following parameter area: measurement point distance is between 25m to 50m, spread of electrodes is 50m, adopts tensor to lay measuring station mode; The minimum effective frequency of observation data is not more than 10Hz, and the highest effective frequency is not less than 8000Hz; Every measurement point time series data recording is not less than 25 minutes; Calculate the impedance information of each measuring point by Robust method, impedance data has 10 frequencies at least and is uniformly distributed in the order of magnitude of each frequency.
5. the method for the electrically continuous change information of a kind of quick obtaining underground medium as claimed in claim 1, it is characterized in that: in step (4), when being carried out to high-density electric observation, every section of laid geophysics survey grid controls following parameter area: effectively Observational depth >=120m, and effectively the length of observation covers whole piece section; Spread of electrodes length≤5 meter; Many 2 times of stack observation frequency.
CN201210576169.2A 2012-12-26 2012-12-26 Method of quickly acquiring continuous underground medium electric change information Pending CN103901482A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210576169.2A CN103901482A (en) 2012-12-26 2012-12-26 Method of quickly acquiring continuous underground medium electric change information

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210576169.2A CN103901482A (en) 2012-12-26 2012-12-26 Method of quickly acquiring continuous underground medium electric change information

Publications (1)

Publication Number Publication Date
CN103901482A true CN103901482A (en) 2014-07-02

Family

ID=50992930

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210576169.2A Pending CN103901482A (en) 2012-12-26 2012-12-26 Method of quickly acquiring continuous underground medium electric change information

Country Status (1)

Country Link
CN (1) CN103901482A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106597552A (en) * 2016-12-25 2017-04-26 中南大学 Chinese-character-mi-shaped three-dimensional electrical prospecting method
CN107548457A (en) * 2015-04-30 2018-01-05 斯伦贝谢技术有限公司 The method of water saturation degree is estimated in electromagnetic measurement
CN114509822A (en) * 2022-01-20 2022-05-17 中铁二院工程集团有限责任公司 Ground-air electromagnetic array surveying method for railway tunnel and survey line arrangement method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080224704A1 (en) * 2004-09-15 2008-09-18 Allan Westersten Apparatus and method for detecting and identifying ferrous and non-ferrous metals
CN101419294A (en) * 2008-09-23 2009-04-29 中国科学院地质与地球物理研究所 Multichannel measuring electrode converter and measurement method thereof
US20120146647A1 (en) * 2010-06-18 2012-06-14 Minelab Electronics Pty Limited Metal detector with at least one transmit/receive switch

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080224704A1 (en) * 2004-09-15 2008-09-18 Allan Westersten Apparatus and method for detecting and identifying ferrous and non-ferrous metals
CN101419294A (en) * 2008-09-23 2009-04-29 中国科学院地质与地球物理研究所 Multichannel measuring electrode converter and measurement method thereof
US20120146647A1 (en) * 2010-06-18 2012-06-14 Minelab Electronics Pty Limited Metal detector with at least one transmit/receive switch

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘祜 等: "电、磁综合方法在南方硬岩型铀矿勘查中的应用", 《物探与化探》, vol. 35, no. 6, 31 December 2011 (2011-12-31) *
底青云 等: "CSAMT法和高密度电法探测地下水资源", 《地球物理学进展》, vol. 16, no. 3, 30 September 2001 (2001-09-30) *
马庚杰 等: "甚低频电磁法龙头山银铅锌矿床勘查中的应用", 《地球物理学进展》, vol. 22, no. 5, 31 October 2007 (2007-10-31), pages 1627 - 1636 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107548457A (en) * 2015-04-30 2018-01-05 斯伦贝谢技术有限公司 The method of water saturation degree is estimated in electromagnetic measurement
CN106597552A (en) * 2016-12-25 2017-04-26 中南大学 Chinese-character-mi-shaped three-dimensional electrical prospecting method
CN114509822A (en) * 2022-01-20 2022-05-17 中铁二院工程集团有限责任公司 Ground-air electromagnetic array surveying method for railway tunnel and survey line arrangement method thereof
CN114509822B (en) * 2022-01-20 2023-04-07 中铁二院工程集团有限责任公司 Ground-air electromagnetic array surveying method for railway tunnel and survey line arrangement method thereof

Similar Documents

Publication Publication Date Title
Metwaly et al. Application of 2-D geoelectrical resistivity tomography for subsurface cavity detection in the eastern part of Saudi Arabia
Caputo et al. The use of electrical resistivity tomographies in active tectonics: examples from the Tyrnavos Basin, Greece
CN102758622B (en) Monitoring method for earth surface environment damage in underground mining area
Okazaki et al. Airborne electromagnetic and magnetic surveys for long tunnel construction design
Wu et al. Mapping coalmine goaf using transient electromagnetic method and high density resistivity method in Ordos City, China
CN103809204A (en) Field audio magnetotelluric data acquisition method
Jayeoba et al. 2-D electrical resistivity tomography for groundwater exploration in hard rock terrain
CN105204078A (en) Method for calculating three-dimensional magnetotelluric sounding main impedance
Supper et al. A complex geo-scientific strategy for landslide hazard mitigation–from airborne mapping to ground monitoring
CN103901482A (en) Method of quickly acquiring continuous underground medium electric change information
CN103901503A (en) Comprehensive detection method for front unfavorable geologic bodies in mine underground roadway tunneling
Jianliang et al. Integrated Geophysical Survey in Defining Subsidence Features of Glauber's Salt Mine, Gansu Province in China
Usama et al. Mapping of subsoil water level and its impacts on Hawara archeological site by transient and multi-frequency electromagnetic survey
Cheng et al. Experimental study of small fixed-loop transient electromagnetic method for characterizing water-bearing structures in tunnels
Wang et al. Research on the cave exploration technology of overhead transmission line tower foundation
Sarris et al. Contribution of geophysical approaches to the study of Priniatikos Pyrgos
CN103901480A (en) Method of quickly contouring multi-metal mineralization position
Mathieson et al. The National Museums of Scotland Saqqara survey project, earth sciences 1990–1998
Zhou et al. Application of Comprehensive Geophysical Prospecting Method in Fine Detection of Goaf
Nordiana et al. 2-D Resistivity imaging of buried furnace at Sik, Kedah (Malaysia)
Zhao et al. Research and application of AMT in tunnel hidden goaf under complex conditions
Monahan Investigating fault structure using electrical resistivity tomography
Batayneh Resistivity tomography as an aid to planning gas‐pipeline construction, Risha area, north‐east Jordan
Galone et al. Integrating near-surface geophysical methods and remote sensing techniques for reconstructing fault-bounded valleys (Mellieha valley, Malta)
Su et al. A High-resolution Imaging and Interpretation Method for Electrical Resistivity Tomography Based on Reflection Coefficient Analysis

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20140702

RJ01 Rejection of invention patent application after publication