CN103901341A - DCU test box - Google Patents

DCU test box Download PDF

Info

Publication number
CN103901341A
CN103901341A CN201410179352.8A CN201410179352A CN103901341A CN 103901341 A CN103901341 A CN 103901341A CN 201410179352 A CN201410179352 A CN 201410179352A CN 103901341 A CN103901341 A CN 103901341A
Authority
CN
China
Prior art keywords
dcu
interface
power
pilot lamp
signal transmission
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410179352.8A
Other languages
Chinese (zh)
Inventor
王柯
刘海涛
张倩
刘东升
刘永春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinotruk Jinan Power Co Ltd
China National Heavy Duty Truck Group Jinan Power Co Ltd
Original Assignee
China National Heavy Duty Truck Group Jinan Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Heavy Duty Truck Group Jinan Power Co Ltd filed Critical China National Heavy Duty Truck Group Jinan Power Co Ltd
Priority to CN201410179352.8A priority Critical patent/CN103901341A/en
Publication of CN103901341A publication Critical patent/CN103901341A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

The invention provides a DCU test box which comprises a box body and an integrated test harness. The box body is provided with multiple potentiometers, multiple actuator indicator lights, an external power interface, a DCU power interface and a DCU signal transmission interface. The potentiometers and the actuator indicator lights are connected with the DCU signal transmission interface respectively. The external power interface is connected with the DCU power interface through a power inverter. The DCU power interface and the DCU signal transmission interface are connected with a DCU to be tested through the integrated test harness. The integrated test harness is provided with an OBD plug used for being connected with a third-party diagnostic tool. A power switch is arranged between the power inverter and the DCU power interface. The integrated test harness comprises a DCU power line, an OBD line and a DCU signal transmission line. According to the scheme of the DCU test box, wiring is simple, the testing process is visual, a common technician can use the DCU test box conveniently, the testing time is short, cost is low, and popularization and use are convenient.

Description

DCU test box
Technical field
The present invention relates to a kind of test box, specifically a kind of for state four vehicle SCR after-treatment system DCU(Dosing Control Unit, urea-spray control module) DCU test box.
Background technology
For guaranteeing quality and the usability of car load, DCU needs to test before its Assembling Production.And at present, the test of DCU ECU (Electrical Control Unit) is not still had to systematic testing tool, and conventional testing tool has two kinds: the one, and connect all parts by wire harness and judge whether short circuit or the fault opening circuit, now need to use a large amount of wire harness to carry out connection, complex circuit.And while using this instrument test, first will get rid of wire harness problem, guarantee that wire harness connects normal, not only cost is high, and often because wire harness redundancy takies more space, not Portable belt; The 2nd, use oscillograph, multimeter to measure each test point on circuit board, it needs professional to test, and the test used time is longer, and cost is also higher.This is the deficiencies in the prior art part.
Summary of the invention
The technical problem to be solved in the present invention is, for the deficiencies in the prior art part, the technical scheme of DCU test box is provided, this scheme wiring is simple, test is directly perceived, and avoid in prior art, needing to use by professional the use of the mode of each test point on oscillograph, multimeter metering circuit plate, be convenient to those of ordinary skill and use, and Measuring Time is short, cost is low, is convenient to promote the use of.
In order to solve the problems of the technologies described above, the invention provides following DCU test box, comprise casing and integration testing wire harness; Casing is provided with multiple potentiometers, multiple actuator pilot lamp, external power source interface, DCU power interface and DCU signal transmission interface, described potentiometer is connected with DCU signal transmission interface respectively with actuator pilot lamp, external power source interface is connected with DCU power interface by a power supply changeover device, and power supply changeover device is arranged in casing; Described DCU power interface is connected with DCU to be measured by described integration testing wire harness respectively with DCU signal transmission interface, described integration testing wire harness is provided with the OBD(Onboard Diagnosis for connecting third-party diagnostic tool, On-Board Diagnostics (OBD)) diagnostic plug.
When use, simulate the working environment of DCU to be measured by changing the resistance value of each potentiometer, simulate by actuator pilot lamp each actuator that DCU to be measured controls, and the corresponding control circuit of the bright DCU to be measured of actuator pilot lamp can normally work, otherwise cannot normally work.In addition, the resistance value of each potentiometer can be transferred to third-party diagnostic tool by integration testing wire harness, be convenient to third-party diagnostic tool the signal output apparatus of DCU to be measured is diagnosed.Simple in structure, easy to use.
Between power supply changeover device and DCU power interface, be provided with power switch, described power switch is arranged on casing.
Described integration testing wire harness comprises DCU power lead, OBD(On-Board Diagnostics (OBD)) diagnostics lines and DCU signal transmssion line, one end of DCU power lead is provided with the DCU attaching plug for connecting DCU power interface, one end of OBD diagnostics lines is provided with described OBD diagnostic plug, one end of DCU signal transmssion line is provided with the DCU signal transmission plug for connecting DCU signal transmission interface, and the connection terminal of the other end of described DCU power lead, OBD diagnostics lines and DCU signal transmssion line is arranged on same DCU Signal plug.
Described casing is provided with CAN communication interface, and described CAN communication interface is connected with DCU signal transmission interface.
Described potentiometer comprises urea temperature potentiometer, urea level potentiometer, urea pressure potentiometer and exhaust temperature potentiometer, and each potentiometer is connected with DCU signal transmission interface respectively.
Described actuator pilot lamp comprises nozzle operation pilot lamp, pump work pilot lamp, pipeline heating pilot lamp, casing burner on light and pump box burner on light, and described nozzle operation pilot lamp, pump work pilot lamp, pipeline heating pilot lamp, casing burner on light and pump box burner on light are connected with DCU signal transmission interface respectively.
Described casing is provided with handle, thereby is convenient to movement of the present invention.
Described handle is provided with protective layer.The use of protective layer can effectively prevent opponent's injury.
Described protective layer is rubber layer or plastic layer.
Compared with prior art scheme, the invention has the advantages that:
(1) use of integration testing wire harness, overcome in prior art the drawback that connects all parts and judge whether short circuit or open circuit fault by wire harness, this has been avoided easily causing while connection by a large amount of wire harness in prior art the drawback of wiring confusion, easy to use, thereby shorten setting up time, improved testing efficiency;
(2) be provided with plug at the two ends of integration testing wire harness, and integration testing wire harness only can be realized the present invention by a connector and be connected with the signal of DCU to be measured, wiring is simple, thereby shorten setting up time, improved wiring efficiency, and then improve testing efficiency, also reduced production cost, be convenient to promote the use of;
(3) be provided with plug at the two ends of integration testing wire harness, on casing, be provided with the relevant interface being used in conjunction with, be convenient to being connected and dismounting of integration testing wire harness and casing, thereby be convenient to the local replacing of integration testing wire harness or casing, economy is practical again;
(4) the present invention is provided with potentiometer on casing, potentiometer communicates by integration testing wire harness and DCU to be measured, and integration testing wire harness is provided with the OBD diagnostic plug for connecting third-party diagnostic tool, when use, be communicated with DCU to be measured and potentiometer and third-party diagnostic tool by integration testing wire harness, simulate the working environment of DCU to be measured by changing the resistance value of each potentiometer, integration testing wire harness in this programme has the effect of signal transmission passage, the resistance value of each potentiometer can be transferred to third-party diagnostic tool, so that third-party diagnostic tool diagnoses out each potentiometer whether to have the variation of resistance value, near and be convenient to the signal input circuit that third-party diagnostic tool tests out DCU to be measured and whether can normally use, simple in structure, easy to use,
(5) the present invention is provided with actuator pilot lamp on casing, actuator pilot lamp is simulated each actuator that DCU to be measured controls, each actuator pilot lamp communicates by integration testing wire harness and DCU to be measured respectively, and integration testing wire harness is provided with the OBD diagnostic plug for connecting third-party diagnostic tool, when use, be communicated with DCU to be measured and actuator pilot lamp and third-party diagnostic tool by integration testing wire harness, when use, integration testing wire harness of the present invention has the effect of third-party diagnostic tool control signal transmission channels, under the control action of DCU to be measured, respective actuators pilot lamp is bright or go out, thereby whether the signal output apparatus of testing DCU to be measured by the light on and off of actuator pilot lamp can normally use, simple in structure, cost is low and easy to use, the use of actuator pilot lamp has simultaneously increased the intuitive that tester tests observation.
As can be seen here, the present invention compared with prior art, has outstanding substantive distinguishing features and significant progressive, and the beneficial effect of its enforcement is also apparent.
Accompanying drawing explanation
Fig. 1 is the front view schematic diagram of casing of the present invention.
Fig. 2 is the rear view schematic diagram of casing of the present invention.
Fig. 3 is structure composition schematic diagram of the present invention.
Fig. 4 is electrical schematic diagram of the present invention.
Wherein: 1, casing, 2, integration testing wire harness, 3, DCU power lead, 4, DCU signal transmssion line, 5, OBD diagnostics lines, 6, DCU attaching plug, 7, DCU signal transmission plug, 8, OBD diagnostic plug, 9, DCU Signal plug, 10, power supply changeover device, 11, DCU signal transmission interface, 12, DCU power interface, 13, external power source interface, 14, power switch pilot lamp, 15, actuator pilot lamp, 16, potentiometer, 17, CAN1 communication interface, 18, CAN2 communication interface, 19, spread signal switch, 20, handle, 21, protective layer, 22, power switch.
Embodiment
For ease of explanation, below in conjunction with accompanying drawing, the present invention is described in further detail.
As shown in Figure 1, Figure 2, Figure 3 and Figure 4, DCU test box of the present invention, comprises casing 1 and integration testing wire harness 2; Casing 1 is provided with 12 and 1 DCU signal transmission interface 11 of 13,1 DCU power interface of 15,1 external power source interface of 16,5 actuator pilot lamp of 4 potentiometers, described potentiometer 16 is connected with DCU signal transmission interface 11 respectively with actuator pilot lamp 15, external power source interface 13 is connected with DCU power interface 12 by a power supply changeover device 10, and power supply changeover device 10 is arranged in casing 1; Described DCU power interface 12 and DCU signal transmission interface 11 are connected with DCU to be measured by described integration testing wire harness 2 respectively, and described integration testing wire harness 2 is provided with the OBD diagnostic plug 8 for connecting third-party diagnostic tool.
Between power supply changeover device 10 and DCU power interface 12, be provided with power switch 22, described power switch 22 is arranged on casing 1.Between described power switch 22 and DCU power interface 12, be provided with power switch pilot lamp 14, and power switch pilot lamp 14 is arranged on casing 1.
Wherein, power supply changeover device 10 can be arranged on the optional position in casing 1, specifically can carry out its set positions according to the distribution situation of casing 1 connection wire bundle, easy to use and flexible.
Wherein, in the above-described embodiment, described third-party diagnostic tool is the diagnostic tool that rolls off the production line, and in addition, above-mentioned third-party diagnostic tool can also be OBD diagnostic tool.
Wherein, what described power supply changeover device 10 adopted is that universal 220V is exchanged to the power supply changeover device that is converted to 24V direct-current switch power supply, and when use, this power supply changeover device 10 is converted to the alternating current of 220V in the direct current of 24V, is the present invention and DCU to be measured power supply.And can be the present invention and DCU normal power supply to be measured time, power switch pilot lamp 14 is bright, otherwise can not normal power supply.Whether normal the use of power switch pilot lamp 14, be convenient to observe intuitively power supply.
Wherein, above-mentioned integration testing wire harness 2 comprises DCU power lead 3, DCU signal transmssion line 4 and OBD diagnostics lines 5, one end of DCU power lead 3 is provided with the DCU attaching plug 6 for connecting DCU power interface 12, one end of DCU signal transmssion line 4 is provided with the DCU signal transmission plug 7 for connecting DCU signal transmission interface 11, one end of OBD diagnostics lines 5 is connected with above-mentioned OBD diagnostic plug 8, and the connection terminal of the other end of described DCU power lead 3, DCU signal transmssion line 4 and OBD diagnostics lines 5 is arranged on same DCU Signal plug 9.
Wherein, in view of the DCU in state's four vehicle SCR after-treatment systems needs the working environment state of real-time perception SCR after-treatment system, as urea temperature, urea level, urea pressure and exhaust temperature, for this reason, above-mentioned potentiometer 16 comprises urea temperature potentiometer, urea level potentiometer, urea pressure potentiometer and exhaust temperature potentiometer, and adopt successively Turea urea temperature potentiometer, Lurea urea level potentiometer, Purea urea pressure potentiometer and Tpre exhaust temperature potentiometer, and each potentiometer is connected with DCU signal transmission interface respectively.Simulate the working environment state of DCU to be measured by above-mentioned potentiometer 16, and be transferred to DCU to be measured, as the testing source of third-party diagnostic tool, easy to use.
In addition, according to the actual controlled actuator kind of the DCU in state's four vehicle SCR after-treatment systems, above-mentioned actuator pilot lamp 15 comprises nozzle operation pilot lamp, pump work pilot lamp, pipeline heating pilot lamp, casing burner on light and pump box burner on light, and described nozzle operation pilot lamp, pump work pilot lamp, pipeline heating pilot lamp, casing burner on light and pump box burner on light are connected with DCU signal transmission interface respectively.When use, use third-party diagnostic tool to send instruction by the present invention to DCU to be measured, such as test nozzles partial circuit, diagnostic tool sends the instruction of nozzle operation, DCU to be measured receives this corresponding instruction, closed-nozzle operating circuit, and now nozzle pilot lamp is bright, its corresponding circuit can normally be worked, otherwise has fault.
In addition, the present invention is provided with handle 20 on its casing 1, and is provided with rubber layer protective layer 21 on handle 20, thereby is convenient to movement of the present invention, is convenient to opponent's protection simultaneously.
When use, casing 1 is connected with integration testing wire harness 2, the DCU Signal plug 9 of integration testing wire harness 2 is connected with the signaling interface of above-mentioned DCU to be measured simultaneously, OBD diagnostic plug 8 is connected and can be used with third-party diagnostic tool simultaneously.
To sum up, the present invention can provide analog power for DCU to be measured, can be used in the signal source of test DCU signal input to be measured is provided, can also provide the passage of the signal output of test DCU to be measured, be convenient to work in coordination with the test to DCU to be measured with third-party diagnostic tool, simple in structure, easy to use, practical.
In addition, above-mentioned casing 1 is provided with CAN communication interface, is specially CAN1 communication interface 17 and CAN2 communication interface 18, and CAN1 communication interface 17 is connected respectively described DCU signal transmission interface with CAN2 communication interface 18.In the time that DCU occurs that CAN bus data sends problem, available CAN bus diagnostic instrument reads the data analysis that DCU sends, and solves failure problems.
In addition, on above-mentioned casing 1, be preset with a spread signal switch 19, treat that other function of later stage is used.
The above, it is only preferred embodiments of the present invention, not in order to limit the present invention, any those skilled in the art, in any simple modification, equivalent variations and the modification that do not depart from the content of technical solution of the present invention, according to technical spirit of the present invention, above embodiment done, all belong to the scope of technical solution of the present invention.

Claims (9)

1.DCU test box, is characterized in that: comprise casing and integration testing wire harness; Casing is provided with multiple potentiometers, multiple actuator pilot lamp, external power source interface, DCU power interface and DCU signal transmission interface, described potentiometer is connected with DCU signal transmission interface respectively with actuator pilot lamp, external power source interface is connected with DCU power interface by a power supply changeover device, and power supply changeover device is arranged in casing; Described DCU power interface and DCU signal transmission interface are connected with DCU to be measured by described integration testing wire harness respectively, and described integration testing wire harness is provided with the OBD diagnostic plug for connecting third-party diagnostic tool.
2. DCU test box according to claim 1, is characterized in that: between power supply changeover device and DCU power interface, be provided with power switch, described power switch is arranged on casing.
3. DCU test box according to claim 1 and 2, it is characterized in that: described integration testing wire harness comprises DCU power lead, OBD diagnostics lines and DCU signal transmssion line, one end of DCU power lead is provided with the DCU attaching plug for connecting DCU power interface, one end of OBD diagnostics lines is provided with described OBD diagnostic plug, one end of DCU signal transmssion line is provided with the DCU signal transmission plug for connecting DCU signal transmission interface, and the connection terminal of the other end of described DCU power lead, OBD diagnostics lines and DCU signal transmssion line is arranged on same DCU Signal plug.
4. DCU test box according to claim 1 and 2, is characterized in that: described casing is provided with CAN communication interface, described CAN communication interface is connected with DCU signal transmission interface.
5. DCU test box according to claim 1 and 2, it is characterized in that: described potentiometer comprises urea temperature potentiometer, urea level potentiometer, urea pressure potentiometer and exhaust temperature potentiometer, each potentiometer is connected with DCU signal transmission interface respectively.
6. DCU test box according to claim 1 and 2, it is characterized in that: described actuator pilot lamp comprises nozzle operation pilot lamp, pump work pilot lamp, pipeline heating pilot lamp, casing burner on light and pump box burner on light, described nozzle operation pilot lamp, pump work pilot lamp, pipeline heating pilot lamp, casing burner on light and pump box burner on light are connected with DCU signal transmission interface respectively.
7. DCU test box according to claim 1 and 2, is characterized in that: described casing is provided with handle.
8. DCU test box according to claim 7, is characterized in that: described handle is provided with protective layer.
9. DCU test box according to claim 8, is characterized in that: described protective layer is rubber layer or plastic layer.
CN201410179352.8A 2014-04-29 2014-04-29 DCU test box Pending CN103901341A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410179352.8A CN103901341A (en) 2014-04-29 2014-04-29 DCU test box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410179352.8A CN103901341A (en) 2014-04-29 2014-04-29 DCU test box

Publications (1)

Publication Number Publication Date
CN103901341A true CN103901341A (en) 2014-07-02

Family

ID=50992794

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410179352.8A Pending CN103901341A (en) 2014-04-29 2014-04-29 DCU test box

Country Status (1)

Country Link
CN (1) CN103901341A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104181918A (en) * 2014-09-19 2014-12-03 中国重汽集团济南动力有限公司 DCU electrical control unit testing system
CN106646024A (en) * 2016-11-03 2017-05-10 谢梦 Rapid line tester
CN107989679A (en) * 2017-12-23 2018-05-04 无锡威孚力达催化净化器有限责任公司 Diesel engine after treatment control system test device
CN108170129A (en) * 2017-12-29 2018-06-15 凯龙高科技股份有限公司 A kind of controller develops test platform
CN108388239A (en) * 2018-04-25 2018-08-10 中国重汽集团济南动力有限公司 A kind of device of test engine electronic control unit function
CN109253802A (en) * 2017-07-13 2019-01-22 南京理工大学 A kind of multispectral polarization synchronous of bionic navigation and method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0548425A (en) * 1991-08-12 1993-02-26 Fujitsu Ltd Transmission test method for feed termination system for logic circuit
CN102918245A (en) * 2010-05-25 2013-02-06 五十铃自动车株式会社 Selective catalytic reduction system
CN202974664U (en) * 2012-11-27 2013-06-05 南京直觉科技有限公司 Fault diagnostic apparatus for vehicle diesel engine
CN103527296A (en) * 2013-10-08 2014-01-22 潍柴动力股份有限公司 Method and device for testing SCR urea injection system
CN203420767U (en) * 2013-07-31 2014-02-05 中国重汽集团济南动力有限公司 Urea spraying controller of diesel engine tail gas after-treatment system
CN203894374U (en) * 2014-04-29 2014-10-22 中国重汽集团济南动力有限公司 DCU testing casing

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0548425A (en) * 1991-08-12 1993-02-26 Fujitsu Ltd Transmission test method for feed termination system for logic circuit
CN102918245A (en) * 2010-05-25 2013-02-06 五十铃自动车株式会社 Selective catalytic reduction system
CN202974664U (en) * 2012-11-27 2013-06-05 南京直觉科技有限公司 Fault diagnostic apparatus for vehicle diesel engine
CN203420767U (en) * 2013-07-31 2014-02-05 中国重汽集团济南动力有限公司 Urea spraying controller of diesel engine tail gas after-treatment system
CN103527296A (en) * 2013-10-08 2014-01-22 潍柴动力股份有限公司 Method and device for testing SCR urea injection system
CN203894374U (en) * 2014-04-29 2014-10-22 中国重汽集团济南动力有限公司 DCU testing casing

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104181918A (en) * 2014-09-19 2014-12-03 中国重汽集团济南动力有限公司 DCU electrical control unit testing system
CN106646024A (en) * 2016-11-03 2017-05-10 谢梦 Rapid line tester
CN109253802A (en) * 2017-07-13 2019-01-22 南京理工大学 A kind of multispectral polarization synchronous of bionic navigation and method
CN109253802B (en) * 2017-07-13 2021-10-26 南京理工大学 Bionic navigation multispectral polarization synchronous acquisition system and method
CN107989679A (en) * 2017-12-23 2018-05-04 无锡威孚力达催化净化器有限责任公司 Diesel engine after treatment control system test device
CN108170129A (en) * 2017-12-29 2018-06-15 凯龙高科技股份有限公司 A kind of controller develops test platform
CN108388239A (en) * 2018-04-25 2018-08-10 中国重汽集团济南动力有限公司 A kind of device of test engine electronic control unit function

Similar Documents

Publication Publication Date Title
CN103901341A (en) DCU test box
CN104181918A (en) DCU electrical control unit testing system
CN202974664U (en) Fault diagnostic apparatus for vehicle diesel engine
CN106598024B (en) Retarder signal simulation detection device and detection method
CN103557880B (en) A kind of automobile combination instrument test device
CN202404164U (en) Power supply system processor simulation system
CN203894374U (en) DCU testing casing
CN106443545B (en) Fault diagnosis and positioning system and method for battery management system of pure electric vehicle
CN210803614U (en) Electric automobile interoperability test equipment
CN105842609B (en) A kind of SCR system of diesel engine control unit hardware circuit detection device
CN111830428A (en) Automatic detection system for cable wiring
CN107989679A (en) Diesel engine after treatment control system test device
CN103197151B (en) A kind of storage battery parameter measurement device
CN204166379U (en) A kind of DCU electronic control unit testing system
CN102004188A (en) Device for simulating insulation resistor and method for calibrating accuracy of monitoring device
CN107076981A (en) Interface integrated circuit and vehicle diagnostic device for vehicle diagnostics/programming
CN206193529U (en) Electrical system diagnoses case
CN206402245U (en) A kind of test board
CN104391462B (en) Joint debugging control method for whole vehicle rack of pure electric vehicle
CN207557751U (en) A kind of test system for the control of vehicle hybrid power
CN208013328U (en) High-voltage distribution box detects frock
CN207459364U (en) Information acquisition equipment
CN203133180U (en) Storage battery parameter measurement device
CN109946094A (en) Motor vehicle detecting control instrument and its control circuit, control method
CN205068148U (en) On -vehicle computer detects platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140702