CN103883131A - Connecting structure for roof truss tube and steel tube column and construction method thereof - Google Patents
Connecting structure for roof truss tube and steel tube column and construction method thereof Download PDFInfo
- Publication number
- CN103883131A CN103883131A CN201410125470.0A CN201410125470A CN103883131A CN 103883131 A CN103883131 A CN 103883131A CN 201410125470 A CN201410125470 A CN 201410125470A CN 103883131 A CN103883131 A CN 103883131A
- Authority
- CN
- China
- Prior art keywords
- roof system
- column
- welded
- truss
- steel pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a connecting structure for a roof truss tube and a steel tube column and the construction method hereof. The construction method includes the following steps that a single frame roof truss tube is assembled; a steel tube column head is welded at the lower end of the assembled single frame roof truss tube; the above construction steps are repeated to finish welded connection of multi-frame roof truss tube and the steel tube column head; the adjacent frame roof truss tubes are welded and assembled to form a roof truss tube hoisting unit block through a secondary truss joint lever; the assembled roof truss tube hoisting unit block is hoisted so that the steel tube column head at the lower end of the roof truss tube hoisting unit block can be welded to a steel tube column body. Through the separation of the steel tube column head and the steel tube column body, the pre-assembly of the steel tube column head with an upper chord, a lower chord, a ventral rod, and the secondary truss, and the after-welding construction of the steel tube column body, quantity of high altitude welding work is reduced and difficulty in welding the roof truss tube and the steel tube column is reduced.
Description
Technical field
The present invention relates to engineering construction field, relate in particular to for steel structure system, overhead welding workload is large, pipe truss and steel pipe column welding connection node complexity, and welding precision requires high roof system pipe truss and steel pipe column welded construction and construction method.
Background technology
Space truss structure is exactly a kind of spatial steel structure product being linked by node according to certain grid configuration by many rod members.Due to advantages such as it have space-load, lightweight, rigidity is large, anti-seismic performance is good; A kind of space structures that space truss structure is normally made up of two-way or three-dimensional plane frame, also by being four jiaos of reverse taper space structures that form with rod member.The former constructs simply, is applicable to the connection of node of various types simultaneously, as the Capital Gymnasium, International Club's indoor tennis stadium, and the roof structure such as the Shanghai Gymnasium building up recently, all belong to this type of.In general rectangle plane, the roof structure of large span (30~100 meters across), it is two-way more reasonable to adopt, because of rod member less, the simple feature of node processing.
In recent years, space truss structure is widely used as the roof structure in sports palace, exhibition hall, clubhouse, cinema, dining room, conference room, Waiting Lounge, hangar, workshop etc.Have industrialization degree high, from the feature of heavy and light, good stability, good looking appearance.Shortcoming is that to intersect at rod member quantity on node more, and fabrication and installation are compared with plane structure complexity, the especially sphere nodes in space truss structure, and welding difficulty is large, is difficult to guarantee welding precision.Reasonably install, welding procedure is particularly important to guaranteeing the construction of space truss structure, therefore, is necessary to propose a kind of new construction method for pipe truss in space truss structure and sphere nodes connection construction method.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of by adopting steel pipe column column cap and the pipe truss element piecemeal processing mode of integral solder in advance, reduce overhead welding workload, improve welding precision, reduction roof system pipe truss and steel pipe column welding difficulty are large, guarantee construction quality and safety, the roof system pipe truss of accelerating construction progress and syndeton and the construction method of steel pipe column.
For realizing above-mentioned technique effect, the invention discloses a kind of connection construction method of roof system pipe truss and steel pipe column, comprise the following steps:
Assembled single Pin roof system pipe truss;
Lower end at the assembled single Pin roof system pipe truss completing is welded to connect steel pipe column column cap;
Repeat above-mentioned construction sequence and complete being welded to connect of many Pin roof system pipe truss and steel pipe column column cap;
By jack truss connecting rod, adjacent Pin roof system pipe truss welding is assembled into roof system pipe truss lifting elements piecemeal;
The assembled roof system pipe truss lifting elements piecemeal completing is lifted, the steel pipe column column cap of described roof system pipe truss lifting elements piecemeal lower end is welded to connect to steel pipe column cylinder.
Described construction method is further improved and is, described single Pin roof system pipe truss comprise upper chord, lower chord and be welded in described upper chord and described lower chord between web member, described steel pipe column column cap is welded to connect to the lower end of described lower chord and described web member.
Described construction method is further improved and is, described steel pipe column cylinder is and is in tilted layout.
The syndeton that the invention also discloses a kind of roof system pipe truss and steel pipe column, comprises roof system pipe truss and steel pipe column, and described steel pipe column comprises cylinder and be welded in the column cap at described cylinder top, and described column cap is welded in the lower end of described roof system pipe truss.
Described syndeton is further improved and is, described in single Pin roof system pipe truss comprise upper chord, lower chord and be welded in described upper chord and described lower chord between web member, the top of described column cap is a sphere, and the lower end of described lower chord and web member is welded on described sphere.
The present invention has been owing to having adopted above technical scheme, makes it have following beneficial effect to be: taken into full account roof system pipe truss lifting elements from upper and lower chord member great, that be connected with steel pipe column and horizontal web member, connect that tie-rod is many and welding job amount is large.By taking steel pipe column column cap to separate with steel pipe column cylinder, steel pipe column column cap and upper and lower chord member, web member and jack truss are carried out assembled in advance, the mode of welding procedure after steel pipe column cylinder, reduce overhead welding workload, improve welding precision, reduce roof system pipe truss and steel pipe column welding difficulty large, guaranteed construction quality and safety, accelerated construction speed.
Accompanying drawing explanation
Fig. 1 is the syndeton schematic diagram of roof system pipe truss of the present invention and steel pipe column.
Fig. 2 is the structural representation of single Pin roof system pipe truss of the present invention.
Fig. 3 is the thin portion of the syndeton enlarged diagram of roof system pipe truss of the present invention and steel pipe column.
Fig. 4 is the connection diagram of roof system pipe truss of the present invention and steel pipe column column cap.
Fig. 5 is the thin portion of the syndeton enlarged diagram of roof system pipe truss of the present invention and steel pipe column column cap.
The specific embodiment
Below in conjunction with accompanying drawing and the specific embodiment, the present invention is further detailed explanation.
First consult shown in Fig. 1, the syndeton of roof system pipe truss of the present invention and steel pipe column comprises roof system pipe truss 13 and steel pipe column 10, coordinate shown in Fig. 2, single Pin roof system pipe truss 13 comprise upper chord 131, lower chord 132 and be welded in upper chord 131 and lower chord 132 between web member 133.Again in conjunction with shown in Fig. 3, steel pipe column 10 comprises cylinder 12 and is welded in the column cap 11 at cylinder 12 tops, and the top of column cap 11 is a sphere, is welded to connect with the lower chord 132 of roof system pipe truss 13 and the lower end of web member 133; The bottom of column cap 11 is a plane, is connected with the welded top of cylinder 12.Roof system pipe truss of the present invention and the connection construction method of steel pipe column taken into full account roof system pipe truss lifting elements from upper and lower chord member great, that be connected with steel pipe column and horizontal web member, connect that tie-rod is many and welding job amount is large.By taking steel pipe column column cap 11 to separate with steel pipe column cylinder 12, steel pipe column column cap 11 and upper and lower chord member, web member and jack truss are carried out assembled in advance, the mode of steel pipe column cylinder 12 rear welding procedures, reduce overhead welding workload, improve welding precision, reduced roof system pipe truss and steel pipe column welding difficulty large, guaranteed construction quality and safety, accelerate construction speed, specifically comprised following construction sequence:
First site layout project roof system pipe truss platform for lining completes accurate location and the welding procedure of Pin roof system pipe truss 13 upper chords 131, lower chord 132 and web member 133, as shown in Figure 2 on platform for lining;
Steel pipe column column cap 11 and lower chord 132 and the termination that is connected web member 133 are welded to connect, as shown in Figure 4 and Figure 5;
Repeating above-mentioned construction sequence completes many Pin roof system pipe truss 13 and is welded to connect with steel pipe column column cap 11;
By jack truss connecting rod, adjacent Pin roof system pipe truss 13 is welded to connect into roof system pipe truss lifting elements piecemeal;
After weld seam detection is qualified, carry out the lifting of roof system pipe truss lifting elements piecemeal;
The steel pipe column column cap 11 of roof system pipe truss lifting elements piecemeal by its lower end with steel pipe column cylinder 12 by being welded to connect, as shown in Figure 1;
Treat that the lifting of whole roof system pipe truss lifting elements piecemeals welded, carry out the rear welding procedure of steel pipe column cylinder 12;
Whole steel pipe column cylinders 12 have welded malformation and have tended towards stability, and remove temporary supporting roof system pipe truss, complete construction.
Below embodiment has been described in detail the present invention by reference to the accompanying drawings, and those skilled in the art can make many variations example to the present invention according to the above description.Thereby some details in embodiment should not form limitation of the invention, the present invention by the scope defining using appended claims as protection scope of the present invention.
Claims (5)
1. a connection construction method for roof system pipe truss and steel pipe column, is characterized in that, described construction method comprises the following steps:
Assembled single Pin roof system pipe truss;
Lower end at the assembled single Pin roof system pipe truss completing is welded to connect steel pipe column column cap;
Repeat above-mentioned construction sequence and complete being welded to connect of many Pin roof system pipe truss and steel pipe column column cap;
By jack truss connecting rod, adjacent Pin roof system pipe truss welding is assembled into roof system pipe truss lifting elements piecemeal;
The assembled roof system pipe truss lifting elements piecemeal completing is lifted, the steel pipe column column cap of described roof system pipe truss lifting elements piecemeal lower end is welded to connect to steel pipe column cylinder.
2. construction method as claimed in claim 1, it is characterized in that: described single Pin roof system pipe truss comprise upper chord, lower chord and be welded in described upper chord and described lower chord between web member, described steel pipe column column cap is welded to connect to the lower end of described lower chord and described web member.
3. construction method as claimed in claim 1, is characterized in that: described steel pipe column cylinder is and is in tilted layout.
4. a syndeton for roof system pipe truss and steel pipe column, comprises roof system pipe truss and steel pipe column, it is characterized in that: described steel pipe column comprises cylinder and be welded in the column cap at described cylinder top, and described column cap is welded in the lower end of described roof system pipe truss.
5. syndeton as claimed in claim 4, it is characterized in that: described in single Pin roof system pipe truss comprise upper chord, lower chord and be welded in described upper chord and described lower chord between web member, the top of described column cap is a sphere, and the lower end of described lower chord and web member is welded on described sphere.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410125470.0A CN103883131A (en) | 2014-03-31 | 2014-03-31 | Connecting structure for roof truss tube and steel tube column and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410125470.0A CN103883131A (en) | 2014-03-31 | 2014-03-31 | Connecting structure for roof truss tube and steel tube column and construction method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103883131A true CN103883131A (en) | 2014-06-25 |
Family
ID=50952230
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410125470.0A Pending CN103883131A (en) | 2014-03-31 | 2014-03-31 | Connecting structure for roof truss tube and steel tube column and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103883131A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105863054A (en) * | 2016-05-31 | 2016-08-17 | 安徽富煌建筑设计研究有限公司 | Steel structural pipe truss beam column transferring joint |
CN113123469A (en) * | 2021-03-24 | 2021-07-16 | 中国五冶集团有限公司 | Method for constructing complex curved surface modeling roof grid structure |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06288009A (en) * | 1993-04-02 | 1994-10-11 | Shimizu Corp | Construction of large space truss |
CN2823382Y (en) * | 2005-07-12 | 2006-10-04 | 徐国彬 | Supporting node |
JP2009138449A (en) * | 2007-12-07 | 2009-06-25 | Shimizu Corp | Truss beam structure and method of constructing truss beam |
CN101666163A (en) * | 2009-09-15 | 2010-03-10 | 中冶建工有限公司 | High-altitude long-span roofing pipe truss installation method |
CN102691420A (en) * | 2012-06-21 | 2012-09-26 | 中国建筑第八工程局有限公司 | Installation and construction method for multilayer large-span steel truss |
CN102777047A (en) * | 2012-08-22 | 2012-11-14 | 河北二十冶工程技术有限公司 | Assembling and splicing installation method of large-span tube-truss roof beam |
-
2014
- 2014-03-31 CN CN201410125470.0A patent/CN103883131A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06288009A (en) * | 1993-04-02 | 1994-10-11 | Shimizu Corp | Construction of large space truss |
CN2823382Y (en) * | 2005-07-12 | 2006-10-04 | 徐国彬 | Supporting node |
JP2009138449A (en) * | 2007-12-07 | 2009-06-25 | Shimizu Corp | Truss beam structure and method of constructing truss beam |
CN101666163A (en) * | 2009-09-15 | 2010-03-10 | 中冶建工有限公司 | High-altitude long-span roofing pipe truss installation method |
CN102691420A (en) * | 2012-06-21 | 2012-09-26 | 中国建筑第八工程局有限公司 | Installation and construction method for multilayer large-span steel truss |
CN102777047A (en) * | 2012-08-22 | 2012-11-14 | 河北二十冶工程技术有限公司 | Assembling and splicing installation method of large-span tube-truss roof beam |
Non-Patent Citations (2)
Title |
---|
姚刚等: "大跨度钢管桁架屋盖施工技术", 《重庆建筑》 * |
无: "钢结构工程施工总结", 《HTTP://WWW.DOC88.COM/P-80492536204.HTML》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105863054A (en) * | 2016-05-31 | 2016-08-17 | 安徽富煌建筑设计研究有限公司 | Steel structural pipe truss beam column transferring joint |
CN113123469A (en) * | 2021-03-24 | 2021-07-16 | 中国五冶集团有限公司 | Method for constructing complex curved surface modeling roof grid structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102635209B (en) | Cornice steel skeleton and bracket steel skeleton for large-span big roof of pseudo-classic architecture and construction method of cornice steel skeleton and bracket steel skeleton | |
CN104453248B (en) | Complex irregular-shaped multi-layer net rack construction method based on layered modular assembling technology | |
CN104674665B (en) | Large-spatial structures vestibule bridge installation method | |
CN202324340U (en) | Combined type large steel-pipe truss | |
CN104775364B (en) | The installation method of Cable-stayed Bridge Pylon king-post reinforcing bar | |
CN109235902A (en) | Positive quadrangular pyramid bolt-ball net frame multi-point support high-altitude dissipates splicing method | |
CN102979185A (en) | Variable-beam depth H-beam and rectangular steel tube column assembly type node and construction method thereof | |
CN102179651A (en) | On-site plane trusses of extra-large welded ball net frame and method for splicing three-dimensional sections | |
CN114525877B (en) | Stadium combined roof based on large cantilever inclined triangular truss and construction method | |
CN103883131A (en) | Connecting structure for roof truss tube and steel tube column and construction method thereof | |
CN105735477A (en) | Latticed shell unit block and manufacturing method thereof | |
CN106759909A (en) | Bearing structure system and its construction method are hung up under one kind | |
CN105023293A (en) | Round and square pipe transition joint and three-dimensional modeling method thereof | |
CN104947804B (en) | A kind of steel bracket and the construction method that beam-column node structure is built using it | |
CN108457374A (en) | A kind of box beam and column are linked and packed formula node preparation process and its node | |
CN104264781B (en) | Latticed cylinder Steel Shell and construction method thereof | |
CN105822066B (en) | Underground large span large space superelevation is without post steel-structure tube truss construction engineering method | |
CN205296398U (en) | Large -span individual layer net shell steel construction roofing | |
CN204850196U (en) | Large -scale minute crutch and complicated curved surface spatial grid structure | |
CN205035902U (en) | Crutch supported complicated curved surface rack axle construction in large -scale minute | |
CN104372892B (en) | Multicarity combines huge post and preparation method thereof | |
CN103174292B (en) | Frame construction multiaspect concrete joint pouring construction method | |
CN105822016A (en) | Crossed twisted column and making method thereof | |
CN202577802U (en) | Large-roof and large-span cornice bucket arch steel skeleton of archaized architecture | |
CN103882941B (en) | Modular many high-rise assembling type steel structure frame center support systems |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140625 |